MENUJU BERDIRINYA UM (UNIVERSITAS MANDAILING)
TOWARDS THE ESTABLISHMENT OF MU (MANDAILING UNIVERSITY)
https://www.youtube.com/watch?v=qLJL00wedag&list=PLxo9BSZMgjTa6QAGlHKueJWEbMV_kQFfV&index=338&t=0s
TOWARDS THE ESTABLISHMENT OF MU (MANDAILING UNIVERSITY)
https://www.youtube.com/watch?v=qLJL00wedag&list=PLxo9BSZMgjTa6QAGlHKueJWEbMV_kQFfV&index=338&t=0s
KISI-KISI KONTEN JURNAL ILMIAH UM (UNIVERSITAS MANDAILING)
TABLE OF SPECIFICATIONS OF THE SCIENTIFIC JOURNAL OF MU (MANDAILING UNIVERSITY)
TABLE OF SPECIFICATIONS OF THE SCIENTIFIC JOURNAL OF MU (MANDAILING UNIVERSITY)
JBAR MGB SM (JURNAL BULANAN ANALISIS RISET MIKRON GEN BIOLOGIS SEPANJANG MASA)
THE MONTHLY JOURNAL OF RESEARCH ANALYSIS OF BIOLOGICAL GENETIC MICRON OF ALL TIME
Juli 2031
July 2031
Arahan Pendiri & Ketum (Ketua Umum)
MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya,
The Direction from The Founder & The General Chairman of
The Central (Global) Leadership Assembly of The Great Mandailing Foundation,
Agussalim, ST bin Abdur Rahim Nasution
Materi - Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) di KPG (Kantor Pusat Global) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya, Banggua, Desa Roburan Lombang, Kecamatan Panyabungan Selatan, Kabupaten Mandailing Natal, Sumatera Utara - Indonesia.
Materials of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference in The Global Head Office of The Central (Global) Leadership Assembly of The Great Mandailing Foundation, Banggua, Desa Roburan Lombang, Kecamatan Panyabungan Selatan, Kabupaten Mandailing Natal, Sumatera Utara - Indonesia.
Sabtu, 02 Agustus 2031 Materi Kuliah Umum - e-teleconference, "Eksistensi Koordinator Biro Hasil Penjualan JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa), Divisi Usaha dan Dana MPRT YMR (Majelis Pimpinan Rukun Tetangga Yayasan Mandailing Raya) di seluruh dunia yang dikonsentrasitaktiskan di Kabupaten Mandailing Natal" yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 0259/Juli/2031.
Saturday, August 02nd, 2031 Public Lecture material - e-teleconference “Existence of The Coordinator of The Bureau of Sale Results of The Monthly Journal of Research Analysis of All Time, The Division of Effort and Fund of The Neighborhood Leadership Assembly of The Great Mandailing Foundation on worldwide is concerned and tacticed in Regency of Mandailing Natal" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 0259/July/2031.
Koordinator Biro Hasil Penjualan JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa), Divisi Usaha dan Dana MPRT YMR (Majelis Pimpinan Rukun Tetangga Yayasan Mandailing Raya) untuk merekomendasikan kepada Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Lingkungan (FTSL); Jurusan Hukum Administrasi Negara, Jurusan Hukum Masyarakat dan Pembangunan, Jurusan Hukum Bisnis, Jurusan Hukum Ekonomi, Jurusan Hukum Perdagangan Internasional dan Jurusan Hukum Keuangan Negara, Fakultas Hukum; Jurusan Pendidikan Teknik dan Kejuruan (JPTK), Jurusan Pendidikan Ekonomi dan Jurusan Pendidikan Teknik Bangunan (PTB), Fakultas Keguruan dan Ilmu Pendidikan; Manajemen dan Kebijakan Publik (Ilmu Administrasi Negara) dan Ilmu Administrasi Publik, Fakultas ISIPOL (Ilmu Sosial & Ilmu Politik); Mu’amalah (Hukum Bisnis Islam), Keuangan Islam dan HES (Hukum Ekonomi Syari’ah), Fakultas Syariah; Jurusan Teknik Sipil dan Lingkungan, Fakultas Teknologi Pertanian (FATETA); Jurusan Ekonomi dan Studi Pembangunan dan Jurusan Ekonomi Sumberdaya dan Lingkungan, Fakultas Ekonomi dan Manajemen; Jurusan Perencananaan dan Kebijakan Publik dan Jurusan Bisnis Islam, FE (Fakultas Ekonomi); The Department of Urban Studies + Planning, School of Architecture and Planning (SA+P); Civil and Environmental Engineering, School of Engineering; BA (Master of Administration) Program, Agussalim Management; Jurusan Perencanaan Wilayah dan Kota, Sekolah Arsitektur, Perencanaan, dan Pengembangan Kebijakan (SAPPK); dan Jurusan Manajemen dan Jurusan Kewirausahaan, Sekolah Bisnis dan Manajemen (SBM) UM (Universitas Mandailing) untuk memutakhirkan dengan memahami Surat Edaran Nomor 10/SE/M/2018 tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi Dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu Lampiran I Surat Edaran Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 10 / SE / M / 2018 tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu Pembukaan dan Evaluasi Penawaran, 1. Evaluasi Kualifikasi, 1.1. Kelompok Kerja (Pokja) Pemilihan melakukan evaluasi kualifikasi terhadap dokumen kualifikasi yang disampaikan (diunggah) oleh peserta melalui form elektronik isian kualifikasi dalam aplikasi Sistem Pengadaan Secara Elektronik (SPSE) atau pada fasilitas upload data kualifikasi lainnya, 1.2. Data kualifikasi pada form elektronik isian kualifikasi dalam aplikasi Sistem Pengadaan Secara Elektronik (SPSE) atau pada fasilitas upload data kualifikasi lainnya merupakan bagian yang saling melengkapi, 1.3. dalam hal dijumpai perbedaan mengenai isian data kualifikasi dengan data yang diunggah (upload), maka data yang dianggap benar adalah data yang terdapat dalam isian kualifikasi form elektronik Sistem Pengadaan Secara Elektronik (SPSE), 1.4. Evaluasi kualifikasi dapat dilakukan bersamaan dengan tahapan Evaluasi Penawaran, 1.5. Evaluasi kualifikasi menggunakan sistem gugur, 1.6. Evaluasi terhadap Sertifikat Badan Usaha (SBU) memperhatikan ketentuan sebagai berikut: a) masa berlaku Sertifikat Badan Usaha (SBU) berdasarkan masa berlaku yang tertera/tertulis pada sertifikat tersebut dengan tidak memperhatikan ketentuan registrasi tahunan, b) Sertifikat Badan Usaha (SBU) yang habis masa berlakunya sebelum batas akhir pemasukan Dokumen Penawaran tidak dapat diterima dan penyedia dinyatakan gugur, dan c) dalam hal masa berlaku Sertifikat Badan Usaha (SBU) habis setelah batas akhir pemasukan Dokumen Penawaran, maka Peserta harus menyampaikan Sertifikat Badan Usaha (SBU) yang sudah diperpanjang kepada Pejabat Pembuat Komitmen pada saat rapat persiapan penunjukan penyedia, 1.7. dalam hal peserta ber- KSO (Kerja Sama Operasi), dokumen kualifikasi dilengkapi dengan Pakta Integritas dari anggota KSO (Kerja Sama Operasi)-nya. Apabila tidak ada, maka tidak dievaluasi lebih lanjut dan dinyatakan gugur kualifikasi, 1.8. apabila ditemukan hal-hal dan/atau data yang kurang jelas maka dilakukan klarifikasi secara tertulis namun tidak boleh mengubah substansi formulir isian kualifikasi, 1.9. evaluasi kualifikasi dalam proses pascakualifikasi sudah merupakan ajang kompetisi, maka data yang kurang tidak dapat dilengkapi, 1.10. Selain ketentuan di atas, Peserta dinyatakan lulus kualifikasi apabila memenuhi ketentuan pada Lembar Data Kualifikasi (LDK); 2. Pembuktian Kualifikasi, 2.1. Pembuktian kualifikasi dilakukan terhadap peserta yang memenuhi persyaratan kualifikasi, 2.2. Undangan pembuktian kualifikasi harus disampaikan tertulis secara elektronik dan/atau non elektronik, 2.3. dalam undangan pembuktian kualifikasi sudah menyebutkan dokumen yang wajib dibawa oleh peserta pada saat pembuktian kualifikasi, 2.4. Pembuktian kualifikasi tidak dilakukan jika peserta telah terkualifikasi melalui Sistem Informasi Kinerja Penyedia (SIKaP), 2.5. Pembuktian kualifikasi dilakukan di luar aplikasi Sistem Pengadaan Secara Elektronik (SPSE) [offline] dengan memperhitungkan waktu yang dibutuhkan untuk kehadiran penyedia dan penyiapan dokumen yang akan dibuktikan, 2.6. apabila peserta tidak dapat menghadiri pembuktian kualifikasi dengan alasan yang dapat diterima, maka Kelompok Kerja (Pokja) Pemilihan memperpanjang waktu pembuktian kualifikasi sekurang - kurangnya 1 (satu) hari kerja, 2.7. dalam hal peserta tidak hadir karena tidak dapat mengakses data kontak (misal akun email atau no telepon) tidak dapat dibuka/dihubungi, tidak sempat mengakses atau alasan teknis apapun dari sisi peserta, maka risiko sepenuhnya ada pada peserta, 2.8. Wakil peserta yang hadir pada saat pembuktian kualifikasi adalah: a. Direksi yang namanya ada dalam akta pendirian/perubahan atau pihak yang sah menurut akta pendirian/perubahan, b. Penerima kuasa dari direksi yang nama penerima kuasanya tercantum dalam akta pendirian/perubahan, c. Pihak lain yang bukan direksi dapat menghadiri pembuktian kualifikasi selama berstatus sebagai tenaga kerja tetap (yang dibuktikan dengan bukti setor pajak PPH (Pajak Penghasilan) Pasal 21 Form 1721 atau Form 1721-I atau kepesertaan BPJS (Badan Penyelenggara Jaminan Sosial)-Ketenagakerjaan dan memperoleh kuasa dari Direksi yang namanya ada dalam akta pendirian/perubahan atau pihak yang sah menurut akta pendirian/perubahan, d. Kepala Cabang perusahaan yang diangkat oleh kantor pusat yang dibuktikan dengan dokumen otentik, atau e. Pejabat yang menurut Perjanjian Kerja Sama Operasi (KSO) berhak mewakili KSO (Kerja Sama Operasi), 2.9. pembuktian kualifikasi dilakukan dengan memverifikasi kesesuaian data pada informasi Formulir elektonik isian kualifikasi pada Sistem Pengadaan Secara Elektronik (SPSE) atau fasilitas lain yang disediakan dengan dokumen asli, salinan dokumen yang sudah dilegalisir oleh pejabat yang berwenang dan meminta salinan dokumen tersebut, dan/atau melalui fasilitas elektronik yang disediakan oleh penerbit dokumen. Pembuktian kualifikasi terhadap alamat penyedia, peralatan, dan/atau sumber daya manusia serta persyaratan kualifikasi lainnya dapat dilakukan dengan klarifikasi/verifikasi lapangan apabila dibutuhkan, 2.10. Pembuktian kualifikasi untuk memeriksa/ meneliti keabsahan pengalaman pekerjaan sejenis, dievaluasi dengan cara melihat dokumen kontrak asli dan Berita Acara Serah Terima Pekerjaan dari pekerjaan yang telah diselesaikan sebelumnya, 2.11. apabila peserta tidak hadir dalam pembuktian kualifikasi dan/atau telah diberikan kesempatan namun tetap tidak dapat menghadiri pembuktian kualifikasi sesuai dengan 2.6, maka peserta dinyatakan gugur dan Jaminan Penawaran (apabila disyaratkan) dicairkan ke Kas Negara/Daerah, 2.12. apabila hasil pembuktian kualifikasi ditemukan pemalsuan data, maka peserta digugurkan, dikenakan sanksi Daftar Hitam, Jaminan Penawaran (apabila disyaratkan) dicairkan ke Kas Negara/Daerah, 2.13. dalam hal tidak ada peserta yang lulus pembuktian kualifikasi, maka tender dinyatakan gagal; 3. penawaran Harga Secara Berulang (e-reverse auction), 3.1. dalam hal hanya terdapat 2 (dua) penawar yang dinyatakan lulus administrasi, teknis, dan kualifikasi, peserta dapat diberikan kesempatan untuk berkompetisi kembali dengan cara menyampaikan penawaran harga lebih dari 1 (satu) kali dan bersifat lebih rendah dari penawaran sebelumnya, 3.2. Kelompok Kerja (Pokja) pemilihan mengundang peserta melakukan e-reverse auction dengan mencantumkan waktu pelaksanaan untuk peserta menyampaikan penawaran berulang dalam kurun waktu yang telah ditetapkan, dan 3.3. Peserta menyampaikan penawaran harga melalui fitur pada aplikasi Sistem Pengadaan Secara Elektronik (SPSE) atau sistem pengaman dokumen berdasarkan alokasi waktu (batch) atau secara real-time, 32.4. setelah masa penyampaian penawaran berulang berakhir maka sistem akan menginformasikan peringkat berdasarkan urutan posisi penawar (positional bidding) secara real-time; dan 4. Klarifikasi dan Negosiasi Teknis dan Harga, 4.1. dalam hal hanya 1 (satu) peserta yang memenuhi persyaratan administrasi, teknis, dan kualifikasi, dilakukan klarifikasi dan negosiasi teknis dan harga, 4.2. hal yang diklarifikasi adalah metode pelaksanaan pekerjaan yang dapat mempengaruhi harga untuk dilakukan negosiasi, dan 4.3. hasil klarifikasi dan negosiasi teknis dan harga dituangkan dalam berita acara klarifikasi dan negosiasi teknis dan harga.
The Coordinator of The Bureau of Sale Results of The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time, The Division of Effort and Fund of The Neighborhood Leadership Assembly of The Great Mandailing Foundation to recommend to to recommend to The Department of Civil Engineering, The Faculty of Civil and Environmental Engineering; The Department of State Administrative Law, The Department of Law of Public and Development, The Department of Business Law, The Department of Economic Law, The Department of International Trade Law and The Department of State Financial Law, The Faculty of Law; The Department of Engineering and Vocational Education, The Department of Economic Education and The Department of Building Engineering Education, The Faculty of Teacher Training and Education Science; Management and Public Policy (State Administration Science) and Public Administration Science, The Faculty of Social Sciences & Political Sciences; Mu'amalah (Islamic Business Law), Islamic Finance and Syari'ah Economic Law, The Faculty of Sharia; The Department of Civil and Environmental Engineering, The Faculty of Agricultural Technology; The Department of Economics and Development Studies and The Department of Resource and Environmental Economics, The Faculty of Economics and Management; The Department of Planning and Public Policy and The Department of Islamic Business, The Faculty of Economics; The Department of Urban Studies + Planning, School of Architecture and Planning (SA+P); Civil and Environmental Engineering, School of Engineering; MBA (Master of Business Administration) Program, Agussalim Management; The Department of Regional and City Planning, The School of Architecture, Planning, and Policy Development; and The Department of Management and Department of Entrepreneurship, The School of Business and Management of MU (Mandailing University) to update by understanding Circular Letter Number 10 / SE / M / 2018 concerning Enforcement of Standard of Selection Documents for the Procurement of Construction Services in the Context of Early Auction in the Ministry of Public Works and Public Housing for Budget Year 2019, namely Annex I of Circular Letter of the Minister of Public Works and Public Housing Number 10 / SE / M / 2018 concerning the Enactment of the Standared of Selection Document for the Procurement of Construction Services in the Early Auction Framework at the Ministry of Public Works and Public Housing for Fiscal Year 2019, namely Bid Opening and Evaluation, 1. Qualification Evaluation, 1.1. The Election Working Group evaluates the qualifications of the qualification documents submitted (uploaded) by participants through the electronic form of qualification in the Electronic Procurement System application or in other qualification data upload facilities, 1.2. Qualification data on the electronic form of qualification in the Electronic Procurement System application or in other qualification data upload facilities are complementary parts, 1.3. in the event that differences are found regarding the contents of the qualification data with the uploaded data, then the data that is considered correct is the data contained in the electronic form of qualification field of the Electronic Procurement System qualification field, 1.4. Qualification evaluation can be carried out simultaneously with the Bid Evaluation stages, 1.5. Evaluation of qualifications using the knockout system, 1.6. Evaluation of the Business Entity Certificate takes into account the following provisions: a) the validity period of the Business Entity Certificate based on the validity period stated / written on the certificate with no regard to the annual registration provisions, b) Business Entity Certificate is exhausted the validity period before the deadline for submission of Bid Documents cannot be accepted and the provider is declared null, and c) in the event that the validity period of the Business Entity Certificate expires after the deadline for submission of Bid Documents, the Participant must submit an Extended Business Entity Certificate to the Commitment Making Officer during the provider appointment preparation meeting, 1.7. in the case of an Operational Cooperation participant, the qualification document is equipped with an Integrity Pact from its Operational Cooperation members. if it does not exist, it will not be further evaluated and declared to be a qualifying deceased, 1.8. if things are unclear and / or data is unclear, clarification is carried out in writing but may not change the substance of the form of the qualification form, 1.9. qualification evaluation in the post-qualification process is already a competition event, the data that is lacking cannot be completed, 1.10. in addition to the provisions above, Participants are declared to have passed the qualification if they fulfill the provisions in the Qualification Data Sheet; 2. Proof of Qualification, 2.1. Proof of qualification is carried out for participants who meet the qualification requirements, 2.2. Invitation to prove qualifications must be submitted in writing electronically and / or non-electronically, 2.3. in the invitation to prove the qualification, the document must be submitted by the participant at the time of proof of qualification, 2.4. Proof of qualification is not done if the participant has been qualified through the Provider Performance Information System, 2.5. Proof of qualification is carried out outside the application of the Electronic Procurement System [offline] by taking into account the time needed for the presence of the provider and preparation of documents to be proven, 2.6. if the participant cannot attend the proof of qualification with an acceptable reason, the Election Working Group will extend the time of proof of qualification at least 1 (one) working day, 2.7. in the event that the participant is absent because he cannot access contact data (e.g. an e-mail account or telephone number) cannot be opened / contacted, does not have time to access or any technical reason from the participant's side, then the risk is entirely on the participant, 2.8. representatives of participants present at the time of verification of qualifications are: a. Directors whose names are in the certificate of deed of establishment / change or legitimate party according to the deed of establishment / change, b. Endorsee from the board of directors whose name is stated in the deed of establishment / change, c. other Parties who are not directors can attend the proof of qualification for the status of permanent workers (as evidenced by the proof of Income Tax Article 21 Form 1721 or Form 1721-I or membership of the Social Security Organizing Agency and obtain the power from the Board of Directors whose name is in the deed of establishment / change or the legitimate party according to the deed of establishment / change, d. Head of company branch appointed by the head office as evidenced by authentic documents, or e. Officials who, according to the Operational Cooperation Agreement, are entitled to represent the Operational Cooperation, 2.9. verification of qualifications is carried out by verifying the suitability of the data in the electronic Form information in the qualification form of the Electronic Procurement System or other facilities provided with original documents, copies of documents that have been legalized by authorized officials and requesting copies of the documents, and / or facilities electronics provided by the document issuer. Proof of qualifications for the address of the provider, equipment, and / or human resources and other qualification requirements can be done with clarification / verification of the field if needed, 2.10. Proof of qualifications for examining the validity of similar work experience, evaluated by looking at the original contract document and Job Handover Minutes of work previously completed, 2.11. if the participant is not present in the proof of qualification and / or has been given the opportunity but still cannot attend the verification of qualifications in accordance with 2.6, the participant is declared null and the Bid Guarantee (if required) is disbursed to the State / Regional Cash, 2.12. if the results of proof of qualifications are found to be forgery of data, then the participant will be aborted, subject to Black List sanction, Bid Security (if required) disbursed to State / Regional Cash, 2.13. In the event that no participant has passed the proof of qualification, then the tender is declared failed; 3. repeat Price offer (e-reverse auction), 3.1. in the event that there are only 2 (two) bidders who have passed administration, technical, and qualifications, participants can be given the opportunity to compete again by submitting a price offer of more than 1 (one) time and being lower than the previous bid, 3.2. The selection Working Group invites participants to conduct an e-reverse auction by stating the implementation time for participants to submit repeated offers within a specified time period, and 3.3. Participants submit price offers through features in the Electronic Procurement System application or document security system based on time allocation (batch) or in real-time, 32.4. after the repeat bidding period has expired, the system will inform the ranking based on the positional bidding in real-time; and 4. Technical Clarification and Negotiation and Price, 4.1. in the event that only 1 (one) participant meets administrative, technical, and qualification requirements, technical clarification and negotiation and prices are carried out, 4.2. what is clarified is the method of carrying out work that can affect the price for negotiation, and 4.3. results of clarification and technical negotiations and prices are set forth in minutes of clarification and technical negotiations and prices.
