Senin, 12 November 2018

KISI - KISI JBAR MGB SM NOMOR : 0279 MARET 2033

KISI-KISI KONTEN JURNAL ILMIAH UM (UNIVERSITAS MANDAILING)
TABLE OF SPECIFICATIONS OF THE SCIENTIFIC JOURNAL OF MU (MANDAILING UNIVERSITY)

JBAR MGB SM (JURNAL BULANAN ANALISIS RISET MIKRON GEN BIOLOGIS SEPANJANG MASA)
THE MONTHLY JOURNAL OF RESEARCH ANALYSIS OF BIOLOGICAL GENETIC MICRON OF ALL TIME


Maret 2033
March 2033


Arahan Pendiri & Ketum (Ketua Umum) 
MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya,
The Direction from The Founder & The General Chairman of 
The Central (Global) Leadership Assembly of The Great Mandailing Foundation,
Agussalim, ST bin Abdur Rahim Nasution


Materi - Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) di KPG (Kantor Pusat Global) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya, Banggua, Desa Roburan Lombang, Kecamatan Panyabungan Selatan, Kabupaten Mandailing Natal, Sumatera Utara - Indonesia.
Materials of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference in The Global Head Office of The Central (Global) Leadership Assembly of The Great Mandailing FoundationBanggua, Desa Roburan Lombang, Kecamatan Panyabungan Selatan, Kabupaten Mandailing Natal, Sumatera Utara - Indonesia.

Sabtu, 02 April 2033 Materi Kuliah Umum - e-teleconference, "Eksistensi Divisi Tanggap Darurat MPRT YMR (Majelis Pimpinan Rukun Tetangga Yayasan Mandailing Raya) di seluruh dunia yang dikonsentrasitaktiskan di Kabupaten Mandailing Natal" yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 0279/Maret/2033.
Saturday, April 02nd, 2033 Public Lecture material - e-teleconference “Existence of The Division of Emergency Response of The Neighborhood Leadership Assembly of The Great  Mandailing Foundation on worldwide who concerned and tacticed in Mandailing Natal" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 0279/March/2033.

Personil Divisi Tanggap Darurat MPRT YMR (Majelis Pimpinan Rukun Tetangga Yayasan Mandailing Raya) untuk merekomendasikan kepada Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Lingkungan (FTSL); Jurusan Hukum Administrasi Negara, Jurusan Hukum Masyarakat dan Pembangunan, Jurusan Hukum Bisnis, Jurusan Hukum Ekonomi, Jurusan Hukum Perdagangan Internasional dan Jurusan Hukum Keuangan Negara, Fakultas Hukum; Jurusan Pendidikan Teknik dan Kejuruan (JPTK), Jurusan Pendidikan Ekonomi dan Jurusan Pendidikan Teknik Bangunan (PTB), Fakultas Keguruan dan Ilmu Pendidikan; Manajemen dan Kebijakan Publik (Ilmu Administrasi Negara) dan Ilmu Administrasi Publik, Fakultas ISIPOL (Ilmu Sosial & Ilmu Politik); Mu’amalah (Hukum Bisnis Islam), Keuangan Islam dan HES (Hukum Ekonomi Syari’ah), Fakultas Syariah; Jurusan Teknik Sipil dan Lingkungan, Fakultas Teknologi Pertanian (FATETA); Jurusan Ekonomi dan Studi Pembangunan dan Jurusan Ekonomi Sumberdaya dan Lingkungan, Fakultas Ekonomi dan Manajemen; Jurusan Perencananaan dan Kebijakan Publik dan Jurusan Bisnis Islam, FE (Fakultas Ekonomi); The Department of Urban Studies + Planning, School of Architecture  and Planning (SA+P); Civil and Environmental Engineering, School of  Engineering;  BA (Master of Administration) Program, Agussalim  Management; Jurusan Perencanaan Wilayah dan Kota, Sekolah Arsitektur, Perencanaan, dan Pengembangan Kebijakan (SAPPK); dan Jurusan Manajemen dan Jurusan Kewirausahaan, Sekolah Bisnis dan Manajemen (SBM) UM (Universitas Mandailing) untuk memutakhirkan dengan memahami Surat Edaran Nomor 10/SE/M/2018 tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi Dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu Lampiran III Surat Edaran Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 10 / SE / M / 2018 tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu
Personnel of The Division of Emergency Response of The Neighborhood Leadership Assembly of The Great  Mandailing Foundation to recomend to The Department of Civil Engineering, The Faculty of Civil and Environmental Engineering; The Department of State Administrative Law, The Department of Law of Public and Development, The Department of Business Law, The Department of Economic Law, The Department of International Trade Law and The Department of State Financial Law, The Faculty of Law; The Department of Engineering and Vocational Education, The Department of Economic Education and The Department of Building Engineering Education, The Faculty of Teacher Training and Education Science; Management and Public Policy (State Administration Science) and Public Administration Science, The Faculty of Social Sciences & Political Sciences; Mu'amalah (Islamic Business Law), Islamic Finance and Syari'ah Economic Law, The Faculty of Sharia; The Department of Civil and Environmental Engineering, The Faculty of Agricultural Technology; The Department of Economics and Development Studies and The Department of Resource and Environmental Economics, The Faculty of Economics and Management; The Department of Planning and Public Policy and The Department of Islamic Business, The Faculty of Economics; The Department of Urban Studies + Planning, School of Architecture and Planning (SA+P); Civil and Environmental Engineering, School of  Engineering; MBA (Master of Business Administration) Program, Agussalim  Management; The  Department of Regional and City Planning, The School of Architecture, Planning, and Policy Development; and The Department of Management and Department of Entrepreneurship, The School of Business and Management of MU (Mandailing University) to update by understanding The Circular Letter Number 10 / SE / M / 2018 concerning Enforcement of Standard of Selection Documents for the Procurement of Construction Services in the Context of Early Auction in the Ministry of Public Works and Public Housing for Budget Year 2019 namely is Annex III of The Circular Letter Number 10 / SE / M / 2018 concerning Enforcement of Standard of Selection Documents for the Procurement of Construction Services in the Context of Early Auction in the Ministry of Public Works and Public Housing for Budget Year 2019 namely

BAB VII. PETUNJUK PENGISIAN DATA KUALIFIKASI.
CHAPTER VII. INSTRUCTIONS FOR FILLING QUALIFICATION DATA.

I. Petunjuk Pengisian Untuk Peserta Bukan KSO (Kerja Sama Operasi) mengikuti petunjuk dan penggunaan aplikasi SPSE (Sistem Pengadaan Secara Elektronik) [User Guide].
I. Instruction of Filling for Participants of Non-Operation Cooperation follow the instructions and use of the Electronic Procurement System application.

II. KSO (Kerja Sama Operasi) [hanya dicantumkan apabila membolehkan KSO (Kerja Sama Operasi)].
II. Operational Cooperation [only included when allowing Joint Operation].

Untuk peserta yang berbentuk KSO (Kerja Sama Operasi) masing – masing anggota KSO (Kerja Sama Operasi) wajib mengisi formulir isian kualifikasi untuk masing – masing kualifikasi badan usahanya dengan petunjuk pengisian formulir isian kualifikasi sebagai berikut:
For participants in the form of Operational Cooperation, each member of Operational Cooperation is required to fill out the qualification form for each of the qualifications of the business entity with the instructions to fill in the qualification form as follows:

A. Data Administrasi.
A. Administrative Data.

1. Diisi dengan nama badan usaha peserta.
2. Pilih status badan usaha (Pusat/Cabang).
3. Diisi dengan alamat, nomor telepon, nomor fax dan email kantor pusat yang dapat dihubungi.
4. Diisi dengan alamat, nomor telepon, nomor fax, dan email kantor cabang yang dapat dihubungi, apabila peserta berstatus kantor cabang.
1. Fill in the name of the participant of business entity.
2. Select the status of the business entity (Center / Branch).
3. Filled with address, telephone number, fax number and e-mail of address of the head office that can be contacted.
4. Fill in the address, telephone number, fax number, and e-mail of address of the branch office that can be contacted, if the participant has the status of a branch office.

B. Landasan Hukum Pendirian Badan Usaha.
B. Legal Basis for Establishment of Business Entities.

1. Diiisi dengan nomor, tanggal dan nama notaris penerbit Akta Pendirian perusahaan /Anggaran Dasar, serta untuk badan usaha yang berbentuk Perseroan Terbatas diisi nomor pengesahan dari Kementerian Hukum dan HAM (Hak Azasi Manusia).
1. Filled with number, date and name of the notary of publisher of company Establishment Deed / Articles of Association, and for business entities in the form of Limited Liability Companies filled with ratification numbers from the Ministry of Law and Human Rights.

2. Diiisi dengan nomor, tanggal dan nama notaris penerbit akta perubahan terakhir badan usaha, apabila ada. Khusus untuk Perseroan Terbatas, jika terdapat perubahan nama anggota Direksi dan/atau Dewan Komisaris, pada Pembuktian Kualifikasi peserta diminta menunjukkan asli dan memberikan salinan Bukti Pemberitahuan dari Notaris selaku Kuasa Direksi yang telah diajukan melalui Sisminbakum (Sistem Administrasi Badan Hukum) atas Akta Perubahan Terakhir.
2. Fill in the number, date and name of the notary of issuer of the last change of business entity, if any. Especially for Limited Liability Companies, if there is a change in the name of the members of the Board of Directors and / or Board of Commissioners, in the Qualification Proof the participant is asked to show the original and provide a copy of the Notification as the Board of Directors Proxy that has been submitted through Legal Entity Administration System for the Last Amendment Deed.

C. Pengurus Badan Usaha Diisi dengan nama, nomor  KTP (Kartu Tanda Penduduk) / SIM (Surat Izin Mengemudi) / Paspor, dan jabatan dalam badan usaha.
C. Business Entity Management Filled with name, number of Identity Card / Driver's License / Passport, and position in the business entity.

D. Izin Usaha.
D. Business License.

Tabel izin usaha :
Business permit table:

1. Diisi dengan jenis surat izin usaha, nomor dan tanggal penerbitannya.
1. To be completed with the type of business permit, number and date of issuance.

2. Diisi dengan masa berlaku surat izin usaha.
2. Filled with the validity period of the business license.

3. Diisi dengan nama instansi penerbit surat izin usaha.
3. Fill in the name of the agency issuing the business license.

E. Sertifikat Badan Usaha.
E. Business Entity Certificate.

Tabel Sertifikat Badan usaha :
1. Diisi dengan jenis Sertifikat Badan usaha, nomor dan tanggal penerbitannya.
2. Diisi dengan masa berlaku Sertifikat Badan usaha.
3. Diisi dengan nama instansi penerbit Sertifikat Badan usaha.
4. Diisi dengan kualifikasi usaha.
5. Diisi dengan klasifikasi usaha.
6. Diisi dengan Subklasifikasi usaha.
Table of Business Entity Certificates:
1. Filled with type of Business Entity Certificate, number and date of issuance.
2. Filled with the validity period of the Business Entity Certificate.
3. Fill in the name of the agency issuing the Business Entity Certificate.
4. Filled with business qualifications.
5. Filled with business classification.
6. Filled with business sub-classification.

F. Sertifikat Lainnya [apabila dipersyaratkan].
1. Diisi dengan jenis sertifikat, nomor dan tanggal penerbitannya.
2. Diisi dengan masa berlaku sertifikat.
3. Diisi dengan nama instansi penerbit sertifikat.
F. Other Certificates [if required].
1. Filled with type of certificate, number and date of issuance.
2. Filled with the validity period of the certificate.
3. Fill in the name of the agency issuing certificate.

G. Data Keuangan.
G. Financial Data.

1. Diisi dengan nama, nomor identitas KTP (Kartu Tanda Penduduk) / SIM (Surat Izin Mengemudi) / Paspor, alamat pemilik saham / pesero dan persentase kepemilikan saham / persero.
1. Filled with name, identity number of Identity Card / Driver's License / Passport, address of shareholders and share ownership percentage.

2. Pajak.
2. Tax.

a. Diisi NPWP (Nomor Pokok Wajib Pajak) badan usaha.
b. Diisi nomor dan tanggal bukti laporan pajak tahun terakhir berupa SPT (Surat Pemberitahuan) Tahunan.
a. Fill in the Taxpayer Identification Number of the business entity.
b. Fill in the number and date of the last year tax report proof in the form of an Annual Tax Return.

H. Data Tenaga Tetap (Tenaga ahli/terampil badan usaha).
H. Permanent Manpower Data (expert / skilled of business entity).

Diisi dengan nama, tingkat pendidikan SLTP/SLTA/S1/S2/S3 (Sekolah Lanjutan Tingkat Pertama / Sekolah Lanjutan Tingkat Atas / Strata-1 / Strata-2 / Strata-3) dan nomor dan tahun penerbitan ijazah, jabatan, lama pengalaman kerja profesional, Sertifikat Kompetensi Kerja dan nomor Bukti Setor Pajak [PPH (Pajak Penghasilan)] Pasal 1721/1721-I atau nomor keanggotaan BPJS (Badan Penyelenggara Jaminan Sosial) Ketenagakerjaan.
Filled with name, education level of Junior High School / Senior High School / Strata-1 / Strata-3 / Strata-3 and number and year of diploma issuance, position, length of work experience professional, Work Competency Certificate and Tax Payment Proof Number [Income Tax] Article 1721/1721-I or membership number of the Social Security Administering Agency of Employment.

I. Data Pengalaman Perusahaan.
I. Data on Company Experience.

Diisi dengan nama paket pekerjaan, subklasifikasi pekerjaan yang disyaratkan, ringkasan lingkup pekerjaan, lokasi tempat pelaksanaan pekerjaan, nama dan alamat/telepon dari pemberi tugas / Pejabat Pembuat Komitmen, nomor/tanggal dan nilai kontrak, tanggal selesai paket pekerjaan / PHO (Provisional Hand Over) berdasarkan kontrak, dan tanggal berita acara serah terima, untuk masing-masing paket pekerjaan selama 10 (sepuluh) tahun terakhir. Data ini digunakan untuk menghitung Kemampuan Dasar (KD) (Usaha Kecil tidak disyaratkan).
Filled with name of work package, required sub-classification of work, summary of work scope, location of work implementation, name and address / telephone of assignor / Commitment Making Officer, number / date and contract value, completion date of work package / PHO (Provisional Hand Over ) based on the contract, and the date of the handover report, for each work package for the last 10 (ten) years. This data is used to calculate Basic Capabilities (Small Business is not required).

J. Data Pengalaman Perusahaan Dalam Kurun Waktu 04 (Empat) Tahun Terakhir.
J. Data on Company Experience in the Last 04 (Four) Years.

Diisi dengan nama paket pekerjaan, ringkasan lingkup pekerjaan, lokasi tempat pelaksanaan pekerjaan, nama dan alamat/telepon dari pemberi tugas / Pejabat Pembuat Komitmen, nomor/tanggal dan nilai kontrak, tanggal selesai paket pekerjaan / PHO (Provisional Hand Over) berdasarkan kontrak, dan tanggal berita acara serah terima, untuk perusahaan yang telah berdiri 3 (tiga) tahun atau lebih. Untuk perusahaan yang baru berdiri kurang dari 03 (tiga) tahun tidak wajib mengisi tabel ini.
Filled with name of work package, summary of work scope, location of work location, name and address / telephone of assignor / Commitment Making Officer, number / date and contract value, date of completion of work package / PHO (Provisional Hand Over) based on contract, and the date of the handover report, for companies that have stood 03 (three) of years or more. For companies that have just established less than 3 (three) years, they are not required to fill in this table.

K. Data Pekerjaan yang sedang Dilaksanakan.
K. Job Data that is being Implemented.

Diisi dengan nama paket pekerjaan, klasifikasi/subklasifikasi pekerjaan, lokasi tempat pelaksanaan pekerjaan, nama dan alamat/telepon dari pemberi tugas/Pejabat Pembuat Komitmen, nomor/tanggal dan nilai kontrak, serta persentase progres menurut kontrak, dan prestasi kerja terakhir. Data ini digunakan untuk menghitung Sisa Kemampuan Paket (SKP) dan Sisa kemampuan nyata (SKN) (apabila disyaratkan).
Filled with name of work package, job classification / subclassification, location of work location, name and address / telephone of the assignor / Commitment Making Officer, number / date and contract value, and percentage of progress according to the contract, and final work performance . This data is used to calculate Remaining Package Capability and Remaining Real Capacity (if required).

L. Kualifikasi Keuangan.
L. Financial Qualifications.

Diisi dengan nomor dan tanggal laporan keuangan / neraca tahun terakhir, nama auditor / konsultan akuntan publik yang menyiapkan laporan keuangan / neraca tahun terakhir, dan kekayaan bersih perusahaan berdasarkan laporan keuangan / neraca tahun terakhir. Penyedia menyampaikan Laporan Keuangan / Neraca Tahun Terakhir.
To be completed with the number and date of the last year financial statement / balance sheet, the name of the auditor / consultant of public accountant who prepared the last year's financial / balance sheet, and the net worth of the company based on the last year financial statement / balance sheet. The Provider submits the Final Year Financial Report / Balance Sheet.

Sabtu, 09 April 2033 Materi Kuliah Umum - e-teleconference, "Eksistensi 05 (lima) orang anggota Biro Pemenuhan Kebutuhan Papan, Divisi Program Pro Rakyat MPRT YMR (Majelis Pimpinan Rukun Tetangga Yayasan Mandailing Raya) di seluruh dunia yang dikonsentrasitaktiskan di Kabupaten Mandailing Natal" yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 0279/Maret/2033.
Saturday, April 09th, 2033 Public Lecture material - e-teleconference “Existence of 05 (five) of members of The Bureau of Accomplishment for House Needs, The Division of Program for Pro People of The Neighborhood Leadership Assembly of The Great  Mandailing Foundation on worldwide who concerned and tacticed in Mandailing Natal" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 0279/March/2033.

05 (lima) orang anggota Biro Pemenuhan Kebutuhan Papan, Divisi Program Pro Rakyat MPRT YMR (Majelis Pimpinan Rukun Tetangga Yayasan Mandailing Raya) untuk merekomendasikan kepada Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Lingkungan (FTSL); Jurusan Hukum Administrasi Negara, Jurusan Hukum Masyarakat dan Pembangunan, Jurusan Hukum Bisnis, Jurusan Hukum Ekonomi, Jurusan Hukum Perdagangan Internasional dan Jurusan Hukum Keuangan Negara, Fakultas Hukum; Jurusan Pendidikan Teknik dan Kejuruan (JPTK), Jurusan Pendidikan Ekonomi dan Jurusan Pendidikan Teknik Bangunan (PTB), Fakultas Keguruan dan Ilmu Pendidikan; Manajemen dan Kebijakan Publik (Ilmu Administrasi Negara) dan Ilmu Administrasi Publik, Fakultas ISIPOL (Ilmu Sosial & Ilmu Politik); Mu’amalah (Hukum Bisnis Islam), Keuangan Islam dan HES (Hukum Ekonomi Syari’ah), Fakultas Syariah; Jurusan Teknik Sipil dan Lingkungan, Fakultas Teknologi Pertanian (FATETA); Jurusan Ekonomi dan Studi Pembangunan dan Jurusan Ekonomi Sumberdaya dan Lingkungan, Fakultas Ekonomi dan Manajemen; Jurusan Perencananaan dan Kebijakan Publik dan Jurusan Bisnis Islam, FE (Fakultas Ekonomi); The Department of Urban Studies + Planning, School of Architecture  and Planning (SA+P); Civil and Environmental Engineering, School of  Engineering;  BA (Master of Administration) Program, Agussalim  Management; Jurusan Perencanaan Wilayah dan Kota, Sekolah Arsitektur, Perencanaan, dan Pengembangan Kebijakan (SAPPK); dan Jurusan Manajemen dan Jurusan Kewirausahaan, Sekolah Bisnis dan Manajemen (SBM) UM (Universitas Mandailing) untuk memutakhirkan dengan memahami Surat Edaran Nomor 10/SE/M/2018 tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi Dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu Lampiran III Surat Edaran Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 10 / SE / M / 2018 tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu
05 (five) of members of The Bureau of Accomplishment for House Needs, The Division of Program for Pro People of The Neighborhood Leadership Assembly of The Great  Mandailing Foundation to recomend to The Department of Civil Engineering, The Faculty of Civil and Environmental Engineering; The Department of State Administrative Law, The Department of Law of Public and Development, The Department of Business Law, The Department of Economic Law, The Department of International Trade Law and The Department of State Financial Law, The Faculty of Law; The Department of Engineering and Vocational Education, The Department of Economic Education and The Department of Building Engineering Education, The Faculty of Teacher Training and Education Science; Management and Public Policy (State Administration Science) and Public Administration Science, The Faculty of Social Sciences & Political Sciences; Mu'amalah (Islamic Business Law), Islamic Finance and Syari'ah Economic Law, The Faculty of Sharia; The Department of Civil and Environmental Engineering, The Faculty of Agricultural Technology; The Department of Economics and Development Studies and The Department of Resource and Environmental Economics, The Faculty of Economics and Management; The Department of Planning and Public Policy and The Department of Islamic Business, The Faculty of Economics; The Department of Urban Studies + Planning, School of Architecture and Planning (SA+P); Civil and Environmental Engineering, School of  Engineering; MBA (Master of Business Administration) Program, Agussalim  Management; The  Department of Regional and City Planning, The School of Architecture, Planning, and Policy Development; and The Department of Management and Department of Entrepreneurship, The School of Business and Management of MU (Mandailing University) to update by understanding The Circular Letter Number 10 / SE / M / 2018 concerning Enforcement of Standard of Selection Documents for the Procurement of Construction Services in the Context of Early Auction in the Ministry of Public Works and Public Housing for Budget Year 2019 namely is Annex III of The Circular Letter Number 10 / SE / M / 2018 concerning Enforcement of Standard of Selection Documents for the Procurement of Construction Services in the Context of Early Auction in the Ministry of Public Works and Public Housing for Budget Year 2019 namely

BAB VIII. TATA CARA EVALUASI KUALIFIKASI.
CHAPTER VIII. PROCEDURES FOR EVALUATION OF QUALIFICATIONS.

