https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN MANDAILING 418 (EMPAT RATUS DELAPAN BELAS) TAHUN DI TAHUN 2024
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
24 Mei 2442 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
May 24th, 2442 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERALREPUBLIK INDONESIANOMOR : 373.K/MB.01/MEM.B/2023TENTANGPEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARADECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIANUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
Matrik 2a. Rekapitulasi Hasil Kegiatan Eksplorasi sampai Tahun N-1Matrix 2a. Recapitulation of Exploration Activity Results up to Year N-1
Lokasi Kegiatan
Activity Location
KEGIATAN
ACTIVITY
SATUAN *)
UNIT *)
BIAYA/ SATUAN (Rp/USD per Satuan)
COST/ UNIT (Rp/USD per Unit)
RENCANA TAHUN (N-1)
YEAR PLAN (N-1)
BIAYA/ SATUAN (Rp/USD per Satuan)
COST/ UNIT (Rp/USD per Unit)
REALISASI TAHUN (N-1)
YEAR REALIZATION (N-1)
BIAYA/ SATUAN (Rp/USD per Satuan)
COST/UNIT (Rp/USD per Unit)
RENCANA TAHUN (N)
YEAR PLAN (N)
KEGIATAN
ACTIVITY
BIAYA COST
KEGIATAN ACTIVITY
BIAYA
COST
KEGIATAN
ACTIVITY
BIAYA
COST
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
Blok/Prospek
Studi Indraja
Indraja Studies
Pemetaan
Mapping
- Topografi
- Topography
ha
- Geologi lokal
- Local geology
ha
Survei Geokimia
Geochemical Survey
Survei Geofisika
Geophysical Survey
Pengeboran Open Hole
Open Hole Drilling
- Jumlah
- Amount
Titik
point
- Kedalaman
- Depth
- Spasi Pengeboran
- Drilling Spacing
m
Pengeboran Coring
Coring Drilling
- Jumlah
- Amount
Titik
point
Kedalaman
Depth
m
- Spasi Pengeboran
- Drilling Spacing
m
Sumur Uji
Test Well
m
Parit Uji
Test Trench
m
Analisa Conto **)
Example Analysis **)
sampel
sample
Analisa Geoteknik
Geotechnical Analysis
sampel
sample
Analisa Metalurgi
Metallurgical Analysis
sampel
sample
Hidrologi dan Hidrogeologi
Hydrology and Hydrogeology
sampel
sample
Penyusunan laporan lengkap eksplorasi
Preparation of complete exploration reports
Penyusunan Laporan Studi Kelayakan
Preparation of Feasibility Study Report
Kajian Lingkungan
Environmental Studies
Kegiatan teknis dan non teknis yang terkait kegiatan eksplorasi***)
Technical and non-technical activities related to exploration activities***)
Total Biaya Eksplorasi
Total Exploration Costs
Penjelasan matrik:1. Kolom (6) = Kolom (4) x kolom (5)2. Kolom (9) = Kolom (7) x kolom (8)3. Kolom (12) = Kolom (10) x kolom (11)Keterangan:*) Satuan menyesuaikan kegiatan yang dicantumkan**) Jika analisa conto dilakukan di luar negeri, pemegang IUP/IUPK wajib mengajukan permohonan pengiriman conto ke luar negeri secara khusus sesuai ketentuan peraturan perundangan.***) Kegiatan teknis dan non teknis harus dirinci per kegiatanMatrix explanation:1. Column (6) = Column (4) x column (5)2. Column (9) = Column (7) x column (8)3. Column (12) = Column (10) x column (11)Information:*) Units adjust to the activities listed**) If the sample analysis is carried out abroad, the IUP/IUPK (in Bahasa) holder is required to submit a special application for sending the sample abroad in accordance with the provisions of the laws and regulations.***) Technical and non-technical activities must be detailed per activity
sumber (source) :Google Translate
EVOLUSI PENDIDIKAN MANDAILING 418 (EMPAT RATUS DELAPAN BELAS) TAHUN DI TAHUN 2024
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
24 Mei 2442 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
Lokasi Kegiatan Activity Location | KEGIATAN ACTIVITY | SATUAN *) UNIT *) | BIAYA/ SATUAN (Rp/USD per Satuan) COST/ UNIT (Rp/USD per Unit) | RENCANA TAHUN (N-1) YEAR PLAN (N-1) | BIAYA/ SATUAN (Rp/USD per Satuan) COST/ UNIT (Rp/USD per Unit) | REALISASI TAHUN (N-1) YEAR REALIZATION (N-1) | BIAYA/ SATUAN (Rp/USD per Satuan) COST/UNIT (Rp/USD per Unit) | RENCANA TAHUN (N) YEAR PLAN (N) | |||
|
|
| KEGIATAN ACTIVITY | BIAYA COST
|
| KEGIATAN ACTIVITY | BIAYA COST |
| KEGIATAN ACTIVITY | BIAYA COST | |
(1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | (11) | (12) |
Blok/Prospek | Studi Indraja Indraja Studies
|
|
|
|
|
|
|
|
|
|
|
Pemetaan Mapping |
|
|
|
|
|
|
|
|
|
| |
- Topografi - Topography | ha |
|
|
|
|
|
|
|
|
| |
- Geologi lokal - Local geology | ha |
|
|
|
|
|
|
|
|
| |
Survei Geokimia Geochemical Survey |
|
|
|
|
|
|
|
|
|
| |
Survei Geofisika Geophysical Survey |
|
|
|
|
|
|
|
|
|
| |
Pengeboran Open Hole Open Hole Drilling |
|
|
|
|
|
|
|
|
|
| |
- Jumlah - Amount | Titik point |
|
|
|
|
|
|
|
|
| |
- Kedalaman - Depth |
|
|
|
|
|
|
|
|
|
| |
| - Spasi Pengeboran - Drilling Spacing | m |
|
|
|
|
|
|
|
|
|
| Pengeboran Coring Coring Drilling |
|
|
|
|
|
|
|
|
|
|
- Jumlah - Amount | Titik point |
|
|
|
|
|
|
|
|
| |
Kedalaman Depth | m |
|
|
|
|
|
|
|
|
| |
- Spasi Pengeboran - Drilling Spacing | m |
|
|
|
|
|
|
|
|
| |
Sumur Uji Test Well | m |
|
|
|
|
|
|
|
|
| |
Parit Uji Test Trench | m |
|
|
|
|
|
|
|
|
| |
Analisa Conto **) Example Analysis **) | sampel sample |
|
|
|
|
|
|
|
|
| |
Analisa Geoteknik Geotechnical Analysis | sampel sample |
|
|
|
|
|
|
|
|
| |
Analisa Metalurgi Metallurgical Analysis | sampel sample |
|
|
|
|
|
|
|
|
| |
Hidrologi dan Hidrogeologi Hydrology and Hydrogeology | sampel sample |
|
|
|
|
|
|
|
|
| |
Penyusunan laporan lengkap eksplorasi Preparation of complete exploration reports |
|
|
|
|
|
|
|
|
|
| |
Penyusunan Laporan Studi Kelayakan Preparation of Feasibility Study Report |
|
|
|
|
|
|
|
|
|
| |
Kajian Lingkungan Environmental Studies |
|
|
|
|
|
|
|
|
|
| |
Kegiatan teknis dan non teknis yang terkait kegiatan eksplorasi***) Technical and non-technical activities related to exploration activities***) |
|
|
|
|
|
|
|
|
|
| |
Total Biaya Eksplorasi Total Exploration Costs |
|
|
|
|
|
|
|
|
|
Tidak ada komentar:
Posting Komentar