Sabtu, 02 Agustus 2031 Materi Kuliah Umum - e-teleconference, "Eksistensi Koordinator Biro Hasil Penjualan JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa), Divisi Usaha dan Dana MPRT YMR (Majelis Pimpinan Rukun Tetangga Yayasan Mandailing Raya) di seluruh dunia yang dikonsentrasitaktiskan di Kabupaten Mandailing Natal" yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 0259/Juli/2031.
Saturday, August 02nd, 2031 Public Lecture material - e-teleconference “Existence of The Coordinator of The Bureau of Sale Results of The Monthly Journal of Research Analysis of All Time, The Division of Effort and Fund of The Neighborhood Leadership Assembly of The Great Mandailing Foundation on worldwide is concerned and tacticed in Regency of Mandailing Natal" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 0259/July/2031.
Koordinator Biro Hasil Penjualan JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa), Divisi Usaha dan Dana MPRT YMR (Majelis Pimpinan Rukun Tetangga Yayasan Mandailing Raya) untuk merekomendasikan kepada Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Lingkungan (FTSL); Jurusan Hukum Administrasi Negara, Jurusan Hukum Masyarakat dan Pembangunan, Jurusan Hukum Bisnis, Jurusan Hukum Ekonomi, Jurusan Hukum Perdagangan Internasional dan Jurusan Hukum Keuangan Negara, Fakultas Hukum; Jurusan Pendidikan Teknik dan Kejuruan (JPTK), Jurusan Pendidikan Ekonomi dan Jurusan Pendidikan Teknik Bangunan (PTB), Fakultas Keguruan dan Ilmu Pendidikan; Manajemen dan Kebijakan Publik (Ilmu Administrasi Negara) dan Ilmu Administrasi Publik, Fakultas ISIPOL (Ilmu Sosial & Ilmu Politik); Mu’amalah (Hukum Bisnis Islam), Keuangan Islam dan HES (Hukum Ekonomi Syari’ah), Fakultas Syariah; Jurusan Teknik Sipil dan Lingkungan, Fakultas Teknologi Pertanian (FATETA); Jurusan Ekonomi dan Studi Pembangunan dan Jurusan Ekonomi Sumberdaya dan Lingkungan, Fakultas Ekonomi dan Manajemen; Jurusan Perencananaan dan Kebijakan Publik dan Jurusan Bisnis Islam, FE (Fakultas Ekonomi); The Department of Urban Studies + Planning, School of Architecture and Planning (SA+P); Civil and Environmental Engineering, School of Engineering; BA (Master of Administration) Program, Agussalim Management; Jurusan Perencanaan Wilayah dan Kota, Sekolah Arsitektur, Perencanaan, dan Pengembangan Kebijakan (SAPPK); dan Jurusan Manajemen dan Jurusan Kewirausahaan, Sekolah Bisnis dan Manajemen (SBM) UM (Universitas Mandailing) untuk memutakhirkan dengan memahami Surat Edaran Nomor 10/SE/M/2018 tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi Dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu Lampiran I Surat Edaran Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 10 / SE / M / 2018 tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu Pembukaan dan Evaluasi Penawaran, 1. Evaluasi Kualifikasi, 1.1. Kelompok Kerja (Pokja) Pemilihan melakukan evaluasi kualifikasi terhadap dokumen kualifikasi yang disampaikan (diunggah) oleh peserta melalui form elektronik isian kualifikasi dalam aplikasi Sistem Pengadaan Secara Elektronik (SPSE) atau pada fasilitas upload data kualifikasi lainnya, 1.2. Data kualifikasi pada form elektronik isian kualifikasi dalam aplikasi Sistem Pengadaan Secara Elektronik (SPSE) atau pada fasilitas upload data kualifikasi lainnya merupakan bagian yang saling melengkapi, 1.3. dalam hal dijumpai perbedaan mengenai isian data kualifikasi dengan data yang diunggah (upload), maka data yang dianggap benar adalah data yang terdapat dalam isian kualifikasi form elektronik Sistem Pengadaan Secara Elektronik (SPSE), 1.4. Evaluasi kualifikasi dapat dilakukan bersamaan dengan tahapan Evaluasi Penawaran, 1.5. Evaluasi kualifikasi menggunakan sistem gugur, 1.6. Evaluasi terhadap Sertifikat Badan Usaha (SBU) memperhatikan ketentuan sebagai berikut: a) masa berlaku Sertifikat Badan Usaha (SBU) berdasarkan masa berlaku yang tertera/tertulis pada sertifikat tersebut dengan tidak memperhatikan ketentuan registrasi tahunan, b) Sertifikat Badan Usaha (SBU) yang habis masa berlakunya sebelum batas akhir pemasukan Dokumen Penawaran tidak dapat diterima dan penyedia dinyatakan gugur, dan c) dalam hal masa berlaku Sertifikat Badan Usaha (SBU) habis setelah batas akhir pemasukan Dokumen Penawaran, maka Peserta harus menyampaikan Sertifikat Badan Usaha (SBU) yang sudah diperpanjang kepada Pejabat Pembuat Komitmen pada saat rapat persiapan penunjukan penyedia, 1.7. dalam hal peserta ber- KSO (Kerja Sama Operasi), dokumen kualifikasi dilengkapi dengan Pakta Integritas dari anggota KSO (Kerja Sama Operasi)-nya. Apabila tidak ada, maka tidak dievaluasi lebih lanjut dan dinyatakan gugur kualifikasi, 1.8. apabila ditemukan hal-hal dan/atau data yang kurang jelas maka dilakukan klarifikasi secara tertulis namun tidak boleh mengubah substansi formulir isian kualifikasi, 1.9. evaluasi kualifikasi dalam proses pascakualifikasi sudah merupakan ajang kompetisi, maka data yang kurang tidak dapat dilengkapi, 1.10. Selain ketentuan di atas, Peserta dinyatakan lulus kualifikasi apabila memenuhi ketentuan pada Lembar Data Kualifikasi (LDK); 2. Pembuktian Kualifikasi, 2.1. Pembuktian kualifikasi dilakukan terhadap peserta yang memenuhi persyaratan kualifikasi, 2.2. Undangan pembuktian kualifikasi harus disampaikan tertulis secara elektronik dan/atau non elektronik, 2.3. dalam undangan pembuktian kualifikasi sudah menyebutkan dokumen yang wajib dibawa oleh peserta pada saat pembuktian kualifikasi, 2.4. Pembuktian kualifikasi tidak dilakukan jika peserta telah terkualifikasi melalui Sistem Informasi Kinerja Penyedia (SIKaP), 2.5. Pembuktian kualifikasi dilakukan di luar aplikasi Sistem Pengadaan Secara Elektronik (SPSE) [offline] dengan memperhitungkan waktu yang dibutuhkan untuk kehadiran penyedia dan penyiapan dokumen yang akan dibuktikan, 2.6. apabila peserta tidak dapat menghadiri pembuktian kualifikasi dengan alasan yang dapat diterima, maka Kelompok Kerja (Pokja) Pemilihan memperpanjang waktu pembuktian kualifikasi sekurang - kurangnya 1 (satu) hari kerja, 2.7. dalam hal peserta tidak hadir karena tidak dapat mengakses data kontak (misal akun email atau no telepon) tidak dapat dibuka/dihubungi, tidak sempat mengakses atau alasan teknis apapun dari sisi peserta, maka risiko sepenuhnya ada pada peserta, 2.8. Wakil peserta yang hadir pada saat pembuktian kualifikasi adalah: a. Direksi yang namanya ada dalam akta pendirian/perubahan atau pihak yang sah menurut akta pendirian/perubahan, b. Penerima kuasa dari direksi yang nama penerima kuasanya tercantum dalam akta pendirian/perubahan, c. Pihak lain yang bukan direksi dapat menghadiri pembuktian kualifikasi selama berstatus sebagai tenaga kerja tetap (yang dibuktikan dengan bukti setor pajak PPH (Pajak Penghasilan) Pasal 21 Form 1721 atau Form 1721-I atau kepesertaan BPJS (Badan Penyelenggara Jaminan Sosial)-Ketenagakerjaan dan memperoleh kuasa dari Direksi yang namanya ada dalam akta pendirian/perubahan atau pihak yang sah menurut akta pendirian/perubahan, d. Kepala Cabang perusahaan yang diangkat oleh kantor pusat yang dibuktikan dengan dokumen otentik, atau e. Pejabat yang menurut Perjanjian Kerja Sama Operasi (KSO) berhak mewakili KSO (Kerja Sama Operasi), 2.9. pembuktian kualifikasi dilakukan dengan memverifikasi kesesuaian data pada informasi Formulir elektonik isian kualifikasi pada Sistem Pengadaan Secara Elektronik (SPSE) atau fasilitas lain yang disediakan dengan dokumen asli, salinan dokumen yang sudah dilegalisir oleh pejabat yang berwenang dan meminta salinan dokumen tersebut, dan/atau melalui fasilitas elektronik yang disediakan oleh penerbit dokumen. Pembuktian kualifikasi terhadap alamat penyedia, peralatan, dan/atau sumber daya manusia serta persyaratan kualifikasi lainnya dapat dilakukan dengan klarifikasi/verifikasi lapangan apabila dibutuhkan, 2.10. Pembuktian kualifikasi untuk memeriksa/ meneliti keabsahan pengalaman pekerjaan sejenis, dievaluasi dengan cara melihat dokumen kontrak asli dan Berita Acara Serah Terima Pekerjaan dari pekerjaan yang telah diselesaikan sebelumnya, 2.11. apabila peserta tidak hadir dalam pembuktian kualifikasi dan/atau telah diberikan kesempatan namun tetap tidak dapat menghadiri pembuktian kualifikasi sesuai dengan 2.6, maka peserta dinyatakan gugur dan Jaminan Penawaran (apabila disyaratkan) dicairkan ke Kas Negara/Daerah, 2.12. apabila hasil pembuktian kualifikasi ditemukan pemalsuan data, maka peserta digugurkan, dikenakan sanksi Daftar Hitam, Jaminan Penawaran (apabila disyaratkan) dicairkan ke Kas Negara/Daerah, 2.13. dalam hal tidak ada peserta yang lulus pembuktian kualifikasi, maka tender dinyatakan gagal; 3. penawaran Harga Secara Berulang (e-reverse auction), 3.1. dalam hal hanya terdapat 2 (dua) penawar yang dinyatakan lulus administrasi, teknis, dan kualifikasi, peserta dapat diberikan kesempatan untuk berkompetisi kembali dengan cara menyampaikan penawaran harga lebih dari 1 (satu) kali dan bersifat lebih rendah dari penawaran sebelumnya, 3.2. Kelompok Kerja (Pokja) pemilihan mengundang peserta melakukan e-reverse auction dengan mencantumkan waktu pelaksanaan untuk peserta menyampaikan penawaran berulang dalam kurun waktu yang telah ditetapkan, dan 3.3. Peserta menyampaikan penawaran harga melalui fitur pada aplikasi Sistem Pengadaan Secara Elektronik (SPSE) atau sistem pengaman dokumen berdasarkan alokasi waktu (batch) atau secara real-time, 32.4. setelah masa penyampaian penawaran berulang berakhir maka sistem akan menginformasikan peringkat berdasarkan urutan posisi penawar (positional bidding) secara real-time; dan 4. Klarifikasi dan Negosiasi Teknis dan Harga, 4.1. dalam hal hanya 1 (satu) peserta yang memenuhi persyaratan administrasi, teknis, dan kualifikasi, dilakukan klarifikasi dan negosiasi teknis dan harga, 4.2. hal yang diklarifikasi adalah metode pelaksanaan pekerjaan yang dapat mempengaruhi harga untuk dilakukan negosiasi, dan 4.3. hasil klarifikasi dan negosiasi teknis dan harga dituangkan dalam berita acara klarifikasi dan negosiasi teknis dan harga.
The Coordinator of The Bureau of Sale Results of The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time, The Division of Effort and Fund of The Neighborhood Leadership Assembly of The Great Mandailing Foundation to recommend to to recommend to The Department of Civil Engineering, The Faculty of Civil and Environmental Engineering; The Department of State Administrative Law, The Department of Law of Public and Development, The Department of Business Law, The Department of Economic Law, The Department of International Trade Law and The Department of State Financial Law, The Faculty of Law; The Department of Engineering and Vocational Education, The Department of Economic Education and The Department of Building Engineering Education, The Faculty of Teacher Training and Education Science; Management and Public Policy (State Administration Science) and Public Administration Science, The Faculty of Social Sciences & Political Sciences; Mu'amalah (Islamic Business Law), Islamic Finance and Syari'ah Economic Law, The Faculty of Sharia; The Department of Civil and Environmental Engineering, The Faculty of Agricultural Technology; The Department of Economics and Development Studies and The Department of Resource and Environmental Economics, The Faculty of Economics and Management; The Department of Planning and Public Policy and The Department of Islamic Business, The Faculty of Economics; The Department of Urban Studies + Planning, School of Architecture and Planning (SA+P); Civil and Environmental Engineering, School of Engineering; MBA (Master of Business Administration) Program, Agussalim Management; The Department of Regional and City Planning, The School of Architecture, Planning, and Policy Development; and The Department of Management and Department of Entrepreneurship, The School of Business and Management of MU (Mandailing University) to update by understanding Circular Letter Number 10 / SE / M / 2018 concerning Enforcement of Standard of Selection Documents for the Procurement of Construction Services in the Context of Early Auction in the Ministry of Public Works and Public Housing for Budget Year 2019, namely Annex I of Circular Letter of the Minister of Public Works and Public Housing Number 10 / SE / M / 2018 concerning the Enactment of the Standared of Selection Document for the Procurement of Construction Services in the Early Auction Framework at the Ministry of Public Works and Public Housing for Fiscal Year 2019, namely Bid Opening and Evaluation, 1. Qualification Evaluation, 1.1. The Election Working Group evaluates the qualifications of the qualification documents submitted (uploaded) by participants through the electronic form of qualification in the Electronic Procurement System application or in other qualification data upload facilities, 1.2. Qualification data on the electronic form of qualification in the Electronic Procurement System application or in other qualification data upload facilities are complementary parts, 1.3. in the event that differences are found regarding the contents of the qualification data with the uploaded data, then the data that is considered correct is the data contained in the electronic form of qualification field of the Electronic Procurement System qualification field, 1.4. Qualification evaluation can be carried out simultaneously with the Bid Evaluation stages, 1.5. Evaluation of qualifications using the knockout system, 1.6. Evaluation of the Business Entity Certificate takes into account the following provisions: a) the validity period of the Business Entity Certificate based on the validity period stated / written on the certificate with no regard to the annual registration provisions, b) Business Entity Certificate is exhausted the validity period before the deadline for submission of Bid Documents cannot be accepted and the provider is declared null, and c) in the event that the validity period of the Business Entity Certificate expires after the deadline for submission of Bid Documents, the Participant must submit an Extended Business Entity Certificate to the Commitment Making Officer during the provider appointment preparation meeting, 1.7. in the case of an Operational Cooperation participant, the qualification document is equipped with an Integrity Pact from its Operational Cooperation members. if it does not exist, it will not be further evaluated and declared to be a qualifying deceased, 1.8. if things are unclear and / or data is unclear, clarification is carried out in writing but may not change the substance of the form of the qualification form, 1.9. qualification evaluation in the post-qualification process is already a competition event, the data that is lacking cannot be completed, 1.10. in addition to the provisions above, Participants are declared to have passed the qualification if they fulfill the provisions in the Qualification Data Sheet; 2. Proof of Qualification, 2.1. Proof of qualification is carried out for participants who meet the qualification requirements, 2.2. Invitation to prove qualifications must be submitted in writing electronically and / or non-electronically, 2.3. in the invitation to prove the qualification, the document must be submitted by the participant at the time of proof of qualification, 2.4. Proof of qualification is not done if the participant has been qualified through the Provider Performance Information System, 2.5. Proof of qualification is carried out outside the application of the Electronic Procurement System [offline] by taking into account the time needed for the presence of the provider and preparation of documents to be proven, 2.6. if the participant cannot attend the proof of qualification with an acceptable reason, the Election Working Group will extend the time of proof of qualification at least 1 (one) working day, 2.7. in the event that the participant is absent because he cannot access contact data (e.g. an e-mail account or telephone number) cannot be opened / contacted, does not have time to access or any technical reason from the participant's side, then the risk is entirely on the participant, 2.8. representatives of participants present at the time of verification of qualifications are: a. Directors whose names are in the certificate of deed of establishment / change or legitimate party according to the deed of establishment / change, b. Endorsee from the board of directors whose name is stated in the deed of establishment / change, c. other Parties who are not directors can attend the proof of qualification for the status of permanent workers (as evidenced by the proof of Income Tax Article 21 Form 1721 or Form 1721-I or membership of the Social Security Organizing Agency and obtain the power from the Board of Directors whose name is in the deed of establishment / change or the legitimate party according to the deed of establishment / change, d. Head of company branch appointed by the head office as evidenced by authentic documents, or e. Officials who, according to the Operational Cooperation Agreement, are entitled to represent the Operational Cooperation, 2.9. verification of qualifications is carried out by verifying the suitability of the data in the electronic Form information in the qualification form of the Electronic Procurement System or other facilities provided with original documents, copies of documents that have been legalized by authorized officials and requesting copies of the documents, and / or facilities electronics provided by the document issuer. Proof of qualifications for the address of the provider, equipment, and / or human resources and other qualification requirements can be done with clarification / verification of the field if needed, 2.10. Proof of qualifications for examining the validity of similar work experience, evaluated by looking at the original contract document and Job Handover Minutes of work previously completed, 2.11. if the participant is not present in the proof of qualification and / or has been given the opportunity but still cannot attend the verification of qualifications in accordance with 2.6, the participant is declared null and the Bid Guarantee (if required) is disbursed to the State / Regional Cash, 2.12. if the results of proof of qualifications are found to be forgery of data, then the participant will be aborted, subject to Black List sanction, Bid Security (if required) disbursed to State / Regional Cash, 2.13. In the event that no participant has passed the proof of qualification, then the tender is declared failed; 3. repeat Price offer (e-reverse auction), 3.1. in the event that there are only 2 (two) bidders who have passed administration, technical, and qualifications, participants can be given the opportunity to compete again by submitting a price offer of more than 1 (one) time and being lower than the previous bid, 3.2. The selection Working Group invites participants to conduct an e-reverse auction by stating the implementation time for participants to submit repeated offers within a specified time period, and 3.3. Participants submit price offers through features in the Electronic Procurement System application or document security system based on time allocation (batch) or in real-time, 32.4. after the repeat bidding period has expired, the system will inform the ranking based on the positional bidding in real-time; and 4. Technical Clarification and Negotiation and Price, 4.1. in the event that only 1 (one) participant meets administrative, technical, and qualification requirements, technical clarification and negotiation and prices are carried out, 4.2. what is clarified is the method of carrying out work that can affect the price for negotiation, and 4.3. results of clarification and technical negotiations and prices are set forth in minutes of clarification and technical negotiations and prices.
Sabtu,
09 Agustus 2031 Materi KUM S3 MET (Kuliah
Umum Sabtu Sore Sepanjang Masa - Electronic-Teleconference),
"Eksistensi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa - Electronic-Teleconference) dari Tahun 2016 sampai dengan tahun 2020 yang
dikonsentrasitaktiskan di Kabupaten Mandailing Natal" yang terdapat dalam
JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa)
Nomor : 0259/Juli/2031.
Saturday, August 09th,
2031 Public Lecture material - e-teleconference “Existence of The Public Lecture of Afternoon Saturday of All Time
with Electronic Teleconference from 2016 to 2020 is concerned
and tacticed in Regency of Mandailing Natal" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number :
0259/July/2031.
