Jumat, 09 November 2018

KISI - KISI JBAR MGB SM NOMOR : 0258 JUNI 2031

MENUJU BERDIRINYA UM (UNIVERSITAS MANDAILING)
TOWARDS THE ESTABLISHMENT OF MU (MANDAILING UNIVERSITY)

https://www.youtube.com/watch?v=akgkL3Dd3cs&list=PLxo9BSZMgjTa6QAGlHKueJWEbMV_kQFfV&index=339&t=0s


KISI-KISI KONTEN JURNAL ILMIAH UM (UNIVERSITAS MANDAILING)
TABLE OF SPECIFICATIONS OF THE SCIENTIFIC JOURNAL OF MU (MANDAILING UNIVERSITY)

JBAR MGB SM (JURNAL BULANAN ANALISIS RISET MIKRON GEN BIOLOGIS SEPANJANG MASA)
THE MONTHLY JOURNAL OF RESEARCH ANALYSIS OF BIOLOGICAL GENETIC MICRON OF ALL TIME


Juni 2031
June 2031


Arahan Pendiri & Ketum (Ketua Umum) 
MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya,
The Direction from The Founder & The General Chairman of 
The Central (Global) Leadership Assembly of The Great Mandailing Foundation,
Agussalim, ST bin Abdur Rahim Nasution


Materi - Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) di KPG (Kantor Pusat Global) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya, Banggua, Desa Roburan Lombang, Kecamatan Panyabungan Selatan, Kabupaten Mandailing Natal, Sumatera Utara - Indonesia.
Materials of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference in The Global Head Office of The Central (Global) Leadership Assembly of The Great Mandailing FoundationBanggua, Desa Roburan Lombang, Kecamatan Panyabungan Selatan, Kabupaten Mandailing Natal, Sumatera Utara - Indonesia.

Sabtu, 05 Juli 2031 Materi Kuliah Umum - e-teleconference, "Eksistensi Divisi Logistik MPRT YMR (Majelis Pimpinan Rukun Tetangga Yayasan Mandailing Raya) di seluruh dunia yang dikonsentrasitaktiskan di Kabupaten Mandailing Natal" yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 0258/Juni/2031.
Saturday, July 05th, 2031 Public Lecture material - e-teleconference “Existence of The Division of Logistics of The Neighborhood Leadership Assembly of The Great Mandailing Foundation on worldwide is concerned and tacticed in Regency of Mandailing Natal" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 0258/June/2031.