A. Dokumen Kualifikasi yang akan dievaluasi harus memenuhi persyaratan sesuai yang tercantum dalam Lembar Data Kualifikasi.
A. The Qualification Documents to be evaluated must meet the requirements as stated in the Qualification Data Sheet.

B. Tata cara penilaian untuk setiap persyaratan kualifikasi:
B. Procedures for evaluating each qualification requirement:

1. Persyaratan Izin Usaha Jasa Konstruksi, Sertifikat Badan Usaha, Sertifikat lainnya (apabila disyaratkan) dengan ketentuan:
1. Construction Services Business License Requirements, Business Entity Certificates, Other Certificates (if required) provided:

a. Pokja (Kelompok Kerja) pemilihan melihat kesesuaian antara persyaratan pada LDK (Lembar Data Kualifikasi) dengan Formulir Isian Kualifikasi yang telah diisi oleh peserta pada SPSE (Sistem Pengadaan Secara Elektronik).
a. The Working Group selects the suitability between the requirements in the Qualification Data Sheet and the Qualification Form that has been filled out by participants in the Electronic Procurement System.

b. Pokja (Kelompok Kerja) memeriksa masa berlaku izin/sertifikat dengan ketentuan:
b. The Working Group checks the validity period of the permit / certificate provided that:

1) Izin/sertifikat wajib masih berlaku berdasarkan masa berlaku yang tertera/tertulis pada izin/sertifikat tersebut;
2) Izin/sertifikat yang habis masa berlakunya sebelum batas akhir pemasukan Dokumen Penawaran tidak dapat diterima dan penyedia dinyatakan gugur;
3) Dalam hal masa berlaku izin/sertifikat habis setelah batas akhir pemasukan Dokumen Penawaran, maka Peserta harus menyampaikan izin/sertifikat yang sudah diperpanjang kepada PPK (Pejabat Pembuat Komitmen) sebelum penandatanganan kontrak.
1) Permit / certificate must still be valid based on the validity period stated / written on the permit / certificate;
2) Permit / certificate that expires before the deadline for submission of Bid Documents cannot be accepted and the provider is declared dead;
3) In the event that the validity of the permit / certificate expires after the deadline for submission of the Bid Documents, the Participant must submit an extended permit / certificate to The Commitment Making Officer before signing the contract.

c. Pokja (Kelompok Kerja) Pemilihan dapat memeriksa kesesuaian izin/sertifikat dengan menghubungi penerbit dokumen, dan/atau mengecek melalui layanan daring (online) milik penerbit dokumen yang tersedia.
c. The Working Group of Elections can check the suitability of the permit / certificate by contacting the issuer of the document, and / or checking through the online service owned by the issuer of the available documents.

2. Persyaratan Kemampuan Dasar (KD) (apabila disyaratkan), dengan ketentuan:
2. Basic Capability Requirements (if required), provided that:

a. Perhitungan Kemampuan Dasar (KD).
a. Basic Ability Calculation.

KD         = 3 NPt

NPt         = Nilai pengalaman tertinggi pada pekerjaan sesuai yang disyaratkan dalam 10
    (sepuluh) tahun terakhir.
NPt         = The highest experience value on a job according to the requirements in the last 10
    (ten) years.

b. dalam hal KSO (Kerja Sama Operasi), yang diperhitungkan adalah KD (Kemampuan Dasar) dari perusahaan yang mewakili / leadfirm KSO (Kerja Sama Operasi);
b. in the case of Operational Cooperation, which is calculated as Basic Capability of the company representing / leadfirm of Operational Cooperation;

c. KD (Kemampuan Dasar) sekurang-kurangnya sama dengan nilai total HPS (Harga Perkiraan Sendiri);
c. Basic Capability is at least equal to the total value of the Self Estimated Price;

d. pengalaman perusahaan dinilai dari pengalaman tertinggi pada pekerjaan sesuai yang disyaratkan dalam 10 (sepuluh) tahun terakhir, nilai kontrak dan status peserta pada saat menyelesaikan kontrak pekerjaan tersebut.
d. the company's experience is judged from the highest experience on the job as required in the last 10 (ten) years, the contract value and the status of the participant when completing the employment contract.

e. Nilai pengalaman pekerjaan dapat dikonversi menjadi nilai pekerjaan sekarang (present value) menggunakan perhitungan sebagai berikut:
e. Job experience values can be converted into value present working using the following calculations:
NPs        = Nilai pekerjaan sekarang
Npo        = Nilai pekerjaan keseluruhan termasuk eskalasi (apabila ada) saat serah terima
    pertama
Io           = Indeks dari Biro Pusat Statistik (BPS) pada bulan serah terima pertama
Is            = Indeks dari Biro Pusat Statistik (BPS) pada bulan penilaian prakualifikasi (apabila   
    belum ada, dapat dihitung dengan regresi linier berdasarkan indeks bulan-bulan
    sebelumnya)
NPs        = Current work value
Npo        = Overall work value including escalation (if any) when first handover            
Io           = Index from the Central Bureau of Statistics on the first handover month
Is            = Index of the Central Bureau of Statistics  in the month of prequalification
   assessment (if not available, it can be calculated by linear regression based on the
   index of the previous months

Indeks Biro Pusat Statistik (BPS) yang dipakai adalah indeks yang merupakan komponen terbesar dari pekerjaan.
The Central Bureau of Statistics index used is an index which is the largest component of employment.

3. Persyaratan NPWP (Nomor Pokok Wajib Pajak) dan kewajiban perpajakan tahun pajak terakhir [SPT (Surat Pemberitahuan) Tahunan] dapat dikecualikan untuk peserta yang secara peraturan perpajakan belum diwajibkan memiliki laporan perpajakan tahun terakhir, misalnya baru berdiri sebelum batas waktu laporan pajak tahun terakhir.
3. The requirements of Taxpayer Identification Number and taxation obligations of the last tax year [Annual Notice] can be excluded for participants whose tax regulations have not been required to have the latest tax report, for example, just before the deadline for last year's tax report.

4. Persyaratan akta pendirian perusahaan disertai dengan akta perubahan perusahaan (apabila ada perubahan). Akta asli/legalisir wajib dibawa pada saat pembuktian kualifikasi.
4. Requirements for the company's deed of establishment are accompanied by a company amendment (if there is a change). The original / legalized deed must be brought at the time of proof of qualification.

5. Pernyataan Tidak masuk dalam Daftar Hitam, keikutsertaannya tidak menimbulkan pertentangan kepentingan pihak yang terkait, tidak dalam pengawasan pengadilan, tidak pailit, kegiatan usahanya tidak sedang dihentikan dan/atau yang bertindak untuk dan atas nama Badan Usaha tidak sedang dalam menjalani sanksi pidana, dan pengurus/pegawai tidak berstatus Aparatur Sipil Negara, kecuali yang bersangkutan mengambil cuti diluar tanggungan Negara, dengan ketentuan:
5. Statement not included in the Black List, its participation does not cause conflict of interests of the parties concerned, is not under court supervision, is not bankrupt, its business activities are not being stopped and / or acting for and on behalf of the Business Entity are not under criminal sanctions, and management / employee is not a State Civil Apparatus status, except the concerned takes leave of absence outside the State, provided that:

a. Ketentuan ini berbentuk pernyataan oleh peserta pada aplikasi SPSE (Sistem Pengadaan Secara Elektronik). Tidak perlu dinyatakan dalam surat pernyataan, kecuali untuk KSO (Kerja Sama Operasi);
a. This provision is in the form of a statement by participants in the Electronic Procurement System application. It does not need to be stated in a statement, except for the Joint Operation;

b. Apabila suatu saat ditemukan bukti bahwa peserta mengingkari pernyataan ini/menyampaikan informasi yang tidak benar terhadap pernyataan ini, maka dapat menjadi dasar untuk pengenaan sanksi daftar hitam.
b. If at any time evidence is found that participants deny this statement / submit not true information to this statement, then it can be the basis for sanctions for blacklisting.

6. Persyaratan pengalaman paling kurang 1 (satu) pekerjaan dalam kurun waktu 4 (empat) tahun terakhir, dengan ketentuan:
6. Experience requirements of at least 1 (one) job within the last 4 (four) years, provided that:

a. Pengalaman diambil dari daftar pengalaman pada isian kualifikasi yang dibuktikan pada saat pembuktian kualifikasi dengan membawa Kontrak Asli dan Berita Acara Serah Terima;
a. Experience is taken from the list of experiences in the proven qualification fields at the time of verification of qualifications by bringing the Original Contract and the Handover Report;

b. Khusus untuk pengalaman sebagai subkontraktor, maka selain membawa dan memperlihatkan kontrak subkontrak, juga harus dilengkapi dengan surat referensi dari PPK (Pejabat Pembuat Komitmen) / Pemilik Pekerjaan yang menyatakan bahwa peserta memang benar adalah subkontrak untuk pekerjaan dimaksud.
b. Especially for experience as a subcontractor, in addition to carrying and showing subcontracting contracts, it must also be completed with a reference letter from the Commitment Making Officer / Job Owner stating that the participant is indeed a subcontractor for the said work.

7. Persyaratan Sisa Kemampuan Paket (SKP) (apabila disyaratkan), dengan ketentuan:
7. Package Capability Remaining Requirements (if required), provided that:

a. Rumusan SKP (Sisa Kemampuan Paket).
a. Formulation of Remaining Package Ability.

SKP        = KP – jumlah paket yang sedang dikerjakan
KP          = Kemampuan menangani paket pekerjaan. KP = 5
N            = Jumlah paket pekerjaan terbanyak yang dapat ditangani pada saat bersamaan
   selama kurun waktu 5 (lima) tahun terakhir
SKP        = KP - number of packages being worked on
KP          = Ability to handle work packages. KP = 5
N            = The highest number of work packages that can be handled at the same time
                   for the past 5 (five) years

b. Peserta wajib mengisi daftar pekerjaan yang sedang dikerjakan;
b. Participants must fill in the list of work being worked on;

c. Apabila ditemukan bukti peserta tidak mengisi daftar pekerjaan yang sedang dikerjakan walaupun sebenarnya ada pekerjaan yang sedang dikerjakan, maka apabila pekerjaan tersebut menyebabkan SKP (Sisa Kemampuan Paket) peserta tidak memenuhi, maka dinyatakan gugur, dikenakan sanksi daftar hitam, dan pencairan jaminan penawaran (apabila ada).
c. If evidence is found that the participant did not fill in the list of work being carried out even though there is actually work being worked on, then if the work causes Remaining Package Ability of the participant does not fulfill, then it is declared null, blacklisted and and disbursement of offer guarantees (if any).

8. Persyaratan Tenaga Tetap, dengan ketentuan pembuktian Tenaga Tetap dilakukan pada tahap pembuktian kualifikasi dengan meminta peserta membawa:
8. Requirements for Permanent Personnel, with the provision of Permanent Personnel verification conducted at the stage of proof of qualifications by asking participants to bring:

a. Bukti setor pajak PPH (Pajak Penghasilan) Pasal 21 Form 1721 atau Form 1721-I, atau
b. Bukti kepersertaan BPJS (Badan Penyelenggara Jaminan Sosial) Ketenagakerjaan yang mencantumkan nama jelas serta nama perusahaan yang sama dengan nama perusahaan peserta tender.
c. SK (Surat Keputusan), Susunan Organisasi, atau Daftar Gaji tidak dapat menjadi bukti tenaga kerja tetap.
a. Deposit evidence of Income Tax Article 21 Form 1721 or Form 1721-I, or
b. Proof of the employment of the Social Security Organizing Agency of Employment that includes a clear name and company name that is the same as the company name of the bidder.
c. Decree, Organizational Structure or Salary List cannot be proof of permanent employment.

9. Persyaratan Sisa Kemampuan Nyata (SKN) (apabila disyaratkan), dengan ketentuan:
9. Requirements for Reamaining Real Capability (if required), provided that:

a. Rumusan Sisa Kemampuan Nyata(SKN).
a. Formulation of Real Ability Remaining.

SKN       = KN - Σnilai kontrak paket pekerjaan yang sedang dikerjakan
KN         = fp x MK
MK         = fl x KB
KN         = Kemampuan Nyata
fp           = Faktor perputaran modal (untuk usaha menengah dan besar, fp = 7)
MK         = Modal kerja
fl            = Faktor likuiditas (untuk usaha menengah dan besar, fl = 0,6)
KB         = Kekayaan Bersih/total ekuitas yang dilihat dari neraca keuangan tahun terakhir
SKN        = KN - Σvalue of the work package contract being worked on
KN          = fp x MK
MK         = fl x KB
KN          = Real Ability
fp            = Capital turnover factor (for medium and large businesses, fp = 7)
MK         = Working capital
fl             = Liquidity factor (for medium and large businesses, fl = 0.6)
KB          = Net Wealth / total equity seen from the last year's financial balance

b. Σnilai kontrak paket pekerjaan diambil dari daftar pekerjaan yang sedang dikerjakan dalam Formulir Isian Kualifikasi.
b.  Σvalue of the work package contract is taken from the list of work being carried out in the Qualification Form.

c. SKN (Sisa Kemampuan Nyata) harus sama atau lebih besar dari 10% (sepuluh perseratus) nilai total HPS (Harga Perkiraan Sendiri).
c. Remaining Real Ability must be equal to or greater than 10% (ten percent) of the total value of the Self Estimated Price.

d. Apabila ditemukan bukti peserta tidak mengisi daftar pekerjaan yang sedang dikerjakan walaupun sebenarnya ada pekerjaan yang sedang dikerjakan, maka apabila pekerjaan tersebut menyebabkan SKN (Sisa Kemampuan Nyata) peserta tidak memenuhi, maka dinyatakan gugur, dikenakan sanksi daftar hitam, dan pencairan jaminan penawaran (apabila ada).
d. If evidence is found that the participant did not fill in the list of work being carried out even though there is actually work being worked on, then if the work causes the Real Ability Remaining of the participant does not fulfill it, then it is declared dead, then he or she will be subject to blacklist sanction, and disbursement of offer guarantees (if any).

10. Persyaratan surat keterangan dukungan keuangan (apabila disyaratkan) diterbitkan dari bank pemerintah/swasta dengan nilai paling kurang 10% (sepuluh perseratus) dari nilai total HPS (Harga Perkiraan Sendiri).
10. Requirements for a financial support certificate (if required) are issued from a government / private bank with a value of at least 10% (ten percent) of the total value of the Self Estimated Price.

C. Pokja (Kelompok Kerja) Pemilihan memeriksa membandingkan/mengevaluasi/ membuktikan antara persyaratan pada Dokumen Kualifikasi dengan data isian peserta dalam hal:
C. The Working Group Election checks comparing / evaluating / proving between requirements in the Qualification Document with participant data in terms of:

1. kelengkapan Dokumen Kualifikasi; dan
2. pemenuhan persyaratan kualifikasi.
1. Qualification Document completeness; and
2. fulfillment of qualification requirements.

D. Formulir Isian Kualifikasi untuk KSO (Kerja Sama Operasi) yang tidak dibubuhi materai tidak digugurkan, peserta diminta untuk membayar denda meterai sesuai ketentuan peraturan perundang-undangan.
D. Qualification Forms for Joint Operation that are not stamped are not aborted, participants are asked to pay stamp duty according to the provisions of the legislation.

E. Apabila ditemukan hal-hal dan/atau data yang kurang jelas maka Pokja (Kelompok Kerja) Pemilihan dapat meminta peserta untuk menyampaikan klarifikasi/konfirmasi secara tertulis namun tidak boleh mengubah substansi Formulir Isian Kualifikasi termasuk dapat melakukan peninjauan lapangan pada pihak-pihak / instansi terkait.
E. If there are unclear matters and / or data, the Election Working Group can ask participants to submit clarification / confirmation in writing but may not change the substance of the Qualification Form including being able to carry out field visits to the parties / agencies related.

F. Evaluasi kualifikasi (pascakualifikasi) sudah merupakan kompetisi, sehingga data yang kurang tidak dapat dilengkapi.
F. Evaluation of qualifications (post-qualification) is already a competition, so that less data cannot be completed.

Sabtu, 16 April 2033 Materi Kuliah Umum - e-teleconference, "Eksistensi Sekretaris Biro Pemenuhan Kebutuhan Papan, Divisi Program Pro Rakyat MPRT YMR (Majelis Pimpinan Rukun Tetangga Yayasan Mandailing Raya) di seluruh dunia yang dikonsentrasitaktiskan di Kabupaten Mandailing Natal" yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 0279/Maret/2033.
Saturday, April 16th, 2033 Public Lecture material - e-teleconference “Existence of The Secretary of The Bureau of Accomplishment for Food Needs, The Division of Program for Pro People of The Neighborhood Leadership Assembly of The Great  Mandailing Foundation on worldwide who concerned and tacticed in Mandailing Natal" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 0279/March/2033.


Sekretaris Biro Pemenuhan Kebutuhan Papan, Divisi Program Pro Rakyat MPRT YMR (Majelis Pimpinan Rukun Tetangga Yayasan Mandailing Raya) untuk merekomendasikan kepada Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Lingkungan (FTSL); Jurusan Hukum Administrasi Negara, Jurusan Hukum Masyarakat dan Pembangunan, Jurusan Hukum Bisnis, Jurusan Hukum Ekonomi, Jurusan Hukum Perdagangan Internasional dan Jurusan Hukum Keuangan Negara, Fakultas Hukum; Jurusan Pendidikan Teknik dan Kejuruan (JPTK), Jurusan Pendidikan Ekonomi dan Jurusan Pendidikan Teknik Bangunan (PTB), Fakultas Keguruan dan Ilmu Pendidikan; Manajemen dan Kebijakan Publik (Ilmu Administrasi Negara) dan Ilmu Administrasi Publik, Fakultas ISIPOL (Ilmu Sosial & Ilmu Politik); Mu’amalah (Hukum Bisnis Islam), Keuangan Islam dan HES (Hukum Ekonomi Syari’ah), Fakultas Syariah; Jurusan Teknik Sipil dan Lingkungan, Fakultas Teknologi Pertanian (FATETA); Jurusan Ekonomi dan Studi Pembangunan dan Jurusan Ekonomi Sumberdaya dan Lingkungan, Fakultas Ekonomi dan Manajemen; Jurusan Perencananaan dan Kebijakan Publik dan Jurusan Bisnis Islam, FE (Fakultas Ekonomi); The Department of Urban Studies + Planning, School of Architecture  and Planning (SA+P); Civil and Environmental Engineering, School of  Engineering;  BA (Master of Administration) Program, Agussalim  Management; Jurusan Perencanaan Wilayah dan Kota, Sekolah Arsitektur, Perencanaan, dan Pengembangan Kebijakan (SAPPK); dan Jurusan Manajemen dan Jurusan Kewirausahaan, Sekolah Bisnis dan Manajemen (SBM) UM (Universitas Mandailing) untuk memutakhirkan dengan memahami Surat Edaran Nomor 10/SE/M/2018 tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi Dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu Lampiran III Surat Edaran Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 10 / SE / M / 2018 tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu
The Secretary of The Bureau of Accomplishment for Food Needs, The Division of Program for Pro People of The Neighborhood Leadership Assembly of The Great  Mandailing Foundation to recomend to The Department of Civil Engineering, The Faculty of Civil and Environmental Engineering; The Department of State Administrative Law, The Department of Law of Public and Development, The Department of Business Law, The Department of Economic Law, The Department of International Trade Law and The Department of State Financial Law, The Faculty of Law; The Department of Engineering and Vocational Education, The Department of Economic Education and The Department of Building Engineering Education, The Faculty of Teacher Training and Education Science; Management and Public Policy (State Administration Science) and Public Administration Science, The Faculty of Social Sciences & Political Sciences; Mu'amalah (Islamic Business Law), Islamic Finance and Syari'ah Economic Law, The Faculty of Sharia; The Department of Civil and Environmental Engineering, The Faculty of Agricultural Technology; The Department of Economics and Development Studies and The Department of Resource and Environmental Economics, The Faculty of Economics and Management; The Department of Planning and Public Policy and The Department of Islamic Business, The Faculty of Economics; The Department of Urban Studies + Planning, School of Architecture and Planning (SA+P); Civil and Environmental Engineering, School of  Engineering; MBA (Master of Business Administration) Program, Agussalim  Management; The  Department of Regional and City Planning, The School of Architecture, Planning, and Policy Development; and The Department of Management and Department of Entrepreneurship, The School of Business and Management of MU (Mandailing University) to update by understanding The Circular Letter Number 10 / SE / M / 2018 concerning Enforcement of Standard of Selection Documents for the Procurement of Construction Services in the Context of Early Auction in the Ministry of Public Works and Public Housing for Budget Year 2019 namely is Annex III of The Circular Letter Number 10 / SE / M / 2018 concerning Enforcement of Standard of Selection Documents for the Procurement of Construction Services in the Context of Early Auction in the Ministry of Public Works and Public Housing for Budget Year 2019 namely
















Sabtu, 23 April 2033 Materi Kuliah Umum - e-teleconference, "Eksistensi Koordinator Biro Pemenuhan Kebutuhan Papan, Divisi Program Pro Rakyat MPRT YMR (Majelis Pimpinan Rukun Tetangga Yayasan Mandailing Raya) di seluruh dunia yang dikonsentrasitaktiskan di Kabupaten Mandailing Natal" yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 0279/Maret/2033.
Saturday, April 23th, 2033 Public Lecture material - e-teleconference “Existence of The Coordinator of The Bureau of Accomplishment for House Needs, The Division of Program for Pro People of The Neighborhood Leadership Assembly of The Great  Mandailing Foundation on worldwide who concerned and tacticed in Mandailing Natal" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 0279/March/2033.