Peserta
KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa - Electronic-Teleconference) untuk merekomendasikan kepada Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Lingkungan (FTSL);
Jurusan Hukum Administrasi Negara, Jurusan Hukum Masyarakat dan Pembangunan,
Jurusan Hukum Bisnis, Jurusan Hukum Ekonomi, Jurusan Hukum Perdagangan
Internasional dan Jurusan Hukum Keuangan Negara, Fakultas Hukum; Jurusan Pendidikan Teknik dan
Kejuruan (JPTK), Jurusan Pendidikan Ekonomi
dan Jurusan Pendidikan Teknik
Bangunan (PTB), Fakultas Keguruan dan Ilmu Pendidikan; Manajemen dan
Kebijakan Publik (Ilmu Administrasi Negara) dan Ilmu Administrasi Publik, Fakultas ISIPOL (Ilmu Sosial & Ilmu Politik); Mu’amalah (Hukum Bisnis
Islam), Keuangan Islam dan HES (Hukum Ekonomi
Syari’ah), Fakultas Syariah; Jurusan Teknik Sipil dan Lingkungan, Fakultas Teknologi Pertanian (FATETA); Jurusan Ekonomi dan Studi Pembangunan dan Jurusan Ekonomi Sumberdaya dan Lingkungan, Fakultas Ekonomi dan Manajemen; Jurusan Perencananaan dan Kebijakan
Publik dan Jurusan Bisnis Islam, FE (Fakultas Ekonomi); The Department of Urban Studies + Planning, School of Architecture
and Planning (SA+P); Civil and
Environmental Engineering, School of Engineering; BA (Master of Administration) Program, Agussalim Management; Jurusan Perencanaan Wilayah
dan Kota, Sekolah Arsitektur, Perencanaan, dan
Pengembangan Kebijakan (SAPPK); dan Jurusan Manajemen dan Jurusan Kewirausahaan, Sekolah Bisnis dan
Manajemen (SBM) UM (Universitas Mandailing) untuk memutakhirkan dengan memahami
Surat Edaran Nomor 10/SE/M/2018 tentang Pemberlakuan Standar Dokumen Pemilihan
Pengadaan Jasa Konstruksi Dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum
dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu Lampiran I Surat Edaran
Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 10 / SE / M / 2018 tentang
Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi dalam Rangka
Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun
Anggaran 2019 yaitu Penetapan Pemenang, 1. Penetapan Pemenang, 1.1. Kelompok Kerja
(Pokja) Pemilihan menetapkan pemenang apabila isian yang disampaikan peserta
pada formulir isian kualifikasi benar dan masih berlaku/valid, 1.2. dalam hal peserta diketahui mengikuti beberapa paket
pekerjaan yang di-tender-kan oleh
beberapa Kelompok Kerja (Pokja) Pemilihan dalam waktu yang bersamaan dan telah
ditetapkan menjadi pemenang pada beberapa paket tersebut, dilakukan perhitungan
ulang Sisa Kemampuan menangani Paket (SKP) (untuk usaha kecil)/Sisa Kemampuan Nyata
(SKN) [untuk usaha menengah dan besar], 1.3. dalam hal peserta mengikuti tender beberapa paket pekerjaan
konstruksi dalam waktu penetapan pemenang bersamaan: a. menawarkan peralatan
yang sama untuk beberapa paket yang diikuti dan dalam evaluasi memenuhi
persyaratan pada masing-masing paket pekerjaan, maka hanya dapat ditetapkan
sebagai pemenang pada 1 (satu) paket pekerjaan dengan cara melakukan klarifikasi
untuk menentukan peralatan tersebut akan ditempatkan, sedangkan untuk paket
pekerjaan lainnya dinyatakan peralatan tidak ada dan dinyatakan gugur, b.
apabila peserta menawarkan peralatan yang sama pada paket pekerjaan lain/yang
sedang berjalan, maka hanya dapat ditetapkan sebagai pemenang, apabila setelah
dilakukan klarifikasi peralatan tersebut tidak terikat pada paket lain, c.
ketentuan hanya dapat ditetapkan sebagai pemenang pada 1 (satu) paket pekerjaan
sebagaimana dimaksud pada huruf a dan b, dapat dikecualikan dengan syarat waktu
penggunaan alat tidak tumpang tindih (overlap),
ada peralatan cadangan yang diusulkan dalam Dokumen Penawaran yang memenuhi
syarat, lokasi peralatan yang berdekatan dalam pelaksanaan pekerjaan sehingga
dapat digunakan sesuai dengan jadwal pelaksanaan pekerjaan, dan/atau kapasitas
dan produktivitas peralatan secara teknis dapat menyelesaikan lebih dari 1
(satu) paket pekerjaan, d. menawarkan personel yang sama pada lebih dari 1
(satu) paket pekerjaan, maka hanya dapat ditetapkan sebagai pemenang pada 1
(satu) paket pekerjaan setelah dilakukan klarifikasi untuk menentukan personil
tersebut akan ditempatkan, sedangkan untuk paket pekerjaan lainnya dinyatakan
personel tidak ada dan dinyatakan gugur, e. ketentuan pada huruf d hanya dapat
ditetapkan sebagai pemenang pada 1 (satu) paket pekerjaan konstruksi, kecuali:
1) Personel yang diusulkan penugasannya sebagai Kepala Proyek/ General Superintendent (GS), 2) jadwal penugasan personel tidak
tumpang tindih (overlap) dengan
kegiatan lain berdasarkan jadwal pelaksanaan pekerjaan atau jadwal penugasan,
3) terdapat personel cadangan yang diusulkan dalam Dokumen Penawaran yang
memenuhi syarat, dan f. menawarkan personel yang sedang bekerja di paket lain,
maka pada saat akan ditetapkan sebagai pemenang dipastikan sudah tidak terikat
pada paket lain, 1.4. Kelompok Kerja (Pokja) Pemilihan membuat dan
menandatangani Berita Acara Hasil Pemilihan (BAHP) yang paling sedikit memuat:
a. Nama seluruh peserta, b. Harga penawaran atau harga penawaran terkoreksi
dari masing-masing peserta, c. Metode evaluasi yang digunakan, d. Unsur-unsur
yang dievaluasi, e. Rumus yang dipergunakan, f. Keterangan-keterangan lain yang
dianggap perlu hal Ikhwal pelaksanaan tender,
g. jumlah peserta yang lulus dan tidak lulus pada setiap tahapan evaluasi, h.
tanggal dibuatnya Berita Acara, dan i. Pernyataan bahwa tender gagal apabila tidak ada penawaran yang memenuhi syarat, 1.5.
dalam hal nilai pagu anggaran paling banyak Rp100.000.000.000,00 (seratus miliar
rupiah) maka penetapan pemenang dilakukan oleh Kelompok Kerja (Pokja)
Pemilihan, 1.6. dalam hal nilai pagu anggaran paling sedikit di atas
Rp100.000.000.000,00 (seratus miliar rupiah) maka penetapan pemenang dilakukan
oleh Pengguna Anggaran (PA), 1.7. apabila terjadi keterlambatan dalam
menetapkan pemenang dan akan mengakibatkan Surat Penawaran dan/atau Jaminan
Penawaran (apabila disyaratkan) habis masa berlakunya, maka dilakukan
konfirmasi kepada semua peserta yang lulus evaluasi penawaran dan evaluasi
kualifikasi untuk memperpanjang masa berlaku surat penawaran dan/atau Jaminan
Penawaran (apabila disyaratkan) secara tertulis sampai dengan perkiraan jadwal
penandatanganan kontrak, dan 1.8. dalam hal peserta yang lulus evaluasi
penawaran dan evaluasi kualifikasi tidak bersedia memperpanjang surat penawaran
dan/atau Jaminan Penawaran (apabila disyaratkan) dianggap mengundurkan diri dan
tidak dikenakan sanksi; 2. Pengumuman
Pemenang, Kelompok Kerja (Pokja) Pemilihan mengumumkan pemenang, pemenang
cadangan 1 dan 2 (apabila ada) melalui aplikasi Sistem Pengadaan Secara
Elektronik (SPSE); 3. Sanggah dari Peserta Tender,
3.1. Sanggahan dari Peserta yang memasukkan penawaran yang namanya tertera
dalam surat penawaran dan/atau tertera dalam akta pendirian perusahaan, 3.2.
Sanggahan disampaikan secara elektronik melalui aplikasi Sistem Pengadaan
Secara Elektronik (SPSE) disertai bukti terjadinya penyimpangan, 3.3. Sanggahan
diajukan oleh peserta apabila terjadi penyimpangan prosedur meliputi: a.
kesalahan dalam melakukan evaluasi, b. penyimpangan terhadap ketentuan dan
prosedur yang telah ditetapkan dalam Dokumen Pemilihan, c.
rekayasa/persekongkolan tertentu sehingga menghalangi terjadinya persaingan
usaha yang sehat, dan/atau d. penyalahgunaan wewenang oleh Kelompok Kerja
(Pokja) Pemilihan, pimpinan Unit Kerja Pengadaan
Barang/Jasa (UKPBJ), PPK (Pejabat Pembuat Komitmen) dan/atau pejabat yang berwenang
lainnya, 3.4. Sanggahan disampaikan dalam waktu 5 (lima) hari kerja setelah
pengumuman pemenang, 3.5. Kelompok Kerja (Pokja) Pemilihan wajib memberikan
jawaban secara elektronik atas semua sanggahan paling lambat 3 (tiga) hari
kerja setelah akhir masa sanggah, 3.6. apabila sanggahan dinyatakan benar maka
Kelompok Kerja (Pokja) Pemilihan menyatakan tender
gagal, 3.7. sanggahan dianggap sebagai pengaduan, dalam hal: a. sanggahan
disampaikan tidak melalui aplikasi Sistem Pengadaan Secara Elektronik (SPSE) [offline], kecuali keadaan kahar atau
gangguan teknis, b. sanggahan ditujukan bukan kepada Kelompok Kerja (Pokja)
Pemilihan, atau c. sanggahan disampaikan di luar masa sanggah, dan 3.8.
Sanggahan yang dianggap sebagai pengaduan tetap harus diproses sebagaimana
penanganan pengaduan; 4. Sanggah Banding dari Peserta Tender, 4.1. Peserta dapat mengajukan sanggah banding apabila tidak
setuju atas jawaban sanggah, 4.2. Penyanggah menyampaikan sanggah banding
secara tertulis kepada KPA (Kuasa Pengguna Anggaran) selambat-lambatnya 05
(lima) hari kerja setelah jawaban sanggah dimuat dalam aplikasi SPSE (Sistem
Pengadaan Secara Elektronik). Tembusan sanggah banding disampaikan kepada Aparat Pengawasan Intern Pemerintah (APIP) sesuai Lembar Data Pemilihan
(LDP), 4.3. Penyanggah banding harus menyerahkan Jaminan Sanggah
Banding yang ditujukan kepada Kelompok Kerja (Pokja) Pemilihan sebesar 1% (satu
persen) dari nilai total HPS (Harga
Perkiraan Sendiri) dengan masa berlaku 30 (tiga puluh) hari kalender sejak
tanggal pengajuan sanggah banding, 4.4. Kelompok Kerja (Pokja) pemilihan
mengklarifikasi atas kebenaran Jaminan Sanggah Banding kepada penerbit jaminan
dan KPA (Kuasa Pengguna Anggaran) tidak akan menindaklanjuti Sanggah Banding
sebelum mendapatkan hasil klarifikasi Kelompok Kerja (Pokja) Pemilihan, 4.5.
KPA (Kuasa Pengguna Anggaran) menyampaikan jawaban Sanggah Banding, dengan
tembusan kepada Unit Kerja Pengadaan
Barang/Jasa (UKPBJ) paling lambat 14 (empat belas) hari kerja setelah menerima
klarifikasi dari Kelompok Kerja (Pokja) Pemilihan. Dalam hal KPA (Kuasa
Pengguna Anggaran) tidak memberikan jawaban Sanggah Banding, maka KPA (Kuasa
Pengguna Anggaran) dianggap menerima
Sanggah Banding, 4.6. apabila Sanggah Banding dinyatakan benar/diterima, Unit Kerja Pengadaan Barang/Jasa (UKPBJ)
memerintahkan Kelompok Kerja (Pokja) Pemilihan melakukan evaluasi ulang atau
pemilihan penyedia ulang, 4.7. apabila Sanggah Banding dinyatakan salah/tidak
diterima, maka: a. Kelompok Kerja (Pokja) Pemilihan melanjutkan proses
pemilihan dengan menyampaikan hasil pemilihan kepada PPK (Pejabat Pembuat
Komitmen), b. Unit Kerja Pengadaan
Barang/Jasa (UKPBJ) mencairkan Jaminan Sanggah Banding dan disetorkan ke Kas
Negara/Daerah, 4.8. Sanggah Banding menghentikan proses Tender, dan 4.9. Sanggah Banding yang disampaikan bukan kepada KPA
(Kuasa Pengguna Anggaran), atau disampaikan diluar masa sanggah banding,
dianggap sebagai pengaduan dan diproses sebagaimana penanganan pengaduan.
Participants in The Public Lecture of Afternoon Saturday
of All Time with Electronic Teleconference to recommend to The Department of Civil Engineering, The Faculty of Civil
and Environmental Engineering; The Department of State Administrative Law, The
Department of Law of Public and Development, The Department of Business Law,
The Department of Economic Law, The Department of International Trade Law and
The Department of State Financial Law, The Faculty of Law; The Department of
Engineering and Vocational Education, The Department of Economic Education and
The Department of Building Engineering Education, The Faculty of Teacher
Training and Education Science; Management and Public Policy (State
Administration Science) and Public Administration Science, The Faculty of
Social Sciences & Political Sciences; Mu'amalah (Islamic Business Law),
Islamic Finance and Syari'ah Economic Law, The Faculty of Sharia; The
Department of Civil and Environmental Engineering, The Faculty of Agricultural
Technology; The Department of Economics and Development Studies and The
Department of Resource and Environmental Economics, The Faculty of Economics
and Management; The Department of Planning and Public Policy and The Department
of Islamic Business, The Faculty of Economics; The Department of Urban Studies +
Planning, School
of Architecture and Planning (SA+P); Civil and
Environmental Engineering, School of Engineering; MBA (Master of Business
Administration) Program, Agussalim Management; The Department of Regional and City Planning, The
School of Architecture, Planning, and Policy Development; and The Department of
Management and Department of Entrepreneurship, The School of Business and
Management of MU (Mandailing University) to update by understanding Circular Letter Number 10 / SE / M / 2018
concerning Enforcement of Standard of Selection Documents for the Procurement
of Construction Services in the Context of Early Auction in the Ministry of
Public Works and Public Housing for
Budget Year 2019, namely Annex I of Circular Letter of the Minister of
Public Works and Public Housing Number 10 / SE / M / 2018 concerning the
Enactment of the Standared of Selection Document for the Procurement of
Construction Services in the Early Auction Framework at the Ministry of Public
Works and Public Housing for Fiscal Year
2019, namely Determination of Winners, 1. Determination of Winners, 1.1. The
Election Working Group determines the winner if the contents submitted by the
participant in the form are correct and valid, 1.2. in the event that
participants are known to participate in a number of work packages tendered by
several Election Working Groups at the same time and have been determined to be
winners in some of these packages, a Remaining Ability to Handle Packages (for
small businesses) / Real Capacity Remaining [for medium and large businesses] is
recalculated, 1.3. in the event the participant participates in several
construction work packages tender within the time of the determination of the
winner together: a. offer the same equipment for several packages that are
followed and in the evaluation to meet the requirements of each work package, then
it can only be determined as a winner in 1 (one) work package by clarifying to
determine the equipment will be placed, while for other work packages declared
equipment not available and declared null, b. if the participant offers the
same equipment in another work package / running, then it can only be
determined as a winner, if after clarification for the equipment is not tied to
another package, c. provision can only be
determined as a winner in 1 (one) work package as referred to in letters a and
b, can be excluded with the condition that the use of the tool does not
overlap, there is a backup equipment proposed in the Bidding Document that
meets the requirements, location of equipment contiguous in the execution of
work so that it can be used according to the work schedule, and / or the
capacity and productivity of the equipment can technically complete more than 1
(one) work package, d. offering the same personnel in more than 1 (one) work
package, then it can only be determined as a winner in 1 (one) work package
after clarification has been made to determine whether the personnel will be
placed, while for other work packages, the personnel are not found and declared
dead, e. the provisions in letter d can only be determined as winners in 1
(one) package of construction works, except: 1) Personnel whose assignments are
proposed as Head of Project / General Superintendent (GS), 2) schedule of
personnel assignments does not overlap with other activities based on the work
schedule or the assignment schedule, 3) there are reserve personnel proposed in
the Bidding Document that meet the requirements, and f. offering personnel who
are working in another package, then when it is determined to be a winner it is
certain that it is not bound to another package, 1.4. The Election Working Group makes and signs the Minutes of Election
Results which at least contains: a. Name of all participants, b. Bid price or
offer price corrected from each participant, c. Evaluation methods used, d.
Elements that are evaluated, e. The formula used, f. Other information that is
deemed necessary for the implementation of the tender, g. the number of
participants who passed and did not pass at each stage of evaluation, h. the
date of the Minutes, and i. A statement that the tender failed if there were no
offers that met the requirements, 1.5. in the event that the budget ceiling
value is in the maximum of Rp. 100,000,000,000.00 (one hundred billion rupiah),
the determination of the winner is carried out by the Election Working Group, 1.6.
in the case that the budget ceiling value is at least above Rp 100,000,000,000
(one hundred billion rupiah), the winner is determined by the Budget User, 1.7.
if there is a delay in determining the winner and will result in a Bid Letter
and / or Bid Security (if required) expiration, confirmation will be made to
all participants who pass the bid evaluation and qualification evaluation to
extend the validity period of the offer letter and / or Bid Guarantee (if
required) in writing up to the estimated schedule for signing the contract, and
1.8. in the event that the participant who passes the bid evaluation and
qualification evaluation is not willing to extend the offer letter and / or the
Bid Security (if required) it is deemed resigned and not subject to sanctions;
2. Announcement of Winners, The Election Working Group announces winners, 1st
and 2nd reserve winners (if any) through the application of the Electronic
Procurement System; 3. Disclaimer from Tender Participants, 3.1. Disclaimer
from the Participant who entered the offer whose name is stated in the offer
letter and / or stated in the company's deed of establishment, 3.2. Disclaimers
are submitted electronically through the application of the Electronic
Procurement System accompanied by evidence of irregularities, 3.3. Disclaimer
submitted by participants in the event of a procedure deviation includes: a.
error in evaluating, b. deviation from the provisions and procedures specified
in the Bidding Document, c. certain engineering / collusion so as to prevent
the occurrence of fair business competition, and / or d. abuse of authority by
the Election Working Group, head of The Unit of Work of Goods / Services
Procurement, The Commitment Making Officer and / or other authorized officials,
3.4. Disclaimer submitted within 5 (five)
working days after announcement of the winner, 3.5. The Election Working Group
must provide electronic answers to all objections no later than 3 (three)
working days after the end of the objection period, 3.6. if the rebuttal is
declared correct then the Election Working Group declares the tender failed,
3.7. disclaimer is considered a complaint, in the event: a. the objection is
submitted not through the application of the Electronic Procurement System
[offline], except for force majeure or technical disturbances, b. the objection
is intended not to the Election Working Group, or c. the objection is submitted
outside the objection period, and 3.8. Disclaimers which are considered as
complaints must still be processed as handling complaints; 4. Disclaimer of
Appeal from Tender Participants, 4.1. Participants can submit an appeal if they
do not agree to the objectionable answer, 4.2. The Respondent submits a written
objection to Budget User Proxies no later than 05 (five) of working days after the
answer has been published in the Electronic Procurement System application. A
copy of the refute the appeal was submitted to the Government Internal
Supervisory Apparatus according to the Election Data Sheet, 4.3. The objector must submit an Appeals
Objection Guarantee addressed to the Election Working Group of 1% (one percent)
of the total value of the Self Estimated Price with a validity period of 30
(thirty) calendar days from the date of filing the objection, 4.4. The
electoral Working Group clarifies the truth of the Disclaimer of the Appeal to
the issuer of guarantees and the Proxy of the Budget User will not follow up on
the Appeals Objection before obtaining the results of clarification of the
Election Working Group, 4.5. The Proxy of Budget User submits the response to
the Appeals Objection, with a copy to The Unit of Work of Goods / Services
Procurement no later than 14 (fourteen) working days after receiving
clarification from the Election Working Group. In the event that the Budget
User Proxy does not provide an answer to the Appellate Disclaimer, then the
Budget User Proxy is deemed to receive the Appeal Objection, 4.6. if the Appeal
Objection is declared correct / accepted, The Unit of Work of Goods / Services
Procurement orders the Election Working Group (Pokja) to re-evaluate or
re-select the provider, 4.7. if the
Appeal Objection is declared wrong / not accepted, then: a. The Election
Working Group continues the electoral process by submitting the election
results to the Commitment Making Officer, b. The Unit of Work of Goods /
Services Procurement disbursed the Appellate Disclaimer Guarantee and remitted
it to State / Regional Cash, 4.8. Appeal Disclaimer stops the Tender process,
and 4.9. The objection appeal submitted not to The Budget User Proxies, or
submitted outside the appeal objection period, is considered a complaint and is
processed as handling complaints.
Sabtu,
16 Agustus 2031 Materi KUM S3 MET (Kuliah
Umum Sabtu Sore Sepanjang Masa - Electronic-Teleconference),
"Eksistensi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa - Electronic-Teleconference) dari Tahun 2021 sampai dengan tahun 2025 yang
dikonsentrasitaktiskan di Kabupaten Mandailing Natal" yang terdapat dalam
JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa)
Nomor : 0259/Juli/2031.
Saturday, August 16th,
2031 Public Lecture material - e-teleconference “Existence of The Public Lecture of Afternoon Saturday of All Time
with Electronic Teleconference from 2021 to 2025 is concerned
and tacticed in Regency of Mandailing Natal" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number :
0259/July/2031.