Personil Divisi Logistik MPRT YMR (Majelis Pimpinan Rukun Tetangga Yayasan Mandailing Raya) untuk merekomendasikan kepada Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Lingkungan (FTSL); Jurusan Hukum Administrasi Negara, Jurusan Hukum Masyarakat dan Pembangunan, Jurusan Hukum Bisnis, Jurusan Hukum Ekonomi, Jurusan Hukum Perdagangan Internasional dan Jurusan Hukum Keuangan Negara, Fakultas Hukum; Jurusan Pendidikan Teknik dan Kejuruan (JPTK), Jurusan Pendidikan Ekonomi dan Jurusan Pendidikan Teknik Bangunan (PTB), Fakultas Keguruan dan Ilmu Pendidikan; Manajemen dan Kebijakan Publik (Ilmu Administrasi Negara) dan Ilmu Administrasi Publik, Fakultas ISIPOL (Ilmu Sosial & Ilmu Politik); Mu’amalah (Hukum Bisnis Islam), Keuangan Islam dan HES (Hukum Ekonomi Syari’ah), Fakultas Syariah; Jurusan Teknik Sipil dan Lingkungan, Fakultas Teknologi Pertanian (FATETA); Jurusan Ekonomi dan Studi Pembangunan dan Jurusan Ekonomi Sumberdaya dan Lingkungan, Fakultas Ekonomi dan Manajemen; Jurusan Perencananaan dan Kebijakan Publik dan Jurusan Bisnis Islam, FE (Fakultas Ekonomi); The Department of Urban Studies + Planning, School of Architecture and Planning (SA+P); Civil and Environmental Engineering, School of  Engineering;  BA (Master of Administration) Program, Agussalim  Management; Jurusan Perencanaan Wilayah dan Kota, Sekolah Arsitektur, Perencanaan, dan Pengembangan Kebijakan (SAPPK); dan Jurusan Manajemen dan Jurusan Kewirausahaan, Sekolah Bisnis dan Manajemen (SBM) UM (Universitas Mandailing) untuk memutakhirkan dengan memahami Surat Edaran Nomor 10/SE/M/2018 tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi Dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu Lampiran I Surat Edaran Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 10 / SE / M / 2018 tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu 1. Penyiapan Dokumen Penawaran yaitu, Jaminan Penawaran Asli, 1.1. Dalam hal HPS (Harga Perkiraan Sendiri) di atas Rp. 10.000.000.000 (sepuluh miliar rupiah), Jaminan Penawaran asli disampaikan sebagai bagian dari dokumen administrasi, 1.2. Besaran nilai nominal, masa berlaku, dan pencairan Jaminan Penawaran sebagaimana tercantum dalam Lembar Data Pemilihan (LDP), 1.3. Peserta harus menyampaikan Jaminan penawaran asli secara langsung atau melalui pos/jasa pengiriman diterima Kelompok Kerja (Pokja) Pemilihan paling lambat sebelum batas akhir penyampaian penawaran, 1.4. Dalam hal Jaminan Penawaran asli tidak diterima Kelompok Kerja (Pokja) Pemilihan sampai dengan batas waktu yang ditentukan, maka penawaran dinyatakan gugur, 1.5. Segala risiko keterlambatan dan kerusakan pengiriman Jaminan Penawaran asli menjadi risiko peserta, dan 1.6. Penerbit Jaminan Penawaran: 1.6.1. Untuk Pekerjaan Konstruksi dengan nilai HPS (Harga Perkiraan Sendiri) di atas Rp10.000.000.000,00 (sepuluh miliar rupiah) sampai dengan Rp100.000.000.000,00 (seratus miliar rupiah), diterbitkan oleh: 1.6.1.1. Bank Umum; 1.6.1.2. Perusahaan Penjaminan; 1.6.1.3. Perusahaan Asuransi; 1.6.1.4. Lembaga khusus yang menjalankan usaha di bidang pembiayaan, penjaminan, dan asuransi untuk mendorong ekspor Indonesia sesuai dengan ketentuan peraturan perundangundangan di bidang Lembaga pembiayaan ekspor Indonesia; atau 1.6.1.5. Konsorsium perusahaan asuransi umum/Lembaga penjaminan/ perusahaan penjaminan yang mempunyai program asuransi kerugian (suretyship), huruf a.2 sampai dengan a.5 telah ditetapkan/mendapatkan rekomendasi dari Otoritas Jasa Keuangan (OJK), 1.6.2. Untuk Pekerjaan Konstruksi dengan nilai HPS (Harga Perkiraan Sendiri) di atas Rp100.000.000.000,00 (seratus miliar rupiah), diterbitkan oleh: 1.6.2.1. Bank Umum; atau 1.6.2.2. Konsorsium perusahaan asuransi umum/Lembaga penjaminan/ perusahaan penjaminan yang mempunyai program asuransi kerugian (suretyship), huruf b.2 telah ditetapkan/ mendapatkan rekomendasi dari Otoritas Jasa Keuangan (OJK); dan  2. Pemasukan Dokumen Penawaran, Persiapan Dokumen Penawaran, 1. Dokumen Penawaran disampaikan oleh peserta terdiri atas 1 (satu) Dokumen Penawaran yang telah disandikan/dienkripsi dan terdiri atas: a. Penawaran administrasi; b. Penawaran teknis; dan c. Penawaran harga, 2. Dokumen Penawaran disandikan/dienkripsi dengan sistem pengaman dokumen, dan 3. Peserta mengirimkan Dokumen Penawaran yang telah disandikan/dienkripsi sesuai jadwal yang ditetapkan.
Personnel of The Division of Logistics of The Neighborhood Leadership Assembly of The Great Mandailing Foundation to recommend to The Department of Civil Engineering, The Faculty of Civil and Environmental Engineering; The Department of State Administrative Law, The Department of Law of Public and Development, The Department of Business Law, The Department of Economic Law, The Department of International Trade Law and The Department of State Financial Law, The Faculty of Law; The Department of Engineering and Vocational Education, The Department of Economic Education and The Department of Building Engineering Education, The Faculty of Teacher Training and Education Science; Management and Public Policy (State Administration Science) and Public Administration Science, The Faculty of Social Sciences & Political Sciences; Mu'amalah (Islamic Business Law), Islamic Finance and Syari'ah Economic Law, The Faculty of Sharia; The Department of Civil and Environmental Engineering, The Faculty of Agricultural Technology; The Department of Economics and Development Studies and The Department of Resource and Environmental Economics, The Faculty of Economics and Management; The Department of Planning and Public Policy and The Department of Islamic Business, The Faculty of Economics; The Department of Urban Studies + Planning, School of Architecture and Planning (SA+P); Civil and Environmental Engineering, School of  Engineering; MBA (Master of Business Administration) Program, Agussalim  Management; The  Department of Regional and City Planning, The School of Architecture, Planning, and Policy Development; and The Department of Management and Department of Entrepreneurship, The School of Business and Management of MU (Mandailing University) to update by understanding Circular Letter Number 10 / SE / M / 2018 concerning Enforcement of Standard of Selection Documents for the Procurement of Construction Services in the Context of Early Auction in the Ministry of Public Works and Public Housing for  Budget Year 2019, namely Annex I of Circular Letter of the Minister of Public Works and Public Housing Number 10 / SE / M / 2018 concerning the Enactment of the Standared of Selection Document for the Procurement of Construction Services in the Early Auction Framework at the Ministry of Public Works and Public Housing for  Fiscal Year 2019,  namely 1. Preparation of Bid Documents namely, Original Offer Guarantee, 1.1. In the case of Self Estimated Prices above Rp. 10,000,000,000 (ten billion rupiahs), the original Bid Security is submitted as part of administrative documents, 1.2. The amount of the nominal value, validity period and disbursement of the Bid Security as stated in the Election Data Sheet, 1.3. Participants must submit the original Bid Security directly or by post / shipping service received by the Election Working Group no later than the deadline for submission of bids, 1.4. in the event that the original Bid Security is not accepted by the Election Working Group until the specified time limit, the offer is declared null and void, 1.5. All risks of delays and damage to delivery of the original Bid Guarantee are at the risk of the participant, and 1.6. Publisher Offer Guarantee: 1.6.1. For Construction Work with a value of Self Estimated Price above Rp.10,000,000,000.00 (ten billion rupiahs) up to Rp.100,000,000,000.00 (one hundred billion rupiahs), issued by: 1.6.1.1. Commercial banks; 1.6.1.2. Guarantee Company; 1.6.1.3. Insurance company; 1.6.1.4. Special institutions that run businesses in the fields of financing, guarantees, and insurance to encourage Indonesian exports in accordance with the provisions of laws and regulations in the field of Indonesian export financing institutions; or 1.6.1.5. Consortium of general insurance companies / guarantee institutions / guarantee companies that have suretyship programs, letters a.2 to a.5 have been determined / obtain recommendations from the Financial Services Authority, 1.6.2. For Construction Works with a value of Self Estimated Prices of more than Rp 100,000,000,000.00 (one hundred billion rupiah), issued by: 1.6.2.1. Commercial banks; or 1.6.2.2. Consortium of general insurance companies / guarantee institutions / guarantee companies that have suretyship programs, letter b.2 has been determined / obtained a recommendation from the Financial Services Authority; and 2. Entry of Bid Documents, Preparation of Bid Documents, 1. Bidding Documents submitted by participants consist of 1 (one) Bidding Document that has been encoded / encrypted and consists of: a. Administration offer; b. Technical offer; and c. Price quote (Bid), 2. Bidding documents are encoded / encrypted with a document security system, and 3. Participants send a bidding document that has been encrypted / encrypted according to the specified schedule.

Sabtu, 12 Juli 2031 Materi Kuliah Umum - e-teleconference, "Eksistensi Lembaga Ad Hoc - Badan Anggaran, Divisi Usaha dan Dana MPRT YMR (Majelis Pimpinan Rukun Tetangga Yayasan Mandailing Raya) di seluruh dunia yang dikonsentrasitaktiskan di Kabupaten Mandailing Natal" yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 0258/Juni/2031.
Saturday, July 12th, 2031 Public Lecture material - e-teleconference “Existence of The Ad Hoc Institution – Budget Body, The Division of Effort and Fund of The Neighborhood Leadership Assembly of The Great Mandailing Foundation on worldwide is concerned and tacticed in Regency of Mandailing Natal" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 0258/June/2031.