Koordinator Biro Pemenuhan Kebutuhan Papan, Divisi Program Pro Rakyat MPRT YMR (Majelis Pimpinan Rukun Tetangga Yayasan Mandailing Raya) untuk merekomendasikan kepada Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Lingkungan (FTSL); Jurusan Hukum Administrasi Negara, Jurusan Hukum Masyarakat dan Pembangunan, Jurusan Hukum Bisnis, Jurusan Hukum Ekonomi, Jurusan Hukum Perdagangan Internasional dan Jurusan Hukum Keuangan Negara, Fakultas Hukum; Jurusan Pendidikan Teknik dan Kejuruan (JPTK), Jurusan Pendidikan Ekonomi dan Jurusan Pendidikan Teknik Bangunan (PTB), Fakultas Keguruan dan Ilmu Pendidikan; Manajemen dan Kebijakan Publik (Ilmu Administrasi Negara) dan Ilmu Administrasi Publik, Fakultas ISIPOL (Ilmu Sosial & Ilmu Politik); Mu’amalah (Hukum Bisnis Islam), Keuangan Islam dan HES (Hukum Ekonomi Syari’ah), Fakultas Syariah; Jurusan Teknik Sipil dan Lingkungan, Fakultas Teknologi Pertanian (FATETA); Jurusan Ekonomi dan Studi Pembangunan dan Jurusan Ekonomi Sumberdaya dan Lingkungan, Fakultas Ekonomi dan Manajemen; Jurusan Perencananaan dan Kebijakan Publik dan Jurusan Bisnis Islam, FE (Fakultas Ekonomi); The Department of Urban Studies + Planning, School of Architecture  and Planning (SA+P); Civil and Environmental Engineering, School of  Engineering;  BA (Master of Administration) Program, Agussalim  Management; Jurusan Perencanaan Wilayah dan Kota, Sekolah Arsitektur, Perencanaan, dan Pengembangan Kebijakan (SAPPK); dan Jurusan Manajemen dan Jurusan Kewirausahaan, Sekolah Bisnis dan Manajemen (SBM) UM (Universitas Mandailing) untuk memutakhirkan dengan memahami Surat Edaran Nomor 10/SE/M/2018 tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi Dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu Lampiran III Surat Edaran Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 10 / SE / M / 2018 tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu
The Coordinator of The Bureau of Accomplishment for House Needs, The Division of Program for Pro People of The Neighborhood Leadership Assembly of The Great  Mandailing Foundation to recomend to The Department of Civil Engineering, The Faculty of Civil and Environmental Engineering; The Department of State Administrative Law, The Department of Law of Public and Development, The Department of Business Law, The Department of Economic Law, The Department of International Trade Law and The Department of State Financial Law, The Faculty of Law; The Department of Engineering and Vocational Education, The Department of Economic Education and The Department of Building Engineering Education, The Faculty of Teacher Training and Education Science; Management and Public Policy (State Administration Science) and Public Administration Science, The Faculty of Social Sciences & Political Sciences; Mu'amalah (Islamic Business Law), Islamic Finance and Syari'ah Economic Law, The Faculty of Sharia; The Department of Civil and Environmental Engineering, The Faculty of Agricultural Technology; The Department of Economics and Development Studies and The Department of Resource and Environmental Economics, The Faculty of Economics and Management; The Department of Planning and Public Policy and The Department of Islamic Business, The Faculty of Economics; The Department of Urban Studies + Planning, School of Architecture and Planning (SA+P); Civil and Environmental Engineering, School of  Engineering; MBA (Master of Business Administration) Program, Agussalim  Management; The  Department of Regional and City Planning, The School of Architecture, Planning, and Policy Development; and The Department of Management and Department of Entrepreneurship, The School of Business and Management of MU (Mandailing University) to update by understanding The Circular Letter Number 10 / SE / M / 2018 concerning Enforcement of Standard of Selection Documents for the Procurement of Construction Services in the Context of Early Auction in the Ministry of Public Works and Public Housing for Budget Year 2019 namely is Annex III of The Circular Letter Number 10 / SE / M / 2018 concerning Enforcement of Standard of Selection Documents for the Procurement of Construction Services in the Context of Early Auction in the Ministry of Public Works and Public Housing for Budget Year 2019 namely

II. SYARAT-SYARAT UMUM KONTRAK.
II. GENERAL TERMS OF CONTRACT.

SYARAT-SYARAT UMUM KONTRAK.
GENERAL TERMS OF CONTRACT.


A.  KETENTUAN UMUM.
A. GENERAL PROVISIONS.

1. Definisi Istilah-istilah yang digunakan dalam Syarat - Syarat Umum Kontrak selanjutnya disebut SSUK (Syarat - Syarat Umum Kontrak) harus mempunyai arti atau tafsiran seperti yang dimaksudkan sebagai berikut.
1. Definition of The terms used in the General Conditions of the Contract hereinafter referred to as GCC (General Conditions of Contract) must have the meaning or interpretation as intended below.

1.1. Aparat Pengawas Intern Pemerintah yang selanjutnya disingkat APIP  adalah aparat yang melakukan pengawasan melalui audit, reviu, pemantauan, evaluasi, dan kegiatan pengawasan lain terhadap penyelenggaraan tugas dan fungsi Pemerintah.
1.1. The Government Internal Supervisory Apparatus, hereinafter abbreviated as APIP (in Bahasa), is an apparatus that conducts supervision through audits, reviews, monitoring, evaluations, and other supervisory activities on the implementation of Government duties and functions.

1.2. Bagian pekerjaan yang disubkontrakkan adalah bagian pekerjaan utama atau bagian pekerjaan bukan utama yang ditetapkan sebagaimana tercantum dalam Dokumen Pemilihan yang pelaksanaannya diserahkan kepada Penyedia lain (subpenyedia) dan disetujui terlebih dahulu oleh PPK (Pejabat Pembuat Komitmen).
1.2. The subcontracted part of the work is the part of the main work or part of the non-primary work specified as stated in the Bidding Document whose implementation is submitted to another Provider (sub-provider) and approved in advance by the Commitment Making Officer.

1.3. Daftar Keluaran dan Harga adalah daftar keluaran yang telah diisi harga satuan keluaran dan jumlah biaya keseluruhannya yang merupakan bagian dari penawaran.
1.3. The Output and Price List is a list of outputs that have been filled in with the unit price of output and the total cost of which is part of the offer.

1.4. Direksi Lapangan adalah tenaga/tim pendukung yang dibentuk/ditetapkan oleh PPK (Pejabat Pembuat Komitmen), terdiri dari 1 (satu) orang atau lebih, untuk mengelola administrasi Kontrak dan mengendalikan pelaksanaan pekerjaan.
1.4. Field Directors are personnel / support teams formed/determined by The Commitment Making Officials, consisting of 1 (one) person or more, to manage Contract administration and control the execution of work.

1.5. Harga Kontrak adalah total harga pelaksanaan pekerjaan yang tercantum dalam Kontrak.
1.5. The Contract Price is the total price of the work carried out in the Contract.

1.6. Harga Perkiraan Sendiri yang selanjutnya disingkat HPS adalah perkiraan harga barang/jasa yang ditetapkan oleh PPK (Pejabat Pembuat Komitmen).
1.6. The Self Estimated Price hereinafter abbreviated as HPS (in Bahasa) is the estimated price of goods / services determined by the Commitment Making Officer.

1.7. Jadwal Pelaksanaan Pekerjaan adalah kerangka waktu yang sudah terinci berdasarkan Masa Pelaksanaan, setelah dilaksanakan pemeriksaan lapangan bersama dan disepakati dalam rapat persiapan pelaksanaan Kontrak.
1.7. The Job Implementation Schedule is a time frame that has been detailed based on the Implementation Period, after a joint field inspection has been carried out and agreed upon in the preparation meeting for the implementation of the Contract.

1.8. Keadaan Kahar adalah suatu keadaan yang terjadi di luar kehendak para pihak dalam Kontrak dan tidak dapat diperkirakan sebelumnya, sehingga kewajiban yang ditentukan dalam Kontrak menjadi tidak dapat dipenuhi.
1.8. Force Majeure is a condition that occurs outside the will of the parties in the Contract and cannot be predicted beforehand, so that the obligations specified in the Contract cannot be fulfilled.

1.9. Kegagalan Bangunan adalah suatu keadaan keruntuhan bangunan dan/atau tidak berfungsinya bangunan setelah penyerahan akhir hasil Jasa Konstruksi.
1.9. Building Failure is a condition of building collapse and / or malfunction of the building after the final delivery of the results of the Construction Services.

1.10. Kerja Sama Operasi yang selanjutnya disingkat KSO (Kerja Sama Operasi) adalah kerja sama usaha antar Penyedia yang masing-masing pihak mempunyai hak, kewajiban dan tanggung jawab yang jelas berdasarkan perjanjian tertulis.
1.10. Operational Cooperation, hereinafter abbreviated as KSO (in Bahasa) is business cooperation between Providers, each of which has clear rights, obligations and responsibilities based on a written agreement.

1.11. Kontrak Kerja Konstruksi selanjutnya disebut Kontrak adalah keseluruhan dokumen yang mengatur hubungan hukum antara PPK (Pejabat Pembuat Komitmen) dengan Penyedia dalam pelaksanaan jasa konsultansi konstruksi atau pekerjaan konstruksi.
1.11. The Construction Work Contract hereinafter referred to as the Contract is the entire document that regulates the legal relationship between the Commitment Making Officer and the Provider in the implementation of construction consultancy services or construction works.

1.12. Kontrak Lumsum adalah kontrak dengan ruang lingkup pekerjaan dan jumlah harga yang pasti dan tetap dalam batas waktu tertentu, dengan semua risiko sepenuhnya ditanggung oleh Penyedia, berorientasi kepada keluaran, dan pembayaran didasarkan pada tahapan produk/keluaran yang dihasilkan sesuai dengan Kontrak.
1.12. General Contract is a contract with a scope of work and a fixed and fixed amount of price within a certain time limit, with all risks fully borne by the Provider, oriented to output, and payments based on the stages of the product / output produced in accordance with the Contract.

1.13. Kuasa Pengguna Anggaran pada pelaksanaan APBN(Anggaran Pendapatan Belanja Negara) yang selanjutnya disingkat KPA (Kuasa Pengguna Anggaran) adalah pejabat yang memperoleh kuasa dari PA (Pengguna Anggaran) untuk melaksanakan sebagian kewenangan dan tanggung jawab Penggunaan Anggaran pada Kementerian Negara/Lembaga yang bersangkutan.
1.13. Budget User Proxies in the implementation of the State Budget (State Expenditures Budget) hereinafter abbreviated as KPA (in Bahasa) are officials who obtain power from Budget User to carry out part of the authority and responsibility of Budget Use in the relevant State Ministries / Institutions.

1.14. Kuasa Pengguna Anggaran pada pelaksanaan APBD (Anggaran Pendapatan Belanja Daerah) yang selanjutnya disingkat KPA (Kuasa Pengguna Anggaran) adalah pejabat yang diberi kuasa untuk melaksanakan sebagian kewenangan Pengguna Anggaran dalam melaksanakan sebagian tugas dan fungsi Perangkat Daerah.
1.14. Budget User Proxies on the implementation of the Regional Budget, hereinafter abbreviated as KPA (in Bahasa) are officials who are authorized to carry out part of the authority of the Budget User in carrying out some tasks and functions of the Regional Devices.

1.15. Masa Kontrak adalah jangka waktu berlakunya Kontrak ini terhitung sejak tanggal penandatanganan Kontrak sampai dengan Tanggal Penyerahan Akhir Pekerjaan.
1.15. The Contract Period is the period of validity of this Contract from the date of the signing of the Contract until the Final Job Delivery Date.

1.16. Masa Pelaksanaan adalah jangka waktu untuk melaksanakan seluruh pekerjaan terhitung sejak Tanggal Mulai Kerja sampai dengan Tanggal Penyerahan Pertama Pekerjaan.
1.16. Period of Implementation is the period of time to carry out all work from the Starting Date of Work to the First Job Submission Date.

1.17. Masa Pemeliharaan adalah jangka waktu untuk melaksanakan kewajiban pemeliharaan oleh Penyedia, terhitung sejak Tanggal Penyerahan Pertama Pekerjaan sampai dengan Tanggal Penyerahan Akhir Pekerjaan.
1.17. Maintenance Period is the period of time to carry out maintenance obligations by the Provider, starting from the First Submission Date of Work to the End of Work Submission Date.

1.18. Metode Pelaksanaan Pekerjaan adalah metode yang menggambarkan penguasaan penyelesaian pekerjaan yang sistematis dari awal sampai akhir meliputi tahapan/urutan pekerjaan utama dan uraian/cara kerja dari masing-masing jenis kegiatan pekerjaan utama yang dapat dipertanggungjawabkan secara teknis.
1.18. Job Implementation Method is a method that describes the mastery of systematic work completion from the beginning to the end includes the stages / sequence of the main work and description / workings of each type of main work activities that can be technically accountable.

1.19. Panitia Pemeriksa Hasil Pekerjaan yang selanjutnya disingkat PPHP adalah tim yang bertugas memeriksa administrasi hasil pekerjaan Pengadaan Barang/Jasa.
1.19. The Work Results Inspection Committee, hereinafter abbreviated as PPHP (in Bahasa), is a team tasked with examining the administration of the results of the procurement of goods / services.

1.20. Pejabat Pembuat Komitmen yang selanjutnya disingkat PPK adalah pejabat yang diberi kewenangan oleh PA/KPA (Pengguna Anggaran / Kuasa Pengguna Anggaran) untuk mengambil keputusan dan/atau melakukan tindakan yang dapat mengakibatkan pengeluaran anggaran belanja negara/anggaran belanja daerah.
1.20. The Commitment Making Official hereinafter abbreviated as PPK (in Bahasa) are officials who are authorized by Budget Users / Budget User Authorities to make decisions and / or take actions that can result in expenditure of the state / regional budget.

1.21. Pekerjaan Konstruksi adalah keseluruhan atau sebagian kegiatan yang meliputi pembangunan, pengoperasian, pemeliharaan, pembongkaran, dan pembangunan kembali suatu bangunan.
1.21. Construction work is the whole or part of activities which include the construction, operation, maintenance, dismantling and rebuilding of a building.

1.22. Pekerjaan Utama adalah jenis pekerjaan yang secara langsung menunjang terwujudnya dan berfungsinya suatu konstruksi sesuai peruntukannya yang ditetapkan sebagaimana tercantum dalam Dokumen Pemilihan.
1.22. Main Work is a type of work that directly supports the realization and functioning of a construction in accordance with the designation specified in the Bidding Document.

1.23. Pelaku Usaha adalah setiap orang perorangan atau badan usaha, baik yang berbentuk badan hukum maupun bukan badan hukum yang didirikan dan berkedudukan atau melakukan kegiatan dalam wilayah hukum negara Republik Indonesia, baik sendiri maupun bersamasama melalui perjanjian menyelenggarakan kegiatan usaha dalam berbagai bidang ekonomi.
1.23. Business Actors are every individual or business entity, whether in the form of a legal entity or not a legal entity that is established and domiciled or conducts activities within the jurisdiction of the Republic of Indonesia, both alone and jointly through agreements to conduct business activities in various economic fields.

1.24. Pengguna Anggaran yang selanjutnya disingkat PA adalah pejabat pemegang kewenangan penggunaan anggaran Kementerian Negara / Lembaga /Perangkat Daerah.
1.24. Budget Users, hereinafter abbreviated as PA (in Bahasa), are officials who hold the authority to use the budget of the State Ministries / Institutions / Regional Devices.

1.25. Penyedia adalah Pelaku Usaha yang menyediakan barang/jasa berdasarkan Kontrak.
1.25. Provider is a business actor providing goods / services based on a contract.

1.26. Personel Manajerial adalah tenaga ahli atau tenaga teknis yang ditempatkan sesuai penugasan pada organisasi pelaksanaan pekerjaan.
1.26. Managerial Personnel are experts or technical personnel who are placed according to assignments to the organization implementing the work.

1.27. Pengawas Pekerjaan atau Direksi Teknis adalah tim pendukung yang  ditunjuk/ditetapkan oleh PPK (Pejabat Pembuat Komitmen) yang bertugas untuk mengawasi pelaksanaan pekerjaan.
1.27. Job Supervisors or Technical Directors are a support team designated / determined by the Commitment Making Officer whose job is to oversee the implementation of the work.

1.28. Sanksi Daftar Hitam adalah sanksi yang diberikan kepada Peserta pemilihan/Penyedia berupa larangan mengikuti Pengadaan Barang/Jasa di seluruh Kementerian / Lembaga / Perangkat Daerah dalam jangka waktu tertentu.
1.28. Black List Sanctions are sanctions given to election Participants / Providers in the form of prohibitions on following the Procurement of Goods / Services in all Ministries / Institutions / Regional Devices within a certain period of time.

1.29. Subpenyedia adalah Penyedia yang mengadakan perjanjian kerja tertulis dengan Penyedia penanggung jawab Kontrak, untuk melaksanakan sebagian pekerjaan (subkontrak).
1.29. Sub-provider is the Provider who holds a written work agreement with the Provider in charge of the contract, to carry out part of the work (subcontracting).

1.30. Surat Jaminan yang selanjutnya disebut Jaminan adalah jaminan tertulis yang dikeluarkan oleh Bank Umum / Perusahaan Penjaminan / Perusahaan Asuransi / lembaga keuangan khusus yang menjalankan usaha di bidang pembiayaan, penjaminan, dan asuransi untuk mendorong ekspor Indonesia / Konsorsium Perusahaan Asuransi Umum / Konsorsium Lembaga Penjaminan / Konsorsium Perusahaan Penjaminan sesuai dengan ketentuan dalam peraturan perundang-undangan.
1.30. Guarantee Letter, hereinafter referred to as Guarantee, is a written guarantee issued by a Commercial Bank / Guarantee Company / Insurance Company / special financial institution that runs businesses in the fields of financing, guarantees and insurance to encourage Indonesian exports / Consortium of General Insurance Companies / Consortium of Guarantee Institutions / Consortia Guarantee Company in accordance with the provisions in the legislation.

1.31. Surat Perintah Mulai Kerja yang selanjutnya disingkat SPMK adalah surat yang diterbitkan oleh PPK (Pejabat Pembuat Komitmen) kepada Penyedia untuk memulai melaksanakan pekerjaan.
1.31. The Order Letter of Start Work, hereinafter abbreviated as SPMK (in Bahasa), is a letter issued by the Commitment Making Officer to the Provider to begin carrying out the work.

1.32. Tanggal Mulai Kerja adalah tanggal yang dinyatakan pada SPMK (Surat Perintah Mulai Kerja) yang diterbitkan oleh PPK (Pejabat Pembuat Komitmen) untuk memulai melaksanakan pekerjaan.
1.32. The Date of Starting Work is the date stated on the Order Letter to Commence Work issued by the Commitment Making Officer to begin carrying out the work.

1.33. Tanggal Penyerahan Pertama Pekerjaan adalah tanggal serah terima pertama pekerjaan selesai (Provisional Hand Over/PHO) dinyatakan dalam Berita Acara Serah Terima Pertama Pekerjaan yang diterbitkan oleh PPK (Pejabat Pembuat Komitmen).
1.33. First Job Submission Date is the date of the first handover (PHO Provisional Hand Over) stated in the Minutes of First Handover of Works issued by The Commitment Making Officer.

1.34. Tanggal Penyerahan Akhir Pekerjaan adalah tanggal serah terima akhir pekerjaan selesai (Final Hand Over/FHO) dinyatakan dalam Berita Acara Serah Terima Akhir Pekerjaan yang diterbitkan oleh PPK (Pejabat Pembuat Komitmen).
1.34. Final Job Submission Date is the date of handover of the final finished work (Final Hand Over / FHO) stated in the Minutes of Final Job Handover issued by The Commitment Making Officer.

1.35. Tenaga Kerja Konstruksi adalah tenaga kerja yang bekerja di sektor konstruksi yang meliputi ahli, teknisi atau analis, dan operator.
1.35. Construction Workers are workers who work in the construction sector which includes experts, technicians or analysts, and operators.

2. Penerapan SSUK (Syarat – Syarat Umum Kontrak) diterapkan secara luas dalam pelaksanaan Pekerjaan Konstruksi ini tetapi tidak dapat bertentangan dengan ketentuan-ketentuan dalam Dokumen Kontrak lain yang lebih tinggi berdasarkan urutan hierarki dalam Surat Perjanjian.
2. The application of the General Conditions of Contract is widely applied in the implementation of this Construction Work but cannot be contrary to the provisions in other Contract Documents which are higher based on the order of the hierarchy in the Letter of Agreement.

3. Bahasa dan Hukum.
3.1. Bahasa Kontrak harus dalam bahasa Indonesia.
3.2. Dalam hal Kontrak dilakukan dengan pihak asing harus dibuat dalam bahasa Indonesia dan bahasa Inggris. Dalam hal terjadi perselisihan dengan pihak asing digunakan Kontrak dalam bahasa Indonesia.
3.3. Hukum yang digunakan adalah hukum yang berlaku di Indonesia.
3. Language and Law.
3.1. The language of the contract must be in Indonesian.
3.2. In the case of contracts carried out with foreign parties must be made in Indonesian and English. In the event of a dispute with a foreign party, a Contract in the Indonesian language is used.
3.3. The law used is the law that applies in Indonesia.

4. Korespondensi.
4. Correspondence.

4.1. Semua korespondensi dapat berbentuk surat, e-mail dan/atau faksimili dengan alamat tujuan para pihak yang tercantum dalam SSKK (Syarat – Syarat Khusus Kontrak).
4.1. All correspondence can be in the form of letters, e-mails and / or facsimiles by addressing the objectives of the parties listed in the Contract Specific Terms.