Peserta
KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa - Electronic-Teleconference) untuk merekomendasikan kepada Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Lingkungan (FTSL);
Jurusan Hukum Administrasi Negara, Jurusan Hukum Masyarakat dan Pembangunan,
Jurusan Hukum Bisnis, Jurusan Hukum Ekonomi, Jurusan Hukum Perdagangan Internasional
dan Jurusan Hukum Keuangan Negara, Fakultas Hukum; Jurusan Pendidikan Teknik dan
Kejuruan (JPTK), Jurusan Pendidikan Ekonomi
dan Jurusan Pendidikan Teknik
Bangunan (PTB), Fakultas Keguruan dan Ilmu Pendidikan; Manajemen dan
Kebijakan Publik (Ilmu Administrasi Negara) dan Ilmu Administrasi Publik, Fakultas ISIPOL (Ilmu Sosial & Ilmu Politik); Mu’amalah (Hukum Bisnis
Islam), Keuangan Islam dan HES (Hukum Ekonomi
Syari’ah), Fakultas Syariah; Jurusan Teknik Sipil dan Lingkungan, Fakultas Teknologi Pertanian (FATETA); Jurusan Ekonomi dan Studi Pembangunan dan Jurusan Ekonomi Sumberdaya dan Lingkungan, Fakultas Ekonomi dan Manajemen; Jurusan Perencananaan dan Kebijakan
Publik dan Jurusan Bisnis Islam, FE (Fakultas Ekonomi); The Department of Urban Studies + Planning, School of Architecture
and Planning (SA+P); Civil and
Environmental Engineering, School of Engineering; BA (Master of Administration) Program, Agussalim Management; Jurusan Perencanaan Wilayah
dan Kota, Sekolah Arsitektur, Perencanaan, dan
Pengembangan Kebijakan (SAPPK); dan Jurusan Manajemen dan Jurusan Kewirausahaan, Sekolah Bisnis dan
Manajemen (SBM) UM (Universitas Mandailing) untuk memutakhirkan dengan memahami
Surat Edaran Nomor 10/SE/M/2018 tentang Pemberlakuan Standar Dokumen Pemilihan
Pengadaan Jasa Konstruksi Dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum
dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu Lampiran I Surat Edaran
Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 10 / SE / M / 2018 tentang
Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi dalam Rangka
Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun
Anggaran 2019 yaitu Penunjukan Pemenang; Penunjukan Penyedia Barang/Jasa; 1. Kelompok
Kerja (Pokja) Pemilihan menyampaikan Berita Acara Hasil Pemilihan (BAHP) kepada
PPK (Pejabat Pembuat Komitmen) dengan tembusan kepada Kepala Unit Kerja Pengadaan Barang/Jasa (UKPBJ) sebagai
dasar untuk menerbitkan Surat Penunjukan Penyedia Barang/Jasa (SPPBJ); 2.
Sebelum menerbitkan Surat Penunjukan Penyedia Barang/Jasa (SPPBJ), Pejabat
Pembuat Komitmen, Kelompok Kerja (Pokja) Pemilihan dan pemenang melaksanakan
Rapat Persiapan Penunjukan Penyedia; 3. PPK (Pejabat Pembuat Komitmen),
Kelompok Kerja (Pokja) Pemilihan dan Pemenang wajib melaksanakan Rapat
Persiapan Penunjukan Penyedia dengan ketentuan paling lambat 3 (tiga) hari
kerja setelah: a. masa sanggah berakhir (apabila tidak ada sanggahan), b.
Kelompok Kerja (Pokja) pemilihan menjawab semua sanggahan dari peserta dan masa
sanggah banding telah berakhir (apabila tidak ada sanggah banding), atau c. KPA
(Kuasa Pengguna Anggaran) menyatakan sanggah banding salah/tidak diterima
(apabila ada sanggah banding); 4. Rapat persiapan penunjukan Penyedia
dilaksanakan untuk memastikan pemenang memenuhi ketentuan sebagai berikut: a.
keberlakuan data isian kualifikasi, b. bukti sertifikat kompetensi personel
manajerial, c. kewajiban melakukan sertifikasi bagi operator, teknisi atau analis yang belum bersertifikat pada saat
pelaksanaan pekerjaan, dan d. pelaksanaan alih pengalaman/keahlian bidang
konstruksi melalui sistem kerja praktik/magang, paling sedikit pembahasan
terkait jumlah peserta, durasi pelaksanaan, dan jenis keahlian; 5. dalam hal
Pemenang tidak memenuhi ketentuan sebagaimana dimaksud pada 4 di atas, maka PPK
(Pejabat Pembuat Komitmen) bersama Kelompok Kerja (Pokja) Pemilihan
melaksanakan rapat persiapan penunjukan penyedia bersama Pemenang Cadangan ke-1
(ke-satu) [apabila ada]; 6. dalam hal pemenang cadangan ke-1 (ke-satu) tidak
memenuhi, maka PPK (Pejabat Pembuat Komitmen)
bersama Kelompok Kerja (Pokja) Pemilihan melaksanakan rapat persiapan
penunjukan penyedia bersama pemenang cadangan ke-2 (ke-dua) [apabila ada], 7. dalam
hal pemenang cadangan ke-2 (kedua) tidak memenuhi, maka PPK (Pejabat Pembuat
Komitmen) bersama Kelompok Kerja (Pokja)
Pemilihan melaksanakan rapat persiapan penunjukan penyedia bersama peserta yang
memenuhi persyaratan penawaran dan kualifikasi (apabila ada), 8. PPK (Pejabat
Pembuat Komitmen) menerbitkan Surat Penunjukan Penyedia Barang/Jasa (SPPBJ)
apabila pernyataan peserta pada formulir isian kualifikasi masih berlaku,
dengan ketentuan: a. berdasarkan hasil rapat persiapan penunjukan penyedia,
peserta mampu memenuhi semua persyaratan pekerjaan, b. tidak ada
sanggah/sanggah banding dari peserta; c. sanggah/sanggah banding terbukti tidak
benar, atau d. masa sanggah berakhir; 9. Proses Surat Penunjukan Penyedia
Barang/Jasa (SPPBJ) pada angka 8 dilakukan dengan ketentuan: a. dilakukan
terhadap pemenang, b. dalam hal pemenang tidak memenuhi, maka proses Surat
Penunjukan Penyedia Barang/Jasa (SPPBJ) dilakukan kepada pemenang cadangan ke-1
(ke-satu) [apabila ada], c. dalam hal pemenang cadangan ke-1 (ke-satu) tidak
memenuhi, maka proses Surat Penunjukan Penyedia Barang/Jasa (SPPBJ) dilakukan
kepada pemenang cadangan ke-2 (ke-dua) [apabila ada], selama masa surat
penawaran dan jaminan penawaran (apabila disyaratkan) masih berlaku atau sudah
diperpanjang masa berlakunya; 10. Proses sebagaimana tercantum pada angka 9
dengan persetujuan KPA (Kuasa Pengguna Anggaran), kecuali angka 9 huruf a.11.
Dalam hal tidak ada pemenang, pemenang cadangan ke1 (ke-satu), dan pemenang
cadangan ke-2 (kedua) yang memenuhi maka Surat Penunjukan Penyedia Barang/Jasa
(SPPBJ) tidak dapat diterbitkan; 12. Pejabat Pembuat Komitmen menginputkan data
Surat Penunjukan Penyedia Barang/Jasa (SPPBJ) dan mengunggah hasil pemindaian
Surat Penunjukan Penyedia Barang/Jasa (SPPBJ) yang telah diterbitkan pada
aplikasi Sistem Pengadaan Secara Elektronik (SPSE) dan mengirimkan Surat
Penunjukan Penyedia Barang/Jasa (SPPBJ) tersebut melalui aplikasi Sistem
Pengadaan Secara Elektronik (SPSE) kepada Penyedia yang ditunjuk; 13. Surat
Penunjukan Penyedia Barang/Jasa (SPPBJ) diterbitkan paling lambat 6 (enam) hari
kerja setelah pengumuman penetapan pemenang apabila tidak ada sanggahan atau 2
(dua) hari kerja setelah semua sanggahan dijawab; 14. Dalam hal DIPA/DPA (Daftar Isian
Pelaksanaan Anggaran / Dokumen Pelaksanaan Anggaran) belum
terbit, Surat Penunjukan Penyedia Barang/Jasa (SPPBJ) dapat ditunda diterbitkan
sampai batas waktu penerbitan oleh otoritas yang berwenang; 15. dalam Surat
Penunjukan Penyedia Barang/Jasa (SPPBJ) dicantumkan bahwa penyedia harus
menyiapkan Jaminan Pelaksanaan sebelum penandatanganan Kontrak; 16. Surat
Penunjukan Penyedia Barang/Jasa (SPPBJ) ditembuskan kepada Aparat Pengawasan Intern Pemerintah (APIP); 17. dalam
hal Pejabat Pembuat Komitmen tidak bersedia menerbitkan Surat Penunjukan
Penyedia Barang/Jasa (SPPBJ) karena tidak sependapat atas penetapan pemenang,
maka: a. Pejabat Pembuat Komitmen menyampaikan penolakan tersebut kepada
Kelompok Kerja (Pokja) Pemilihan diserta alasan dan bukti, b. PPK (Pejabat
Pembuat Komitmen) melakukan pembahasan bersama terkait perbedaan pendapat atas
hasil pemilihan penyedia, c. dalam hal tidak tercapai kesepakatan, maka
pengambilan keputusan diserahkan kepada PA / KPA (Pengguna Anggaran / Kuasa
Pengguna Anggaran) paling lambat 6 (enam) hari kerja setelah tidak tercapai
kesepakatan; d. PA / KPA (Pengguna Anggaran / Kuasa Pengguna Anggaran) dapat
memutuskan: i. menyetujui penolakan Pejabat Pembuat Komitmen, PA / KPA
(Pengguna Anggaran / Kuasa Pengguna Anggaran) memerintahkan Kelompok Kerja
(Pokja) Pemilihan untuk melakukan evaluasi ulang, pemasukan penawaran ulang
atau tender ulang; atau ii.
menyetujui hasil pemilihan penyedia, PA / KPA (Pengguna Anggaran / Kuasa
Pengguna Anggaran) memerintahkan Pejabat Pembuat Komitmen untuk menerbitkan
Surat Penunjukan Penyedia Barang/Jasa (SPPBJ) paling lambat 5 (lima) hari kerja,
iii. Putusan PA / KPA (Pengguna Anggaran / Kuasa Pengguna Anggaran) bersifat
final, e. dalam hal PA / KPA (Pengguna Anggaran / Kuasa Pengguna Anggaran) yang
bertindak sebagai Pejabat Pembuat Komitmen tidak menyetujui hasil pemilihan
penyedia, PA / KPA (Pengguna Anggaran / Kuasa Pengguna Anggaran) menyampaikan
penolakan tersebut kepada Kelompok Kerja (Pokja) Pemilihan diserta alasan dan
bukti dan memerintahkan Kelompok Kerja (Pokja) Pemilihan untuk melakukan
evaluasi ulang, pemasukan penawaran ulang atau tender ulang paling lambat 6 (enam) hari kerja setelah hasil
pemilihan penyedia diterima; 18. Kontrak ditandatangani paling lambat 14 (empat
belas) hari kerja setelah diterbitkannya Surat Penunjukan Penyedia Barang/Jasa
(SPPBJ); 19. PPK (Pejabat Pembuat Komitmen)
dan Penyedia wajib melaksanakan Rapat Persiapan Penandatanganan Kontrak
setelah diterbitkan Surat Penunjukan Penyedia Barang/Jasa (SPPBJ); 20. dalam
Rapat Persiapan Penandatanganan Kontrak, paling sedikit dibahas hal-hal sebagai
berikut: a. Dokumen Kontrak dan kelengkapan, b. kelengkapan Rencana Keselamatan
Konstruksi, c. Rencana penandatanganan Kontrak, d. Jaminan Uang Muka
(ketentuan, bentuk, isi, waktu penyerahan), e. Jaminan Pelaksanaan (ketentuan,
bentuk, isi, waktu penyerahan), f. Asuransi, dan/atau g. hal yang telah
diklarifikasi dan dikonfirmasi pada saat evaluasi penawaran; 21. Pejabat
Pembuat Komitmen meng-input-kan data
kontrak dan mengunggah hasil pemindaian dokumen kontrak yang telah
ditandatangani pada aplikasi Sistem Pengadaan Secara Elektronik (SPSE); 22.
Penyedia yang ditunjuk wajib menerima keputusan tersebut, dengan ketentuan: a.
apabila yang bersangkutan mengundurkan diri dan masa penawarannya masih berlaku
dengan alasan yang dapat diterima secara obyektif oleh Kelompok Kerja (Pokja)
Pemilihan, maka peserta yang bersangkutan tidak dikenakan sanksi apapun; b.
apabila yang bersangkutan mengundurkan diri dan masa penawarannya masih berlaku
dengan alasan yang tidak dapat diterima secara obyektif oleh Kelompok Kerja
(Pokja) Pemilihan, maka peserta dikenakan sanksi Daftar Hitam dan Jaminan
Penawaran (apabila disyaratkan) dicairkan dan disetorkan ke Kas Negara/Daerah;
atau c. apabila yang bersangkutan tidak bersedia ditunjuk karena masa
penawarannya sudah tidak berlaku, maka peserta yang bersangkutan tidak
dikenakan sanksi apapun; 23. apabila pemenang yang ditunjuk mengundurkan diri,
maka penunjukan pemenang dapat dilakukan kepada pemenang cadangan sesuai dengan
urutan peringkat (apabila ada), selama masa surat penawaran dan jaminan
penawaran (apabila disyaratkan) pemenang cadangan masih berlaku atau sudah
diperpanjang masa berlakunya; dan 24. apabila semua pemenang yang ditunjuk
mengundurkan diri, maka tender
dinyatakan gagal oleh PA / KPA (Pengguna Anggaran / Kuasa Pengguna Anggaran)
setelah mendapat laporan dari PPK (Pejabat Pembuat Komitmen).
Participants in The Public Lecture of Afternoon Saturday
of All Time with Electronic Teleconference to recommend to The Department of Civil Engineering, The Faculty of Civil
and Environmental Engineering; The Department of State Administrative Law, The
Department of Law of Public and Development, The Department of Business Law,
The Department of Economic Law, The Department of International Trade Law and
The Department of State Financial Law, The Faculty of Law; The Department of
Engineering and Vocational Education, The Department of Economic Education and
The Department of Building Engineering Education, The Faculty of Teacher
Training and Education Science; Management and Public Policy (State
Administration Science) and Public Administration Science, The Faculty of
Social Sciences & Political Sciences; Mu'amalah (Islamic Business Law),
Islamic Finance and Syari'ah Economic Law, The Faculty of Sharia; The
Department of Civil and Environmental Engineering, The Faculty of Agricultural
Technology; The Department of Economics and Development Studies and The
Department of Resource and Environmental Economics, The Faculty of Economics
and Management; The Department of Planning and Public Policy and The Department
of Islamic Business, The Faculty of Economics; The Department of Urban Studies +
Planning, School
of Architecture and Planning (SA+P); Civil and
Environmental Engineering, School of Engineering; MBA (Master of Business
Administration) Program, Agussalim Management; The Department of Regional and City Planning, The
School of Architecture, Planning, and Policy Development; and The Department of
Management and Department of Entrepreneurship, The School of Business and
Management of MU (Mandailing University) to update by understanding Circular Letter Number 10 / SE / M / 2018
concerning Enforcement of Standard of Selection Documents for the Procurement
of Construction Services in the Context of Early Auction in the Ministry of
Public Works and Public Housing for
Budget Year 2019, namely Annex I of Circular Letter of the Minister of
Public Works and Public Housing Number 10 / SE / M / 2018 concerning the Enactment
of the Standared of Selection Document for the Procurement of Construction
Services in the Early Auction Framework at the Ministry of Public Works and
Public Housing for Fiscal Year 2019, namely The designation of a winner; Appointment of Goods / Services
Providers; 1. The Election Working Group submits the Minutes of Election
Results to The Commitment Making Officials with a copy to the Head of The Unit
of Work of Goods / Services Procurement as a basis for issuing a Letter of
Appointment for Goods / Services Providers; 2. Before issuing a Letter of
Appointment for Goods / Services Providers, The Commitment Making Officials,
Election Working Groups and winners carry out Provider Appointment Preparation
Meetings; 3. The Commitment Making Officials, Election Working Groups and
Winners must carry out The Provider Appointment Preparation Meetings provided that no later than 3 (three) working
days after: a. the objection period ends (if there is no objection), b. The
selection Working Group answers all objections from the participants and the
appeal objection period has ended (if there is no appeal objection), or c. The
Budget User Proxy states that the appeal objection is wrong / not accepted (if
there is an appeal objection); 4. Preparatory meeting for appointment of
Providers is carried out to ensure the winner meets the following conditions:
a. applicability of qualification data, b. proof of managerial personnel
competency certificate, c.
the obligation to certify operators, technicians or analysts who have not been
certified at the time of work, and d. implementing the transfer of experience /
expertise in the field of construction through practical work / apprenticeship
systems, at least discussion related to the number of participants, duration of
implementation, and type of expertise; 5. in the event that the Winner does not
meet the conditions referred to in 4 above, then the Commitment Making Officer
together with the Election Working Group conducts a preparatory meeting for the
appointment of the provider with the 1st Reserve Winner [if any]; 6.
in the event that the winner of the 1st (first) reserve does not
fulfill, the Commitment Making Officer together with the Election Working Group
conducts a preparatory meeting to appoint the provider with the second (second)
reserve winner [if any], 7. in the event that the winner of the second reserve
does not meet, the Commitment Making Officer together with the Election Working
Group conducts a preparation meeting for the appointment of providers with participants
who meet the bidding and qualification requirements (if any), 8. The Commitment
Making Official issues a Letter of Appointment of Goods / Services Providers if
the participant's statement on the qualification form is still valid, provided
that: a. based on the results of the provider appointment preparation meeting,
participants are able to fulfill all job requirements, b. no objections / appeal objections from participants; c. objection / appeal
objection is proven to be incorrect, or d. the objection period ends; 9. The
Process for a Letter of Appointment of Goods / Services Providers at number 8
is carried out provided that: a. done to winners, b. in the event that the
winner does not fulfill, the process of a Letter of Appointment of Goods /
Services Providers is carried out to the winner of the 1st (first) reserve [if
any], c. in the event that the winner of the 1st (first) reserve
does not fulfill, then the process for a Letter of Appointment of Goods /
Services Providers is carried out to the winner of the second reserve [if any],
during the period of offer letter and offer guarantee (if required) is still
valid or has expired; 10. The process as stated in number 9 with the approval
of The Budget User Proxies, except the number 9 letters a.11. In the event that
there is no winner, the 1st (first) reserve winner, and the second
(second) reserve winner who fulfills it, a Letter of Appointment of Goods /
Services Providers cannot be issued; 12. The Commitment Maker Officials input
data of a Letter of Appointment of Goods / Services Providers and upload the
scan results of a Letter of Appointment of Goods / Services Providers that has
been issued in the Electronic Procurement System application and send a Letter
of Appointment of Goods / Services Providers through the application of the
Electronic Procurement System to the designated Provider; 13. a Letter of Appointment of Goods /
Services Providers is issued no later than 6 (six) working days after the
announcement of the determination of the winner if there is no objection or 2
(two) working days after all the objections are answered; 14. In the event that
Budget Implementation List / Budget Implementation Document has not yet been
issued, a Letter of Appointment of Goods / Services Providers may be
postponed issued to the deadline for issuance by the competent authority; 15. in
may be postponed issued to the deadline for issuance by the competent authority
it is stated that the provider must prepare an Implementation Guarantee before
the signing of the Contract; 16. a Letter of Appointment of Goods / Services
Providers is sent to the Government Internal Supervisory Apparatus; 17. in the
event that the Commitment Making Officer is not willing to issue a Letter of
Appointment of Goods / Services Providers because he disagrees with the
determination of the winner, then: a. The Commitment Making Officer submits the
rejection to the Election Working Group along with the reasons and evidence, b.
The Commitment Making Officer conducts joint discussions regarding differences
of opinion over the results of the selection of providers, c. in the event that
no agreement is reached, then the decision is submitted to Budget Users /
Budget User Proxies no later than 6 (six) working days after no agreement is
reached;d. Budget Users / Budget
User Proxies can decide: i. approve the refusal of the Commitment Making
Officer, Budget User / Proxy of Budget User to instruct the Election Working
Group to re-evaluate, re-offer or re-tender entries; or ii. approve the results
of the provider selection, Budget Users / Budget User Proxies instructs the
Commitment Making Official to issue a Letter of Appointment for Goods / Services
Providers no later than 5 (five) working days, iii. decisions of Budget Users /
Budget User Proxies are final, e. in the case of Budget Users / Budget User Proxies
acting as The Commitment Making Officials do not approve the results of
provider selection, Budget Users / Budget User Proxies submit the rejection to
the Election Working Group along with reasons and evidence and instructs the
Election Working Group to re-evaluate, re-enter or re-bidding no later than 6
(six) working days after the provider selection results are received; 18. The
contract is signed no later than 14 (fourteen) working days after the issuance
of the Letter of Appointment for the Supplier of Goods / Services; 19. The Commitment Making Officials and
Providers must carry out Preparatory Meetings for Signing Contracts after the
Letter of Appointment of Goods / Services Providers is issued; 20. in the
Contract Signing Preparatory Meeting, at least the following are discussed: a.