Personil Lembaga Ad Hoc - Badan Anggaran, Divisi Usaha dan Dana MPRT YMR (Majelis Pimpinan Rukun Tetangga Yayasan Mandailing Raya) untuk merekomendasikan kepada Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Lingkungan (FTSL); Jurusan Hukum Administrasi Negara, Jurusan Hukum Masyarakat dan Pembangunan, Jurusan Hukum Bisnis, Jurusan Hukum Ekonomi, Jurusan Hukum Perdagangan Internasional dan Jurusan Hukum Keuangan Negara, Fakultas Hukum; Jurusan Pendidikan Teknik dan Kejuruan (JPTK), Jurusan Pendidikan Ekonomi dan Jurusan Pendidikan Teknik Bangunan (PTB), Fakultas Keguruan dan Ilmu Pendidikan; Manajemen dan Kebijakan Publik (Ilmu Administrasi Negara) dan Ilmu Administrasi Publik, Fakultas ISIPOL (Ilmu Sosial & Ilmu Politik); Mu’amalah (Hukum Bisnis Islam), Keuangan Islam dan HES (Hukum Ekonomi Syari’ah), Fakultas Syariah; Jurusan Teknik Sipil dan Lingkungan, Fakultas Teknologi Pertanian (FATETA); Jurusan Ekonomi dan Studi Pembangunan dan Jurusan Ekonomi Sumberdaya dan Lingkungan, Fakultas Ekonomi dan Manajemen; Jurusan Perencananaan dan Kebijakan Publik dan Jurusan Bisnis Islam, FE (Fakultas Ekonomi); The Department of Urban Studies + Planning, School of Architecture and Planning (SA+P); Civil and Environmental Engineering, School of  Engineering;  BA (Master of Administration) Program, Agussalim  Management; Jurusan Perencanaan Wilayah dan Kota, Sekolah Arsitektur, Perencanaan, dan Pengembangan Kebijakan (SAPPK); dan Jurusan Manajemen dan Jurusan Kewirausahaan, Sekolah Bisnis dan Manajemen (SBM) UM (Universitas Mandailing) untuk memutakhirkan dengan memahami Surat Edaran Nomor 10/SE/M/2018 tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi Dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu Lampiran I Surat Edaran Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 10 / SE / M / 2018 tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu Pemasukan Dokumen Penawaran yaitu Penyampaian Dokumen Penawaran, 1. Peserta menyampaikan Dokumen Penawaran kepada Kelompok Kerja (Pokja) Pemilihan, dengan jadwal sebagaimana tercantum dalam Lembar Data Pemilihan (LDP), dengan ketentuan: a. Peserta mengirimkan Data Kualifikasi melalui formulir isian elektronik data kualifikasi pada aplikasi Sistem Pengadaan Secara Elektronik (SPSE); b. Peserta mengunggah Dokumen Penawaran terenkripsi hanya melalui aplikasi Sistem Pengadaan Secara Elektronik (SPSE) sesuai jadwal yang ditetapkan; c. Peserta dapat mengirimkan data kualifikasi secara berulang sebelum batas akhir waktu pemasukan Dokumen Penawaran. Data kualifikasi yang dikirimkan terakhir akan menggantikan data kualifikasi yang telah terkirim sebelumnya; d. Jika formulir isian elektronik kualifikasi yang tersedia pada aplikasi Sistem Pengadaan Secara Elektronik (SPSE) belum mengakomodir data kualifikasi yang disyaratkan Kelompok Kerja (Pokja) Pemilihan (misalnya untuk data kualifikasi anggota Kerja Sama Operasi, KSO), maka data kualifikasi tersebut diunggah (upload) oleh yang mewakili/leadfirm Kerja Sama Operasi (KSO) pada fasilitas yang tersedia pada Sistem Pengadaan Secara Elektronik (SPSE); e. dengan mengirimkan data kualifikasi secara elektronik, peserta telah menyetujui pernyataan sebagai berikut: 1) badan usaha yang bersangkutan tidak dalam pengawasan pengadilan, tidak pailit, dan kegiatan usahanya tidak sedang dihentikan; 2) badan usaha tidak masuk dalam daftar hitam; 3) perorangan yang bertindak untuk dan atas nama badan usaha tidak sedang dalam menjalani sanksi pidana; 4) data kualifikasi yang diisikan benar dan jika dikemudian hari ditemukan bahwa data/dokumen yang disampaikan tidak benar dan ada pemalsuan, maka direktur utama/pimpinan perusahaan, atau kepala cabang, atau pejabat yang menurut perjanjian kerja sama berhak mewakili badan usaha yang bekerja sama dan badan usaha yang diwakili bersedia dikenakan sanksi administratif, sanksi pencantuman dalam daftar hitam, gugatan secara perdata, dan/atau pelaporan secara pidana kepada pihak berwenang sesuai dengan ketentuan peraturan perundangundangan; daan 5) pimpinan dan pengurus badan usaha bukan sebagai pegawai K/L/PD atau pimpinan dan pengurus badan usaha sebagai pegawai K/L/PD (Kementerian / Lembaga / Pemerintah Daerah) yang sedang mengambil cuti diluar tanggungan K/L/PD (Kementerian / Lembaga / Pemerintah Daerah); 2. Dokumen Penawaran administrasi, teknis, dan harga dienkripsi menggunakan sistem pengaman dokumen; 3. Peserta mengunggah (upload) Dokumen Penawaran administrasi, teknis, dan harga yang telah terenkripsi sesuai jadwal yang ditetapkan; 4. Peserta dapat mengunggah Dokumen Penawaran secara berulang sebelum batas akhir waktu pemasukan Dokumen Penawaran. Dokumen Penawaran terakhir akan menggantikan Dokumen Penawaran yang telah terkirim sebelumnya; 5. Surat Penawaran dan/atau Dokumen lain sebagai bagian dari Dokumen Penawaran yang diunggah (uploaded) ke dalam aplikasi Sistem Pengadaan Secara Elektronik (SPSE) dianggap sah sebagai dokumen elektronik dan dianggap telah disetujui dan ditandatangani secara elektronik oleh pemimpin/direktur perusahaan atau kepala cabang perusahaan yang diangkat oleh kantor pusat yang dibuktikan dengan dokumen autentik atau pejabat yang menurut perjanjian kerja sama adalah yang berhak mewakili perusahaan yang bekerja sama atau pihak yang diberi kuasa oleh pemimpin atau direktur perusahaan yang nama pemberi kuasanya tercantum dalam akta pendirian/perubahan; 6. Peserta tidak perlu mengunggah (upload) hasil pemindaian dokumen asli yang bertanda tangan basah dan berstempel, kecuali surat lain yang memerlukan tanda tangan basah dari pihak lain; 7. Peserta dapat mengunggah (upload) ulang Dokumen Penawaran untuk mengganti atau menimpa Dokumen Penawaran sebelumnya, sampai dengan batas akhir pemasukan penawaran; 8. Pengguna Sistem Pengadaan Secara Elektronik (SPSE) wajib mengetahui dan melaksanakan ketentuan penggunaan sistem pengaman dokumen yang melekat pada Sistem Pengadaan Secara Elektronik (SPSE); dan 9. Untuk Peserta yang berbentuk Kerja Sama Operasi (KSO), pemasukan penawaran dilakukan oleh badan usaha yang ditunjuk mewakili Kerja Sama Operasi (KSO)/leadfirm.