4.2. Semua pemberitahuan, permohonan, atau persetujuan berdasarkan Kontrak ini harus dibuat secara tertulis dalam Bahasa Indonesia, dan dianggap telah diberitahukan jika telah disampaikan secara langsung kepada Wakil Sah Para Pihak dalam SSKK (Syarat – Syarat Khusus Kontrak), atau jika disampaikan melalui surat tercatat dan/atau faksimili ditujukan ke alamat yang tercantum dalam SSKK (Syarat – Syarat Khusus Kontrak).
4.2. All notices, requests or approvals under this Contract must be made in writing in Indonesian, and are deemed to have been notified if they have been submitted directly to the Authorized Representatives of the Parties in the Contract Special Terms, or if they are delivered by registered mail and / or facsimile is addressed to the address listed in the Special Conditions for Contracts.

5. Wakil Sah Para Pihak.
5. Legitimate Representatives of the Parties.

5.1. Setiap tindakan yang disyaratkan atau diperbolehkan untuk dilakukan, dan setiap dokumen yang disyaratkan atau diperbolehkan untuk dibuat berdasarkan Kontrak ini oleh PPK (Pejabat Pembuat Komitmen) atau Penyedia hanya dapat dilakukan atau dibuat oleh Wakil Sah Para Pihak atau pejabat yang disebutkan dalam SSKK (Syarat – Syarat Khusus Kontrak).
5.1. Every action that is required or allowed to be carried out, and every document required or permitted to be made based on this Contract by The Commitment Making Officer or Provider can only be done or made by a Legitimate Representative of the Parties or officials mentioned in the Contract Specific Terms.

5.2. Kewenangan Wakil Sah Para Pihak diatur dalam Surat Keputusan dari Para Pihak dan harus disampaikan kepada masing-masing pihak.
5.2. The Authorized Representative Authority of the Parties is regulated in a Decree of the Parties and must be submitted to each party.

5.3. Direksi Lapangan yang ditunjuk menjadi Wakil Sah PPK (Pejabat Pembuat Komitmen) memiliki tugas :
a. melaksanakan pendelegasian sesuai dengan pelimpahan dari PPK (Pejabat Pembuat Komitmen);
b. mengelola administrasi kontrak; dan
c. mengendalikan pelaksanaan pekerjaan.
5.3. Field Directors appointed as Legitimate Representatives of The Commitment Making Officers have the task:
a. carry out delegation in accordance with the delegation from The Commitment Making Officer;
b. manage contract administration; and
c. controlling the execution of work.

6. Larangan Korupsi, Kolusi dan Nepotisme (KKN), Penyalahgunaan Wewenang serta Penipuan.
6. Prohibition of Corruption, Collusion and Nepotism, Abuse of Authority and Fraud.

6.1. Berdasarkan etika pengadaan barang/jasa pemerintah, para pihak dilarang untuk :
a. menawarkan, menerima atau menjanjikan untuk memberi atau menerima hadiah atau imbalan berupa apa saja atau melakukan tindakan lainnya untuk mempengaruhi siapapun yang diketahui atau patut dapat diduga berkaitan dengan pengadaan ini;
b. mendorong terjadinya persaingan tidak sehat; dan/atau
c. membuat dan/atau menyampaikan secara tidak benar dokumen dan/atau keterangan lain yang disyaratkan untuk penyusunan dan pelaksanaan Kontrak ini.
6.1. Based on the ethics of government goods / services procurement, the parties are prohibited from:
a. offer, accept or promise to give or receive gifts or rewards in the form of anything or take other actions to influence anyone who is known or deserves to be suspected of relating to this procurement;
b. encourage the occurrence of unfair competition; and / or
c. make and / or incorrectly submit documents and / or other information required for the preparation and implementation of this Contract.

6.2. Penyedia menjamin bahwa yang bersangkutan termasuk semua anggota KSO (Kerja Sama Operasi) [apabila berbentuk KSO (Kerja Sama Operasi))] dan subpenyedianya (jika ada) tidak pernah dan tidak akan melakukan tindakan yang dilarang pada pasal 6.1 di atas.
6.2. The Provider guarantees that the person concerned, including all members of Operational Cooperation [if in the form of Joint Operation] and its sub-providers (if any) have never and will not take any prohibited actions in article 6.1 above.

6.3. Penyedia yang menurut penilaian PPK (Pejabat Pembuat Komitmen) terbukti melakukan larangan-larangan di atas dapat dikenakan sanksi-sanksi administratif oleh PPK (Pejabat Pembuat Komitmen)  sebagai berikut:
6.3. Providers who according to the assessment of The Commitment Making Officials are proven to have carried out the above prohibitions, can be subject to administrative sanctions by the Commitment Making Official as follows:

a. pemutusan Kontrak;
a. termination of the Contract;

b. Jaminan Pelaksanaan dicairkan dan disetorkan sebagaimana ditetapkan dalam SSKK (Syarat-Syarat Khusus Kontrak);
b. The Implementation Guarantee is disbursed and deposited as stipulated in the SCC (Special Conditions of Contract);

c. sisa uang muka harus dilunasi oleh Penyedia atau Jaminan Uang Muka dicairkan dan disetorkan sebagaimana ditetapkan dalam SSKK (Syarat-Syarat Khusus Kontrak); dan
c. the remaining down payment must be repaid by the Provider or the Advance Payment Guarantee is disbursed and deposited as stipulated in the SCC (Special Conditions of Contract); and

d. pengenaan Sanksi Daftar Hitam.
d. Imposition of Blacklist Sanctions.

[catatan: pengenaan Sanksi Daftar Hitam ditetapkan oleh PA/KPA (Pengguna Anggaran / Kuasa Pengguna Anggaran) atas usulan PPK (Pejabat Pembuat Komitmen). PA/KPA (Pengguna Anggaran / Kuasa Pengguna Anggaran) menyampaikan dokumen penetapan Sanksi Daftar Hitam kepada:
1) Penyedia yang dikenakan Sanksi Daftar Hitam; dan
2) unit kerja yang melaksanakan fungsi layanan pengadaan secara
elektronik, untuk ditayangkan dalam Daftar Hitam Nasional]
[note: the imposition of Black List Sanctions is determined by The Budget Users / The Budget User Proxies on the proposal of The Commitment Making Officials. The Budget Users / The Budget User Proxies submit Blacklist Sanction determination documents to:
1) Providers subject to Blacklist Sanctions; and
2) work units that carry out the function of procurement services in an electronics manner, for display on the National Black List]

6.4. Pengenaan sanksi administratif di atas dilaporkan oleh PPK (Pejabat Pembuat Komitmen) kepada PA/KPA (Pengguna Anggaran / Kuasa Pengguna Anggaran).
6.4. The imposition of administrative sanctions above is reported by The Commitment Making Officials to The Budget Users / The Budget User Proxies.

6.5. PPK (Pejabat Pembuat Komitmen) yang terlibat dalam KKN (Korupsi, Kolusi, dan Nepotisme) dan penipuan dikenakan sanksi berdasarkan ketentuan peraturan perundang-undangan.
6.5. The Commitment Making Officials involved in Corruption, Collusion and Nepotism and fraud are subject to sanctions based on statutory provisions.

7. Asal Material/Bahan.
7. Origin of Material.

7.1. Penyedia harus menyampaikan asal material/bahan yang terdiri dari rincian komponen dalam negeri dan komponen impor.
7.2. Asal material/bahan merupakan tempat material/bahan diperoleh, antara lain tempat material/bahan ditambang, tumbuh, atau diproduksi.
7.1. The Provider must submit the origin of material consisting of details of domestic components and imported components.
7.2. Origin of material is a place for material to be obtained, among others, the material is mined, grown, or produced.

8. Pembukuan.
8. Bookkeeping.

Penyedia diharapkan untuk melakukan pencatatan keuangan yang akurat dan sistematis sehubungan dengan pelaksanaan pekerjaan ini berdasarkan standar akuntansi yang berlaku.
Providers are expected to carry out accurate and systematic financial records in connection with the implementation of this work based on applicable accounting standards.

9. Perpajakan.
9. Taxation.

Penyedia, Subpenyedia (jika ada), dan Tenaga Kerja Konstruksi yang bersangkutan berkewajiban untuk membayar semua pajak, bea, retribusi, dan pungutan lain yang dibebankan oleh peraturan perpajakan atas pelaksanaan Kontrak ini. Semua pengeluaran perpajakan ini dianggap telah termasuk dalam Harga Kontrak.
The Provider, Sub-Provider (if any), and the Construction Worker concerned are obliged to pay all taxes, duties, levies, and other levies imposed by the tax regulations on the implementation of this Contract. All taxation expenses are considered to be included in the Contract Price.

10. Pengalihan Seluruh Kontrak.
10. Transfer of All Contracts.

10.1. Pengalihan seluruh Kontrak hanya diperbolehkan dalam hal pergantian nama Penyedia, baik sebagai akibat peleburan (merger) maupun akibat lainnya.
10.2. Jika ketentuan di atas dilanggar maka Kontrak diputuskan sepihak oleh PPK (Pejabat Pembuat Komitmen) dan Penyedia dikenakan sanksi sebagaimana diatur dalam pasal 41.2.
10.1. The transfer of all Contracts is only permitted in the case of changing the name of the Provider, both as a result of mergers and other consequences.
10.2. If the above provisions are violated, the Contract is decided unilaterally by the Commitment Making Officer and the Provider is subject to sanctions as stipulated in article 41.2.

11. Pengabaian.
11. Neglect.

Jika terjadi pengabaian oleh satu pihak terhadap pelanggaran ketentuan tertentu Kontrak oleh pihak yang lain maka pengabaian tersebut tidak menjadi pengabaian yang terus-menerus selama Masa Kontrak atau seketika menjadi pengabaian terhadap pelanggaran ketentuan yang lain. Pengabaian hanya dapat mengikat jika dapat dibuktikan secara tertulis dan ditandatangani oleh Wakil Sah Pihak yang melakukan pengabaian.
If there is a negligence by one party against the violation of certain provisions of the Contract by another party, the waiver does not become a continuous neglect during the Contract Period or immediately becomes a waiver of violations of other provisions. Abandonment can only be binding if it can be proven in writing and signed by the Legitimate Representative of the Party who made the waiver.

12. Penyedia Mandiri.
12. Independent Providers.

Penyedia berdasarkan Kontrak ini bertanggung jawab penuh terhadap Tenaga Kerja Konstruksi dan subpenyedianya (jika ada) serta pekerjaan yang dilakukan oleh mereka.
The Provider under this Contract is fully responsible for the Construction Workers and their sub provider (if any) and the work carried out by them.

13. KSO (Kerja Sama Operasi).
13. Operational Cooperation.

KSO (Kerja Sama Operasi) memberi kuasa kepada salah satu anggota yang disebut dalam Surat Perjanjian untuk bertindak atas nama KSO (Kerja Sama Operasi) dalam pelaksanaan hak dan kewajiban terhadap PPK (Pejabat Pembuat Komitmen) berdasarkan Kontrak ini.
Operational Cooperation authorizes one of the members referred to in the Agreement to act on behalf of the Operational Cooperation in the exercise of the rights and obligations of the Commitment Making Official under this Contract.

14. Pengawasan Pelaksanaan Pekerjaan.
14. Supervision of Work Implementation.

14.1. PPK (Pejabat Pembuat Komitmen) menetapkan Pengawas Pekerjaan (Direksi Teknis) untuk melakukan pengawasan pelaksanaan pekerjaan sesuai Kontrak ini. Pengawas Pekerjaan dapat berasal dari personel PPK (Pejabat Pembuat Komitmen) atau Penyedia Jasa Pengawasan (Konsultan Pengawas).
14.1. The Commitment Making Officer determines the Work Supervisor (Technical Directors) to supervise the implementation of work in accordance with this Contract. Job Supervisors can come from personnel of The Commitment Making Officers or Supervision Service Providers (Supervision Consultants).

14.2. Dalam melaksanakan kewajibannya, Pengawas Pekerjaan bertindak profesional. Jika tercantum dalam SSKK (Syarat-Syarat Khusus Kontrak), Pengawas Pekerjaan yang berasal dari Personel PPK (Pejabat Pembuat Komitmen) dapat bertindak sebagai Wakil Sah PPK (Pejabat Pembuat Komitmen).
14.2. In carrying out its obligations, the Work Supervisor acts professionally. If listed in the CST (Contract Specific Terms), the Work Supervisor from the Personnel of The Commitment Making Officer can act as the Legitimate Representative of The Commitment Making Officer.

15. Tugas dan Wewenang Pengawas Pekerjaan.
15. Job Supervisor's Duties and Authorities.

15.1. Semua gambar dan rencana kerja yang digunakan dalam pelaksanaan pekerjaan sesuai Kontrak, untuk pekerjaan permanen maupun pekerjaan sementara mendapatkan persetujuan dari Pengawas Pekerjaan.
15.1. All drawings and work plans used in carrying out work in accordance with the Contract, for permanent work or temporary work get approval from the Work Supervisor.

15.2. Jika dalam pelaksanaan pekerjaan ini diperlukan terlebih dahulu ada pekerjaan sementara yang tidak tercantum dalam Daftar Kuantitas dan Harga di dalam Kontrak maka Penyedia berkewajiban untuk menyerahkan spesifikasi dan gambar usulan pekerjaan sementara tersebut untuk mendapatkan pernyataan tidak berkeberatan
(no objection) untuk dilaksanakan dari Pengawas Pekerjaan. Pernyataan tidak berkeberatan atas rencana pekerjaan sementara ini tidak melepaskan Penyedia dari tanggung jawabnya sesuai Kontrak.
15.2. If in the execution of this work needed first there is a temporary job that is not listed in the Quantity and Price List in the Contract, the Provider is obliged to submit the specifications and drawings of the temporary work proposal to obtain a no objection to be carried out from the Works Supervisor. The statement does not object to this temporary work plan does not release the Provider from his responsibilities in accordance with the Contract.

15.3. Pengawas Pekerjaan melaksanakan tugas dan wewenang paling sedikit meliputi:
15.3. The Occupation Supervisor carries out at least the duties and authorities that include:

a. mengevaluasi dan menyetujui rencana mutu pekerjaan konstruksi Penyedia Jasa pelaksana konstruksi;
b. memberikan ijin dimulainya setiap tahapan pekerjaan;
c. memeriksa dan menyetujui kemajuan pelaksanaan Pekerjaan Konstruksi sesuai dengan ketentuan dalam Kontrak;
d. memeriksa dan menilai mutu dan keselamatan konstruksi terhadap hasil akhir pekerjaan;
e. menghentikan setiap pekerjaan yang tidak memenuhi persyaratan;
f. bertanggungjawab terhadap hasil pelaksanaan Pekerjaan Konstruksi sesuai tugas dan tanggungjawabnya;
g. memberikan laporan secara periodik kepada PPK (Pejabat Pembuat Komitmen) sesuai dengan ketentuan dalam Kontrak.
a. evaluating and approving the quality plan for construction work of Construction service providers;
b. give permission to start each stage of work;
c. check and approve the progress of the implementation of the Construction Work in accordance with the provisions in the Contract;
d. examine and assess the quality and safety of construction against the final results of work;
e. stop any work that does not meet the requirements;
f. responsible for the results of the implementation of Construction Works according to their duties and responsibilities;
g. provide periodic reports to The Commitment Making Officials) in accordance with the provisions in the Contract.

15.4. Penyedia berkewajiban untuk melaksanakan perintah Pengawas Pekerjaan yang sesuai dengan kewenangan Pengawas Pekerjaan dalam Kontrak ini.
15.4. The Provider is obliged to carry out the Work Inspector's orders in accordance with the Supervisory Authority of the Work in this Contract.

16. Penemuan-penemuan.
16. discoveries.

Penyedia wajib memberitahukan kepada PPK (Pejabat Pembuat Komitmen) dan kepada pihak yang berwenang semua penemuan benda/barang yang mempunyai nilai sejarah atau penemuan kekayaan di lokasi pekerjaan yang menurut peraturan perundang-undangan dikuasai oleh negara.
Providers must notify The Commitment Making Officials and to the competent authorities all inventions of objects / goods that have historical value or the discovery of wealth in work locations which according to the laws and regulations are controlled by the state.

17. Akses ke Lokasi Kerja.
17. Access to Work Locations.

17.1. Penyedia berkewajiban untuk menjamin akses PPK (Pejabat Pembuat Komitmen), Wakil Sah PPK (Pejabat Pembuat Komitmen), Pengawas Pekerjaan dan/atau pihak yang mendapat izin dari PPK (Pejabat Pembuat Komitmen) ke lokasi kerja dan lokasi lainnya dimana pekerjaan ini sedang atau akan dilaksanakan.
17.1. The Provider is obliged to guarantee access to The Commitment Making Officer, Legitimate Representative of The Commitment Making Officer, Occupation Supervisor and / or party who gets permission from The Commitment Making Officer to the work location and other locations where this work is being or will be carried out.

17.2. Penyedia harus dianggap telah menerima kelayakan dan ketersediaan jalur akses menuju lapangan. Penyedia harus berupaya menjaga setiap jalan atau jembatan dari kerusakan akibat penggunaan / lalu lintas Penyedia atau akibat personel Penyedia. Kecuali ditentukan lain maka:
a. Penyedia harus bertanggung jawab atas pemeliharaan yang mungkin diperlukan akibat penggunaan jalur akses;
b. Penyedia harus menyediakan rambu atau petunjuk sepanjang jalur akses, dan mendapatkan perizinan yang mungkin disyaratkan oleh otoritas terkait untuk penggunaan jalur, rambu, dan petunjuk;
c. biaya karena ketidaklayakan atau tidak tersedianya jalur akses untuk digunakan oleh Penyedia, harus ditanggung Penyedia; dan
d. PPK (Pejabat Pembuat Komitmen) tidak bertanggung jawab atas klaim yang mungkin timbul akibat penggunaan jalur akses.
17.2. Providers must be deemed to have accepted the feasibility and availability of access points to the field. Providers must endeavor to safeguard every road or bridge from damage due to Provider use / traffic or due to Provider personnel. Unless otherwise specified:
a. Providers must be responsible for maintenance that may be needed due to the use of access points;
b. Providers must provide signs or instructions along the access point, and obtain permits that may be required by the relevant authorities to use lanes, signs and instructions;
c. costs due to the inability or unavailability of access points to be used by the Provider must be borne by the Provider; and
d. The Commitment Making Official is not responsible for claims that may arise due to the use of access points.

17.3. PPK (Pejabat Pembuat Komitmen) tidak bertanggung jawab atas klaim yang mungkin timbul selain penggunaan jalur akses tersebut.
17.3. The Commitment Making Official is not responsible for claims that may arise other than the use of the access point.


Sabtu, 30 April 2033 Materi Kuliah Umum - e-teleconference, "Eksistensi Biro Pemenuhan Kebutuhan Papan, Divisi Program Pro Rakyat MPRT YMR (Majelis Pimpinan Rukun Tetangga Yayasan Mandailing Raya) di seluruh dunia yang dikonsentrasitaktiskan di Kabupaten Mandailing Natal" yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 0279/Maret/2033.
Saturday, April 30th, 2033 Public Lecture material - e-teleconference “Existence of The Bureau of Accomplishment for House Needs, The Division of Program for Pro People of The Neighborhood Leadership Assembly of The Great  Mandailing Foundation on worldwide who concerned and tacticed in Mandailing Natal" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 0279/March/2033.

Personil Biro Pemenuhan Kebutuhan Papan, Divisi Program Pro Rakyat MPRT YMR (Majelis Pimpinan Rukun Tetangga Yayasan Mandailing Raya) untuk merekomendasikan kepada Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Lingkungan (FTSL); Jurusan Hukum Administrasi Negara, Jurusan Hukum Masyarakat dan Pembangunan, Jurusan Hukum Bisnis, Jurusan Hukum Ekonomi, Jurusan Hukum Perdagangan Internasional dan Jurusan Hukum Keuangan Negara, Fakultas Hukum; Jurusan Pendidikan Teknik dan Kejuruan (JPTK), Jurusan Pendidikan Ekonomi dan Jurusan Pendidikan Teknik Bangunan (PTB), Fakultas Keguruan dan Ilmu Pendidikan; Manajemen dan Kebijakan Publik (Ilmu Administrasi Negara) dan Ilmu Administrasi Publik, Fakultas ISIPOL (Ilmu Sosial & Ilmu Politik); Mu’amalah (Hukum Bisnis Islam), Keuangan Islam dan HES (Hukum Ekonomi Syari’ah), Fakultas Syariah; Jurusan Teknik Sipil dan Lingkungan, Fakultas Teknologi Pertanian (FATETA); Jurusan Ekonomi dan Studi Pembangunan dan Jurusan Ekonomi Sumberdaya dan Lingkungan, Fakultas Ekonomi dan Manajemen; Jurusan Perencananaan dan Kebijakan Publik dan Jurusan Bisnis Islam, FE (Fakultas Ekonomi); The Department of Urban Studies + Planning, School of Architecture  and Planning (SA+P); Civil and Environmental Engineering, School of  Engineering;  BA (Master of Administration) Program, Agussalim  Management; Jurusan Perencanaan Wilayah dan Kota, Sekolah Arsitektur, Perencanaan, dan Pengembangan Kebijakan (SAPPK); dan Jurusan Manajemen dan Jurusan Kewirausahaan, Sekolah Bisnis dan Manajemen (SBM) UM (Universitas Mandailing) untuk memutakhirkan dengan memahami Surat Edaran Nomor 10/SE/M/2018 tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi Dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu Lampiran III Surat Edaran Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 10 / SE / M / 2018 tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu
Personnel of The Bureau of Accomplishment for House Needs, The Division of Program for Pro People of The Neighborhood Leadership Assembly of The Great  Mandailing Foundation to recomend to The Department of Civil Engineering, The Faculty of Civil and Environmental Engineering; The Department of State Administrative Law, The Department of Law of Public and Development, The Department of Business Law, The Department of Economic Law, The Department of International Trade Law and The Department of State Financial Law, The Faculty of Law; The Department of Engineering and Vocational Education, The Department of Economic Education and The Department of Building Engineering Education, The Faculty of Teacher Training and Education Science; Management and Public Policy (State Administration Science) and Public Administration Science, The Faculty of Social Sciences & Political Sciences; Mu'amalah (Islamic Business Law), Islamic Finance and Syari'ah Economic Law, The Faculty of Sharia; The Department of Civil and Environmental Engineering, The Faculty of Agricultural Technology; The Department of Economics and Development Studies and The Department of Resource and Environmental Economics, The Faculty of Economics and Management; The Department of Planning and Public Policy and The Department of Islamic Business, The Faculty of Economics; The Department of Urban Studies + Planning, School of Architecture and Planning (SA+P); Civil and Environmental Engineering, School of  Engineering; MBA (Master of Business Administration) Program, Agussalim  Management; The  Department of Regional and City Planning, The School of Architecture, Planning, and Policy Development; and The Department of Management and Department of Entrepreneurship, The School of Business and Management of MU (Mandailing University) to update by understanding The Circular Letter Number 10 / SE / M / 2018 concerning Enforcement of Standard of Selection Documents for the Procurement of Construction Services in the Context of Early Auction in the Ministry of Public Works and Public Housing for Budget Year 2019 namely is Annex III of The Circular Letter Number 10 / SE / M / 2018 concerning Enforcement of Standard of Selection Documents for the Procurement of Construction Services in the Context of Early Auction in the Ministry of Public Works and Public Housing for Budget Year 2019 namely

II. SYARAT-SYARAT UMUM KONTRAK.
II. GENERAL TERMS OF CONTRACT.

SYARAT-SYARAT UMUM KONTRAK.
GENERAL TERMS OF CONTRACT.