Contract Documents and completeness, b. complete of Construction Safety Plan,
c. Plan for signing a Contract, d. Down Payment Guarantee (provisions, forms,
contents, delivery time), e. Implementation Guarantee (provisions, forms,
contents, delivery time), f. Insurance, and / or g. things that have been clarified
and confirmed at the time of bid evaluation; 21. The Commitment Making
Officials enter contract data and upload the results of the scan of the
contract documents that have been signed in the application of the Electronic
Procurement System; 22. The appointed provider must accept the decision,
provided that: a. if the concerned resigns and the offer period is still valid
for reasons that can be objectively accepted by the Election Working Group,
then the participant concerned is not subject to any sanctions; b. if the
person resigns and the offer period is still valid for reasons that cannot be
objectively accepted by the Election Working Group, the participant is subject
to Black List sanction and Bid Security (if required) is disbursed and remitted
to State / Regional Cash; or c. if the relevant
person is not willing to be appointed because the offer period is no longer
valid, then the participant concerned is not subject to any sanction; 23. if
the designated winner withdraws, then the winner's appointment can be made to
the reserve winner in the order of rank (if any), during the offer letter and
offer guarantee (if required) the winner of the reserve is still valid or has
been extended validity period; and 24. if all the appointed winners resign,
then the tender is declared a failure by Budget User / Budget User Proxy after
receiving a report from the Commitment Making Officer.
Sabtu,
23 Agustus 2031 Materi KUM S3 MET (Kuliah
Umum Sabtu Sore Sepanjang Masa - Electronic-Teleconference),
"Eksistensi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa - Electronic-Teleconference) dari Tahun 2026 sampai dengan tahun 2031 yang
dikonsentrasitaktiskan di Kabupaten Mandailing Natal" yang terdapat dalam
JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa)
Nomor : 0259/Juli/2031.
Saturday, August 23rd,
2031 Public Lecture material - e-teleconference “Existence of The Public Lecture of Afternoon Saturday of All Time
with Electronic Teleconference from 2026 to 2031 is concerned
and tacticed in Regency of Mandailing Natal" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number :
0259/July/2031.
Peserta
KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa - Electronic-Teleconference) untuk merekomendasikan kepada Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Lingkungan (FTSL);
Jurusan Hukum Administrasi Negara, Jurusan Hukum Masyarakat dan Pembangunan,
Jurusan Hukum Bisnis, Jurusan Hukum Ekonomi, Jurusan Hukum Perdagangan
Internasional dan Jurusan Hukum Keuangan Negara, Fakultas Hukum; Jurusan Pendidikan Teknik dan
Kejuruan (JPTK), Jurusan Pendidikan Ekonomi
dan Jurusan Pendidikan Teknik
Bangunan (PTB), Fakultas Keguruan dan Ilmu Pendidikan; Manajemen dan
Kebijakan Publik (Ilmu Administrasi Negara) dan Ilmu Administrasi Publik, Fakultas ISIPOL (Ilmu Sosial & Ilmu Politik); Mu’amalah (Hukum Bisnis
Islam), Keuangan Islam dan HES (Hukum Ekonomi
Syari’ah), Fakultas Syariah; Jurusan Teknik Sipil dan Lingkungan, Fakultas Teknologi Pertanian (FATETA); Jurusan Ekonomi dan Studi Pembangunan dan Jurusan Ekonomi Sumberdaya dan Lingkungan, Fakultas Ekonomi dan Manajemen; Jurusan Perencananaan dan Kebijakan
Publik dan Jurusan Bisnis Islam, FE (Fakultas Ekonomi); The Department of Urban Studies + Planning, School of Architecture
and Planning (SA+P); Civil and
Environmental Engineering, School of Engineering; BA (Master of Administration) Program, Agussalim Management; Jurusan Perencanaan Wilayah
dan Kota, Sekolah Arsitektur, Perencanaan, dan
Pengembangan Kebijakan (SAPPK); dan Jurusan Manajemen dan Jurusan Kewirausahaan, Sekolah Bisnis dan
Manajemen (SBM) UM (Universitas Mandailing) untuk memutakhirkan dengan memahami
Surat Edaran Nomor 10/SE/M/2018 tentang Pemberlakuan Standar Dokumen Pemilihan
Pengadaan Jasa Konstruksi Dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum
dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu Lampiran I Surat Edaran
Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 10 / SE / M / 2018 tentang
Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi dalam Rangka
Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun
Anggaran 2019 yaitu 1. Penunjukan Pemenang; Berita Acara Hasil Pemilihan (BAHP), Berita
Acara Lainnya, dan Kerahasiaan Proses, 1.1. Kelompok Kerja (Pokja) Pemilihan
menuangkan ke dalam Berita Acara Hasil Pemilihan (BAHP) atau Berita Acara
tambahan lainnya segala hal terkait proses pemilihan penyedia secara elektronik
yang tidak dapat diakomodir atau difasilitasi aplikasi Sistem Pengadaan Secara
Elektronik (SPSE), 1.2. Berita Acara Tambahan lainnya sebagaimana dimaksud pada
angka 1.1 diunggah (uploaded) oleh
Kelompok Kerja (Pokja) Pemilihan menggunakan menu upload informasi lainnya pada aplikasi Sistem Pengadaan Secara
Elektronik (SPSE), 1.3. proses evaluasi Dokumen Penawaran bersifat rahasia dan
dilaksanakan oleh Kelompok Kerja (Pokja) Pemilihan secara independen, 1.4.
informasi yang berhubungan dengan penelitian, evaluasi, klarifikasi,
konfirmasi, dan usulan calon pemenang tidak boleh diberitahukan kepada peserta,
atau orang lain yang tidak berkepentingan sampai keputusan pemenang diumumkan,
1.5. setiap usaha peserta tender
mencampuri proses evaluasi Dokumen Penawaran atau keputusan pemenang akan
mengakibatkan ditolaknya penawaran yang bersangkutan, dan 1.6. evaluasi Penawaran
yang disimpulkan dalam Berita Acara Hasil Pemilihan (BAHP) oleh Kelompok Kerja
(Pokja) Pemilihan bersifat rahasia sampai dengan saat pengumuman pemenang; 2. Tender Gagal dan Tindak Lanjut Tender Gagal, 2.1. Tender Gagal, 2.1.1. Kelompok Kerja (Pokja) Pemilihan menyatakan tender gagal, apabila: a. terdapat
kesalahan yang substansial dalam proses evaluasi, b. tidak ada peserta yang
menyampaikan Dokumen Penawaran setelah ada pemberian waktu perpanjangan, c.
tidak ada peserta yang lulus evaluasi penawaran, d. dalam Dokumen Pemilihan
ditemukan kesalahan atau Dokumen Pemilihan tidak sesuai dengan ketentuan dalam
Peraturan Perundang-undangan terkait Pengadaan Barang/Jasa Pemerintah, e.
seluruh peserta terlibat Korupsi, Kolusi, dan Nepotisme (KKN), f. seluruh
peserta terlibat persaingan usaha tidak sehat, g. seluruh penawaran harga
terkoreksi di atas HPS (Harga Perkiraan Sendiri), atau h. calon pemenang dan
calon pemenang cadangan 1 dan 2, setelah dilakukan evaluasi dengan sengaja
tidak hadir dalam klarifikasi dan/atau pembuktian kualifikasi, 2.1.2. PA/KPA
(Pengguna Anggaran / Kuasa Pengguna Anggaran) menyatakan Tender gagal, apabila
Korupsi, Kolusi, dan Nepotisme (KKN) melibatkan Kelompok Kerja (Pokja)
Pemilihan/PPK (Pejabat Pembuat Komitmen)/Peserta, 2.1.3. setelah tender dinyatakan gagal, diumumkan
kepada seluruh peserta, dan 2.2. Tindak Lanjut Tender Gagal, 2.2.1. setelah
pengumuman adanya tender gagal,
Kelompok Kerja (Pokja) Pemilihan atau Kelompok Kerja (Pokja) Pemilihan
pengganti (apabila diganti) meneliti dan menganalisis penyebab terjadinya tender gagal, menentukan pilihan langkah
selanjutnya, yaitu antara lain melakukan: a. evaluasi ulang terhadap Dokumen
Penawaran yang telah masuk, b. penyampaian ulang Dokumen Penawaran hanya untuk
peserta yang memasukkan penawaran, c. tender
ulang, atau d. penghentian proses tender,
2.2.2. PA (Pengguna Anggaran) /KPA (Kuasa Pengguna Anggaran), PPK (Pejabat
Pembuat Komitmen), dan/atau Kelompok Kerja (Pokja) Pemilihan dilarang
memberikan ganti rugi kepada peserta tender
apabila penawarannya ditolak atau tender
dinyatakan gagal, 2.2.3. Kelompok Kerja (Pokja) Pemilihan melakukan evaluasi
penawaran ulang apabila terdapat kesalahan dalam evaluasi, 2.2.4. Kelompok
Kerja (Pokja) Pemilihan mengundang peserta untuk menyampaikan penawaran ulang,
apabila ditemukan kesalahan dalam Dokumen Pemilihan atau tidak sesuai dengan
ketentuan dalam Peraturan Perundang-undangan terkait Pengadaan Barang/Jasa
Pemerintah, dengan terlebih dahulu melakukan perbaikan Dokumen Pemilihan,
2.2.5. Kelompok Kerja (Pokja) Pemilihan melakukan tender ulang apabila: a. tidak ada peserta yang menyampaikan
Dokumen Penawaran setelah ada pemberian waktu perpanjangan; b. tidak ada
peserta yang lulus evaluasi penawaran, c. seluruh peserta terlibat Korupsi,
Kolusi, dan Nepotisme (KKN), d. seluruh peserta terlibat persaingan usaha tidak
sehat, e. seluruh penawaran harga di atas HPS (Harga Perkiraan Sendiri),
dan/atau f. Korupsi, Kolusi, dan Nepotisme (KKN) melibatkan Kelompok Kerja
(Pokja) Pemilihan / PPK (Pejabat Pembuat Komitmen), 2.2.6. dalam hal tender ulang yang disebabkan oleh
Korupsi, Kolusi, dan Nepotisme (KKN) yang melibatkan Kelompok Kerja (Pokja)
Pemilihan/PPK, tender ulang dilakukan
oleh Kelompok Kerja (Pokja) Pemilihan/PPK (Pejabat Pembuat Komitmen) yang baru,
2.2.7. Kelompok Kerja (Pokja) Pemilihan melakukan penghentian proses pemilihan
apabila berdasarkan hasil peninjauan dan komunikasi dengan PA/KPA/PPK (Pengguna
Anggaran / Kuasa Pengguna Anggaran / Pejabat Pembuat Komitmen), kebutuhan masih
dapat ditunda dan tidak cukup waktu lagi untuk melaksanakan proses pemilihan
dan/atau pelaksanaan pekerjaan, 2.2.8. khusus untuk tender gagal yang disebabkan karena kesalahan dalam dokumen
pemilihan, apabila penyelesaiannya tidak dapat dilakukan sesuai ketentuan
2.2.4, maka dilakukan dengan cara Tender
Ulang, 2.2.9. dalam hal Tender ulang gagal, Kelompok Kerja (Pokja) Pemilihan
melakukan Penunjukan Langsung dengan kriteria: a. persetujuan PA/KPA (Pengguna
Anggaran / Kuasa Pengguna Anggaran), b. kebutuhan tidak dapat ditunda, dan c.
tidak cukup waktu untuk melaksanakan Tender.
Participants in The Public Lecture of Afternoon Saturday
of All Time with Electronic Teleconference to recommend to The Department of Civil Engineering, The Faculty of Civil
and Environmental Engineering; The Department of State Administrative Law, The
Department of Law of Public and Development, The Department of Business Law,
The Department of Economic Law, The Department of International Trade Law and
The Department of State Financial Law, The Faculty of Law; The Department of
Engineering and Vocational Education, The Department of Economic Education and
The Department of Building Engineering Education, The Faculty of Teacher
Training and Education Science; Management and Public Policy (State
Administration Science) and Public Administration Science, The Faculty of
Social Sciences & Political Sciences; Mu'amalah (Islamic Business Law),
Islamic Finance and Syari'ah Economic Law, The Faculty of Sharia; The
Department of Civil and Environmental Engineering, The Faculty of Agricultural
Technology; The Department of Economics and Development Studies and The
Department of Resource and Environmental Economics, The Faculty of Economics
and Management; The Department of Planning and Public Policy and The Department
of Islamic Business, The Faculty of Economics; The Department of Urban Studies +
Planning, School
of Architecture and Planning (SA+P); Civil and
Environmental Engineering, School of Engineering; MBA (Master of Business
Administration) Program, Agussalim Management; The Department of Regional and City Planning, The
School of Architecture, Planning, and Policy Development; and The Department of
Management and Department of Entrepreneurship, The School of Business and
Management of MU (Mandailing University) to update by understanding Circular Letter Number 10 / SE / M / 2018
concerning Enforcement of Standard of Selection Documents for the Procurement
of Construction Services in the Context of Early Auction in the Ministry of
Public Works and Public Housing for
Budget Year 2019, namely Annex I of The Circular Letter Number 10 / SE / M / 2018 concerning Enforcement of Standard of Selection Documents for the Procurement of Construction Services in the Context of Early Auction in the Ministry of Public Works and Public Housing for Budget Year 2019, namely 1. Appointment of Winner; Minutes of Election
Results, Other Minutes, and Process Confidentiality, 1.1. The Election Working
Group sets forth the Election Result Minutes or other additional Minutes of all
matters related to the provider selection process electronically which cannot
be accommodated or facilitated by the application of the Electronic Procurement
System, 1.2. Other Additional Minutes as referred to in number 1.1 are uploaded
by the Election Working Group using other information upload menus in the Electronic
Procurement System application, 1.3. the evaluation process of the Bidding
Document is confidential and carried out by the Election Working Group
independently, 1.4. information relating to research, evaluation,
clarification, confirmation, and proposals for prospective winners must not be
notified to participants, or other unauthorized persons until the winner's
decision is announced, 1.5. each bidder's business interferes with the Bid
Document evaluation process or the winner's decision will result in the
rejection of the offer in question, and 1.6. Bid evaluation is concluded in the
Election Result Minutes by the Working Group of Elections are confidential
until the winner's announcement; 2. Failed Tender and Follow Up Tender Failed, 2.1. Tender Failure,
2.1.1. The Election Working Group states that the tender failed, if: a. there
is a substantial error in the evaluation process, b. no participant submits the
Bid Document after there is an extension of time, c. no participant has passed
the bid evaluation, d. in the Bidding Document found an error or the Bidding
Document is not in accordance with the provisions in the Legislation concerning
Procurement of Goods / Services of Government, e. all participants were
involved in Corruption, Collusion and Nepotism, f. all participants are
involved in unfair business competition, g. all price quotes are corrected
above the Self Estimated Price, or h. potential winners and prospective reserve
winners 1 and 2, after an evaluation deliberate is not present in the
clarification and / or verification of qualifications, 2.1.2. Budget Users /
Budget User Proxies stated that the Tender failed, if Corruption, Collusion and
Nepotism involved the Election Working Group / the Commitment Making Officer /
Participant, 2.1.3. after the tender was declared failed, it was announced to
all participants, and 2.2. Follow Up Failed Tender, 2.2.1. after the
announcement of a failed tender, the Election Working Group or Working Group of
Selection of substitutes (if replaced) examines and analyzes the causes of
failed tenders, determines choice of the next step, namely, among others: a.
re-evaluation of the Bid Documents that have been entered, b. re-submission of Bid Documents only to
participants who submit bids, c. re-tendering, or d. termination of the tender
process, 2.2.2. Budget User / Budget User Proxy, The Commitment Making Officer,
and / or Election Working Group are prohibited from giving compensation to
tender participants if the offer is rejected or the tender is declared failed,
2.2.3. The Election Working Group evaluates the offer if there is an error in
the evaluation, 2.2.4. The Election Working Group invites participants to
submit a re-offering, if an error is found in the Bidding Document or is not in
accordance with the provisions in the Legislation concerning Procurement of
Goods / Services of Government, by first making improvements to the Bidding
Document, 2.2.5. The Election Working Group conducts a re-tender if: a. no
participant submits the Bidding Document after there is an extension of time;
b. no participant has passed the bid evaluation, c. all participants were
involved in Corruption, Collusion and Nepotism, d. all participants are involved in unfair business competition, e. all
price quotes above the Self Estimated Price, and / or f. Corruption, Collusion
and Nepotism involve the Election Working Group / The Commitment Making
Officer, 2.2.6. in the case of re-tenders caused by Corruption, Collusion and
Nepotism involving the Election Working
Group, re-tendering is carried out by the new Election Working Group / new
Commitment Making Officer, 2.2.7. The Election Working Group will terminate the
selection process if based on the results of a review and communication with
Budget Users / Budget User Proxy / Commitment Making Officials, the needs can
still be postponed and there is not enough time to carry out the selection
process and / or execution of work, 2.2.8. particularly for failed tenders
caused by errors in the selection document, if the settlement cannot be carried
out in accordance with the provisions of 2.2.4, it will be carried out by means
of a Re-Tender, 2.2.9. in the case of a failed Tender, the Election Working
Group conducts Direct Appointment with criteria: a. approval of Budget User /
Budget User Proxy, b. needs cannot be delayed, and c. not enough time to carry
out the Tender.
Sabtu,
30 Agustus 2031 Materi Kuliah Umum - e-teleconference,
"Eksistensi Biro Hasil Penjualan JBAR MGB SM
(Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa), Divisi
Usaha dan Dana MPRT
YMR (Majelis Pimpinan Rukun Tetangga Yayasan Mandailing Raya) di seluruh dunia
yang dikonsentrasitaktiskan di Kabupaten Mandailing Natal" yang terdapat
dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang
Masa) Nomor : 0259/Juli/2031.
Saturday, August 30th,
2031 Public Lecture material - e-teleconference “Existence of The Bureau of
Sale Results of The Monthly Journal of Research Analysis of All Time, The
Division of Effort and Fund of The Neighborhood Leadership Assembly of The Great
Mandailing Foundation on worldwide is concerned and tacticed in Regency of
Mandailing Natal" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 0259/July/2031.
