https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN MANDAILING 418 (EMPAT RATUS DELAPAN BELAS) TAHUN DI TAHUN 2024
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
31 Mei 2442 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
May 31st, 2442 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERALREPUBLIK INDONESIANOMOR : 373.K/MB.01/MEM.B/2023TENTANGPEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARADECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIANUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
Matrik 2c. Rencana dan Realisasi Biaya
Eksplorasi Tahun N-1 dan Rencana Tahun N
Matrix
2c. Plan and Realization of Exploration Costs for Year N-1 and Plan for Year N
Keterangan *)
Information
*)
Rencana N-1
Plan
N-1
Realisasi N-1
Realization
N-1
Rencana N
Plan
N
(Rp/USD)
(Rp/USD)
(Rp/USD)
Biaya Langsung, terdiri dari :
Direct Costs, consisting of :
1. Pemetaan topografi
1. Topographic mapping
2. Pemetaan geologi
2. Geological mapping
3. …
Biaya Tidak Langsung, terdiri dari:
Indirect Costs, consisting of:
1. Gaji
1. Salary
2. Administrasi
2. Administration
3. …
Keterangan:*) Kegiatan eksplorasi yang dibagi berdasarkan biaya langsung (berkaitan langsung dengan kegiatan teknis eksplorasi) dan biaya tidak langsung (tidak berkaitan langsung dengan kegiatan teknis eksplorasi)Information:*) Exploration activities are divided based on direct costs (directly related to technical exploration activities) and indirect costs (not directly related to technical exploration activities)
sumber (source) :Google Translate
EVOLUSI PENDIDIKAN MANDAILING 418 (EMPAT RATUS DELAPAN BELAS) TAHUN DI TAHUN 2024
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
31 Mei 2442 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
Matrik 2c. Rencana dan Realisasi Biaya
Eksplorasi Tahun N-1 dan Rencana Tahun N
Matrix
2c. Plan and Realization of Exploration Costs for Year N-1 and Plan for Year N
Keterangan *) Information
*) |
Rencana N-1 Plan
N-1 |
Realisasi N-1 Realization
N-1 |
Rencana N Plan
N |
(Rp/USD) |
(Rp/USD) |
(Rp/USD) |
|
Biaya Langsung, terdiri dari : Direct Costs, consisting of : |
|
|
|
1. Pemetaan topografi 1. Topographic mapping |
|
|
|
2. Pemetaan geologi 2. Geological mapping |
|
|
|
3. … |
|
|
|
Biaya Tidak Langsung, terdiri dari: Indirect Costs, consisting of: |
|
|
|
1. Gaji 1. Salary |
|
|
|
2. Administrasi 2. Administration |
|
|
|
3. … |
|
|
|
Tidak ada komentar:
Posting Komentar