Personnel of Ad Hoc Institution - Budget Agency, The Division of Effort and Fund of The Neighborhood Leadership Assembly of The Great Mandailing Foundation to recommend to The Department of Civil Engineering, The Faculty of Civil and Environmental Engineering; The Department of State Administrative Law, The Department of Law of Public and Development, The Department of Business Law, The Department of Economic Law, The Department of International Trade Law and The Department of State Financial Law, The Faculty of Law; The Department of Engineering and Vocational Education, The Department of Economic Education and The Department of Building Engineering Education, The Faculty of Teacher Training and Education Science; Management and Public Policy (State Administration Science) and Public Administration Science, The Faculty of Social Sciences & Political Sciences; Mu'amalah (Islamic Business Law), Islamic Finance and Syari'ah Economic Law, The Faculty of Sharia; The Department of Civil and Environmental Engineering, The Faculty of Agricultural Technology; The Department of Economics and Development Studies and The Department of Resource and Environmental Economics, The Faculty of Economics and Management; The Department of Planning and Public Policy and The Department of Islamic Business, The Faculty of Economics; The Department of Urban Studies + Planning, School of Architecture and Planning (SA+P); Civil and Environmental Engineering, School of  Engineering; MBA (Master of Business Administration) Program, Agussalim  Management; The  Department of Regional and City Planning, The School of Architecture, Planning, and Policy Development; and The Department of Management and Department of Entrepreneurship, The School of Business and Management of MU (Mandailing University) to update by understanding Circular Letter Number 10 / SE / M / 2018 concerning Enforcement of Standard of Selection Documents for the Procurement of Construction Services in the Context of Early Auction in the Ministry of Public Works and Public Housing for  Budget Year 2019, namely Annex I of Circular Letter of the Minister of Public Works and Public Housing Number 10 / SE / M / 2018 concerning the Enactment of the Standared of Selection Document for the Procurement of Construction Services in the Early Auction Framework at the Ministry of Public Works and Public Housing for  Fiscal Year 2019, namely Entering Bid Documents, namely Submission of Bid Documents, 1. Participants submit Bid Documents to the Election Working Group, with a schedule as stated in the Election Data Sheet, provided that: a. Participants send Qualification Data through the electronic data form of qualification data in the application of the Electronic Procurement System; b. Participants upload encrypted Bidding Documents only through the Electronic Procurement System application according to the set schedule; c. Participants can submit qualification data repeatedly before the deadline for submission of Bid Documents. Qualification data sent last will replace the qualification data that has been sent before; d. If the qualification electronic form form in the Electronic Procurement System application does not yet accommodate the qualification data required by the Election Working Group (for example the data on qualifying members of Operation Cooperation), then the qualification data is uploaded by the representative / leadfirm of the Operational Cooperation at the facilities available in the Electronic Procurement System; e. by sending electronic qualification data, participants have agreed to the following statement: 1) the business entity concerned is not under court supervision, is not bankrupt, and its business activities are not being stopped; 2) business entities are not blacklisted; 3) individuals acting for and on behalf of a business entity are not under criminal sanctions; 4) qualification data that is filled in correctly and if in the future it is found that the data / documents submitted are incorrect and there is forgery, then the president director / company leader, or branch head, or official who according to the cooperation agreement has the right to represent the business entity that cooperates the business entity represented is willing to be subject to administrative sanctions, blacklisted sanctions, civil claims, and / or criminal reporting to the authorities in accordance with the provisions of the legislation; and 5) leaders and managers of business entities not as employees of Ministries / Institutions / Regional Governments who are taking leave outside responsibility of Ministries / Institutions / Regional Governments; 2. Offer documents of administrative, technical and price are encrypted using a document security system; 3. Participants upload bid documents of administrative, technical, and price that have been encrypted according to the set schedule; 4. Participants can upload the Bid Document repeatedly before the deadline for submission of Bid Documents. The last Bidding Document will replace the Bidding Document that has been previously sent; 5. The Bid Letter and / or other Documents as part of the Bidding Document uploaded into the Electronic Procurement System application are considered valid as electronic documents and are deemed approved and electronically signed by the leader / director of the company or branch head of companies appointed by the head office as evidenced by authentic documents or officials who according to the cooperation agreement are entitled to represent the cooperating company or the party authorized by the leader or director of the company whose name of attorney is stated in the deed of establishment / change; 6. Participants do not need to upload the results of the scanning of original documents that are signed wet and stamped, except for other letters that require a wet signature from another party; 7. Participants can upload (re-upload) the Bid Document to replace or overwrite the previous Bid Document, up to the deadline for submission of bids; 8. Users of the Electronic Procurement System must know and implement the provisions for the use of document security systems attached to the Electronic Procurement System; and 9. For Participants in the form of Operational Cooperation, the bidding shall be made by the business entity appointed to represent Operation Cooperation / leadfirm.