B. PELAKSANAAN, PENYELESAIAN, ADENDUM DAN PEMUTUSAN KONTRAK.
B. IMPLEMENTATION, COMPLETION, ADDENDUM AND DECISION OF THE CONTRACT.

18. Masa Pelaksanaan Kontrak.
18. Period of Contract Implementation.

Kontrak ini berlaku efektif sejak penandatanganan Surat Perjanjian oleh Para Pihak sampai dengan Tanggal Penyerahan Akhir Pekerjaan dan hak dan kewajiban Para Pihak yang terdapat dalam Kontrak sudah terpenuhi.
This contract is effective from the signing of the Agreement by the Parties up to the Final Job Delivery Date and the rights and obligations of the Parties contained in the Contract have been fulfilled.

B.1. Pelaksanaan Pekerjaan.
B.1. Work implementation.

19. Penyerahan Lokasi Kerja.
19. Submission of Job Location.

19.1. Sebelum penyerahan lokasi kerja dilakukan peninjauan lapangan bersama para pihak.
19.1. Before the submission of the work location, a field survey was conducted with the parties.

19.2. PPK (Pejabat Pembuat Komitmen) berkewajiban untuk menyerahkan lokasi kerja sesuai dengan kebutuhan Penyedia yang tercantum dalam rencana kerja yang telah disepakati oleh para pihak dalam Rapat Persiapan Penandatanganan Kontrak, untuk melaksanakan pekerjaan tanpa ada hambatan kepada Penyedia sebelum SPMK (Surat Perintah Mulai Kerja) diterbitkan.
19.2. The Commitment Making Officer is obliged to submit the work location in accordance with the Provider's requirements stated in the work plan agreed upon by the parties in the Preparation Meeting for Signing Contract, to carry out work without any obstacles to the Provider before the Letter of Work Start Order is issued.

19.3. Hasil peninjauan dan penyerahan dituangkan dalam Berita Acara Penyerahan Lokasi Kerja.
19.3. The results of the review and submission are set forth in the Minutes of Submission of Work Locations.

19.4. Jika dalam peninjauan lapangan bersama ditemukan hal-hal yang dapat mengakibatkan perubahan isi Kontrak maka perubahan tersebut harus dituangkan dalam adendum Kontrak.
19.4. If in a joint field review found things that can result in changes to the contents of the Contract, the change must be stated in the addendum to the Contract.

19.5. Jika PPK (Pejabat Pembuat Komitmen) tidak dapat menyerahkan lokasi kerja sesuai kebutuhan Penyedia yang tercantum dalam rencana kerja (sesuai pasal 19.2) untuk melaksanakan pekerjaan dan terbukti merupakan suatu hambatan, maka kondisi ini ditetapkan sebagai Peristiwa Kompensasi.
19.5. If the Commitment Making Officer cannot submit the work location according to the Provider's requirements stated in the work plan (according to article 19.2) to carry out the work and proves to be an obstacle, then this condition is determined as a Compensation Event.

20. Surat Perintah Mulai Kerja (SPMK).
20. The Letter of Order to Start Work.

20.1. PPK (Pejabat Pembuat Komitmen) menerbitkan Surat Perintah Mulai Kerja (SPMK) paling lambat 14 (empat belas) hari kerja sejak tanggal penandatanganan Kontrak atau 14 (empat belas) hari kerja sejak penyerahan lokasi kerja pertama kali.
20.1. The Commitment Making Officer issues The Letter of Order to Start Work no later than 14 (fourteen) working days from the signing date of the Contract or 14 (fourteen) working days after the first job location is submitted.

20.2. Dalam Surat Perintah Mulai Kerja (SPMK) dicantumkan seluruh lingkup pekerjaan dan Tanggal Mulai Kerja.
20.2. In The Letter of Order to Start Work it is stated the entire scope of work and the Date of Starting Work.

21. Rencana Mutu Pekerjaan Konstruksi (RMPK).
21. Quality Plan for Construction Work.

21.1. Penyedia berkewajiban untuk mempresentasikan dan menyerahkan Rencana Mutu Pekerjaan Konstruksi (RMPK) sebagai penjaminan dan pengendalian mutu pelaksanaan pekerjaan pada rapat persiapan pelaksanaan Kontrak, kemudian dibahas dan disetujui oleh PPK (Pejabat Pembuat Komitmen).
21.1. The Provider is obliged to present and submit the Construction Work Quality Plan as a guarantee and quality control of the implementation of work at the preparation meeting for the Contract, then discussed and approved by the Commitment Making Officer.

21.2. Rencana Mutu Pekerjaan Konstruksi (RMPK) disusun paling sedikit berisi:
a. Rencana Pelaksanaan Pekerjaan (Method Statement );
b. Rencana Pemeriksaan dan Pengujian / Inspection and Test Plan (ITP);
c. Pengendalian Subpenyedia dan Pemasok.
21.2. The Construction Work Quality Plan is composed of at least containing:
a. Job Implementation Plan (Method Statement);
b. Inspection and Test Plan (ITP);
c. Sub-provider and Supplier Control.

21.3. Penyedia wajib menerapkan dan mengendalikan pelaksanaan Rencana Mutu Pekerjaan Konstruksi (RMPK) secara konsisten untuk mencapai mutu yang dipersyaratkan pada pelaksanaan pekerjaan ini.
21.3. Providers must implement and control the implementation of the Construction Work Quality Plan consistently in order to achieve the quality required for the implementation of this work.

21.4. Rencana Mutu Pekerjaan Konstruksi (RMPK) dapat direvisi sesuai dengan kondisi pekerjaan.
21.4. The Construction Work Quality Plan can be revised according to work conditions.

21.5. Penyedia berkewajiban untuk memutakhirkan Rencana Mutu Pekerjaan Konstruksi (RMPK) jika terjadi Adendum Kontrak dan/atau Peristiwa Kompensasi.
21.5. The Provider is obliged to update the Construction Work Quality Plan if there is a Contract Addendum and / or Compensation Event.

21.6. Pemutakhiran Rencana Mutu Pekerjaan Konstruksi (RMPK) harus menunjukkan perkembangan kemajuan setiap pekerjaan dan dampaknya terhadap penjadwalan sisa pekerjaan, termasuk perubahan terhadap urutan pekerjaan. Pemutakhiran Rencana Mutu Pekerjaan Konstruksi (RMPK) harus mendapatkan persetujuan PPK (Pejabat Pembuat Komitmen).
21.6. Updating the Construction Work Quality Plan must indicate the progress of each work's progress and its impact on scheduling the rest of the work, including changes to the order of work. Updating the Construction Work Quality Plan must get the approval from The Commitment Making Officer.

21.7. Persetujuan PPK (Pejabat Pembuat Komitmen) terhadap Rencana Mutu Pekerjaan Konstruksi (RMPK) tidak mengubah kewajiban kontraktual Penyedia.
21.7. The approval from The Commitment Making Officer of the Construction Work Quality Plan does not change the contractual obligations of the Provider.

22. Rencana Keselamatan Konstruksi (RKK).
22. Construction Safety Plan.

22.1. Penyedia berkewajiban untuk mempresentasikan dan menyerahkan Rencana Keselamatan Konstruksi (RKK) pada saat rapat persiapan pelaksanaan Kontrak, kemudian pelaksanaan Rencana Keselamatan Konstruksi (RKK) dibahas dan disetujui oleh PPK (Pejabat Pembuat Komitmen).
22.1. The Provider is obliged to present and submit the Construction Safety Plan during the preparation meeting for the Contract implementation, then the implementation of the Construction Safety Plan is discussed and approved by the Commitment Making Officer.

22.2. Para Pihak wajib menerapkan dan mengendalikan pelaksanaan Rencana Keselamatan Konstruksi (RKK) secara konsisten.
22.2. The Parties must implement and control the implementation of the Construction Safety Plan consistently.

22.3. Rencana Keselamatan Konstruksi (RKK) menjadi bagian dari Dokumen Kontrak.
22.3. The Construction Safety Plan is part of the Contract Document.

22.4. Penyedia berkewajiban untuk memutakhirkan Rencana Keselamatan Konstruksi (RKK) sesuai dengan kondisi pekerjaan, jika terjadi perubahan maka dituangkan dalam adendum Kontrak.
22.4. The Provider is obliged to update the Construction Safety Plan in accordance with the conditions of work, if a change occurs then it is stated in the Contract addendum.

22.5. Pemutakhiran Rencana Keselamatan Konstruksi (RKK) harus mendapat persetujuan PPK (Pejabat Pembuat Komitmen).
22.5. Updating the Construction Safety Plan must be approved by the Commitment Making Officer.

22.6. Persetujuan PPK (Pejabat Pembuat Komitmen) terhadap pelaksanaan Rencana Keselamatan Konstruksi (RKK) tidak mengubah kewajiban kontraktual Penyedia.
22.6. The agreement of The Commitment Making Officer on the implementation of the Construction Safety Plan does not change the contractual obligations of the Provider.

23. Rapat Persiapan Pelaksanaan Kontrak.
23. Preparatory Meeting for Contract Implementation.

23.1. Paling lambat 7 (tujuh) hari kalender sejak diterbitkannya SPMK (Surat Perintah Mulai Kerja) dan sebelum pelaksanaan pekerjaan, PPK (Pejabat Pembuat Komitmen) bersama dengan Penyedia, unsur perancangan, dan unsur pengawasan, harus sudah menyelenggarakan rapat persiapan pelaksanaan kontrak.
23.1. At the latest 7 (seven) calendar days from the issuance of the The Letter of Order to Commence Work and prior to the execution of work, The Commitment Making Officials together with the Provider, elements of design, and elements of supervision, must have a preparatory meeting for contract implementation.

23.2. Beberapa hal yang dibahas dan disepakati dalam rapat persiapan pelaksanaan kontrak meliputi:
a. Rencana Mutu Pekerjaan Konstruksi (RMPK);
b. pelaksanaan Rencana Keselamatan Konstruksi (RKK);
c. organisasi kerja;
d. tata cara pengaturan pelaksanaan pekerjaan;
e. jadwal pelaksanaan pekerjaan, yang diikuti uraian tentang metode kerja yang memperhatikan Keselamatan dan Kesehatan Kerja;
f. jadwal pengadaan bahan/material, mobilisasi peralatan dan Tenaga Kerja Konstruksi;
g. penyusunan rencana pengukuran/pemeriksaan bersama; dan
h. hal-hal lain yang dianggap perlu.
23.2. Some of the things discussed and agreed upon in the preparation for the contract implementation include:
a. Construction Work Quality Plan;
b. implementation of the Construction Safety Plan;
c. work organization;
d. the procedures for regulating work;
e. work schedule, which is followed by a description of work methods that pay attention to Occupational Safety and Health;
f. schedule for material procurement, equipment mobilization and construction workforce;
g. preparation of joint measurement / inspection plans; and
h. other things deemed necessary.

23.3. Hasil rapat persiapan pelaksanaan Kontrak dituangkan dalam Berita Acara Rapat Persiapan Pelaksanaan Kontrak.
23.3. The results of the preparatory meeting for the implementation of the Contract are set forth in the Minutes of the Preparation Meeting of Contract Implementation.

24. Mobilisasi.
24. Mobilization.

24.1. Mobilisasi paling lambat harus sudah mulai dilaksanakan dalam waktu 30 (tiga puluh) hari kalender sejak diterbitkan SPMK (Surat Perintah Mulai Kerja), atau sesuai kebutuhan dan rencana kerja.
24.1. Mobilization must be carried out at the latest within 30 (thirty) calendar days since the issuance of the Letter of Order of Commencement of Work, or according to needs and work plans.

24.2. Mobilisasi dilakukan sesuai dengan lingkup pekerjaan, yaitu :
a. mendatangkan peralatan-peralatan terkait yang diperlukan dalam pelaksanaan pekerjaan, termasuk instalasi alat;
b. mempersiapkan fasilitas seperti kantor, rumah, gedung laboratorium, bengkel, gudang, dan sebagainya; dan/atau
c. mendatangkan Tenaga Kerja Konstruksi.
24.2. Mobilization is carried out in accordance with the scope of work, namely:
a. bring in related equipment needed in carrying out work, including installation of tools;
b. prepare facilities such as offices, homes, laboratory buildings, workshops, warehouses, etc .; and / or
c. bring in Construction Workers.

24.3. Mobilisasi peralatan dan Tenaga Kerja Konstruksi dapat dilakukan secara bertahap sesuai dengan kebutuhan.
24.3. Equipment mobilization and construction workforce can be done in stages according to needs.

25. Pengukuran / Pemeriksaan Bersama.
25. Joint Measurement / Examination.

25.1. Pada tahap awal pelaksanaan Kontrak, PPK (Pejabat Pembuat Komitmen) dan Pengawas Pekerjaan bersama-sama dengan Penyedia melakukan pengukuran dan pemeriksaan detail terhadap kondisi lokasi pekerjaan untuk setiap keluaran (output), Tenaga Kerja Konstruksi, dan Peralatan Utama (Mutual Check 0%).
25.1. In the initial stage of the Contract implementation, the Commitment Making Officer and the Work Supervisor together with the Provider take a detailed measurement and inspection of the conditions of the work location for each output, Construction Workforce and Main Equipment (Mutual Check 0%).

25.2. Pada tahapan pengukuran/pemeriksaan bersama, PA/KPA (Pengguna Anggaran / Kuasa Pengguna Anggaran) telah membentuk Panitia Peneliti Pelaksanaan Kontrak.
25.2. At the stage of joint measurement / inspection, The Budget Users / The Budget User Proxies has formed a Contract Implementation Research Committee.

25.3. Hasil pemeriksaan bersama dituangkan dalam Berita Acara. Apabila dalam pengukuran/pemeriksaan bersama mengakibatkan perubahan isi Kontrak, maka harus dituangkan dalam adendum Kontrak.
25.3. The results of the joint examination are set forth in the Minutes. If the joint measurement / examination results in changes to the contents of the Contract, it must be stated in the Contract addendum.

25.4. Tenaga Kerja Konstruksi dan/atau Peralatan Utama yang sesuai dengan persyaratan Kontrak dapat segera dimobilisasi.
25.4. Main Construction and / or Equipment Workers that are in accordance with the requirements of the Contract can be mobilized immediately.

25.5. Tindak lanjut hasil pemeriksaan bersama Tenaga Kerja Konstruksi dan/atau Peralatan Utama mengikuti ketentuan pasal 65 dan 66.
25.5. Follow-up of the results of the inspection with the Main Construction and / or Equipment Workers follows the provisions of articles 65 and 66.

26. Penggunaan Produksi Dalam Negeri.
26. Use of Domestic Production.

26.1. Dalam pelaksanaan pekerjaan ini, Penyedia berkewajiban mengutamakan material/bahan produksi dalam negeri dan tenaga kerja Indonesia untuk pekerjaan yang dilaksanakan di Indonesia sesuai dengan yang disampaikan pada saat penawaran.
26.1. In carrying out this work, the Provider is obliged to prioritize domestic production materials and materials for Indonesian work carried out in Indonesia in accordance with those submitted at the time of bidding.

26.2. Dalam pelaksanaan Pekerjaan Konstruksi, bahan baku, Tenaga Kerja Konstruksi, dan perangkat lunak yang digunakan mengacu kepada dokumen:
a. formulir rekapitulasi perhitungan Tingkat Komponen Dalam Negeri (TKDN), untuk Penyedia yang mendapat preferensi harga; dan
b. daftar barang yang diimpor, untuk barang yang diimpor.
26.2. In the implementation of Construction Works, raw materials, Construction Workers, and software used refer to documents:
a. recapitulation form for calculation of Domestic Component Level, for Providers who get price preferences; and
b. list of imported goods, for imported goods.

26.3. Apabila dalam pelaksanaan pekerjaan ditemukan ketidaksesuaian dengan dokumen pada pasal 26.2, maka akan dikenakan sanksi sesuai peraturan perundangan yang berlaku.
26.3. If there is a discrepancy in the implementation of work with the document in article 26.2, then sanctions will be imposed according to the applicable laws and regulations.

B.2. Pengendalian Waktu.
B.2. Time Control.

27. Masa Pelaksanaan.
27. Implementation Period.

27.1. Kecuali Kontrak diputuskan lebih awal, Penyedia berkewajiban untuk memulai pelaksanaan pekerjaan pada Tanggal Mulai Kerja, dan melaksanakan pekerjaan sesuai dengan Rencana Mutu Pekerjaan Konstruksi (RMPK), serta menyelesaikan pekerjaan paling lambat selama Masa Pelaksanaan yang dinyatakan dalam SSKK (Syarat – Syarat Khusus Kontrak).
27.1. Unless the Contract is decided earlier, the Provider is obliged to commence work at the Commencement Date, and carry out work in accordance with the Construction Work Quality Plan, and complete the work no later than the Implementation Period stated in the Contract Specific Terms.

27.2. Apabila Penyedia berpendapat tidak dapat menyelesaikan pekerjaan sesuai Masa Pelaksanaan karena di luar pengendaliannya yang dapat dibuktikan demikian, dan Penyedia telah melaporkan kejadian tersebut kepada PPK (Pejabat Pembuat Komitmen), dengan disertai bukti-bukti yang dapat disetujui PPK (Pejabat Pembuat Komitmen), maka PPK (Pejabat Pembuat Komitmen) dapat memberlakukan Peristiwa Kompensasi dan melakukan penjadwalan kembali pelaksanaan tugas Penyedia dengan membuat adendum Kontrak.
27.2. If the Provider believes that he cannot complete the work in accordance with the Implementation Period because the control can be proven beyond this, and the Provider has reported the incident to The Commitment Making Officer, accompanied by evidence that can be approved by The Commitment Making Officer, then The Commitment Making Officials can enforce a Compensation Event and reschedule the execution of the Provider's duties by making a Contract addendum.

27.3. Jika pekerjaan tidak selesai sesuai Masa Pelaksanaan bukan akibat Keadaan Kahar atau Peristiwa Kompensasi atau karena kesalahan atau kelalaian Penyedia maka Penyedia dikenakan denda.
27.3. If the work is not completed according to the Period of Implementation not due to Force Majeure or Compensation Event or due to the mistake or negligence of the Provider, the Provider is subject to a fine.

27.4. Apabila diberlakukan serah terima sebagian pekerjaan (secara parsial), Masa Pelaksanaan dibuat berdasarkan bagian pekerjaan tersebut sesuai dengan SSKK (Syarat – Syarat Khusus Kontrak).
27.4. If handover of the work is applied in a partial (partially), the Implementation Period is based on the part of the work in accordance with the CST (Contract Specific Terms).

27.5. Bagian pekerjaan pada pasal 27.4 adalah bagian pekerjaan yang telah ditetapkan dalam Dokumen Pemilihan.
27.5. The portion of work in article 27.4 is part of the work specified in the Bidding Document.

28. Penundaan Oleh Pengawas Pekerjaan.
28. Procrastination by Occupational Supervisor.

Pegawas Pekerjaan dapat memerintahkan secara tertulis Penyedia untuk menunda pelaksanaan pekerjaan. Setiap perintah penundaan ini harus segera ditembuskan kepada PPK (Pejabat Pembuat Komitmen).
The Job Supervisor can order in writing the Provider to postpone the execution of the work. Each postponement order must be immediately sent to The Commitment Making Officer.

29. Rapat Pemantauan.
29. Monitoring Meeting.

29.1. Pengawas Pekerjaan atau Penyedia dapat menyelenggarakan rapat pemantauan, dan meminta satu sama lain untuk menghadiri rapat tersebut. Rapat pemantauan diselenggarakan untuk membahas perkembangan pekerjaan dan perencanaan atas sisa pekerjaan serta untuk menindaklanjuti peringatan dini.
29.1. The Work Supervisor or Provider can hold monitoring meetings, and ask each other to attend the meeting. Monitoring meetings are held to discuss work and planning developments for the rest of the work and to follow up on early warnings.