Personil
Biro Hasil Penjualan JBAR MGB SM
(Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa), Divisi
Usaha dan Dana MPRT
YMR (Majelis Pimpinan Rukun Tetangga Yayasan Mandailing Raya) untuk
merekomendasikan kepada Jurusan Teknik Sipil, Fakultas Teknik
Sipil dan Lingkungan (FTSL); Jurusan Hukum Administrasi Negara, Jurusan Hukum
Masyarakat dan Pembangunan, Jurusan Hukum Bisnis,
Jurusan Hukum Ekonomi, Jurusan Hukum Perdagangan Internasional dan Jurusan
Hukum Keuangan Negara, Fakultas Hukum; Jurusan Pendidikan Teknik dan Kejuruan (JPTK), Jurusan Pendidikan Ekonomi dan Jurusan Pendidikan Teknik Bangunan (PTB), Fakultas
Keguruan dan Ilmu Pendidikan; Manajemen dan Kebijakan Publik (Ilmu Administrasi
Negara) dan Ilmu Administrasi Publik,
Fakultas ISIPOL (Ilmu Sosial & Ilmu Politik); Mu’amalah (Hukum Bisnis
Islam), Keuangan Islam dan HES (Hukum Ekonomi
Syari’ah), Fakultas Syariah; Jurusan Teknik Sipil dan Lingkungan, Fakultas Teknologi Pertanian (FATETA); Jurusan Ekonomi dan Studi Pembangunan dan Jurusan Ekonomi Sumberdaya dan Lingkungan, Fakultas Ekonomi dan Manajemen; Jurusan Perencananaan dan Kebijakan
Publik dan Jurusan Bisnis Islam, FE (Fakultas Ekonomi); The Department of Urban Studies + Planning, School of Architecture
and Planning (SA+P); Civil and
Environmental Engineering, School of Engineering; BA (Master of Administration) Program, Agussalim Management; Jurusan Perencanaan Wilayah
dan Kota, Sekolah Arsitektur, Perencanaan, dan
Pengembangan Kebijakan (SAPPK); dan Jurusan Manajemen dan Jurusan Kewirausahaan, Sekolah Bisnis dan
Manajemen (SBM) UM (Universitas Mandailing) untuk memutakhirkan dengan memahami
Surat Edaran Nomor 10/SE/M/2018 tentang Pemberlakuan Standar Dokumen Pemilihan
Pengadaan Jasa Konstruksi Dalam Rangka Lelang Dini di Kementerian Pekerjaan
Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu Lampiran I Surat
Edaran Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 10 / SE / M / 2018
tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi dalam
Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk
Tahun Anggaran 2019 yaitu 1. Jaminan Pelaksanaan; Jaminan Pelaksanaan; 1.1. Jaminan Pelaksanaan
diberikan Penyedia sebelum penandatanganan Kontrak, 1.2. Jaminan Pelaksanaan
dikembalikan kepada Penyedia setelah: a. penyerahan seluruh pekerjaan, b.
penyerahan Jaminan Pemeliharaan sebesar 5% (lima per seratus) dari nilai
Kontrak, atau c. pembayaran termin terakhir/bulan terakhir/sekaligus telah
dikurangi uang retensi sebesar 5% (lima perseratus) dari nilai Kontrak (apabila
diperlukan), 1.3. Jaminan Pelaksanaan diserahkan kepada PPK (Pejabat Pembuat
Komitmen), memenuhi ketentuan sebagai berikut: a. Paket pekerjaan dengan nilai
HPS (Harga Perkiraan Sendiri) sampai dengan Rp10.000.000.000,00 (sepuluh miliar
rupiah) dapat diterbitkan oleh: 1) Bank Umum, 2) Perusahaan Penjaminan, 3) Perusahaan
Asuransi, 4) Lembaga khusus yang menjalankan usaha di bidang pembiayaan,
penjaminan, dan asuransi untuk mendorong ekspor Indonesia sesuai dengan
ketentuan peraturan perundangundangan di bidang Lembaga pembiayaan ekspor
Indonesia, atau 5) Konsorsium perusahaan asuransi umum/Lembaga penjaminan/
perusahaan penjaminan yang mempunyai program
asuransi kerugian (suretyship), huruf a.2 sampai dengan a.5 telah ditetapkan/
mendapatkan rekomendasi dari Otoritas Jasa Keuangan (OJK), b. Paket pekerjaan
dengan nilai HPS (Harga Perkiraan Sendiri) di atas Rp10.000.000.000,00 (sepuluh
miliar rupiah) diterbitkan oleh: 1) Bank Umum, atau 2) Konsorsium perusahaan
asuransi umum/Lembaga penjaminan/perusahaan penjaminan yang mempunyai program
asuransi kerugian (suretyship), huruf
b.2 telah ditetapkan/mendapatkan rekomendasi dari Otoritas Jasa Keuangan (OJK),
c. masa berlaku Jaminan Pelaksanaan sejak tanggal penandatanganan Kontrak
sampai dengan serah terima pertama pekerjaan berdasarkan Kontrak (PHO, Provisional Hand Over) sebagaimana
tercantum dalam Lembar Data Pemilihan (LDP), d. Nama Penyedia sama dengan
nama yang tercantum dalam surat Jaminan Pelaksanaan, e. besaran nilai Jaminan
Pelaksanaan tidak kurang dari nilai jaminan yang ditetapkan, f. Besaran nilai
Jaminan Pelaksanaan dicantumkan dalam angka dan huruf, g. Nama PPK (Pejabat
Pembuat Komitmen) yang menerima Jaminan Pelaksanaan sama dengan nama PPK (Pejabat
Pembuat Komitmen) yang menandatangan kontrak, h. Paket pekerjaan yang dijamin
sama dengan paket pekerjaan yang tercantum dalam Surat Penunjukan Penyedia
Barang/Jasa (SPPBJ), i. Jaminan Pelaksanaan harus dapat dicairkan tanpa syarat
(unconditional) sebesar nilai jaminan
dalam jangka waktu paling lambat 14 (empat belas) hari kerja setelah surat
pernyataan wanprestasi dari Pejabat Pembuat Komitmen diterima oleh penerbit
Jaminan, j. Jaminan Pelaksanaan atas nama KSO (Kerja Sama Operasi) ditulis atas
nama KSO (Kerja Sama Operasi) atau masing-masing anggota KSO (Kerja Sama
Operasi) [apabila masing-masing mengajukan Jaminan Pelaksanaan secara terpisah],
dan k. Memuat nama, alamat dan tanda tangan pihak penjamin, 1.4. PPK (Pejabat
Pembuat Komitmen) mengkonfirmasi dan mengklarifikasi secara tertulis substansi
dan keabsahan/keaslian Jaminan Pelaksanaan kepada penerbit jaminan apabila ada
hal yang meragukan, 1.5. Kegagalan penyedia yang ditunjuk untuk menyerahkan
Surat Jaminan Pelaksanaan dipersamakan dengan penolakan untuk menandatangani
Kontrak, dan 1.6. Ketentuan lebih lanjut mengenai pencairan Jaminan Pelaksanaan
diatur dalam Syarat-Syarat Umum Kontrak; dan 2. Penandatanganan Kontrak;
Penandatanganan; 2.1. Penandatanganan Kontrak dilakukan setelah penandatanganan
Kontrak DIPA/DPA (Daftar Isian Pelaksanaan Anggaran / Dokumen Pelaksanaan
Anggaran) ditetapkan, 2.2. sebelum penandatanganan kontrak Pejabat Pembuat
Komitmen wajib memeriksa apakah pernyataan dalam Data Isian Kualifikasi masih berlaku. Apabila salah satu pernyataan
tersebut sudah tidak terpenuhi, maka penandatanganan kontrak tidak dapat
dilakukan, 2.3. Penandatanganan kontrak dilakukan setelah diterbitkan Surat
Penunjukan Penyedia Barang/Jasa (SPPBJ), dan setelah penyedia menyerahkan
Jaminan Pelaksanaan, dengan ketentuan: a. nilai Jaminan Pelaksanaan untuk harga
penawaran terkoreksi antara 80% (delapan puluh perseratus) sampai dengan 100%
(seratus perseratus) nilai total HPS (Harga Perkiraan Sendiri) adalah sebesar
5% (lima perseratus) dari nilai Kontrak, atau b. nilai Jaminan Pelaksanaan
untuk harga penawaran atau penawaran terkoreksi dibawah 80% (delapan puluh
perseratus) nilai total HPS (Harga
Perkiraan Sendiri) adalah sebesar 5% (lima perseratus) dari nilai total HPS
(Harga Perkiraan Sendiri), 2.4. PPK (Pejabat Pembuat Komitmen) dan penyedia
tidak diperkenankan mengubah substansi Dokumen Pemilihan sampai dengan
penandatanganan Kontrak, kecuali mempersingkat waktu pelaksanaan pekerjaan
dikarenakan jadwal pelaksanaan pekerjaan yang ditetapkan sebelumnya akan melewati
batas tahun anggaran, 2.5. dalam hal perubahan waktu pelaksanaan pekerjaan
melewati batas tahun anggaran, maka penandatanganan kontrak dilakukan setelah
mendapat persetujuan kontrak tahun jamak, 2.6. PPK (Pejabat Pembuat Komitmen)
dan Penyedia wajib memeriksa konsep Kontrak meliputi substansi, bahasa,
redaksional, angka dan huruf serta membubuhkan paraf pada setiap lembar Dokumen
Kontrak, 2.7. menetapkan urutan hierarki kontrak sebagai berikut: a. adendum
Surat Perjanjian (apabila ada), b. Surat Perjanjian, c. Surat Penawaran berikut
Daftar Kuantitas dan Harga/ Daftar Keluaran dan Harga, d. Syarat-Syarat Khusus
Kontrak, e. Syarat-Syarat Umum Kontrak, f. spesifikasi teknis, dan g.
gambar-gambar, dengan maksud apabila terjadi pertentangan ketentuan antara
bagian satu dengan bagian yang lain, maka berlaku urutan hierarki hukum, 2.8. banyaknya
rangkap kontrak dibuat sesuai kebutuhan, yaitu: a. sekurang-kurangnya 2 (dua)
Kontrak asli, terdiri atas: 1) kontrak asli pertama untuk PPK (Pejabat Pembuat
Komitmen) dibubuhi materai pada bagian yang ditandatangani oleh penyedia, dan
2) kontrak asli kedua untuk penyedia dibubuhi materai pada bagian yang ditandatangani
oleh Pejabat Pembuat Komitmen; b. rangkap kontrak lainnya (apabila diperlukan)
tanpa dibubuhi meterai, 2.9. Pihak yang berwenang menandatangani kontrak atas
nama penyedia adalah direktur utama/pimpinan perusahaan atau yang namanya
tercantum dalam Akta Pendirian/Anggaran Dasar, yang telah didaftarkan sesuai
dengan peraturan perundangundangan, 2.10. Pihak lain yang bukan direktur
utama/pimpinan perusahaan atau yang namanya tidak disebutkan dalam Akta
Pendirian/Anggaran Dasar, dapat menandatangani Kontrak, sepanjang pihak
tersebut adalah pengurus/karyawan perusahaan yang berstatus sebagai tenaga
kerja tetap dan mendapat kuasa atau pendelegasian wewenang yang sah dari
direktur utama/pimpinan perusahaan/ pengurus atau pihak yang sah berdasarkan
Akta Pendirian/Anggaran Dasar untuk menandatangani Kontrak, dan 2.11. PPK (Pejabat
Pembuat Komitmen) meng-input-kan data
kontrak dan mengunggah hasil pemindaian dokumen kontrak yang telah
ditandatangani pada aplikasi Sistem Pengadaan Secara Elektronik (SPSE).
Personnel of The Bureau of Sale Results of The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time, The Division of Effort and Fund of The
Neighborhood Leadership Assembly of The Great Mandailing Foundation to recommend to The Department
of Civil Engineering, The Faculty of Civil and Environmental Engineering; The
Department of State Administrative Law, The Department of Law of Public and
Development, The Department of Business Law, The Department of Economic Law,
The Department of International Trade Law and The Department of State Financial
Law, The Faculty of Law; The Department of Engineering and Vocational
Education, The Department of Economic Education and The Department of Building
Engineering Education, The Faculty of Teacher Training and Education Science;
Management and Public Policy (State Administration Science) and Public
Administration Science, The Faculty of Social Sciences & Political
Sciences; Mu'amalah (Islamic Business Law), Islamic Finance and Syari'ah
Economic Law, The Faculty of Sharia; The Department of Civil and Environmental
Engineering, The Faculty of Agricultural Technology; The Department of
Economics and Development Studies and The Department of Resource and
Environmental Economics, The Faculty of Economics and Management; The
Department of Planning and Public Policy and The Department of Islamic Business,
The Faculty of Economics; The Department of Urban Studies + Planning, School of Architecture
and Planning (SA+P); Civil and
Environmental Engineering, School of Engineering; MBA (Master of Business
Administration) Program, Agussalim Management; The Department of Regional and City Planning, The
School of Architecture, Planning, and Policy Development; and The Department of
Management and Department of Entrepreneurship, The School of Business and
Management of MU (Mandailing University) to update by understanding Circular Letter Number 10 / SE / M / 2018
concerning Enforcement of Standard of Selection Documents for the Procurement
of Construction Services in the Context of Early Auction in the Ministry of
Public Works and Public Housing for
Budget Year 2019, namely Annex I of The Circular Letter Number 10 / SE / M / 2018 concerning Enforcement of Standard of Selection Documents for the Procurement of Construction Services in the Context of Early Auction in the Ministry of Public Works and Public Housing for Budget Year 2019, namely 1. Guarantee of Implementation; Performance Bond;
1.1. The Guarantee of Implementation is given by the Provider before the
signing of the Contract, 1.2. The Implementation Guarantee is returned to the
Provider after: a. surrender of all work, b. surrender of Maintenance Guarantee
amounting to 5% (five per hundred) of the value of the Contract, or c. payment
of the last session / last month / at the same time has been deducted by
retention of 5% (five percent) of the Contract value (if needed), 1.3. The
Implementation Guarantee is submitted to The Commitment Making Officer,
fulfilling the following conditions: a. Work packages with a value of Self
Estimated Price of up to Rp 10,000,000,000.00 (ten billion rupiahs) can be
issued by: 1) Commercial Banks, 2) Guarantee Companies, 3) Insurance Companies,
4) Special institutions that run businesses in the fields of financing,
guarantees and insurance to encourage Indonesian exports in accordance with the
provisions of legislation in the field of Indonesian export financing
institutions, or 5) Consortium of general insurance companies / guarantee
institutions / guarantee companies that have suretyship programs, letters a.2
up to a.5 has been determined / get a recommendation from the Financial
Services Authority, b. Work packages with a
value of Self Estimated Price above Rp. 10,000,000,000.00 (ten billion rupiahs)
issued by: 1) Commercial Banks, or 2) Consortium of general insurance companies
/ guarantee institutions / guarantee companies that have a loss insurance
program (suretyship), letter b.2 has been determined / obtained a
recommendation from the Financial Services Authority, c. the validity period of
the Implementation Guarantee from the date of signing the Contract until the
first handover of work based on the Contract (PHO, Provisional Hand Over) as
stated in the Election Data Sheet, d. The Provider's name is the same as the
name stated in the Implementation Guarantee letter, e. the amount of the value
of the Implementation Guarantee is not less than the value of the guaranteed
guarantee, f. the amount of the Implementation Guarantee value is stated in
numbers and letters, g. the name of the PPK (Commitment Making Officer) who
receives the Implementation Guarantee is the same as the name of the Commitment
Making Officer who signed the contract, h. Work package that is guaranteed to
be the same as the work package listed in the Letter of Appointment of Goods /
Services Providers, i. The guarantee of implementation must be able to be
disbursed without conditions (unconditional) in the amount of collateral within
a period of no later than 14 (fourteen) working days after the statement of
default from the Commitment Making Officer is received by the Guarantee issuer,
j. The Implementation Guarantee on behalf of the Operational Cooperation is
written on behalf of the Operational Cooperation or each member of Operational
Cooperation [if each submits a Guarantee of Implementation separately], and k.
contains the name, address and signature of the guarantor, 1.4. The Commitment Making Officer confirms
and clarifies in writing the substance and validity / authenticity of the
Implementation Guarantee to the issuer of guarantees if there is any doubt,
1.5. Failure of the designated provider to submit an Implementation Guarantee
Letter equal to the refusal to sign the Contract, and 1.6. Further provisions
regarding the disbursement of the Implementation Guarantee are regulated in the
General Conditions of the Contract; and 2. Signing of the Contract; Signing; 2.1.
The signing of the contract is done after the signing of the Contract of Budget
Implementation List / Budget Implementation Document is stipulated, 2.2. before
signing the contract the Commitment Maker Officer must check whether the statement
in the Qualification Data is still valid. If one of these statements is not
fulfilled, then the signing of the contract cannot be done, 2.3. The signing of
the contract is carried out after the issuance of the Letter of Appointment for
the Goods / Services Provider, and after the provider submits the
Implementation Guarantee, provided that: a. the value of the Implementation
Guarantee for the offer price is corrected between 80% (eighty percent) to 100%
(one hundred percent) of the total value of the Self Estimated Price of 5%
(five percent) of the Contract value, or b. the value of the Implementation
Guarantee for the offer price or offer corrected below 80% (eighty percent) of
the total value of the Self Estimated Price is 5% (five percent) of the total
value of the Self Estimated Price, 2.4.
The Commitment Making Officials and providers are not permitted to change the
substance of the Bidding Document until the signing of the Contract, except to
shorten the time of execution of the work because the schedule for the
implementation of the previously determined work will exceed the budget year,
2.5. in the event of a change in the execution time of the work beyond the
budget year limit, then the signing of the contract is carried out after
obtaining multi-year contract approval, 2.6. The Commitment Making Officers and
Providers must examine the concept of Contract covering substance, language,
editorial, numbers and letters and affix initials to each Contract Documents
sheet, 2.7. establish the order of the contract hierarchy as follows: a.
addendum to the Agreement (if any), b. Letter of Agreement, c. The Bid Letter
follows the List of Quantities and Prices / List of Outputs and Prices, d.
Special Conditions for Contracts, e. Contract General Conditions, f. technical
specifications, and g. Images, with the intention that if there are conflicting
provisions between part one and another part, then the order of the legal
hierarchy applies, 2.8. the number of multiple contracts is made according to
needs, namely: a. at least 2 (two) original contracts, consisting of: 1) the
first original contract for The Commitment Making Officer affixed a stamp to
the part signed by the provider, and 2) the second original contract to the
provider stamped on the part signed by the Official Commitment Maker; b.
duplicate other contracts (if needed) without stamped, 2.9. The party authorized to sign the contract on behalf of the
provider is the president director / head of the company or whose name is
listed in the Deed of Establishment / Articles of Association, which has been
registered in accordance with the laws and regulations, 2.10. Other parties who
are not the main director / head of the company or whose names are not
mentioned in the Deed of Establishment / Articles of Association, can sign a
Contract, as long as the party is a official / employee of the company who is a
permanent laborer and authorized or delegated legal authority from the
president director / company leaders / management or legitimate parties based
on the Deed of Establishment / Articles of Association to sign the Contract, and
2.11. The Commitment Making Officer inputs contract data and uploads the
results of the scan of the contract documents that have been signed in the Electronic
Procurement System application.
Penjadwalan KUM S3 MET (Kuliah Umum Sabtu Sore
Sepanjang Masa Electronic Teleconference)
Tahun 2415 (dua ribu empat ratus lima belas) Masehi.
Scheduling The
Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference
in 2415 (two thousand and four hundreds and fifteen) AD.
03 Januari 2415 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Astronomi, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Astronomi, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4860 / Desember / 2414.
January 03rd, 2415 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Astronomy, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Astronomy, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4860 / December / 2414.
10 Januari 2415 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Fisika, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Fisika, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4860 / Desember / 2414.
January
10th, 2415 AD, Material of The Public Lecture of Afternoon Saturday
of All Time with Electronic Teleconference “Existence of Multiplier Effects to
the wider community of the existence of The Department of Physic, The Faculty of Mathematic and Natural
Sciences of
MU (Mandailing University) as The Research of Final Project for Degree of
Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert
(AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert
(AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV,
D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1,
S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD
(Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for
students of The Department of Physic,
The Faculty of Mathematic and
Natural Sciences of MU (Mandailing University)"
contained in The Monthly Journal of Research Analysis of Biological Genetic
Micron of All Time Number : 4860 / December / 2414.
17 Januari 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Matematika, Fakultas
Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing)
sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP,
Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II,
D-II), Paper atau Tugas Akhir (TA)
untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas
Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana
(Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk
Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan
Matematika, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM
(Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan
Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4860 / Desember /
2414.
January
17th, 2415 AD, Material of The Public Lecture of Afternoon Saturday
of All Time with Electronic Teleconference “Existence of Multiplier Effects to
the wider community of the existence of The Department of Mathematic, The Faculty of Mathematic and Natural
Sciences of
MU (Mandailing University) as The Research of Final Project for Degree of
Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert
(AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert
(AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV,
D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1,
S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD
(Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for
students of The Department of Mathematic,
The Faculty of Mathematic and
Natural Sciences of MU (Mandailing University)"
contained in The Monthly Journal of Research Analysis of Biological Genetic
Micron of All Time Number : 4860 / December / 2414.
24 Januari 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Fakultas Matematika dan Ilmu
Pengetahuan Alam (FMIPA) UM (Universitas Mandailing) sebagai Penelitian untuk
Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir
(TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar
Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A,
Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk
Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3),
& Promosi Guru Besar (Profesor) mahasiswa Fakultas Matematika dan Ilmu
Pengetahuan Alam (FMIPA) UM (Universitas Mandailing)” yang terdapat dalam JBAR
MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor
: 4860 / Desember / 2414.
January
24th, 2415 AD, Material of The Public Lecture of Afternoon Saturday
of All Time with Electronic Teleconference “Existence of Multiplier Effects to
the wider community of the existence of The Faculty of Mathematic and Natural Sciences
of MU (Mandailing University) as The
Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I),
Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or
Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final
Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for
Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master
(Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor)
[Strata-III, S-3], and Promoter of Professor for students of The
Faculty of Mathematic and Natural Sciences of MU (Mandailing University)" contained in The Monthly
Journal of Research Analysis of Biological Genetic Micron of All Time Number :
4860 / December / 2414.
31 Januari 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Rekayasa Infrastruktur
Lingkungan, Fakultas Teknik Sipil dan Lingkungan (FTSL) UM (Universitas
Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama
(AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II,
D-II), Paper atau Tugas Akhir (TA)
untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas
Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana
(Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk
Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan
Rekayasa Infrastruktur Lingkungan, Fakultas Teknik Sipil dan Lingkungan (FTSL) UM
(Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan
Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4860 / Desember /
2414.
January
31st, 2415 AD, Material of The Public Lecture of Afternoon Saturday
of All Time with Electronic Teleconference “Existence of Multiplier Effects to
the wider community of the existence of The Department of Environmental Infrastructure Engineering, The
Faculty of Civil and Environmental Engineering of MU (Mandailing University) as The Research of Final
Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for
Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for
Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of
Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for
Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2),
Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and
Promoter of Professor for students of The Department of Environmental
Infrastructure Engineering, The Faculty of Civil and Environmental Engineering of MU (Mandailing University)" contained in The Monthly
Journal of Research Analysis of Biological Genetic Micron of All Time Number :
4860 / December / 2414.