Sabtu, 19 Juli 2031 Materi Kuliah Umum - e-teleconference, "Eksistensi 05 (lima) orang anggota Biro Hasil Penjualan JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa), Divisi Usaha dan Dana MPRT YMR (Majelis Pimpinan Rukun Tetangga Yayasan Mandailing Raya) di seluruh dunia yang dikonsentrasitaktiskan di Kabupaten Mandailing Natal" yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 0258/Juni/2031.
Saturday, July 19th, 2031 Public Lecture material - e-teleconference “Existence of 05 (five) of members of The Bureau of Sale Results of The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time, The Division of Effort and Fund of The Neighborhood Leadership Assembly of The Great Mandailing Foundation on worldwide is concerned and tacticed in Regency of Mandailing Natal" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 0258/June/2031.

05 (lima) orang anggota Biro Hasil Penjualan JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa), Divisi Usaha dan Dana MPRT YMR (Majelis Pimpinan Rukun Tetangga Yayasan Mandailing Raya) untuk merekomendasikan kepada Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Lingkungan (FTSL); Jurusan Hukum Administrasi Negara, Jurusan Hukum Masyarakat dan Pembangunan, Jurusan Hukum Bisnis, Jurusan Hukum Ekonomi, Jurusan Hukum Perdagangan Internasional dan Jurusan Hukum Keuangan Negara, Fakultas Hukum; Jurusan Pendidikan Teknik dan Kejuruan (JPTK), Jurusan Pendidikan Ekonomi dan Jurusan Pendidikan Teknik Bangunan (PTB), Fakultas Keguruan dan Ilmu Pendidikan; Manajemen dan Kebijakan Publik (Ilmu Administrasi Negara) dan Ilmu Administrasi Publik, Fakultas ISIPOL (Ilmu Sosial & Ilmu Politik); Mu’amalah (Hukum Bisnis Islam), Keuangan Islam dan HES (Hukum Ekonomi Syari’ah), Fakultas Syariah; Jurusan Teknik Sipil dan Lingkungan, Fakultas Teknologi Pertanian (FATETA); Jurusan Ekonomi dan Studi Pembangunan dan Jurusan Ekonomi Sumberdaya dan Lingkungan, Fakultas Ekonomi dan Manajemen; Jurusan Perencananaan dan Kebijakan Publik dan Jurusan Bisnis Islam, FE (Fakultas Ekonomi); The Department of Urban Studies + Planning, School of Architecture and Planning (SA+P); Civil and Environmental Engineering, School of  Engineering;  BA (Master of Administration) Program, Agussalim  Management; Jurusan Perencanaan Wilayah dan Kota, Sekolah Arsitektur, Perencanaan, dan Pengembangan Kebijakan (SAPPK); dan Jurusan Manajemen dan Jurusan Kewirausahaan, Sekolah Bisnis dan Manajemen (SBM) UM (Universitas Mandailing) untuk memutakhirkan dengan memahami Surat Edaran Nomor 10/SE/M/2018 tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi Dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu Lampiran I Surat Edaran Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 10 / SE / M / 2018 tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu 1. Pemasukan Dokumen Penawaran, 1.1. Batas Akhir Waktu Pemasukan Penawaran, 1.1.1. Penawaran harus disampaikan secara elektronik melalui aplikasi Sistem Pengadaan Secara Elektronik (SPSE) kepada Kelompok Kerja (Pokja) Pemilihan paling lambat pada waktu yang ditentukan oleh Kelompok Kerja (Pokja) Pemilihan sebagaimana tercantum dalam Lembar Data Pemilihan (LDP), 1.1.2. Kelompok Kerja (Pokja) Pemilihan tidak diperkenankan mengubah waktu batas akhir pemasukan penawaran kecuali: a. keadaan kahar; b. terjadi gangguan teknis; c. perubahan dokumen pemilihan yang mengakibatkan kebutuhan penambahan waktu penyiapan Dokumen Penawaran; atau d. tidak ada peserta yang memasukkan penawaran sampai dengan batas akhir penyampaian penawaran, 1.1.3. Dalam hal Kelompok Kerja (Pokja) Pemilihan mengubah waktu batas akhir pemasukan penawaran maka harus menyampaikan/menginformasikan pada Sistem Pengadaan Secara Elektronik (SPSE) alasan yang dapat dipertanggungjawabkan, 1.1. 4. Dalam hal setelah batas akhir pemasukan penawaran tidak ada peserta yang memasukkan penawaran, Kelompok Kerja (Pokja) Pemilihan dapat memperpanjang batas akhir jadwal pemasukan penawaran, 1.1.5. Perpanjangan jangka waktu sebagaimana dimaksud pada angka 1.1.4 dilakukan pada hari yang sama dengan batas akhir pemasukan penawaran; 1.2. Dokumen Penawaran Terlambat Aplikasi Sistem Pengadaan Secara Elektronik (SPSE) menolak setiap Dokumen Penawaran yang dikirimkan setelah batas akhir waktu pemasukan penawaran; dan 2. Pembukaan dan Evaluasi Penawaran, Pembukaan Penawaran, 2.1. Jadwal pembukaan penawaran sebagaimana tercantum dalam Lembar Data Pemilihan (LDP), 2.2. pada tahap pembukaan penawaran, Kelompok Kerja (Pokja) Pemilihan mengunduh (download) dan melakukan deskripsi Dokumen Penawaran dengan menggunakan sistem pengaman dokumen sesuai waktu yang telah ditetapkan, 2.3. terhadap Dokumen Penawaran yang tidak dapat dibuka (didekripsi), Kelompok Kerja (Pokja) Pemilihan menyampaikan Dokumen Penawaran tersebut kepada Layanan Pengadaan Secara Elektronik (LPSE) untuk mendapat keterangan bahwa Dokumen yang bersangkutan tidak dapat dibuka dan bila dianggap perlu Layanan Pengadaan Secara Elektronik (LPSE) dapat menyampaikan Dokumen Penawaran tersebut kepada LKPP (Lembaga Kebijakan Pengadaan Barang/Jasa Pemerintah), 2.4. Berdasarkan keterangan dari Layanan Pengadaan Secara Elektronik (LPSE), apabila Dokumen Penawaran tidak dapat dibuka/didekripsi maka Kelompok Kerja (Pokja) Pemilihan dapat menetapkan bahwa Dokumen Penawaran tersebut tidak memenuhi syarat sebagai penawaran dan penyedia barang/jasa yang mengirimkan Dokumen Penawaran tersebut dianggap tidak memasukkan penawaran. Apabila dapat dibuka, maka Kelompok Kerja (Pokja) Pemilihan akan melanjutkan proses atas penawaran yang bersangkutan, 2.5. dinyatakan sebagai penawaran yang masuk apabila Dokumen Penawaran sebagaimana dimaksud pada Instruksi Kepada Peserta (IKP), Dokumen Penawaran paling kurang terdiri atas: a. Penawaran Administrasi; b. Penawaran Teknis; dan c. Penawaran Harga terpenuhi. Surat pengunduran diri (misalnya) tidak termasuk sebagai penawaran, 2.6. Apabila penawaran yang masuk kurang dari 3 (tiga) peserta maka tender dilanjutkan dengan tahap evaluasi penawaran dan kualifikasi, serta selanjutnya dilakukan:1) dalam hal terdapat 2 (dua) peserta yang memenuhi persyaratan administrasi, teknis, dan kualifikasi, dapat dilakukan E-Reverse Auction (apabila sudah didukung oleh Sistem Pengadaan Secara Elektronik, SPSE), dan 2) dalam hal hanya 1 (satu) peserta yang memenuhi persyaratan administrasi, teknis, dan kualifikasi, dilanjutkan dengan klarifikasi dan negosiasi teknis dan harga, 2.7. apabila penawaran yang masuk hanya 1 (satu), maka tender dilanjutkan seperti proses penunjukan langsung, dan 2.8. Kelompok Kerja (Pokja) Pemilihan tidak boleh menggugurkan penawaran pada waktu pembukaan penawaran, kecuali untuk Dokumen Penawaran yang sudah dipastikan tidak dapat dibuka berdasarkan keterangan Layanan Pengadaan Secara Elektronik (LPSE).