29.2. Hasil rapat pemantauan akan dituangkan oleh Pengawas Pekerjaan dalam berita acara rapat, dan rekamannya diserahkan kepada PPK (Pejabat Pembuat Komitmen) dan pihak-pihak yang menghadiri rapat.
29.2. The results of the monitoring meeting will be poured out by the Work Supervisor in the minutes of the meeting, and the records are submitted to The Commitment Making Officials and parties attending the meeting.

29.3. Mengenai hal-hal dalam rapat yang perlu diputuskan, Pengawas Pekerjaan dapat memutuskan baik dalam rapat atau setelah rapat melalui pernyataan tertulis kepada semua pihak yang menghadiri rapat.
29.3. Regarding matters in the meeting that need to be decided, the Work Supervisor can decide either in the meeting or after the meeting through a written statement to all parties attending the meeting.

30. Peringatan Dini.
30. Early Warning.

30.1. Penyedia berkewajiban untuk memperingatkan sedini mungkin Pengawas Pekerjaan atas peristiwa atau kondisi tertentu yang dapat mempengaruhi mutu pekerjaan, menaikkan Harga Kontrak atau menunda penyelesaian pekerjaan. Pengawas Pekerjaan dapat memerintahkan Penyedia untuk menyampaikan secara tertulis perkiraan dampak peristiwa atau kondisi tersebut di atas terhadap Harga Kontrak dan Masa Pelaksanaan. Pernyataan perkiraan ini harus sesegera mungkin disampaikan oleh Penyedia.
30.1. The Provider is obliged to warn the Occupation Supervisor as early as possible of the certain events or conditions that could affect the quality of work, increase the Contract Price or delay the completion of work. The Works Supervisor can instruct the Provider to deliver in writing the estimated of impact of the events or conditions mentioned above on the Contract Price and the Implementation Period. This approximate statement must be submitted as soon as possible by the Provider.

30.2. Penyedia berkewajiban untuk bekerja sama dengan Pengawas Pekerjaan untuk mencegah atau mengurangi dampak peristiwa atau kondisi tersebut.
30.2. The Provider is obliged to cooperate with the Work Supervisor to prevent or reduce the impact of such events or conditions.

B.3. Penyelesaian Kontrak.
B.3. Contract Completion.

31. Serah Terima Pekerjaan.
31. Job Handover.

31.1. Setelah pekerjaan selesai 100% (seratus perseratus), sesuai dengan ketentuan yang tertuang dalam Kontrak, Penyedia mengajukan permintaan secara tertulis kepada PPK (Pejabat Pembuat Komitmen) untuk serah terima pertama pekerjaan.
31.1. After the work is completed 100% (one hundred percent), in accordance with the provisions contained in the Contract, the Provider submits a request in writing to the Commitment Making Officer for the first handover of the work.

31.2. PPK (Pejabat Pembuat Komitmen) memerintahkan Pengawas Pekerjaan untuk melakukan pemeriksaan terhadap hasil pekerjaan.
31.2. The Commitment Making Officer instructs the Job Supervisor to carry out an examination of the work results.

31.3. Pemeriksaan dilakukan terhadap kesesuaian hasil pekerjaan terhadap kriteria/spesifikasi yang tercantum dalam Kontrak.
31.3. The inspection is carried out on the suitability of the results of the work against the criteria / specifications stated in the Contract.

31.4. Hasil pemeriksaan dari Pengawas Pekerjaan disampaikan kepada PPK (Pejabat Pembuat Komitmen), apabila dalam pemeriksaan hasil pekerjaan tidak sesuai dengan ketentuan yang tercantum dalam Kontrak dan/atau cacat hasil pekerjaan, PPK (Pejabat Pembuat Komitmen) memerintahkan Penyedia untuk memperbaiki dan/atau melengkapi kekurangan pekerjaan.
31.4. The inspection results from the Work Supervisor are submitted to The Commitment Making Officials, if in the inspection of work results are not in accordance with the provisions contained in the Contract and / or work defects, The Commitment Making Officer instructs the Provider to repair and / or complete work shortages.

31.5. Apabila dalam pemeriksaan hasil pekerjaan telah sesuai dengan ketentuan yang tercantum dalam Kontrak maka PPK (Pejabat Pembuat Komitmen) dan Penyedia menandatangani Berita Acara Serah Terima Pertama Pekerjaan.
31.5. If the inspection of the work results are in accordance with the provisions stated in the Contract, the Commitment Making Officer and the Provider sign the Official Report of the First Handover.

31.6. Pembayaran dilakukan sebesar 95% (sembilan puluh lima perseratus) dari Harga Kontrak, sedangkan yang 5% (lima perseratus) merupakan retensi selama masa pemeliharaan, atau pembayaran dilakukan sebesar 100% (seratus perseratus) dari Harga Kontrak dan Penyedia harus menyerahkan Jaminan Pemeliharaan sebesar 5% (lima perseratus) dari Harga Kontrak.
31.6. Payment is made at 95% (ninety-five percent) of the Contract Price, while the 5% (five percent) is retention during the maintenance period, or payment is made at 100% (one hundred percent) of the Contract Price and the Provider must submit a Maintenance Guarantee of 5 % (five percent) of the Contract Price.

31.7. Penyedia wajib memelihara hasil pekerjaan selama Masa Pemeliharaan sehingga kondisi tetap seperti pada saat penyerahan pertama pekerjaan.
31.7. The provider must maintain the work results during the Maintenance Period so that the conditions remain as they were during the first delivery of work.

31.8. Masa Pemeliharaan paling singkat untuk pekerjaan permanen selama 6 (enam) bulan, sedangkan untuk pekerjaan semi permanen selama 3 (tiga) bulan dan dapat melampaui Tahun Anggaran. Lamanya Masa Pemeliharaan ditetapkan dalam SSKK (Syarat-Syarat Khusus Kontrak).
31.8. The shortest maintenance period for permanent work for 6 (six) months, while for semi-permanent work for 3 (three) months and may exceed the Budget Year. The duration of the Maintenance Period is specified in the SCT (Special Contract Terms).

31.9. Setelah Masa Pemeliharaan berakhir, Penyedia mengajukan permintaan secara tertulis kepada PPK (Pejabat Pembuat Komitmen) untuk penyerahan akhir pekerjaan.
31.9. After the Maintenance Period ends, the Provider submits a request in writing to the Commitment Making Officer for the final submission of work.

31.10. Apabila dalam pemeriksaan hasil pekerjaan, Penyedia telah melaksanakan semua kewajibannya selama Masa Pemeliharaan dengan baik dan telah sesuai dengan ketentuan yang tercantum dalam Kontrak maka PPK (Pejabat Pembuat Komitmen) dan Penyedia menandatangani Berita Acara Serah Terima Akhir Pekerjaan.
31.10. If in the inspection of the results of work, the Provider has carried out all its obligations during the Maintenance Period properly and in accordance with the provisions stated in the Contract, the Commitment Making Officer and the Provider sign the Minutes of Handover of the End of Work.

31.11. PPK (Pejabat Pembuat Komitmen) wajib melakukan pembayaran sisa Harga Kontrak yang belum dibayar atau mengembalikan Jaminan Pemeliharaan.
31.11. The Commitment Making Officer is obliged to make a payment for the remaining Contract Price that has not been paid or return a Maintenance Guarantee.

31.12. Apabila Penyedia tidak melaksanakan kewajiban pemeliharaan sebagaimana mestinya, maka Kontrak dapat diputuskan sepihak oleh PPK (Pejabat Pembuat Komitmen) dan Penyedia dikenakan sanksi sebagaimana diatur dalam pasal 41.4.
31.12. If the Provider does not carry out maintenance obligations properly, the Contract can be decided unilaterally by the Commitment Making Officer and the Provider will be subject to sanctions as stipulated in article 41.4.

31.13. Setelah penandatanganan Berita Acara Serah Terima Akhir Pekerjaan, PPK (Pejabat Pembuat Komitmen) menyerahkan hasil pekerjaan kepada PA/KPA (Pengguna Anggaran / Kuasa Pengguna Anggaran).
31.13. After the signing of the Final Job Handover Minutes, The Commitment Making Official submits the work results to The Budget Users / The Budget User Proxies.

31.14. PA/KPA (Pengguna Anggaran / Kuasa Pengguna Anggaran) meminta PPHP (Panitia Pemeriksa Hasil Pekerjaan) untuk melakukan pemeriksaan administratif terhadap hasil pekerjaan yang diserahterimakan.
31.14. The Budget Users / The Budget User Proxies requests The Committee of Inspection of Work Result to conduct administrative checks on the results of handed over work.

31.15. PPHP (Panitia Pemeriksa Hasil Pekerjaan) melakukan pemeriksaan administratif proses pengadaan barang/jasa sejak perencanaan pengadaan sampai dengan serah terima hasil pekerjaan, meliputi dokumen program/penganggaran, surat penetapan PPK (Pejabat Pembuat Komitmen), dokumen perencanaan pengadaan, RUP/SIRUP (Rencana Umum Pengadaan / Sistem Rencana Umum Pengadaan), dokumen persiapan pengadaan, dokumen pemilihan Penyedia, dokumen Kontrak dan perubahannya serta pengendaliannya, dan dokumen serah terima hasil pekerjaan.
31.15. The Committee of Inspection of Work Result conducts administrative checks on the process of procurement of goods / services from procurement planning to handover of work results, including program / budgeting documents, letter of determination of The Commitment Making Officer, procurement planning documents, General Plan of Procurement / Procurement General Plan System, procurement preparation documents, Provider selection documents, Contract documents and their changes and controls, and handover documents for the results of work.

31.16. Apabila hasil pemeriksaan administrasi ditemukan ketidaksesuaian/kekurangan, PPHP (Panitia Pemeriksa Hasil Pekerjaan) melalui PA/KPA (Pengguna Anggaran / Kuasa Pengguna Anggaran) memerintahkan PPK (Pejabat Pembuat Komitmen) untuk memperbaiki dan/atau melengkapi kekurangan dokumen administratif.
31.16. If the results of the administrative examination find a discrepancy / deficiency, the Committee of Inspection of Work Results through The Budget Users / The Budget User Proxies instructs The Commitment Making Officials to correct and / or complete the lack of administrative documents.

31.17. Hasil pemeriksaan administratif dituangkan dalam Berita Acara.
31.17. The results of the administrative examination are set forth in the Minutes.

31.18. Serah terima pekerjaan dapat dilakukan perbagian pekerjaan (secara parsial) yang ketentuannya ditetapkan dalam SSKK (Syarat-Syarat Khusus Kontrak).
31.18. The job handover can be done in part (partially) where the conditions are specified in the CST (Contract Specific Terms).

31.19. Bagian pekerjaan yang dapat dilakukan serah terima pekerjaan sebagian atau secara parsial yaitu:
a. bagian pekerjaan yang tidak tergantung satu sama lain; dan
b. bagian pekerjaan yang fungsinya tidak terkait satu sama lain dalam pencapaian kinerja pekerjaan.
31.19. The part of work that can be done partially job handover is:
a. parts of work that are independent of each other; and
b. part of work whose function is not related to each other in achieving work performance.

31.20. Dalam hal dilakukan serah terima pekerjaan secara parsial, maka cara pembayaran, ketentuan denda dan kewajiban pemeliharaan tersebut di atas disesuaikan.
31.20. In the case of a partial job handover, the method of payment, the provisions of the fines and the above maintenance obligations are adjusted.

31.21. Kewajiban pemeliharaan diperhitungkan setelah serah terima pertama pekerjaan untuk bagian pekerjaan [PHO (Provisional Hand Over) parsial] tersebut dilaksanakan sampai Masa Pemeliharaan bagian pekerjaan tersebut berakhir sebagaimana yang tercantum dalam SSKK (Syarat – Syarat Khusus Kontrak).
31.21. Maintenance obligations are calculated after the first handover of the work for the part of the work [partial Provisional Hand Over] is carried out until the Maintenance Period for that part of the work ends as stated in the CST (Contract Specific Terms).

31.22. Serah terima pertama pekerjaan untuk bagian pekerjaan [PHO (Provisional Hand Over) parsial] dituangkan dalam Berita Acara.
31.22. The first handover of work for part of the work [partial PHO (Provisional Hand Over)] was stated in the Minutes.

32. Pengambilalihan PPK (Pejabat Pembuat Komitmen) akan mengambil alih lokasi dan hasil pekerjaan dalam jangka waktu tertentu setelah dikeluarkan surat keterangan selesai/pengakhiran pekerjaan.
32. Takeover of The Commitment Making Officer will take over the location and results of work within a certain period of time after the certificate of completion / termination of employment is issued.

33. Pedoman Pengoperasian dan Perawatan / Pemeliharaan.
33.1. Penyedia diwajibkan memberikan petunjuk kepada PPK (Pejabat Pembuat Komitmen) tentang pedoman pengoperasian dan perawatan/pemeliharaan sesuai dengan SSKK (Syarat-Syarat Khusus Kontrak).
33.2. Apabila Penyedia tidak memberikan pedoman pengoperasian dan perawatan/pemeliharaan, PPK (Pejabat Pembuat Komitmen) berhak menahan uang retensi atau Jaminan Pemeliharaan.
33. Guidelines of Operation and Treatment / Maintenance.
33.1. Providers are required to provide instructions to the Commitment Making Officials regarding guidelines for operation and treatment / maintenance in accordance with the SCC (Special Conditions for Contracts).
33.2. If the Provider does not provide guidelines of operating and treatment / maintenance, The Commitment Making Officer has the right to withhold retention money or Maintenance Guarantee.

B.4. Adendum.
B.4. Addendum.

34. Perubahan Kontrak.
34. Change of Contract.

34.1. Kontrak hanya dapat diubah melalui adendum Kontrak.
34.1. The contract can only be changed through the Contract addendum.

34.2. Perubahan Kontrak dapat dilaksanakan apabila disetujui oleh para pihak, yang diakibatkan beberapa hal berikut meliputi:
a. perubahan pekerjaan;
b. perubahan Harga Kontrak;
c. perubahan jadwal pelaksanaan pekerjaan dan/atau Masa Pelaksanaan;
d. perubahan Kontrak yang disebabkan masalah administrasi.
34.2. Contract changes can be carried out if approved by the parties, resulting in the following matters including:
a. job change;
b. changes in Contract Prices;
c. changes to the schedule for carrying out work and / or the Period of Implementation;
d. Contract changes caused by administrative problems.

34.3. Untuk kepentingan perubahan Kontrak, PPK (Pejabat Pembuat Komitmen) dapat meminta pertimbangan dari Pengawas Pekerjaan dan Panitia Peneliti Pelaksanaan Kontrak.
34.3. For the purposes of changing the Contract, the Commitment Making Officer may request consideration from the Job Supervisor and The Committee of Research of Contract Implementation.

35. Perubahan Pekerjaan.
35. Job Changes.

35.1. Dalam hal terdapat perbedaan antara kondisi lapangan pada saat pelaksanaan dengan gambar dan/atau spesifikasi teknis yang ditentukan dalam dokumen Kontrak atau ada perintah perubahan dari PPK (Pejabat Pembuat Komitmen), PPK (Pejabat Pembuat Komitmen) bersama Penyedia dapat melakukan perubahan pekerjaan, yang meliputi:
a. menambah dan/atau mengurangi jenis/jumlah keluaran;
b. mengubah spesifikasi teknis dan/atau gambar pekerjaan; dan/atau
c. mengubah jadwal pelaksanaan pekerjaan.
35.1. In the event that there is a difference between the field conditions at the time of implementation and the drawings and / or technical specifications specified in the Contract document or there is a change order from the Commitment Making Officer, the Commitment Making Officer together with the Provider may make changes to the work, including:
a. add and / or reduce the type / amount of output;
b. change technical specifications and / or job drawings; and / or
c. change work schedule.

35.2. Perintah perubahan pekerjaan dibuat oleh PPK (Pejabat Pembuat Komitmen) secara tertulis kepada Penyedia kemudian dilanjutkan dengan negosiasi teknis dan harga dengan tetap mengacu pada ketentuan yang tercantum dalam Kontrak awal.
35.2. The job change order is made by the Commitment Making Officer in writing to the Provider then proceed with technical negotiations and prices while still referring to the provisions stated in the initial Contract.

35.3. Hasil negosiasi tersebut dituangkan dalam Berita Acara sebagai dasar penyusunan adendum Kontrak.
35.3. The results of the negotiations are stated in the Minutes as the basis for the preparation of the Contract addendum.

35.4. Dalam hal perubahan pekerjaan sebagaimana dimaksud pada pasal 35.1 mengakibatkan penambahan Harga Kontrak, perubahan Kontrak dilaksanakan dengan ketentuan penambahan Harga Kontrak akhir tidak melebihi 10% (sepuluh perseratus) dari harga yang tercantum dalam Kontrak awal dan tersedianya anggaran.
35.4. In the event that the change of work referred to in article 35.1 results in the addition of the Contract Price, the change of Contract is carried out provided that the final Contract Price does not exceed 10% (ten percent) of the price stated in the initial Contract and budget availability.

36. Perubahan Harga.
36. Price Changes.

36.1. Perubahan Harga Kontrak dapat diakibatkan oleh perubahan pekerjaan dan/atau Peristiwa Kompensasi.
36.1. Changes in Contract Prices can be caused by changes in work and / or Compensation Events.

36.2. Apabila terdapat perubahan pekerjaan, maka penentuan harga baru dilakukan dengan negosiasi.
36.2. If there is a change in work, then the new pricing is done by negotiation.

36.3. Ketentuan ganti rugi akibat Peristiwa Kompensasi mengacu pada pasal Peristiwa Kompensasi.
36.3. Compensation provisions due to the Compensation Event refer to the article on Compensation Events.

37. Perubahan Jadwal Pelaksanaan Pekerjaan dan/atau Masa Pelaksanaan.
37. Amendment to the Schedule of Implementation of Work and / or Period of Implementation.

37.1. Perubahan jadwal pelaksanaan pekerjaan dapat diakibatkan oleh:
a. perubahan pekerjaan;
b. perpanjangan Masa Pelaksanaan; dan/atau
c. Peristiwa Kompensasi.
37.1. Changes to the work schedule can be caused by:
a. job change;
b. extension of the Implementation Period; and / or
c. Compensation Event.

37.2. Perpanjangan Masa Pelaksanaan dapat diberikan oleh PPK (Pejabat Pembuat Komitmen) atas pertimbangan yang layak dan wajar untuk hal-hal sebagai berikut:
a. perubahan pekerjaan;
b. Peristiwa Kompensasi; dan/atau
c. Keadaan Kahar.
37.2. The Extension of Implementation Period can be given by the Commitment Making Officer for proper and reasonable consideration for the following matters:
a. job change;
b. Compensation events; and / or
c. Force Majeure.

37.3. Masa Pelaksanaan dapat diperpanjang paling kurang sama dengan waktu terhentinya Kontrak akibat Keadaan Kahar atau waktu yang diperlukan untuk menyelesaikan pekerjaan akibat dari ketentuan pada pasal 37.2 huruf a atau b.
37.3. The implementation period can be extended at least at the same time as the termination of the Contract due to the Force Majeure or the time needed to complete the work due to the provisions in article 37.2 letter a or b.

37.4. PPK (Pejabat Pembuat Komitmen) dapat menyetujui perpanjangan Masa Pelaksanaan atas Kontrak setelah melakukan penelitian terhadap usulan tertulis yang diajukan oleh Penyedia dalam jangka waktu sesuai pertimbangan yang wajar setelah Penyedia meminta perpanjangan. Jika Penyedia lalai untuk memberikan peringatan dini atas keterlambatan atau tidak dapat bekerja sama untuk mencegah keterlambatan sesegera mungkin, maka keterlambatan seperti ini tidak dapat dijadikan alasan untuk memperpanjang Masa Pelaksanaan.
37.4. The Commitment Making Officer can approve the extension of the Implementation Period for the Contract after conducting a study of the written proposal submitted by the Provider within a period of time according to reasonable consideration after the Provider requests an extension. If the Provider fails to provide early warning of delay or cannot work together to prevent delays as soon as possible, then such delays cannot be used as an excuse to extend the Period of Implementation.

37.5. PPK (Pejabat Pembuat Komitmen) berdasarkan pertimbangan Pengawas Pekerjaan dan Panitia Peneliti Pelaksanaan Kontrak harus telah menetapkan ada tidaknya perpanjangan dan untuk berapa lama,
37.5. The Commitment Making Officer based on the consideration of the Work Supervisor and the Committee of Research of Contract Implementation must have determined whether there is an extension and for how long,

37.6. Persetujuan perubahan jadwal pelaksanaan dan/atau perpanjangan Masa Pelaksanaan dituangkan dalam Adendum Kontrak.
37.6. Approval of amendments to the implementation schedule and / or extension of the Period of Implementation is set forth in the Contract Addendum.

37.7. Jika terjadi Peristiwa Kompensasi sehingga penyelesaian pekerjaan akan melampaui Masa Pelaksanaan maka Penyedia berhak untuk meminta perpanjangan Masa Pelaksanaan berdasarkan data penunjang. PPK (Pejabat Pembuat Komitmen) berdasarkan pertimbangan Pengawas Pekerjaan memperpanjang Masa Pelaksanaan secara tertulis. Perpanjangan Masa Pelaksanaan harus dilakukan melalui adendum Kontrak.
37.7. If a Compensation Event occurs so that the completion of the work will exceed the Implementation Period, the Provider has the right to request an extension of the Implementation Period based on supporting data. The Commitment Making Official is based on the consideration that the Work Supervisor extends the Implementation Period in writing. The Extension of Execution Period must be carried out through a Contract addendum.

B.5. Keadaan Kahar .
B.5. Force Majeure.