07 Februari 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Teknik dan Pengelolaan
Sumber Daya Air, Fakultas Teknik Sipil dan Lingkungan (FTSL) UM (Universitas
Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama
(AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II,
D-II), Paper atau Tugas Akhir (TA)
untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas
Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana
(Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk
Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan
Teknik dan Pengelolaan Sumber Daya Air, Fakultas Teknik Sipil dan Lingkungan (FTSL) UM
(Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan
Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4861 / Januari / 2415.
February
07th, 2415 AD, Material of The Public Lecture of Afternoon Saturday
of All Time with Electronic Teleconference “Existence of Multiplier Effects to
the wider community of the existence of The Department of Water Resources Engineering and Management, The
Faculty of Civil and Environmental Engineering of MU (Mandailing University) as The Research of Final
Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for
Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for
Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of
Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for
Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2),
Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and
Promoter of Professor for students of The Department of Water Resources
Engineering and Management, The Faculty of Civil and Environmental Engineering of MU (Mandailing University)" contained in The Monthly
Journal of Research Analysis of Biological Genetic Micron of All Time Number :
4861 / January / 2415.
14 Februari 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Teknik Kelautan, Fakultas Teknik
Sipil dan Lingkungan (FTSL) UM (Universitas Mandailing) sebagai Penelitian
untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas
Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar
Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A,
Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk
Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3),
& Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Kelautan, Fakultas Teknik
Sipil dan Lingkungan (FTSL) UM (Universitas Mandailing)” yang terdapat dalam
JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa)
Nomor : 4861 / Januari / 2415.
February
14th, 2415 AD, Material of The Public Lecture of Afternoon Saturday
of All Time with Electronic Teleconference “Existence of Multiplier Effects to
the wider community of the existence of The Department of Marine Engineering, The Faculty of Civil and
Environmental Engineering of
MU (Mandailing University) as The Research of Final Project for Degree of
Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert
(AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert
(AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV,
D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1,
S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD
(Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for
students of The Department of Marine Engineering, The
Faculty of Civil and Environmental Engineering of MU (Mandailing University)" contained in The Monthly
Journal of Research Analysis of Biological Genetic Micron of All Time Number :
4861 / January / 2415.
21 Februari 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Teknik Lingkungan, Fakultas Teknik
Sipil dan Lingkungan (FTSL) UM (Universitas Mandailing) sebagai Penelitian
untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas
Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar
Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A,
Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk
Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3),
& Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Lingkungan, Fakultas Teknik
Sipil dan Lingkungan (FTSL) UM (Universitas Mandailing)” yang terdapat dalam
JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa)
Nomor : 4861 / Januari / 2415.
February
21st, 2415 AD, Material of The Public Lecture of Afternoon Saturday
of All Time with Electronic Teleconference “Existence of Multiplier Effects to
the wider community of the existence of The Department of Environmental Engineering, The Faculty of
Civil and Environmental Engineering of
MU (Mandailing University) as The Research of Final Project for Degree of
Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert
(AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert
(AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV,
D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1,
S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD
(Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for
students of The Department of Environmental
Engineering, The Faculty of Civil and Environmental Engineering of MU (Mandailing University)" contained in The Monthly
Journal of Research Analysis of Biological Genetic Micron of All Time Number :
4861 / January / 2415.
28 Februari 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Teknik Sipil, Fakultas Teknik
Sipil dan Lingkungan (FTSL) UM (Universitas Mandailing) sebagai Penelitian
untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas
Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar
Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A,
Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk
Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3),
& Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Sipil, Fakultas Teknik
Sipil dan Lingkungan (FTSL) UM (Universitas Mandailing)” yang terdapat dalam
JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa)
Nomor : 4861 / Januari / 2415.
February
28th, 2415 AD, Material of The Public Lecture of Afternoon Saturday
of All Time with Electronic Teleconference “Existence of Multiplier Effects to
the wider community of the existence of The Department of Civil Engineering, The Faculty of Civil and
Environmental Engineering of
MU (Mandailing University) as The Research of Final Project for Degree of
Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert
(AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert
(AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV,
D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1,
S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD
(Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for
students of The Department of Civil Engineering, The
Faculty of Civil and Environmental Engineering of MU (Mandailing University)" contained in The Monthly
Journal of Research Analysis of Biological Genetic Micron of All Time Number :
4861 / January / 2415.
07 Maret 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Fakultas Teknik
Sipil dan Lingkungan (FTSL) UM (Universitas Mandailing) sebagai Penelitian
untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas
Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar
Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A,
Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk
Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3),
& Promosi Guru Besar (Profesor) mahasiswa Fakultas Teknik
Sipil dan Lingkungan (FTSL) UM (Universitas Mandailing)” yang terdapat dalam
JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa)
Nomor : 4862 / Februari / 2415.
March
07th, 2415 AD, Material of The Public Lecture of Afternoon Saturday
of All Time with Electronic Teleconference “Existence of Multiplier Effects to
the wider community of the existence of The Faculty of Civil and Environmental Engineering of MU (Mandailing University) as The Research of Final
Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for
Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for
Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of
Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for
Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2),
Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and
Promoter of Professor for students of The Faculty of Civil and Environmental
Engineering of MU (Mandailing University)"
contained in The Monthly Journal of Research Analysis of Biological Genetic
Micron of All Time Number : 4862 / February / 2415.
14 Maret 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Teknik Bioenergi dan Kemurgi,
Fakultas Teknologi Industri (FTI) UM (Universitas Mandailing) sebagai
Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I,
D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek
Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA)
untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1,
S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor
(Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan
Teknik Bioenergi dan Kemurgi, Fakultas Teknologi Industri (FTI) UM (Universitas
Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset
Mikron Gen Biologis Sepanjang Masa) Nomor : 4862 / Februari / 2415.
March
14th, 2415 AD, Material of The Public Lecture of Afternoon Saturday
of All Time with Electronic Teleconference “Existence of Multiplier Effects to
the wider community of the existence of The Department of Bioenergy and Kemurgi Engineering, The Faculty
of Industrial Technology of
MU (Mandailing University) as The Research of Final Project for Degree of
Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert
(AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert
(AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV,
D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1,
S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD
(Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for
students of The Department of Bioenergy and Kemurgi
Engineering, The Faculty of Industrial Technology of MU (Mandailing University)" contained in The Monthly
Journal of Research Analysis of Biological Genetic Micron of All Time Number :
4862 / February / 2415.
21 Maret 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Teknik Pangan, Fakultas
Teknologi Industri (FTI) UM (Universitas Mandailing) sebagai Penelitian untuk
Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir
(TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar
Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A,
Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk
Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3),
& Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Pangan, Fakultas
Teknologi Industri (FTI) UM (Universitas Mandailing)” yang terdapat dalam JBAR
MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor
: 4862 / Februari / 2415.
March
21st, 2415 AD, Material of The Public Lecture of Afternoon Saturday
of All Time with Electronic Teleconference “Existence of Multiplier Effects to
the wider community of the existence of The Department of Food Engineering, The Faculty of Industrial
Technology of MU (Mandailing University) as The
Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I),
Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or
Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final
Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for
Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master
(Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor)
[Strata-III, S-3], and Promoter of Professor for students of The
Department of Food Engineering, The Faculty of Industrial Technology of MU (Mandailing University)" contained in The Monthly
Journal of Research Analysis of Biological Genetic Micron of All Time Number :
4862 / February / 2415.
28 Maret 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Manajemen Rekayasa Industri,
Fakultas Teknologi Industri (FTI) UM (Universitas Mandailing) sebagai
Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I,
D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek
Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA)
untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1,
S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor
(Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan
Manajemen Rekayasa Industri, Fakultas Teknologi Industri (FTI) UM (Universitas
Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset
Mikron Gen Biologis Sepanjang Masa) Nomor : 4862 / Februari / 2415.
March
28th, 2415 AD, Material of The Public Lecture of Afternoon Saturday
of All Time with Electronic Teleconference “Existence of Multiplier Effects to
the wider community of the existence of The Department of Industrial Engineering Management, The Faculty
of Industrial Technology of
MU (Mandailing University) as The Research of Final Project for Degree of
Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert
(AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert
(AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV,
D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1,
S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD
(Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for
students of The Department of Industrial Engineering
Management, The Faculty of Industrial Technology of MU (Mandailing University)" contained in The Monthly
Journal of Research Analysis of Biological Genetic Micron of All Time Number :
4862 / February / 2415.
04 April 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Teknik Industri, Fakultas
Teknologi Industri (FTI) UM (Universitas Mandailing) sebagai Penelitian untuk
Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir
(TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar
Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A,
Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk
Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3),
& Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Industri, Fakultas
Teknologi Industri (FTI) UM (Universitas Mandailing)” yang terdapat dalam JBAR
MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor
: 4863 / Maret / 2415.
April
04th, 2415 AD, Material of The Public Lecture of Afternoon Saturday
of All Time with Electronic Teleconference “Existence of Multiplier Effects to
the wider community of the existence of The Department of Industrial Engineering, The Faculty of
Industrial Technology of MU
(Mandailing University) as The Research of Final Project for Degree of Pratama
Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa,
Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd,
Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV),
Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1),
Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy
of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The
Department of Industrial Engineering, The Faculty of Industrial Technology of MU (Mandailing University)" contained in The Monthly
Journal of Research Analysis of Biological Genetic Micron of All Time Number :
4863 / March / 2415.
11 April 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Teknik Fisika, Fakultas
Teknologi Industri (FTI) UM (Universitas Mandailing) sebagai Penelitian untuk
Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir
(TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar
Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A,
Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk
Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3),
& Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Fisika, Fakultas
Teknologi Industri (FTI) UM (Universitas Mandailing)” yang terdapat dalam JBAR
MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor
: 4863 / Maret / 2415.
April
11th, 2415 AD, Material of The Public Lecture of Afternoon Saturday
of All Time with Electronic Teleconference “Existence of Multiplier Effects to
the wider community of the existence of The Department of Physic Engineering, The Faculty of Industrial
Technology of MU (Mandailing University) as The
Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I),
Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or
Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final
Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for
Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master
(Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III,
S-3], and Promoter of Professor for students of The
Department of Physic Engineering, The Faculty of Industrial Technology of MU (Mandailing University)" contained in The Monthly
Journal of Research Analysis of Biological Genetic Micron of All Time Number :
4863 / March / 2415.
18 April 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Teknik Kimia, Fakultas Teknologi
Industri (FTI) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir
(TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk
Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper
atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd,
Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV),
Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master
(Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi
Guru Besar (Profesor) mahasiswa Jurusan Teknik Kimia, Fakultas
Teknologi Industri (FTI) UM (Universitas Mandailing)” yang terdapat dalam JBAR
MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor
: 4863 / Maret / 2415.
April
18th, 2415 AD, Material of The Public Lecture of Afternoon Saturday
of All Time with Electronic Teleconference “Existence of Multiplier Effects to
the wider community of the existence of The Department of Chemical Engineering, The Faculty of
Industrial Technology of MU
(Mandailing University) as The Research of Final Project for Degree of Pratama
Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa,
Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd,
Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV),
Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1),
Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy
of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The
Department of Chemical Engineering, The Faculty of Industrial Technology of MU (Mandailing University)" contained in The Monthly
Journal of Research Analysis of Biological Genetic Micron of All Time Number :
4863 / March / 2415.
25 April 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Fakultas Teknologi Industri (FTI) UM
(Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar
Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa,
Diploma-II, D-II), Paper atau Tugas
Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III,
D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk
Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2),
Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar
(Profesor) mahasiswa Fakultas Teknologi Industri (FTI) UM (Universitas
Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset
Mikron Gen Biologis Sepanjang Masa) Nomor : 4863 / Maret / 2415.
April
25th, 2415 AD, Material of The Public Lecture of Afternoon Saturday
of All Time with Electronic Teleconference “Existence of Multiplier Effects to
the wider community of the existence of The Faculty of Industrial Technology of MU (Mandailing University) as The Research of Final
Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for
Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for
Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of
Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for
Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2),
Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and
Promoter of Professor for students of The Faculty of Industrial Technology of MU (Mandailing University)" contained in The Monthly
Journal of Research Analysis of Biological Genetic Micron of All Time Number :
4863 / March / 2415.
02 Mei 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Teknik
Material, Fakultas Teknik Mesin dan
Dirgantara UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir
(TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk
Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper
atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd,
Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV),
Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master
(Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi
Guru Besar (Profesor) mahasiswa Jurusan Teknik
Material, Fakultas Teknik Mesin dan
Dirgantara UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal
Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4864 / April
/ 2415.
May
02nd, 2415 AD, Material of The Public Lecture of Afternoon Saturday
of All Time with Electronic Teleconference “Existence of Multiplier Effects to
the wider community of the existence of The Department of Material Engineering, The Faculty of
Mechanical and Aerospace Engineering of
MU (Mandailing University) as The Research of Final Project for Degree of
Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert
(AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert
(AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV,
D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1,
S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD
(Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for
students of The Department of Material Engineering, The
Faculty of Mechanical and Aerospace Engineering of MU (Mandailing University)" contained in The Monthly
Journal of Research Analysis of Biological Genetic Micron of All Time Number :
4864 / April / 2415.
09 Mei 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Aeronotika dan Astronotika, Fakultas Teknik Mesin dan Dirgantara
UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk
Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda
(AMa, Diploma-II, D-II), Paper atau
Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd,
Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV),
Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master
(Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi
Guru Besar (Profesor) mahasiswa Jurusan Aeronotika dan Astronotika, Fakultas Teknik Mesin dan Dirgantara UM
(Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan
Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4864 / April / 2415.
May
09th, 2415 AD, Material of The Public Lecture of Afternoon Saturday
of All Time with Electronic Teleconference “Existence of Multiplier Effects to
the wider community of the existence of The Department of Aeronautic and Astronotic, The Faculty of
Mechanical and Aerospace Engineering of
MU (Mandailing University) as The Research of Final Project for Degree of
Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert
(AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert
(AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV,
D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1,
S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD
(Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for
students of The Department of Aeronautic and
Astronotic, The Faculty of Mechanical and Aerospace Engineering of MU (Mandailing University)" contained in The Monthly
Journal of Research Analysis of Biological Genetic Micron of All Time Number :
4864 / April / 2415.
16 Mei 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Teknik Mesin, Fakultas Teknik Mesin dan Dirgantara
UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk
Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda
(AMa, Diploma-II, D-II), Paper atau
Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd,
Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV),
Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master
(Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi
Guru Besar (Profesor) mahasiswa Jurusan Teknik Mesin, Fakultas Teknik Mesin dan Dirgantara UM
(Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan
Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4864 / April / 2415.
May
16th, 2415 AD, Material of The Public Lecture of Afternoon Saturday
of All Time with Electronic Teleconference “Existence of Multiplier Effects to
the wider community of the existence of The Department of Mechanical Engineering, The Faculty of
Mechanical and Aerospace Engineering of
MU (Mandailing University) as The Research of Final Project for Degree of
Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa,
Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd,
Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV),
Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1),
Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy
of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The
Department of Mechanical Engineering, The Faculty of Mechanical and Aerospace
Engineering of MU (Mandailing University)"
contained in The Monthly Journal of Research Analysis of Biological Genetic
Micron of All Time Number : 4864 / April / 2415.
23 Mei 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Fakultas Teknik Mesin dan Dirgantara
UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk
Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda
(AMa, Diploma-II, D-II), Paper atau
Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd,
Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV),
Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2,
S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar
(Profesor) mahasiswa Fakultas Teknik Mesin dan Dirgantara UM (Universitas
Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset
Mikron Gen Biologis Sepanjang Masa) Nomor : 4864 / April / 2415.
May
23rd, 2415 AD, Material of The Public Lecture of Afternoon Saturday
of All Time with Electronic Teleconference “Existence of Multiplier Effects to
the wider community of the existence of The Faculty of Mechanical and Aerospace Engineering of MU (Mandailing University) as The Research of Final
Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for
Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for
Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of
Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for
Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2),
Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and
Promoter of Professor for students of The Faculty of Mechanical and Aerospace
Engineering of MU (Mandailing University)"
contained in The Monthly Journal of Research Analysis of Biological Genetic
Micron of All Time Number : 4864 / April / 2415.
30 Mei 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Disain Produk, Fakultas Seni
Rupa dan Disain (FSRD) UM
(Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar
Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa,
Diploma-II, D-II), Paper atau Tugas
Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III,
D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk
Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2),
Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar
(Profesor) mahasiswa Jurusan Disain Produk, Fakultas Seni Rupa dan Disain (FSRD) UM
(Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan
Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4864 / April / 2415.
May 30th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Multiplier Effects to the wider
community of the existence of The Department of Product Design, The Faculty
of Art and Design of MU (Mandailing University) as The Research of Final
Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for
Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for
Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of
Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for
Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2),
Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and
Promoter of Professor for students of The
Department of Product Design, The Faculty of Art and Design of MU (Mandailing University)" contained in The
Monthly Journal of Research Analysis of Biological Genetic Micron of All Time
Number : 4864 / April / 2415.
06 Juni 2415 Masehi, Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Disain Komunikasi Visual, Fakultas Seni Rupa dan Disain
(FSRD) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas
Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA)
untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar
Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A,
Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk
Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3),
& Promosi Guru Besar (Profesor) mahasiswa Jurusan Disain Komunikasi Visual, Fakultas Seni Rupa dan Disain
(FSRD) UM
(Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan
Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4865 / Mei / 2415.
June 06th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Multiplier Effects to the wider
community of the existence of The Department of Visual Communication Design,
The Faculty of Art and Design of MU (Mandailing University) as The Research of Final
Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for
Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for
Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of
Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for
Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2),
Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and
Promoter of Professor for students of The
Department of Visual Communication Design, The Faculty of Art and Design of MU (Mandailing University)" contained in The
Monthly Journal of Research Analysis of Biological Genetic Micron of All Time
Number : 4865 / May / 2415.
13 Juni 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Disain Interior, Fakultas Seni Rupa dan Disain (FSRD) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas
Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA)
untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar
Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A,
Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk
Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3),
& Promosi Guru Besar (Profesor) mahasiswa Jurusan Disain Interior, Fakultas Seni Rupa dan Disain (FSRD) UM
(Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan
Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4865 / Mei / 2415.
June 13th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Multiplier Effects to the wider
community of the existence of The Department of Interior Design, The Faculty
of Art and Design of MU (Mandailing University) as The Research of Final
Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for
Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for
Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of
Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for
Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2),
Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and
Promoter of Professor for students of The
Department of Interior Design, The Faculty of Art and Design of MU (Mandailing University)" contained in The
Monthly Journal of Research Analysis of Biological Genetic Micron of All Time
Number : 4865 / May / 2415.
20 Juni 2415 Masehi, Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Kria, Fakultas Seni Rupa dan
Disain (FSRD) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas
Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA)
untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar
Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A,
Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk
Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3),
& Promosi Guru Besar (Profesor) mahasiswa Jurusan Kria, Fakultas Seni Rupa dan
Disain (FSRD) UM
(Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan
Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4865 / Mei / 2415.
June 20th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Multiplier Effects to the wider
community of the existence of The Department of Art of Craft, The Faculty of
Art and Design of MU (Mandailing University) as The Research of Final
Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for
Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for
Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of
Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for
Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2),
Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and
Promoter of Professor for students of The
Department of Art of Craft, The Faculty of Art and Design of MU (Mandailing University)" contained in The
Monthly Journal of Research Analysis of Biological Genetic Micron of All Time
Number : 4865 / May / 2415.
27 Juni 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Seni Rupa, Fakultas Seni
Rupa dan Disain (FSRD) UM
(Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar
Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa,
Diploma-II, D-II), Paper atau Tugas
Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III,
D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk
Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2),
Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar
(Profesor) mahasiswa Jurusan Seni Rupa, Fakultas Seni Rupa dan Disain (FSRD) UM
(Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan
Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4865 / Mei / 2415.
June 27th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Multiplier Effects to the wider
community of the existence of The Department of Fine Arts, The Faculty of
Art and Design of MU (Mandailing University) as The Research of Final
Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for
Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for
Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of
Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for
Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2),
Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and
Promoter of Professor for students of The
Department of Fine Arts, The Faculty of Art and Design of MU (Mandailing University)" contained in The
Monthly Journal of Research Analysis of Biological Genetic Micron of All Time
Number : 4865 / May / 2415.
04 Juli 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Fakultas Seni Rupa dan Disain (FSRD) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas
Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA)
untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar
Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A,
Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk
Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3),
& Promosi Guru Besar (Profesor) mahasiswa Fakultas Seni Rupa dan Disain (FSRD) UM
(Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan
Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4866 / Juni / 2415.
July 04th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Multiplier Effects to the wider
community of the existence of The Faculty of Art and Design of
MU (Mandailing University) as The Research of Final Project for Degree of
Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert
(AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert
(AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV,
D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1,
S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD
(Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for
students of The
Faculty of Art and Design
of MU (Mandailing University)" contained in The Monthly Journal of
Research Analysis of Biological Genetic Micron of All Time Number : 4866 / June
/ 2415.
11 Juli 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Oseanografi, Fakultas Ilmu
dan Teknologi Kebumian UM (Universitas Mandailing) sebagai Penelitian untuk
Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir
(TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar
Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A,
Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk
Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3),
& Promosi Guru Besar (Profesor) mahasiswa Jurusan Oseanografi, Fakultas Ilmu
dan Teknologi Kebumian UM (Universitas Mandailing)” yang terdapat dalam JBAR
MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor
: 4866 / Juni / 2415.