05 (five) of members of The Bureau of Sale Results of The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time, The Division of Effort and Fund of The Neighborhood Leadership Assembly of The Great Mandailing Foundation to recommend to The Department of Civil Engineering, The Faculty of Civil and Environmental Engineering; The Department of State Administrative Law, The Department of Law of Public and Development, The Department of Business Law, The Department of Economic Law, The Department of International Trade Law and The Department of State Financial Law, The Faculty of Law; The Department of Engineering and Vocational Education, The Department of Economic Education and The Department of Building Engineering Education, The Faculty of Teacher Training and Education Science; Management and Public Policy (State Administration Science) and Public Administration Science, The Faculty of Social Sciences & Political Sciences; Mu'amalah (Islamic Business Law), Islamic Finance and Syari'ah Economic Law, The Faculty of Sharia; The Department of Civil and Environmental Engineering, The Faculty of Agricultural Technology; The Department of Economics and Development Studies and The Department of Resource and Environmental Economics, The Faculty of Economics and Management; The Department of Planning and Public Policy and The Department of Islamic Business, The Faculty of Economics; The Department of Urban Studies + Planning, School of Architecture and Planning (SA+P); Civil and Environmental Engineering, School of  Engineering; MBA (Master of Business Administration) Program, Agussalim  Management; The  Department of Regional and City Planning, The School of Architecture, Planning, and Policy Development; and The Department of Management and Department of Entrepreneurship, The School of Business and Management of MU (Mandailing University) to update by understanding Circular Letter Number 10 / SE / M / 2018 concerning Enforcement of Standard of Selection Documents for the Procurement of Construction Services in the Context of Early Auction in the Ministry of Public Works and Public Housing for  Budget Year 2019, namely Annex I of Circular Letter of the Minister of Public Works and Public Housing Number 10 / SE / M / 2018 concerning the Enactment of the Standared of Selection Document for the Procurement of Construction Services in the Early Auction Framework at the Ministry of Public Works and Public Housing for  Fiscal Year 2019 namely 1. Entering Bid Documents, 1.1. Deadline for Bid Submission, 1.1.1. Offers must be submitted electronically through the Electronic Procurement System application to the Election Working Group at the latest at the time determined by the Election Working Group as stated in the Election Data Sheet, 1.1.2. Election Working Groups are not permitted to change the deadline for submission of bids except: a. force state; b. technical problems; c. changes to the selection document resulting in the need for additional time to prepare the Bidding Document; or d. no participant enters an offer up to the deadline for submission of bids, 1.1.3. In the case of the Election Working Group changes the deadline for submission of bids, it must inform the Electronic Procurement System of reasons that can be accounted for, 1.1. 4. In the event that after the deadline for submission of offers no participant enters an offer, the Election Working Group can extend the deadline for submission of bidding schedules, 1.1.5. The extension of the period as referred to in number 1.1.4 is carried out on the same day as the deadline for submission of bids; 1.2. Late Bidding Documents, Electronic Procurement System Application (SPSE) rejects every Bidding Document sent after the deadline for submission of bids;and 2. Opening and Evaluating Bid, Opening Bid, 2.1. Bid opening schedule as stated in the Election Data Sheet, 2.2. at the bid opening stage, the Election Working Group downloads and decrypts the Bidding Documents by using the document security system within the stipulated time, 2.3. with respect to Bidding Documents that cannot be opened (decrypted), the Election Working Group presents the Bidding Document to Electronic Procurement Services to obtain information that the relevant Document cannot be opened and if deemed necessary Electronic Procurement Service may submit the Bidding Document to The Policy Institution of Goods / Services Procurement of Government, 2.4. Based on information from Electronic Procurement Service, if the Bidding Document cannot be opened / decrypted, the Election Working Group can determine that the Bidding Document does not fulfill the requirements as an offer and the goods / service provider that submits the Bidding Document is deemed not included offer. If it can be opened, the Election Working Group will continue the process of the relevant offer, 2.5. declared as an incoming offer if the Bid Document as referred to in Instruction to Participant, the Bidding Document must consist of at least: a. Administrative Offer; b. Technical Offer; and c. Price Offer fulfilled. Resignation letters (for example) are not included as offers, 2.6. If the bids are less than 3 (three) participants, the tender will be continued with stage of the bid and qualification evaluation, and then carried out: 1) in the event there are 2 (two) participants who meet administrative, technical and qualification requirements, E-Reverse Auction can be carried out (if already supported by the Electronic Procurement System), and 2) in the event that only 1 (one) participant meets administrative, technical, and qualification requirements, followed by clarification and technical negotiations and prices, 2.7. if the incoming bid is only 1 (one), then the tender is continued as a direct appointment process, and 2.8. The Election Working Group may not abort the bid at the time of bid opening, except for the Bid Documents that have been ascertained that they cannot be opened based on the statement of Electronic Procurement Services.