38. Keadaan Kahar.
38. Force Majeure.

38.1. Contoh Keadaan Kahar tidak terbatas pada: bencana alam, bencana non alam, bencana sosial, pemogokan, kebakaran, kondisi cuaca ekstrem, dan gangguan industri lainnya.
38.1. Examples of Force Majeure are not limited to: natural disasters, non-natural disasters, social disasters, strikes, fires, extreme weather conditions, and other industrial disturbances.

38.2. Tidak termasuk Keadaan Kahar adalah hal - hal merugikan yang disebabkan oleh perbuatan atau kelalaian para pihak.
38.2. Excluding the Force Majeure is a detrimental things caused by the actions or negligence of the parties.

38.3. Dalam hal terjadi keadaan kahar, PPK (Pejabat Pembuat Komitmen) atau Penyedia memberitahukan tentang terjadinya Keadaan Kahar kepada salah satu pihak secara tertulis dalam waktu paling lambat 14 (empat belas) hari kalender sejak menyadari atau seharusnya menyadari atas kejadian atau terjadinya Keadaan Kahar, dengan menyertakan bukti serta hasil identifikasi kewajiban dan kinerja pelaksanaan yang terhambat dan/atau akan terhambat akibat Keadaan Kahar tersebut.
38.3. In the event of force majeure, The Commitment Making Officer or Provider notifies the occurrence of Force Majeure to one of the parties in writing within no later than 14 (fourteen) calendar days from realizing or should be aware of the event or occurrence of Force Majeure, by including evidence and the results of identification of obligations and implementation performance are hampered and / or will be hampered due to the Force Majeure.

38.4. Bukti Keadaan Kahar dapat berupa :
38.4. Proof of Force Majeure can be:

a. pernyataan yang diterbitkan oleh pihak/instansi yang berwenang sesuai ketentuan peraturan perundang undangan; dan/atau
b. foto/video dokumentasi Keadaan Kahar yang telah diverifikasi kebenarannya.
a. statement issued by the authorized party / agency in accordance with the provisions of the legislation; and / or
b. photo / video of documentation of the Force Majeure which has been verified.

38.5. PPK (Pejabat Pembuat Komitmen) meminta Pengawas Pekerjaan untuk melakukan penelitian terhadap penyampaian pemberitahuan Keadaan Kahar dan bukti sebagaimana dimaksud pada pasal 38.4.
38.5. The Commitment Making Officer asks the Work Supervisor to conduct research on the delivery of notification of Force Majeure and evidence as referred to in article 38.4.

38.6. Dalam Keadaan Kahar, kegagalan salah satu Pihak untuk memenuhi kewajibannya yang ditentukan dalam Kontrak bukan merupakan cidera janji atau wanprestasi apabila telah dilakukan sesuai pada pasal 38.3. Kewajiban yang dimaksud adalah hanya kewajiban dan kinerja pelaksanaan terhadap pekerjaan/bagian pekerjaan yang terdampak dan/atau akan terdampak akibat dari Keadaan Kahar.
38.6. In the Force Majeure, the failure of one Party to fulfill its obligations specified in the Contract does not constitute a breach of contract or default if it has been carried out in accordance with article 38.3. The obligation in question is only the obligation and performance of the work / part of the work affected and / or will be affected as a result of the Force Majeure.

38.7. Dalam hal terjadi Keadaan Kahar, pelaksanaan Kontrak dapat dihentikan. Penghentian Kontrak karena Keadaan Kahar dapat bersifat
a. sementara hingga Keadaan Kahar berakhir; atau
b. permanen apabila akibat Keadaan Kahar tidak memungkinkan dilanjutkan/diselesaikannya pekerjaan.
38.7. In the event of a Force Majeure, the execution of the Contract can be stopped. Termination of Contract because of Force Majeure can be of a nature
a. temporary until the Force Majeure ends; or
b. permanent if the result of the Force Majeure is not possible to continue / complete the work.

38.8. Penghentian Kontrak karena Keadaan Kahar dilakukan secara tertulis oleh PPK (Pejabat Pembuat Komitmen) dengan disertai alasan penghentian pekerjaan.
38.8. Termination of Contract because the Force Majeure is carried out in writing by the Commitment Making Officer accompanied by reasons for termination of employment.

38.9. Dalam hal pelaksanaan Kontrak dilanjutkan, para pihak dapat melakukan perubahan Kontrak. Masa Pelaksanaan dapat diperpanjang sekurang-kurangnya sama dengan jangka waktu terhentinya Kontrak akibat Keadaan Kahar. Perpanjangan Masa Pelaksanaan dapat melewati Tahun Anggaran.
38.9. In the event that the Contract is continued, the parties may make changes to the Contract. The Implementation Period can be extended at least equal to the term of the termination of the Contract due to the Force Majeure. The Extension Period of Execution can exceed the Budget Year.

38.10. Selama masa Keadaan Kahar, jika PPK (Pejabat Pembuat Komitmen) memerintahkan secara tertulis kepada Penyedia untuk sedapat mungkin meneruskan pekerjaan, maka Penyedia berhak untuk menerima pembayaran sebagaimana ditentukan dalam Kontrak dan mendapat penggantian biaya yang wajar sesuai dengan kondisi yang telah dikeluarkan untuk bekerja dalam Keadaan Kahar. Penggantian biaya ini harus diatur dalam suatu adendum Kontrak.
38.10. During the Force Majeure period, if the Commitment Making Officer orders in writing to the Provider to proceed as far as possible, the Provider has the right to receive payments as specified in the Contract and receive reasonable reimbursement in accordance with the conditions for working in the Force . Reimbursement of this fee must be regulated in a Contract addendum.

38.11. Dalam hal pelaksanaan Kontrak dihentikan, para pihak menyelesaikan hak dan kewajiban sesuai Kontrak. Penyedia berhak untuk menerima pembayaran sesuai dengan prestasi atau kemajuan hasil pekerjaan yang telah dicapai setelah dilakukan pengukuran/pemeriksaan bersama atau berdasarkan hasil audit.
38.11. In the event that the contract is terminated, the parties settle their rights and obligations under the Contract. The provider has the right to receive payments in accordance with the achievements or progress of the work achieved after a joint measurement / inspection or based on the audit results.

B.6. Penghentian dan Pemutusan Kontrak.
B.6. Cessation and Termination of Contract.

39. Penghentian Kontrak.
Penghentian Kontrak dapat dilakukan karena terjadi Keadaan Kahar sebagaimana dimaksud pada pasal 38.
39. Cessation of Contract.
Cessation of Contract can be done because of the Force Majeure as referred to in article 38.

40. Pemutusan Kontrak.
40. Termination of Contract.

40.1. Pemutusan Kontrak dapat dilakukan oleh PPK (Pejabat Pembuat Komitmen) atau Penyedia.
40.1. Termination of contract can be done by The Commitment Making Officer or Provider.

40.2. Pemutusan kontrak dilakukan sekurang-kurangnya 14 (empat belas) hari kalender setelah PPK (Pejabat Pembuat Komitmen) / Penyedia menyampaikan pemberitahuan rencana Pemutusan Kontrak secara tertulis kepada Penyedia / PPK (Pejabat Pembuat Komitmen).
40.2. Termination of contract is carried out at least 14 (fourteen) calendar days after The Commitment Making Officer / Provider notifies the Contract Termination plan in writing to the Provider / The Commitment Making Officer.

40.3. Dalam hal dilakukan pemutusan Kontrak oleh salah satu pihak maka PPK (Pejabat Pembuat Komitmen) membayar kepada Penyedia sesuai dengan pencapaian prestasi pekerjaan yang telah diterima oleh PPK (Pejabat Pembuat Komitmen) dikurangi denda yang harus dibayar Penyedia (apabila ada), serta Penyedia menyerahkan semua hasil pelaksanaan kepada PPK (Pejabat Pembuat Komitmen) dan selanjutnya menjadi hak milik PPK (Pejabat Pembuat Komitmen).
40.3. In the event that a Contract is terminated by one party, the Commitment Making Officer pays the Provider in accordance with the work achievement that has been received by the The Commitment Making Officer minus the fine that the Provider must pay (if any), and the Provider submits all the results of implementation to The Commitment Making Officer and subsequently becomes the property of The Commitment Making Officer.

 41. Pemutusan Kontrak oleh PPK (Pejabat Pembuat Komitmen).
 41. Termination of Contract by The Commitment Making Officer.

41.1. Mengesampingkan Pasal 1266 dan 1267 Kitab Undang-Undang Hukum Perdata, PPK (Pejabat Pembuat Komitmen) dapat melakukan pemutusan Kontrak apabila:
41.1. Leaving aside Articles 1266 and 1267 of the Civil Code, The Commitment Making Official can terminate the Contract if:

a. Penyedia terbukti melakukan KKN (Korupsi, Kolusi, dan Nepotisme), kecurangan dan/atau pemalsuan dalam proses pengadaan yang diputuskan oleh Instansi yang berwenang;
a. Providers are proven to have conducted Corruption, Collusion and Nepotism, fraud and / or counterfeiting in the procurement process decided by the competent agency;

b. pengaduan tentang penyimpangan prosedur, dugaan KKN (Korupsi, Kolusi, dan Nepotisme) dan/atau pelanggaran persaingan sehat dalam pelaksanaan Pengadaan Barang/Jasa dinyatakan benar oleh Instansi yang berwenang;
b. complaints about procedural irregularities, alleged Corruption, Collusion and Nepotism and / or violations of fair competition in the implementation of the Procurement of Goods / Services declared true by the competent agency;

c. Penyedia berada dalam keadaan pailit;
c. The provider is in bankruptcy;

d. Penyedia terbukti dikenakan Sanksi Daftar Hitam sebelum penandatanganan Kontrak;
d. Providers are proven to be subject to Black List Sanctions before signing the Contract;

e. Penyedia gagal memperbaiki kinerja setelah mendapat Surat Peringatan Kontrak Kritis berturut-turut sebanyak 3 (tiga) kali;
e. The provider fails to improve its performance after receiving 3 (three) letters of The Letter of Warning of Critical Contract;

f. Penyedia tidak mempertahankan berlakunya Jaminan Pelaksanaan;
f. The Provider does not maintain the entry into force of the Implementation Guarantee;

g. Penyedia lalai/cidera janji dalam melaksanakan kewajibannya dan tidak memperbaiki kelalaiannya dalam jangka waktu yang telah ditetapkan;
g. Provider is negligent / injured in carrying out his obligations and does not correct his negligence within the stipulated period;

h. berdasarkan penelitian PPK (Pejabat Pembuat Komitmen), Penyedia tidak akan mampu menyelesaikan keseluruhan pekerjaan walaupun diberikan kesempatan sampai dengan 50 (lima puluh) hari kalender sejak masa berakhirnya pelaksanaan pekerjaan untuk menyelesaikan pekerjaan;
h. based on research of The Commitment Making Officials, the Provider will not be able to complete the entire work even though given the opportunity up to 50 (fifty) calendar days from the end of the work to complete the work;

i. setelah diberikan kesempatan menyelesaikan pekerjaan sampai dengan 50 (lima puluh) hari kalender sejak masa berakhirnya pelaksanaan pekerjaan, Penyedia tidak dapat menyelesaikan pekerjaan;
i. after being given the opportunity to complete the work up to 50 (fifty) calendar days from the end of the execution of the work, the Provider cannot complete the work;

j. Penyedia menghentikan pekerjaan selama 28 (dua puluh delapan) hari kalender dan penghentian ini tidak tercantum dalam jadwal pelaksanaan pekerjaan serta tanpa persetujuan pengawas pekerjaan; atau
j. Providers stop work for 28 (twenty eight) calendar days and this termination is not listed in the schedule of execution of work and without the approval of the work supervisor; or

k. Penyedia mengalihkan seluruh kontrak bukan dikarenakan pergantian nama Penyedia.
k. The provider transfers all contracts not because of the change of name of the Provider.

41.2. Dalam hal pemutusan Kontrak dilakukan pada Masa Pelaksanaan karena kesalahan Penyedia, maka:
a. Jaminan Pelaksanaan dicairkan;
b. sisa uang muka harus dilunasi oleh Penyedia atau Jaminan Uang Muka dicairkan (apabila diberikan);
c. Penyedia membayar denda (apabila ada); dan
d. Penyedia dikenakan Sanksi Daftar Hitam.
41.2. In the event the termination of the Contract is carried out during the Implementation Period due to the Provider's fault, then:
a. Implementation Guarantee is disbursed;
b. the remaining down payment must be repaid by the Provider or the Advance Payment Guarantee is disbursed (if given);
c. Provider pays a fine (if any); and
d. Providers are subject to Blacklist Sanctions.

41.3. Pencairan jaminan sebagaimana dimaksud pada pasal 41.2 di atas, dicairkan dan disetorkan sesuai ketentuan dalam SSKK (Syarat-Syarat Khusus Kontrak).
41.3. The guarantee disbursement as referred to in article 41.2 above, is disbursed and deposited in accordance with the provisions in the SCC (Special Conditions of Contract).

 41.4. Dalam hal pemutusan Kontrak dilakukan pada Masa Pemeliharaan karena kesalahan Penyedia, maka:
a. PPK (Pejabat Pembuat Komitmen) berhak untuk tidak membayar retensi atau Jaminan Pemeliharaan dicairkan untuk membiayai perbaikan/pemeliharaan; dan
b. Penyedia dikenakan sanksi Daftar Hitam.
41.4. In the event that a Contract is terminated during the Maintenance Period due to the Provider's fault, then:
a. The Commitment Making Officer has the right not to pay retention or Maintenance Guarantee disbursed to finance repairs / maintenance; and
b. Providers are subject to blacklist sanctions.

41.5. Dalam hal terdapat nilai sisa penggunaan uang retensi atau uang pencairan Jaminan Pemeliharaan untuk membiayai pembiayaan/pemeliharaan maka PPK (Pejabat Pembuat Komitmen) wajib menyetorkan sebagaimana ditetapkan dalam SSKK (Syarat-Syarat Khusus Kontrak).
41.5. In the event that there is a residual value of the use of retention money or maintenance guarantee disbursement money to finance financing / maintenance, the Commitment Making Officer must deposit as stipulated in the STC (Special Terms of Contract).

41.6. Dalam hal dilakukan pemutusan Kontrak secara sepihak oleh PPK (Pejabat Pembuat Komitmen) karena kesalahan Penyedia, maka Pokja (Kelompok Kerja) Pemilihan dapat menunjuk pemenang cadangan berikutnya pada paket pekerjaan yang sama atau Penyedia yang mampu dan memenuhi syarat.
41.6. In the event of a unilateral termination of the Contract by the Commitment Making Officer due to the Provider's fault, the Election Working Group can appoint the next reserve winner on the same work package or the Provider who is capable and meets the requirements.

 42. Pemutusan Kontrak oleh Penyedia.
 42. Termination of Contract by the Provider.

Mengesampingkan Pasal 1266 dan 1267 Kitab Undang-Undang Hukum Perdata, Penyedia dapat melakukan pemutusan Kontrak apabila:
a. Setelah mendapatkan persetujuan PPK (Pejabat Pembuat Komitmen), Pengawas Pekerjaan memerintahkan Penyedia untuk menunda pelaksanaan pekerjaan atau kelanjutan pekerjaan, dan perintah tersebut tidak ditarik selama 28 (dua puluh delapan) hari kalender;
b. PPK (Pejabat Pembuat Komitmen) tidak menerbitkan Surat Permintaan Pembayaran (SPP) untuk pembayaran tagihan angsuran sesuai dengan yang disepakati sebagaimana tercantum dalam SSKK (Syarat-Syarat Khusus Kontrak).
Leaving aside Article 1266 and 1267 of the Civil Code, the Provider may terminate the Contract if:
a. After obtaining approval from The Commitment Making Officer, the Works Supervisor instructs the Provider to delay the execution of work or continuation of work, and the order is not withdrawn for 28 (twenty eight) calendar days;
b. The Commitment Making Official does not issue a Payment Request for payment of installment bills as agreed upon as stated in the SCT (Special Contract Terms).

43. Berakhirnya Kontrak.
Kontrak berakhir apabila pekerjaan telah selesai dan hak dan kewajiban para pihak yang terdapat dalam Kontrak sudah terpenuhi.
43. End of Contract.
The contract ends when the work has been completed and the rights and obligations of the parties contained in the Contract have been fulfilled.

44. Keterlambatan Pelaksanaan Pekerjaan dan Kontrak Kritis.
44. Delay in the Implementation of Work and Critical Contracts.

44.1. Apabila Penyedia terlambat melaksanakan pekerjaan sesuai jadwal, maka PPK (Pejabat Pembuat Komitmen) harus memberikan peringatan secara tertulis atau memberlakukan ketentuan kontrak kritis.
44.1. If the Provider is late in carrying out work on schedule, the Commitment Making Officer must provide a written warning or impose critical contract provisions.

44.2. Kontrak dinyatakan kritis apabila:
a. Dalam periode I (rencana fisik pelaksanaan 0% - 70% dari Kontrak), selisih keterlambatan antara realisasi fisik pelaksanaan dengan rencana lebih besar 10%
b. Dalam periode II (rencana fisik pelaksanaan 70% - 100% dari Kontrak), selisih keterlambatan antara realisasi fisik pelaksanaan dengan rencana lebih besar 5%;
c. Dalam periode III (rencana fisik pelaksanaan 70% - 100% dari Kontrak), selisih keterlambatan antara realisasi fisik pelaksanaan dengan rencana pelaksanaan kurang dari 5% dan akan melampaui tahun anggaran berjalan.
44.2. Contracts are declared critical if:
a. In Ist period (physical implementation plan of 0% - 70% of the Contract), the difference in delay between physical realization of the implementation and the plan is greater than 10%
b. In IInd period (physical plan of implementation of 70% - 100% of the Contract), the difference in delay between the physical realization of the implementation and the plan is greater than 5%;
c. In IIIrd period (physical plan of implementation of 70% - 100% of the Contract), the difference in delay between the physical realization of the implementation and the implementation plan is less than 5% and will exceed the current fiscal year.

44.3. Penanganan kontrak kritis dilakukan dengan rapat pembuktian (Show Cause meeting / SCM).
44.3. Handling critical contracts is carried out with a Show Cause Meeting (SCM).

a. Pada saat Kontrak dinyatakan kritis, Pengawas Pekerjaan memberikan peringatan secara tertulis kepada Penyedia dan selanjutnya menyelenggarakan Rapat Pembuktian (Show Cause meeting/SCM) Tahap I.
a. When the Contract is declared critical, the Work Supervisor gives a written warning to the Provider and then holds a Show Cause Meeting (SCM) of Ist Stage.

b. Dalam (Show Cause meeting/SCM) Tahap I, PPK (Pejabat Pembuat Komitmen), Pengawas Pekerjaan dan Penyedia membahas dan menyepakati besaran kemajuan fisik yang harus dicapai oleh Penyedia dalam periode waktu tertentu (uji coba pertama) yang dituangkan dalam Berita Acara (Show Cause meeting/SCM) Tahap I.
b. In Show Cause Meeting (SCM) of Ist Stage, The Commitment Making Officer, Job Supervisor and Provider discuss and agree on the amount of physical progress that must be achieved by the Provider in a certain period of time (first trial) as outlined in the Minutes of Show Cause meeting  (SCM) of Ist Phase.

c. Apabila Penyedia gagal pada uji coba pertama, maka PPK (Pejabat Pembuat Komitmen) menerbitkan Surat Peringatan Kontrak Kritis I dan harus diselenggarakan (Show Cause meeting/SCM) Tahap II yang membahas dan menyepakati besaran kemajuan fisik yang harus dicapai oleh Penyedia dalam waktu tertentu (uji coba kedua) yang dituangkan dalam Berita Acara (Show Cause meeting/SCM) Tahap II.
c. If the Provider fails the first trial, the Commitment Making Officer issues a Warning Letter on Ist Critical Contract and must be held Show Cause meeting  (SCM) of IInd Phase which discusses and agrees on the amount of physical progress that must be achieved by the Provider in a certain time (second try test) which is set forth in the Show Cause meeting (SCM) of IInd Phase.

d. Apabila Penyedia gagal pada uji coba kedua, maka PPK (Pejabat Pembuat Komitmen) menerbitkan Surat Peringatan Kontrak Kritis II dan harus diselenggarakan (Show Cause meeting/SCM) Tahap III yang membahas dan menyepakati besaran kemajuan fisik yang harus dicapai oleh Penyedia dalam waktu tertentu (uji coba ketiga) yang dituangkan dalam Berita Acara (Show Cause meeting/SCM) Tahap III.
d. If the Provider fails the second trial, the Commitment Making Officer issues a Warning Letter on IInd Critical Contract and must be held Show Cause meeting (SCM) of IIIrd Phase which discusses and agrees the amount of physical progress that must be achieved by the Provider in a certain time (third try test) as outlined in the Show Cause meeting (SCM) of IIIrd Phase.

e. Apabila Penyedia gagal pada uji coba ketiga, maka PPK (Pejabat Pembuat Komitmen) menerbitkan Surat Peringatan Kontrak Kritis III dan PPK (Pejabat Pembuat Komitmen) dapat melakukan pemutusan Kontrak secara sepihak dengan mengesampingkan Pasal 1266 dan 1267 Kitab Undang-Undang Hukum Perdata.
e. If the Provider fails the third trial, the Commitment Making Officer issues a Warning Letter on IIIrd Critical Contract and The Commitment Making Officer can unilaterally terminate the Contract by ruling out Articles 1266 and 1267 of the Civil Code.

f. Apabila uji coba berhasil, namun pada pelaksanaan pekerjaan selanjutnya Kontrak dinyatakan kritis lagi maka berlaku ketentuan (Show Cause meeting/SCM) dari awal.
f. If the trial is successful, but in the implementation of the next work the Contract is declared critical again, the provisions of Show Cause Meeting (SCM) are valid from the beginning.