July 11th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Multiplier Effects to the wider
community of the existence of The Department of Oceanography, The Faculty of
Sciences and Technology of Earth of MU (Mandailing University) as The Research of Final
Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for
Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree
of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert
(A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor
Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for
Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of
Professor for students of The
Department of Oceanography, The Faculty of Sciences and Technology of Earth of MU (Mandailing University)" contained in The
Monthly Journal of Research Analysis of Biological Genetic Micron of All Time
Number : 4866 / June / 2415.
18 Juli 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Metereologi, Fakultas Ilmu
dan Teknologi Kebumian UM (Universitas Mandailing) sebagai Penelitian untuk
Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir
(TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar
Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A,
Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk
Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3),
& Promosi Guru Besar (Profesor) mahasiswa Jurusan Metereologi, Fakultas Ilmu
dan Teknologi Kebumian UM (Universitas Mandailing)” yang terdapat dalam JBAR
MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor
: 4866 / Juni / 2415.
July 18th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Multiplier Effects to the wider
community of the existence of The Department of Meteorology, The Faculty of
Sciences and Technology of Earth of MU (Mandailing University) as The Research of Final
Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for
Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree
of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert
(A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor
Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for
Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of
Professor for students of The
Department of Meteorology, The Faculty of Sciences and Technology of Earth of MU (Mandailing University)" contained in The
Monthly Journal of Research Analysis of Biological Genetic Micron of All Time
Number : 4866 / June / 2415.
25 Juli 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Teknik Geodesi dan Geomatika,
Fakultas Ilmu dan Teknologi Kebumian UM (Universitas Mandailing) sebagai
Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I,
D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek
Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA)
untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1,
S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor
(Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan
Teknik Geodesi dan Geomatika, Fakultas Ilmu dan Teknologi Kebumian UM
(Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan
Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4866 / Juni / 2415.
July 25th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Multiplier Effects to the wider
community of the existence of The Department of Geodesy and Geomatic
Engineering, The Faculty of Sciences and Technology of Earth of
MU (Mandailing University) as The Research of Final Project for Degree of
Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert
(AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert
(AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV,
D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1,
S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD
(Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for
students of The
Department of Geodesy and Geomatic Engineering, The Faculty of Sciences and
Technology of Earth of MU
(Mandailing University)" contained in The Monthly Journal of Research
Analysis of Biological Genetic Micron of All Time Number : 4866 / June / 2415.
01 Agustus 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Teknik Geologi, Fakultas
Ilmu dan Teknologi Kebumian UM (Universitas Mandailing) sebagai Penelitian
untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas
Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar
Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A,
Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk
Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3),
& Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Geologi, Fakultas
Ilmu dan Teknologi Kebumian UM (Universitas Mandailing)” yang terdapat dalam
JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa)
Nomor : 4867 / Juli / 2415.
August 01st, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with Electronic
Teleconference “Existence of Multiplier Effects to the wider community of the
existence of The Department of Geological Engineering, The
Faculty of Sciences and Technology of Earth of MU (Mandailing University) as The
Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I),
Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or
Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final
Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for
Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master
(Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor)
[Strata-III, S-3], and Promoter of Professor for students of The Department of Geological Engineering, The
Faculty of Sciences and Technology of Earth of MU (Mandailing University)" contained in The
Monthly Journal of Research Analysis of Biological Genetic Micron of All Time
Number : 4867 / July / 2415.
08 Agustus 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Fakultas Ilmu dan Teknologi Kebumian
UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk
Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda
(AMa, Diploma-II, D-II), Paper atau
Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd,
Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV),
Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master
(Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi
Guru Besar (Profesor) mahasiswa Fakultas Ilmu dan Teknologi Kebumian
UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan
Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4867 / Juli / 2415.
August 08th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Multiplier Effects to the wider
community of the existence of The Faculty of Sciences and Technology of
Earth of MU (Mandailing University) as The Research of Final
Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for
Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for
Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of
Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for
Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2),
Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and
Promoter of Professor for students of The
Faculty of Sciences and Technology of Earth of MU (Mandailing University)" contained in The
Monthly Journal of Research Analysis of Biological Genetic Micron of All Time
Number : 4867 / July / 2415.
15 Agustus 2415 Masehi, Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Matematika, Fakultas
Tarbiyah UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA)
untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar
Ahli Muda (AMa, Diploma-II, D-II), Paper
atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd,
Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV),
Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master
(Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi
Guru Besar (Profesor) mahasiswa Jurusan Matematika, Fakultas
Tarbiyah UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal
Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4867 / Juli
/ 2415.
August 15th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Multiplier Effects to the wider
community of the existence of The Department of Mathematic, The Faculty of
Tarbiyah of MU (Mandailing University) as
The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I),
Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or
Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final
Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for
Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master
(Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor)
[Strata-III, S-3], and Promoter of Professor for students of The Department of Mathematic, The Faculty of
Tarbiyah of MU (Mandailing University)"
contained in The Monthly Journal of Research Analysis of Biological Genetic
Micron of All Time Number : 4867 / July / 2415.
22 Agustus 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Bahasa Inggiris, Fakultas
Tarbiyah UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA)
untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar
Ahli Muda (AMa, Diploma-II, D-II), Paper
atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd,
Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV),
Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master
(Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi
Guru Besar (Profesor) mahasiswa Jurusan Bahasa Inggiris, Fakultas
Tarbiyah UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal
Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4867 / Juli
/ 2415.
August 22nd, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Multiplier Effects to the wider
community of the existence of The Department of English, The Faculty of Tarbiyah of MU (Mandailing University) as The Research of Final
Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for
Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for
Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of
Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for
Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2),
Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter
of Professor for students of The
Department of English, The Faculty of Tarbiyah of MU (Mandailing University)" contained in The
Monthly Journal of Research Analysis of Biological Genetic Micron of All Time
Number : 4867 / July / 2415.
29 Agustus 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Bahasa Arab, Fakultas
Tarbiyah UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA)
untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar
Ahli Muda (AMa, Diploma-II, D-II), Paper
atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd,
Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV),
Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master
(Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi
Guru Besar (Profesor) mahasiswa Jurusan Bahasa Arab, Fakultas
Tarbiyah UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal
Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4867 / Juli
/ 2415.
August 29th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Multiplier Effects to the wider
community of the existence of The Department of Arabic Langauge, The Faculty
of Tarbiyah of MU (Mandailing University) as
The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I,
D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper
or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final
Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for
Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master
(Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor)
[Strata-III, S-3], and Promoter of Professor for students of The Department of Arabic Langauge, The Faculty
of Tarbiyah of MU (Mandailing University)"
contained in The Monthly Journal of Research Analysis of Biological Genetic
Micron of All Time Number : 4867 / July / 2415.
05 September 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan PAI (Pendidikan Agama Islam), Fakultas Tarbiyah UM (Universitas Mandailing) sebagai
Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I,
D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek
Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA)
untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1,
S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor
(Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan
PAI (Pendidikan
Agama Islam), Fakultas Tarbiyah UM (Universitas
Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset
Mikron Gen Biologis Sepanjang Masa) Nomor : 4868 / Agustus / 2415.
September 05th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Multiplier Effects to the wider
community of the existence of The Department of Islamic Religious Education,
The Faculty of Tarbiyah of MU (Mandailing
University) as The Research of Final Project for Degree of Pratama Expert (AP,
Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II,
D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III,
D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis
for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for
Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor)
[Strata-III, S-3], and Promoter of Professor for students of The Department of Islamic Religious Education,
The Faculty of Tarbiyah of MU
(Mandailing University)" contained in The Monthly Journal of Research
Analysis of Biological Genetic Micron of All Time Number : 4868 / August / 2415.
12 September 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Fakultas Tarbiyah UM (Universitas
Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama
(AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II,
D-II), Paper atau Tugas Akhir (TA)
untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas
Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana
(Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk
Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Fakultas
Tarbiyah UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal
Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4868 /
Agustus / 2415.
September 12th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Multiplier Effects to the wider
community of the existence of The Faculty of Tarbiyah of MU (Mandailing University) as The Research of Final
Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for
Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for
Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of
Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for
Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2),
Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and
Promoter of Professor for students of The
Faculty of Tarbiyah of MU
(Mandailing University)" contained in The Monthly Journal of Research
Analysis of Biological Genetic Micron of All Time Number : 4868 / August / 2415.
19 September 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Teknik Metalurgi, Fakultas
Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) sebagai
Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I,
D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek
Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA)
untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1,
S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor
(Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan
Teknik Metalurgi, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM
(Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan
Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4868 / Agustus / 2415.
September 19th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Multiplier Effects to the wider
community of the existence of The Department of Metallurgical Engineering, The
Faculty of Mining and Petroleum Engineering of MU (Mandailing University) as The Research of Final
Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for
Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for
Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of
Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for
Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2),
Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and
Promoter of Professor for students of The
Department of Metallurgical Engineering, The Faculty of Mining and Petroleum
Engineering of MU (Mandailing University)"
contained in The Monthly Journal of Research Analysis of Biological Genetic
Micron of All Time Number : 4868 / August / 2415.
26 September 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Teknik Geofisika, Fakultas
Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) sebagai
Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I,
D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek
Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA)
untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1,
S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor
(Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan
Teknik Geofisika, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM
(Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan
Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4868 / Agustus / 2415.
September 26th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Multiplier Effects to the wider
community of the existence of The Department of Geophysical Engineering, The
Faculty of Mining and Petroleum Engineering of MU (Mandailing University) as The Research of Final
Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for
Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for
Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of
Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for
Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2),
Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and
Promoter of Professor for students of The
Department of Geophysical Engineering, The Faculty of Mining and Petroleum
Engineering of MU (Mandailing University)"
contained in The Monthly Journal of Research Analysis of Biological Genetic
Micron of All Time Number : 4868 / August / 2415.
03 Oktober 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Teknik Perminyakan, Fakultas Teknik Pertambangan dan
Perminyakan (FTTM) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas
Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA)
untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar
Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A,
Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk
Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3),
& Promosi Guru Besar (Profesor) mahasiswa Jurusan
Teknik Perminyakan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM
(Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan
Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4869 / September /
2415.
October 03rd, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Multiplier Effects to the wider
community of the existence of The Department of Petroleum Engineering, The
Faculty of Mining and Petroleum Engineering of MU (Mandailing University) as The Research of Final
Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for
Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for
Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of
Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for
Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation
for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of
Professor for students of The
Department of Petroleum Engineering, The Faculty of Mining and Petroleum
Engineering of MU (Mandailing University)"
contained in The Monthly Journal of Research Analysis of Biological Genetic
Micron of All Time Number : 4869 / September / 2415.
10 Oktober 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Jurusan Teknik Pertambangan, Fakultas
Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) sebagai
Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I,
D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek
Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA)
untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1,
S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor
(Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan
Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM
(Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan
Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4869 / September /
2415.
October 10th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Multiplier Effects to the wider
community of the existence of The Department of Mining Engineering, The
Faculty of Mining and Petroleum Engineering of MU (Mandailing University) as The Research of Final
Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for
Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for
Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of
Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for
Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2),
Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and
Promoter of Professor for students of The
Department of Mining Engineering, The Faculty of Mining and Petroleum
Engineering of MU (Mandailing University)"
contained in The Monthly Journal of Research Analysis of Biological Genetic
Micron of All Time Number : 4869 / September / 2415.
17 Oktober 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier
Effects) terhadap masyarakat luas
keberadaan Fakultas Teknik Pertambangan dan
Perminyakan (FTTM) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas
Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA)
untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar
Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A,
Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk
Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), &
Promosi Guru Besar (Profesor) mahasiswa Fakultas Teknik Pertambangan dan
Perminyakan (FTTM) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM
(Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4869
/ September / 2415.
October 17th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Multiplier Effects to the wider
community of the existence of The Faculty of Mining and Petroleum
Engineering of MU (Mandailing University) as
The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I,
D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper
or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final
Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for
Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master
(Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor)
[Strata-III, S-3], and Promoter of Professor for students of The Faculty of Mining and Petroleum
Engineering of MU (Mandailing University)"
contained in The Monthly Journal of Research Analysis of Biological Genetic
Micron of All Time Number : 4869 / September / 2415.
24 Oktober 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Alumni Jurusan Kewirausahaan, Sekolah
Bisnis dan Manajemen (SBM)
UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk
Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda
(AMa, Diploma-II, D-II), Paper atau
Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd,
Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV),
Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master
(Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi
Guru Besar (Profesor) mahasiswa Jurusan Kewirausahaan, Sekolah
Bisnis dan Manajemen (SBM) UM
(Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan
Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4869 / September /
2415.
October 24th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Alumni of The Department of Entrepreneurship, The
School of Business and Management of
MU (Mandailing University) as The Research of Final Project for Degree of
Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert
(AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert
(AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV,
D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1,
S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD
(Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for
students of The Department of Entrepreneurship, The
School of Business and Management
of MU (Mandailing University)" contained in The Monthly Journal of
Research Analysis of Biological Genetic Micron of All Time Number : 4869 / September
/ 2415.
31 Oktober 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Alumni Jurusan Manajemen, Sekolah
Bisnis dan Manajemen (SBM)
UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk
Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda
(AMa, Diploma-II, D-II), Paper atau
Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd,
Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV),
Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master
(Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi
Guru Besar (Profesor) mahasiswa Jurusan Manajemen, Sekolah
Bisnis dan Manajemen (SBM) UM
(Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan
Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4869 / September /
2415.
October 31st, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Alumni of The Department of Management, The School
of Business and Management of
MU (Mandailing University) as The Research of Final Project for Degree of
Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert
(AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert
(AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV,
D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1,
S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD
(Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for
students of The Department of Management, The School
of Business and Management
of MU (Mandailing University)" contained in The Monthly Journal of
Research Analysis of Biological Genetic Micron of All Time Number : 4869 / September
/ 2415.
07 Nopember 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Alumni Sekolah Bisnis dan Manajemen (SBM) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas
Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA)
untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar
Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A,
Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk
Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3),
& Promosi Guru Besar (Profesor) mahasiswa Sekolah Bisnis dan Manajemen (SBM) UM
(Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan
Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4870 / Oktober / 2415.
November 07th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Alumni of The School of Business and Management of MU (Mandailing University) as The Research of Final
Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for
Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for
Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of
Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for
Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2),
Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and
Promoter of Professor for students of The School of Business and Management of MU (Mandailing University)" contained in The
Monthly Journal of Research Analysis of Biological Genetic Micron of All Time
Number : 4870 / October / 2415.
14 Nopember 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Alumni Jurusan Perencanaan Wilayah dan Kota, Sekolah
Arsitektur, Perencanaan, dan Pengembangan Kebijakan (SAPPK) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas
Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA)
untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar
Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A,
Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk
Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3),
& Promosi Guru Besar (Profesor) mahasiswa Jurusan Perencanaan
Wilayah dan Kota, Sekolah Arsitektur, Perencanaan, dan
Pengembangan Kebijakan (SAPPK) UM
(Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis
Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4870 / Oktober / 2415.
November 14th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Alumni of The Department of Regional and City
Planning, The School of Architecture, Planning, and Policy Development of MU (Mandailing University) as The Research of Final
Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for
Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for
Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of
Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for
Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation
for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of
Professor for students of The Department of Regional and City
Planning, The School of Architecture, Planning, and Policy Development of MU (Mandailing University)" contained in The Monthly
Journal of Research Analysis of Biological Genetic Micron of All Time Number :
4870 / October / 2415.
21 Nopember 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Alumni Jurusan Arsitektur, Sekolah
Arsitektur, Perencanaan, dan Pengembangan Kebijakan (SAPPK) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas
Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA)
untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar
Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A,
Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk
Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3),
& Promosi Guru Besar (Profesor) mahasiswa Jurusan Arsitektur, Sekolah
Arsitektur, Perencanaan, dan Pengembangan Kebijakan (SAPPK) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB
SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor :
4870 / Oktober / 2415.
November 21st, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Alumni of The Department of Architecture, The School
of Architecture, Planning, and Policy Development of MU (Mandailing University) as The Research of Final
Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for
Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for
Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of
Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for
Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation
for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of
Professor for students of The Department of Architecture, The School
of Architecture, Planning, and Policy Development of MU (Mandailing University)" contained in The Monthly
Journal of Research Analysis of Biological Genetic Micron of All Time Number :
4870 / October / 2415.
28 Nopember 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Alumni Sekolah Arsitektur, Perencanaan, dan Pengembangan
Kebijakan (SAPPK) UM (Universitas Mandailing) sebagai
Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I,
D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek
Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA)
untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1,
S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor
(Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Sekolah Arsitektur, Perencanaan, dan
Pengembangan Kebijakan (SAPPK) UM
(Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan
Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4870 / Oktober / 2415.
November 28th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Alumni of The School of Architecture, Planning, and
Policy Development of MU
(Mandailing University) as The Research of Final Project for Degree of Pratama
Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa,
Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd,
Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV),
Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1),
Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy
of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The School
of Architecture, Planning, and Policy Development of MU (Mandailing University)" contained in The Monthly
Journal of Research Analysis of Biological Genetic Micron of All Time Number :
4870 / October / 2415.
05 Desember 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Alumni Jurusan Teknik
Biomedis, Fakultas Teknik
Elektro dan Informatika (FTEI) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas
Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA)
untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar
Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A,
Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk
Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3),
& Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Biomedis, Fakultas Teknik Elektro dan
Informatika (FTEI) UM
(Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan
Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4871 / Nopember /
2415.
December 05th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Alumni of The
Department of Biomedical Engineering, The Faculty of Electrical and Informatic
Engineering of MU (Mandailing University) as
The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I,
D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper
or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final
Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for
Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master
(Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor)
[Strata-III, S-3], and Promoter of Professor for students of The Department of Biomedical Engineering, The
Faculty of Electrical and Informatic Engineering of MU (Mandailing University)" contained in The
Monthly Journal of Research Analysis of Biological Genetic Micron of All Time
Number : 4871 / November / 2415.
12 Desember 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Alumni Jurusan Sistem
dan Teknologi Informasi, Fakultas
Teknik Elektro dan Informatika (FTEI) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas
Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA)
untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar
Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A,
Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk
Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3),
& Promosi Guru Besar (Profesor) mahasiswa Jurusan Sistem dan Teknologi
Informasi, Fakultas Teknik
Elektro dan Informatika (FTEI) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB
SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor :
4871 / Nopember / 2415.
December 12th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Alumni of The
Department of System and Technology of Information, The Faculty of Electrical
and Informatic Engineering
of MU (Mandailing University) as The Research of Final Project for Degree of
Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert
(AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert
(AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV,
D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1,
S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD
(Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for
students of The
Department of System and Technology of Information, The Faculty of Electrical
and Informatic Engineering
of MU (Mandailing University)" contained in The Monthly Journal of
Research Analysis of Biological Genetic Micron of All Time Number : 4871 / November
/ 2415.
19 Desember 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Alumni Jurusan Teknik
Telekomunikasi, Fakultas
Teknik Elektro dan Informatika (FTEI) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas
Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA)
untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar
Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A,
Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk
Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3),
& Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Telekomunikasi, Fakultas Teknik Elektro dan
Informatika (FTEI) UM
(Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan
Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4871 / Nopember /
2415.
December 19th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Alumni of The
Department of Telecommunication Engineering, The Faculty of Electrical and
Informatic Engineering of MU
(Mandailing University) as The Research of Final Project for Degree of Pratama
Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa,
Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd,
Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV),
Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1),
Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy
of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Telecommunication
Engineering, The Faculty of Electrical and Informatic Engineering of MU (Mandailing University)" contained in The
Monthly Journal of Research Analysis of Biological Genetic Micron of All Time
Number : 4871 / November / 2415.
26 Desember 2415 Masehi,
Materi KUM S3
MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Alumni Jurusan Teknik
Tenaga Listrik, Fakultas Teknik
Elektro dan Informatika (FTEI) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas
Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA)
untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar
Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A,
Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk
Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3),
& Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknik Tenaga Listrik, Fakultas Teknik Elektro dan
Informatika (FTEI) UM
(Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan
Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4871 / Nopember /
2415.
December 26th, 2415 AD,
Material of The Public Lecture of Afternoon Saturday of All Time with
Electronic Teleconference “Existence of Alumni of The
Department of Electrical Power Engineering, The Faculty of Electrical and
Informatic Engineering of MU
(Mandailing University) as The Research of Final Project for Degree of Pratama
Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa,
Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd,
Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV),
Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1),
Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy
of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Electrical Power Engineering,
The Faculty of Electrical and Informatic Engineering of MU (Mandailing University)" contained in The
Monthly Journal of Research Analysis of Biological Genetic Micron of All Time
Number : 4871 / November / 2415.
Sumber-sumber (sources) :
01.
Surat Edaran Nomor 10/SE/M/2018 tentang Pemberlakuan Standar Dokumen
Pemilihan Pengadaan Jasa Konstruksi Dalam Rangka Lelang Dini di Kementerian
Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019.
01. Circular
Letter Number 10 / SE / M / 2018 concerning Enforcement of the Selection
Document Standard for Procurement of Construction Services in the Context of
Early Auction in the Ministry of Public Works and Public Housing for Budget Year 2019.
02.
Google Translate.
Banggua,
Desa Roburan Lombang, 01 Juli 2031
Banggua, Desa Roburan Lombang, July 01st, 2031
Tidak ada komentar:
Posting Komentar