Sabtu, 26 Juli 2031 Materi Kuliah Umum - e-teleconference, "Eksistensi Sekretaris Biro Hasil Penjualan JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa), Divisi Usaha dan Dana MPRT YMR (Majelis Pimpinan Rukun Tetangga Yayasan Mandailing Raya) di seluruh dunia yang dikonsentrasitaktiskan di Kabupaten Mandailing Natal" yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 0258/Juni/2031.
Saturday, July 26th, 2031 Public Lecture material - e-teleconference “Existence of The Secretary of The Bureau of Sale Results of The Monthly Journal of Research Analysis of All Time, The Division of Effort and Fund of The Neighborhood Leadership Assembly of The Great Mandailing Foundation on worldwide is concerned and tacticed in Regency of Mandailing Natal" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 0258/June/2031.

Sekretaris Biro Hasil Penjualan JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa), Divisi Usaha dan Dana MPRT YMR (Majelis Pimpinan Rukun Tetangga Yayasan Mandailing Raya) untuk merekomendasikan kepada Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Lingkungan (FTSL); Jurusan Hukum Administrasi Negara, Jurusan Hukum Masyarakat dan Pembangunan, Jurusan Hukum Bisnis, Jurusan Hukum Ekonomi, Jurusan Hukum Perdagangan Internasional dan Jurusan Hukum Keuangan Negara, Fakultas Hukum; Jurusan Pendidikan Teknik dan Kejuruan (JPTK), Jurusan Pendidikan Ekonomi dan Jurusan Pendidikan Teknik Bangunan (PTB), Fakultas Keguruan dan Ilmu Pendidikan; Manajemen dan Kebijakan Publik (Ilmu Administrasi Negara) dan Ilmu Administrasi Publik, Fakultas ISIPOL (Ilmu Sosial & Ilmu Politik); Mu’amalah (Hukum Bisnis Islam), Keuangan Islam dan HES (Hukum Ekonomi Syari’ah), Fakultas Syariah; Jurusan Teknik Sipil dan Lingkungan, Fakultas Teknologi Pertanian (FATETA); Jurusan Ekonomi dan Studi Pembangunan dan Jurusan Ekonomi Sumberdaya dan Lingkungan, Fakultas Ekonomi dan Manajemen; Jurusan Perencananaan dan Kebijakan Publik dan Jurusan Bisnis Islam, FE (Fakultas Ekonomi); The Department of Urban Studies + Planning, School of Architecture and Planning (SA+P); Civil and Environmental Engineering, School of  Engineering;  BA (Master of Administration) Program, Agussalim  Management; Jurusan Perencanaan Wilayah dan Kota, Sekolah Arsitektur, Perencanaan, dan Pengembangan Kebijakan (SAPPK); dan Jurusan Manajemen dan Jurusan Kewirausahaan, Sekolah Bisnis dan Manajemen (SBM) UM (Universitas Mandailing) untuk memutakhirkan dengan memahami Surat Edaran Nomor 10/SE/M/2018 tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi Dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu Lampiran I Surat Edaran Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 10 / SE / M / 2018 tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019 yaitu Pembukaan dan Evaluasi Penawaran, Evaluasi Dokumen Penawaran, 1. Evaluasi penawaran dilakukan dengan sistem harga terendah; 2. Kelompok Kerja (Pokja) melakukan evaluasi Dokumen Penawaran berdasarkan data yang diunggah (uploaded) dalam aplikasi Sistem Pengadaan Secara Elektronik (SPSE), dikecualikan untuk evaluasi Jaminan Penawaran dilakukan berdasarkan dokumen Jaminan Penawaran asli yang disampaikan; 3. Data dokumen elektronik yang rusak (sesudah mendapat klarifikasi dari Layanan Pengadaan Secara Elektronik, LPSE) akibat kesalahan pengiriman dokumen oleh Penyedia Jasa, yang mengakibatkan dokumen tersebut tidak dapat dilakukan evaluasi oleh Kelompok Kerja (Pokja) Pemilihan, maka dokumen elektronik tersebut dinyatakan tidak memenuhi syarat; 4. Sebelum evaluasi penawaran, dilakukan koreksi aritmatik dengan ketentuan: a. Bagian Pekerjaan Lumsum: 1) koreksi aritmatik dilakukan tanpa mengubah nilai total harga penawaran untuk bagian pekerjaan Lumsum, dengan menyesuaikan keluaran (output) pekerjaan yang tercantum dalam Daftar Keluaran dan Harga dengan yang tercantum dalam Dokumen Pemilihan; 2) koreksi aritmatik untuk penawaran yang tidak melampirkan Daftar Keluaran dan Harga, maka keluaran (output) pekerjaan yang ditawarkan ditetapkan sama dengan yang tercantum dalam Dokumen Pemilihan tanpa mengubah nilai total penawaran untuk bagian pekerjaan Lumsum; 3) perbedaan angka dan huruf harga penawaran: a) apabila ada perbedaan antara penulisan nilai harga penawaran antara angka dan huruf maka nilai yang diakui adalah nilai dalam tulisan huruf; b) apabila penawaran dalam angka tertulis dengan jelas sedangkan dalam huruf tidak jelas dan/atau tidak bermakna dan/atau salah, maka nilai yang diakui adalah nilai dalam tulisan angka; atau c) apabila penawaran dalam angka dan huruf tidak jelas dan/atau tidak bermakna dan/atau salah, maka penawaran dinyatakan gugur, dan b. Bagian Pekerjaan Harga Satuan: 1) volume pekerjaan yang tercantum dalam Daftar Kuantitas dan Harga disesuaikan dengan yang tercantum dalam Dokumen Pemilihan; 2) apabila terjadi kesalahan hasil perkalian antara volume dengan harga satuan pekerjaan, dilakukan pembetulan, dengan ketentuan harga satuan pekerjaan yang ditawarkan tidak boleh diubah; 3) jenis pekerjaan yang tidak diberi harga satuan dianggap sudah termasuk dalam harga satuan pekerjaan yang lain dan harga satuan pada Daftar Kuantitas dan Harga tetap dibiarkan kosong; 4) jenis pekerjaan yang tidak tercantum dalam Daftar Kuantitas dan Harga disesuaikan dengan jenis pekerjaan yang tercantum dalam dokumen pemilihan dan harga satuan pekerjaan dimaksud dianggap nol; 5. Hasil koreksi aritmatik dapat mengubah nilai total harga penawaran sehingga urutan peringkat dapat menjadi lebih tinggi atau lebih rendah dari urutan peringkat semula; 6. Penawaran setelah koreksi aritmatik yang melebihi nilai total HPS (Harga Perkiraan Sendiri) dinyatakan gugur; 7. Apabila semua harga penawaran setelah koreksi aritmatik di atas nilai total HPS (Harga Perkiraan Sendiri), tender dinyatakan gagal; 8. Berdasarkan hasil koreksi aritmatik Kelompok Kerja (Pokja) Pemilihan menyusun urutan dari penawaran terendah; 9. apabila setelah koreksi aritmatik terdapat kurang dari 3 (tiga) penawar yang menawar di bawah dari nilai total HPS (Harga Perkiraan Sendiri) maka proses tender tetap dilanjutkan dengan melakukan evaluasi penawaran; 10. Setelah melakukan koreksi aritmatik, Kelompok Kerja (Pokja) Pemilihan memeriksa indikasi persekongkolan sebagaimana Instruksi Kepada Peserta (IKP) angka 6; 11. Setelah memeriksa indikasi persekongkolan, Kelompok Kerja (Pokja) Pemilihan melakukan evaluasi penawaran yang meliputi: a. evaluasi administrasi; b. evaluasi teknis; dan c. evaluasi harga; 12. Ketentuan umum dalam melakukan evaluasi sebagai berikut: a. kelompok Kerja (Pokja) Pemilihan dilarang menambah, mengurangi, mengganti, dan/atau mengubah kriteria dan persyaratan yang telah ditetapkan dalam Dokumen Pemilihan ini; b. kelompok Kerja (Pokja) Pemilihan dan/atau peserta dilarang menambah, mengurangi, mengganti, dan/atau mengubah isi Dokumen Penawaran; c. penawaran yang memenuhi syarat adalah penawaran yang sesuai dengan ketentuan, syarat-syarat, dan spesifikasi teknis yang ditetapkan dalam Dokumen Pemilihan ini, tanpa ada penyimpangan yang bersifat penting/pokok atau penawaran bersyarat; d. penyimpangan yang bersifat penting/pokok atau penawaran bersyarat adalah: 1) penyimpangan Dokumen Penawaran dari Dokumen Pemilihan yang mempengaruhi lingkup, kualitas dan hasil/kinerja pekerjaan; dan/atau 2) penawaran dari peserta dengan persyaratan tambahan diluar ketentuan dan syarat-syarat yang akan menimbulkan persaingan usaha tidak sehat dan/atau tidak adil, e. kelompok Kerja (Pokja) Pemilihan dilarang menggugurkan penawaran dengan alasan: 1) Peserta tidak aktif/tidak membuka Sistem Pengadaan Secara Elektronik (SPSE) dan/atau tidak bertanya pada saat pemberian penjelasan; dan/atau 2) kesalahan yang tidak