45. Pemberian Kesempatan.
45. Giving Opportunities.

45.1. Dalam hal diperkirakan Penyedia gagal menyelesaikan pekerjaan sampai Masa Pelaksanaan berakhir, namun PPK (Pejabat Pembuat Komitmen) menilai bahwa Penyedia mampu menyelesaikan pekerjaan, PPK (Pejabat Pembuat Komitmen) dapat memberikan kesempatan kepada Penyedia untuk menyelesaikan pekerjaan.
45.1. In the event that it is estimated that the Provider fails to complete the work until the Implementation Period ends, but the Commitment Making Officer assesses that the Provider is able to complete the work, The Commitment Making Officer can provide the Provider the opportunity to complete the work.

45.2. Pemberian kesempatan kepada Penyedia untuk menyelesaikan pekerjaan dimuat dalam adendum Kontrak yang didalamnya mengatur:
a. waktu pemberian kesempatan penyelesaian pekerjaan;
b. pengenaan sanksi denda keterlambatan kepada Penyedia;
c. perpanjangan masa berlaku Jaminan Pelaksanaan; dan
d. sumber dana untuk membiayai penyelesaian sisa pekerjaan yang akan dilanjutkan ke Tahun Anggaran berikutnya dari DIPA/DPA (Daftar Isian Pelaksanaan Anggaran / Dokumen Pelaksanaan Anggaran) Tahun Anggaran berikutnya, apabila pemberian kesempatan melampaui Tahun Anggaran.
45.2. Providing opportunities to the Provider to complete the work contained in the Contract addendum which regulates:
a. time for giving opportunities for completion of work;
b. imposition of a late penalty for the Provider;
c. extension of the validity of the Implementation Guarantee; and
d. source of funds to finance the completion of the remaining work which will be continued to the next Fiscal Year of The Budget Implementation List / Budget Implementation Document from the next Fiscal Year, if the opportunity exceeds the Budget Year.

45.3. Pemberian kesempatan kepada Penyedia menyelesaikan pekerjaan sampai dengan 50 (lima puluh) hari kalender, sejak Masa Pelaksanaan berakhir.
45.3. Giving opportunity to Provider to complete work up to 50 (fifty) calendar days, since the Implementation Period ends.

45.4. Pemberian kesempatan kepada Penyedia untuk menyelesaikan pekerjaan dapat melampaui Tahun Anggaran.
45.4. Giving the opportunity to the Provider to complete the work can exceed the Budget Year.

46. Peninggalan.
46. Relics.

Semua bahan, perlengkapan, peralatan, hasil pekerjaan sementara yang masih berada di lokasi kerja setelah pemutusan Kontrak akibat kelalaian atau kesalahan Penyedia, dapat dimanfaatkan sepenuhnya oleh PPK (Pejabat Pembuat Komitmen) tanpa kewajiban perawatan/pemeliharaan. Pengambilan kembali semua peninggalan tersebut oleh Penyedia hanya dapat dilakukan setelah mempertimbangkan kepentingan PPK (Pejabat Pembuat Komitmen).
All materials, equipment, apparatus, proceeds from temporary work that are still at the work site after the termination of the Contract due to negligence or fault of the Provider, can be fully utilized by the Commitment Making Officer without the obligation of maintenance / care. Retrieval of all these relics by the Provider can only be done after considering the interests of the Commitment Making Officer.


Penjadwalan KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) Tahun 2435 (dua ribu empat ratus tiga puluh lima) Masehi.
Schedule The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference in 2435 (two thousand and four hundreds and thirty five) AD (Anno Domini).


05 Januari 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Bedah Anak, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Bedah Anak, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5112 / Desember / 2435.
January 05th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Child Surgery, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Child Surgery, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5112 / December / 2435.

12 Januari 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Ilmu Bedah, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Ilmu Bedah, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5112 / Desember / 2435.
January 12th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Surgery Science, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Surgery Science, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5112 / December / 2435.

19 Januari 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Amnesti dan Reanimasi, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Amnesti dan Reanimasi, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5112 / Desember / 2435.
January 19th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Amnesty and Reanimation, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Amnesty and Reanimation, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5112 / December / 2435.

26 Januari 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Gizi Kesehatan, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Gizi Kesehatan, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5112 / Desember / 2435.
January 26th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Health Nutrition, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Health Nutrition, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5112 / December / 2435.

02 Februari 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Pendidikan Dokter, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Pendidikan Dokter, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5113 / Januari / 2436.
Febuary 02nd, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Medical Doctor Education, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Medical Doctor Education, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5113 / January / 2436.

09 Februari 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Biokimia, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Biokimia, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5113 / Januari / 2436.
Febuary 09th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Biochemistry, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Biochemistry, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5113 / January / 2436.

16 Februari 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Ilmu Komputer, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Ilmu Komputer, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5113 / Januari / 2436.
Febuary 16th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Computer Science, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Computer Science, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5113 / January / 2436.

23 Februari 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Biologi, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Biologi, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5113 / Januari / 2436.
Febuary 23rd, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Biology, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Biology, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5113 / January / 2436.

01 Maret 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Meteorologi Terapan, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Meteorologi Terapan, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5114 / Februari / 2436.
March 01st, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Applied Meteorology, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Applied Meteorology, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5114 / February / 2436.

08 Maret 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Statistika, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Statistika, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5114 / Februari / 2436.
March 08th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Statistic, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Statistic, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5114 / February / 2436.

15 Maret 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Kimia, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Kimia, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5114 / Februari / 2436.
March 15th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Chemistry, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Chemistry, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5114 / February / 2436.

22 Maret 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Astronomi, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Astronomi, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5114 / Februari / 2436.
March 22nd, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Astronomy, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Astronomy, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5114 / February / 2436.

29 Maret 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Fisika, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Fisika, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5114 / Februari / 2436.
March 29th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Physic, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Physic, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5114 / February / 2436.

05 April 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Matematika, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Matematika, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5115 / Maret / 2436.
April 05th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Mathematic, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Mathematic, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5115 / March / 2436.

12 April 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Rekayasa Infrastruktur Lingkungan, Fakultas Teknik Sipil dan Lingkungan (FTSL) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Rekayasa Infrastruktur Lingkungan, Fakultas Teknik Sipil dan Lingkungan (FTSL) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5115 / Maret / 2436.
April 12th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Environmental Infrastructure Engineering, The Faculty of Civil and Environmental Engineering of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Environmental Infrastructure Engineering, The Faculty of Civil and Environmental Engineering of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5115 / March / 2436.

19 April 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Teknik dan Pengelolaan Sumber Daya Air, Fakultas Teknik Sipil dan Lingkungan (FTSL) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik dan Pengelolaan Sumber Daya Air, Fakultas Teknik Sipil dan Lingkungan (FTSL) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5115 / Maret / 2436.
April 19th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Engineering and Management of Water Resources, The Faculty of Civil and Environmental Engineering of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Engineering and Management of Water Resources, The Faculty of Civil and Environmental Engineering of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5115 / March / 2436.

26 April 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Teknik Kelautan, Fakultas Teknik Sipil dan Lingkungan (FTSL) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Kelautan, Fakultas Teknik Sipil dan Lingkungan (FTSL) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5115 / Maret / 2436.
April 26th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Marine Engineering, The Faculty of Civil and Environmental Engineering of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Marine Engineering, The Faculty of Civil and Environmental Engineering of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5115 / March / 2436.

03 Mei 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Teknik Lingkungan, Fakultas Teknik Sipil dan Lingkungan (FTSL) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Lingkungan, Fakultas Teknik Sipil dan Lingkungan (FTSL) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5116 / April / 2436.
May 03rd, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Environmental Engineering, The Faculty of Civil and Environmental Engineering of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Environmental Engineering, The Faculty of Civil and Environmental Engineering of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5116 / April / 2436.

10 Mei 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Lingkungan (FTSL) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Lingkungan (FTSL) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5116 / April / 2436.
May 10th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Civil Engineering, The Faculty of Civil and Environmental Engineering of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Civil Engineering, The Faculty of Civil and Environmental Engineering of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5116 / April / 2436.

17 Mei 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Teknik Bioenergi dan Kemurgi, Fakultas Teknologi Industri (FTI) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Bioenergi dan Kemurgi, Fakultas Teknologi Industri (FTI) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5116 / April / 2436.
May 17th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Bioenergy and Kemurgi Engineering, The Faculty of Industrial Technology of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Bioenergy and Kemurgi Engineering, The Faculty of Industrial Technology of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5116 / April / 2436.

24 Mei 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Teknik Pangan, Fakultas Teknologi Industri (FTI) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Pangan, Fakultas Teknologi Industri (FTI) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5116 / April / 2436.
May 24th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Food Engineering, The Faculty of Industrial Technology of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Food Engineering, The Faculty of Industrial Technology of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5116 / April / 2436.

31 Mei 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Manajemen Rekayasa Industri, Fakultas Teknologi Industri (FTI) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Manajemen Rekayasa Industri, Fakultas Teknologi Industri (FTI) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5116 / April / 2436.
May 31st, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Industrial Engineering Management, The Faculty of Industrial Technology of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Industrial Engineering Management, The Faculty of Industrial Technology of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5116 / April / 2436.

07 Juni 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Teknik Industri, Fakultas Teknologi Industri (FTI) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Industri, Fakultas Teknologi Industri (FTI) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5117 / Mei / 2436.
June 07th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Industrial Engineering, The Faculty of Industrial Technology of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Industrial Engineering, The Faculty of Industrial Technology of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5117 / May / 2436.

14 Juni 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Teknik Fisika, Fakultas Teknologi Industri (FTI) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Fisika, Fakultas Teknologi Industri (FTI) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5117 / Mei / 2436.
June 14th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Physic Engineering, The Faculty of Industrial Technology of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Physic Engineering, The Faculty of Industrial Technology of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5117 / May / 2436.

21 Juni 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Teknik Kimia, Fakultas Teknologi Industri (FTI) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Kimia, Fakultas Teknologi Industri (FTI) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5117 / Mei / 2436.
June 21st, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Chemical Engineering, The Faculty of Industrial Technology of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Chemical Engineering, The Faculty of Industrial Technology of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5117 / May / 2436.

28 Juni 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Teknik Material, Fakultas Teknik Mesin dan Dirgantara UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Material, Fakultas Teknik Mesin dan Dirgantara UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5117 / Mei / 2436.
June 28th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Material Engineering, The Faculty of Mechanical and Aerospace Engineering of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Material Engineering, The Faculty of Mechanical and Aerospace Engineering of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5117 / May / 2436.

05 Juli 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Aeronotika dan Astronotika, Fakultas Teknik Mesin dan Dirgantara UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Aeronotika dan Astronotika, Fakultas Teknik Mesin dan Dirgantara UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5118 / Juni / 2436.
July 05th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Aeronautic and Astronotic, The Faculty of Mechanical and Aerospace Engineering of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Aeronautic and Astronotic, The Faculty of Mechanical and Aerospace Engineering of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5118 / June / 2436.

12 Juli 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Teknik Mesin, Fakultas Teknik Mesin dan Dirgantara UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Mesin, Fakultas Teknik Mesin dan Dirgantara UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5118 / Juni / 2436.
July 12th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Mechanical Engineering, The Faculty of Mechanical and Aerospace Engineering of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Mechanical Engineering, The Faculty of Mechanical and Aerospace Engineering of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5118 / June / 2436.

19 Juli 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Disain Produk, Fakultas Seni Rupa dan Disain (FSRD) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Disain Produk, Fakultas Seni Rupa dan Disain (FSRD) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5118 / Juni / 2436.
July 19th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Product Design, The Faculty of Art and Design of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Product Design, The Faculty of Art and Design of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5118 / June / 2436.

26 Juli 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Disain Komunikasi Visual, Fakultas Seni Rupa dan Disain (FSRD) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Disain Komunikasi Visual, Fakultas Seni Rupa dan Disain (FSRD) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5118 / Juni / 2436.
July 26th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Visual Communication Design, The Faculty of Art and Design of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Visual Communication Design, The Faculty of Art and Design of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5118 / June / 2436.

02 Agustus 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Disain Interior, Fakultas Seni Rupa dan Disain (FSRD) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Disain Interior, Fakultas Seni Rupa dan Disain (FSRD) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5119 / Juli / 2436.
August 02nd, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Interior Design, The Faculty of Art and Design of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Interior Design, The Faculty of Art and Design of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5119 / July / 2436.

09 Agustus 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Kria, Fakultas Seni Rupa dan Disain (FSRD) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Kria, Fakultas Seni Rupa dan Disain (FSRD) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5119 / Juli / 2436.
August 09th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Art of Craft, The Faculty of Art and Design of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Art of Craft, The Faculty of Art and Design of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5119 / July / 2436.

16 Agustus 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Seni Rupa, Fakultas Seni Rupa dan Disain (FSRD) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Seni Rupa, Fakultas Seni Rupa dan Disain (FSRD) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5119 / Juli / 2436.
August 16th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Fine Arts, The Faculty of Art and Design of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Fine Arts, The Faculty of Art and Design of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5119 / July / 2436.

23 Agustus 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Oseanografi, Fakultas Ilmu dan Teknologi Kebumian UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Oseanografi, Fakultas Ilmu dan Teknologi Kebumian UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5119 / Juli / 2436.
August 23rd, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Oceanography, The Faculty of Sciences and Technology of Earth of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Oceanography, The Faculty of Sciences and Technology of Earth of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5119 / July / 2436.

30 Agustus 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Metereologi, Fakultas Ilmu dan Teknologi Kebumian UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Metereologi, Fakultas Ilmu dan Teknologi Kebumian UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5119 / Juli / 2436.
August 30th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Meteorology, The Faculty of Sciences and Technology of Earth of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Meteorology, The Faculty of Sciences and Technology of Earth of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5119 / July / 2436.

06 September 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Teknik Geodesi dan Geomatika, Fakultas Ilmu dan Teknologi Kebumian UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Geodesi dan Geomatika, Fakultas Ilmu dan Teknologi Kebumian UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5120 / Agustus / 2436.
September 06th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Geodesy and Geomatic Engineering, The Faculty of Sciences and Technology of Earth of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Geodesy and Geomatic Engineering, The Faculty of Sciences and Technology of Earth of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5120 / August / 2436.

13 September 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Teknik Geologi, Fakultas Ilmu dan Teknologi Kebumian UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Geologi, Fakultas Ilmu dan Teknologi Kebumian UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5120 / Agustus / 2436.
September 13th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Geological Engineering, The Faculty of Sciences and Technology of Earth of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Geological Engineering, The Faculty of Sciences and Technology of Earth of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5120 / August / 2436.

20 September 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Matematika, Fakultas Tarbiyah UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Matematika, Fakultas Tarbiyah UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5120 / Agustus / 2436.
September 20th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Mathematic, The Faculty of Tarbiyah of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Mathematic, The Faculty of Tarbiyah of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5120 / August / 2436.

27 September 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Bahasa Inggiris, Fakultas Tarbiyah UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Bahasa Inggiris, Fakultas Tarbiyah UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5120 / Agustus / 2436.
September 27th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of English, The Faculty of Tarbiyah of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of English, The Faculty of Tarbiyah of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5120 / August / 2436.

04 Oktober 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Bahasa Arab, Fakultas Tarbiyah UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Bahasa Arab, Fakultas Tarbiyah UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5121 / September / 2436.
October 04th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Arabic Langauge, The Faculty of Tarbiyah of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Arabic Langauge, The Faculty of Tarbiyah of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5121 / September / 2436.

11 Oktober 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan PAI (Pendidikan Agama Islam), Fakultas Tarbiyah UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan PAI (Pendidikan Agama Islam), Fakultas Tarbiyah UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5121 / September / 2436.
October 11th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Islamic Religious Education, The Faculty of Tarbiyah of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Islamic Religious Education, The Faculty of Tarbiyah of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5121 / September / 2436.

18 Oktober 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Teknik Metalurgi, Fakultas Tarbiyah UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Metalurgi, Fakultas Tarbiyah UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5121 / September / 2436.
October 18th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Metallurgical Engineering, The Faculty of Tarbiyah of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Metallurgical Engineering, The Faculty of Tarbiyah of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5121 / September / 2436.

25 Oktober 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Teknik Geofisika, Fakultas Tarbiyah UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Geofisika, Fakultas Tarbiyah UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5121 / September / 2436.
October 25th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Geophysical Engineering, The Faculty of Tarbiyah of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Geophysical Engineering, The Faculty of Tarbiyah of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5121 / September / 2436.

01 Nopember 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Teknik Perminyakan, Fakultas Tarbiyah UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Perminyakan, Fakultas Tarbiyah UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5122 / Oktober / 2436.
November 01st, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Petroleum Engineering, The Faculty of Tarbiyah of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Petroleum Engineering, The Faculty of Tarbiyah of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5122 / October / 2436.

08 Nopember 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Sekretaris Jurusan Sejak Berdiri Jurusan Teknik Pertambangan, Fakultas Tarbiyah UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Pertambangan, Fakultas Tarbiyah UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5122 / Oktober / 2436.
November 08th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Secretary of Department Since Standing The Department of Mining Engineering, The Faculty of Tarbiyah of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Mining Engineering, The Faculty of Tarbiyah of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5122 / October / 2436.

15 Nopember 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Dosen-Dosen Jurusan Sejak Berdiri Jurusan Kewirausahaan, Sekolah Bisnis dan Manajemen (SBM) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Kewirausahaan, Sekolah Bisnis dan Manajemen (SBM) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5122 / Oktober / 2436.
November 15th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Lecturers of Department Since Standing The Department of Entrepreneurship, The School of Business and Management of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Entrepreneurship, The School of Business and Management of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5122 / October / 2436.

22 Nopember 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Dosen-Dosen Jurusan Sejak Berdiri Jurusan Manajemen, Sekolah Bisnis dan Manajemen (SBM) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Manajemen, Sekolah Bisnis dan Manajemen (SBM) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5122 / Oktober / 2436.
November 22nd, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Lecturers of Department Since Standing The Department of Management, The School of Business and Management of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Management, The School of Business and Management of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5122 / October / 2436.

29 Nopember 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Dosen-Dosen Jurusan Sejak Berdiri Jurusan Perencanaan Wilayah dan Kota, Sekolah Arsitektur, Perencanaan, dan Pengembangan Kebijakan (SAPPK) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Perencanaan Wilayah dan Kota, Sekolah Arsitektur, Perencanaan, dan Pengembangan Kebijakan (SAPPK) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5122 / Oktober / 2436.
November 29th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Lecturers of Department Since Standing The Department of Regional and City Planning, The School of Architecture, Planning, and Policy Development of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Regional and City Planning, The School of Architecture, Planning, and Policy Development of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5122 / October / 2436.

06 Desember 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Dosen-Dosen Jurusan Sejak Berdiri Jurusan Arsitektur, Sekolah Arsitektur, Perencanaan, dan Pengembangan Kebijakan (SAPPK) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Arsitektur, Sekolah Arsitektur, Perencanaan, dan Pengembangan Kebijakan (SAPPK) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5123 / Nopember / 2436.
December 06th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Lecturers of Department Since Standing The Department of Architecture, The School of Architecture, Planning, and Policy Development of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Architecture, The School of Architecture, Planning, and Policy Development of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5123 / November / 2436.

13 Desember 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Dosen-Dosen Jurusan Sejak Berdiri Jurusan Teknik Biomedis, Fakultas Teknik Elektro dan Informatika (FTEI) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Biomedis, Fakultas Teknik Elektro dan Informatika (FTEI) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5123 / Nopember / 2436.
December 13th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Lecturers of Department Since Standing The Department of Biomedical Engineering, The Faculty of Electrical and Informatic Engineering of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Biomedical Engineering, The Faculty of Electrical and Informatic Engineering of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5123 / November / 2436.

20 Desember 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Dosen-Dosen Jurusan Sejak Berdiri Jurusan Sistem dan Teknologi Informasi, Fakultas Teknik Elektro dan Informatika (FTEI) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Sistem dan Teknologi Informasi, Fakultas Teknik Elektro dan Informatika (FTEI) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5123 / Nopember / 2436.
December 20th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Lecturers of Department Since Standing The Department of System and Technology of Information, The Faculty of Electrical and Informatic Engineering of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of System and Technology of Information, The Faculty of Electrical and Informatic Engineering of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5123 / November / 2436.

27 Desember 2436 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Dosen-Dosen Jurusan Sejak Berdiri Jurusan Teknik Telekomunikasi, Fakultas Teknik Elektro dan Informatika (FTEI) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (A.P., Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (A.Ma., Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (A.Md., Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A., Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Telekomunikasi, Fakultas Teknik Elektro dan Informatika (FTEI) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 5123 / Nopember / 2436.
December 27th, 2436 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of The Lecturers of Department Since Standing The Department of Telecommunication Engineering, The Faculty of Electrical and Informatic Engineering of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (A.P., Diploma-I, D-I), Final Project for Degree of Young Expert (A.Ma., Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (A.Md., Diploma-III, D-III), Final Project for Degree of Expert (A., Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of Ph.D. (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Telecommunication Engineering, The Faculty of Electrical and Informatic Engineering of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 5123 / November / 2436.


Sumber-sumber (sources) :
01.  Surat Edaran Nomor 10/SE/M/2018 tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi Dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019, Lampiran III.
01.  Circular Letter Number 10 / SE / M / 2018 concerning Enforcement of the Selection Document Standard for Procurement of Construction Services in the Context of Early Auction in the Ministry of Public Works and Public Housing for  Budget Year2019, Annex III.

02.  Google Translate.



Banggua, Desa Roburan Lombang, 01 April 2033
Banggua, Desa Roburan Lombang, April 01st, 2033

Tidak ada komentar:

Posting Komentar

TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 05 DECEMBER 2443 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 05 DESEMBER 2443 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos EVOLUSI PENDIDIKAN MANDAILING 419 (EMPAT RATUS SEMBILAN BELAS) TAHUN DI TAHUN 2...