substansial, adalah kesalahan-kesalahan yang tidak mempengaruhi hasil evaluasi, f. para pihak dilarang mempengaruhi atau melakukan intervensi kepada Kelompok Kerja (Pokja) Pemilihan selama proses evaluasi; g. apabila dalam evaluasi ditemukan bukti adanya persaingan usaha yang tidak sehat dan/atau terjadi pengaturan bersama (indikasi kolusi/persekongkolan) antara peserta, Kelompok Kerja (Pokja) Pemilihan, Unit Kerja Pengadaan Barang/Jasa (UKPBJ), PPK (Pejabat Pembuat Komitmen) dan/atau pihak lain yang terlibat, dengan tujuan untuk memenangkan salah satu peserta, maka: 1) peserta yang ditunjuk sebagai calon pemenang dan peserta lain yang terlibat dikenakan sanksi dalam Daftar Hitam; 2) anggota Kelompok Kerja (Pokja) Pemilihan, PPK (Pejabat Pembuat Komitmen) dan/atau pihak lain yang terlibat persekongkolan dikenakan sanksi sesuai dengan ketentuan peraturan perundang-undangan; 3) proses evaluasi tetap dilanjutkan dengan menetapkan peserta lainnya yang tidak terlibat (apabila ada); dan 4) apabila tidak ada peserta lain sebagaimana dimaksud pada angka 3), maka tender dinyatakan gagal, dan h. apabila indikasi persekongkolan terpenuhi, maka peserta digugurkan pada tahap evaluasi administrasi, teknis, dan/atau kualifikasi; 13. Evaluasi Administrasi: a. evaluasi terhadap data administrasi dilakukan terhadap hal-hal yang tidak/belum dinilai pada saat penilaian kualifikasi; b. penawaran dinyatakan memenuhi persyaratan administrasi, apabila: 1) syarat-syarat substansial yang diminta berdasarkan Dokumen Pemilihan terpenuhi, yaitu dengan dilampirkannya: a) Surat Penawaran; b) Jaminan Penawaran Asli (apabila disyaratkan); c) Surat Perjanjian Kerja Sama Operasi (apabila ber-KSO, Kerja Sama Operasi); d) Dokumen Penawaran Teknis; e) Dokumen Penawaran Harga, 2) Surat Penawaran memenuhi ketentuan sebagai berikut: a) bertanggal; b) jangka waktu berlakunya Surat Penawaran tidak kurang dari waktu sebagaimana tercantum dalam Lembar Data Pemilihan (LDP), dengan ketentuan: i. apabila ada perbedaan penulisan antara angka dan huruf maka jangka waktu yang diakui adalah tulisan huruf; ii. apabila yang tertulis dalam angka jelas sedangkan nilai dalam huruf tidak jelas/tidak bermakna/salah, maka jangka waktu yang diakui adalah yang tertulis dalam angka; atau iii. apabila yang tertulis dalam angka dan dalam huruf tidak jelas/tidak bermakna/salah, maka penawaran dinyatakan gugur, c) dalam hal terdapat kesalahan pengetikan dalam penulisan nama Kelompok Kerja (Pokja) dan/atau nama paket, maka tidak dapat dinyatakan gugur; dan d) dalam hal terdapat kesalahan tanggal, maka apabila kesalahan tersebut tidak menyebabkan masa berlaku surat penawaran menjadi kurang dari waktu sebagaimana tercantum dalam Lembar Data Pemilihan (LDP) maka tidak dapat dinyatakan gugur, 3) jaminan Penawaran Asli (apabila disyaratkan) memenuhi ketentuan sebagai berikut: a) dalam hal pekerjaan Konstruksi dengan nilai HPS (Harga Perkiraan Sendiri) di atas Rp10.000.000.000,00 (sepuluh miliar rupiah) sampai dengan Rp100.000.000.000,00 (seratus miliar rupiah), diterbitkan oleh: a).1. Bank Umum; a).2. Perusahaan Penjaminan; a).3. Perusahaan Asuransi; a).4. Lembaga khusus yang menjalankan usaha di bidang pembiayaan, penjaminan, dan asuransi untuk mendorong ekspor Indonesia sesuai dengan ketentuan peraturan perundang-undangan di bidang Lembaga pembiayaan ekspor Indonesia; atau a).5. Konsorsium perusahaan asuransi umum/ konsorsium Lembaga penjaminan/ konsorsium perusahaan penjaminan yang mempunyai program asuransi kerugian (suretyship), huruf a.2 sampai dengan a.5 telah ditetapkan/mendapatkan rekomendasi dari Otoritas Jasa Keuangan (OJK). b) dalam hal pekerjaan Konstruksi dengan nilai HPS (Harga Perkiraan Sendiri) di atas Rp100.000.000.000,00 (seratus miliar rupiah) diterbitkan oleh: a).5.1. Bank Umum; atau a).5.2. Konsorsium perusahaan asuransi umum/konsorsium Lembaga penjaminan/konsorsium perusahaan penjaminan yang mempunyai program asuransi kerugian (suretyship); huruf b.2 telah ditetapkan/ mendapatkan rekomendasi dari Otoritas Jasa Keuangan (OJK), c) masa berlaku tidak kurang dari yang ditetapkan dalam Dokumen Pemilihan; d) masa berlaku dicantumkan dalam angka dan huruf, dengan ketentuan: (1) apabila ada perbedaan penulisan antara angka dan huruf maka masa berlaku yang diakui adalah tulisan huruf; (2) apabila yang tertulis dalam angka jelas sedangkan dalam huruf tidak jelas/tidak bermakna/salah, maka yang diakui adalah masa berlaku yang tertulis dalam angka; atau (3) apabila yang tertulis dalam angka dan dalam huruf tidak jelas/tidak bermakna/salah, maka dinyatakan gugur, e) nama yang tercantum dalam surat Jaminan Penawaran sama dengan nama peserta; f) besaran nilai Jaminan Penawaran tidak kurang dari nilai jaminan yang ditetapkan dalam Dokumen Pemilihan; g) besaran nilai Jaminan Penawaran dicantumkan dalam angka dan huruf, dengan ketentuan: (1) apabila ada perbedaan penulisan antara angka dan huruf maka nilai yang diakui adalah tulisan huruf; (2) apabila yang tertulis dalam angka jelas sedangkan dalam huruf tidak jelas/tidak bermakna/salah, maka yang diakui adalah nilai yang tertulis dalam angka; atau (3) apabila yang tertulis dalam angka dan dalam huruf tidak jelas/tidak bermakna/salah, maka penawaran dinyatakan gugur. h) nama Kelompok Kerja (Pokja) Pemilihan yang menerima Jaminan Penawaran sama dengan nama Kelompok Kerja (Pokja) Pemilihan yang mengadakan Tender; i) Paket pekerjaan yang dijamin sama dengan paket pekerjaan yang ditenderkan; j) Jaminan Penawaran harus dapat dicairkan tanpa syarat (unconditional) sebesar nilai Jaminan dalam waktu paling lambat 14 (empat belas) hari kerja, setelah surat pernyataan wanprestasi dari Kelompok Kerja (Pokja) Pemilihan diterima oleh Penerbit Jaminan; k) Jaminan Penawaran atas nama KSO (Kerja Sama Operasi) harus ditulis atas nama KSO (Kerja Sama Operasi); dan l) substansi dan keabsahan/keaslian Jaminan Penawaran telah dikonfirmasi dan diklarifikasi secara tertulis oleh Kelompok Kerja (Pokja) Pemilihan kepada penerbit jaminan apabila kurang jelas dan meragukan, 4) Surat Perjanjian Kerja Sama Operasi memenuhi persyaratan sebagai berikut: a) mencantumkan nama KSO (Kerja Sama Operasi) sesuai dengan dokumen isian kualifikasi; b) mencantumkan nama perusahaan leadfirm dan anggota KSO (Kerja Sama Operasi); c) mencantumkan pembagian modal (sharing) dari setiap perusahaan; d) mencantumkan nama individu pihak yang mewakili KSO (Kerja Sama Operasi); dan e) ditandatangani para calon peserta KSO (Kerja Sama Operasi), c. Kelompok Kerja (Pokja) Pemilihan dapat melakukan klarifikasi/konfirmasi secara tertulis terhadap hal-hal yang kurang jelas dan meragukan namun tidak boleh mengubah substansi, d. evaluasi administrasi menghasilkan dua kesimpulan, yaitu memenuhi syarat administrasi atau tidak memenuhi syarat administrasi; e. Peserta yang memenuhi persyaratan administrasi dilanjutkan dengan evaluasi teknis, f. apabila dari 3 (tiga) penawaran terendah ada yang tidak memenuhi persyaratan administrasi maka Kelompok Kerja (Pokja) Pemilihan melakukan evaluasi administrasi terhadap penawar terendah berikutnya (apabila ada); g. apabila hanya ada 1 (satu) atau 2 (dua) peserta yang memenuhi persyaratan administrasi, maka evaluasi tetap dilanjutkan dengan evaluasi teknis; dan h. apabila tidak ada peserta yang memenuhi persyaratan administrasi, maka tender dinyatakan gagal; 14. Evaluasi Teknis: a. evaluasi teknis dilakukan terhadap peserta yang memenuhi persyaratan administrasi; b. unsur-unsur yang dievaluasi teknis sesuai dengan yang ditetapkan sebagaimana tercantum dalam Lembar Data Pemilihan (LDP); c. evaluasi teknis dilakukan dengan sistem gugur dengan ketentuan: 1) Kelompok Kerja (Pokja) Pemilihan menilai persyaratan teknis minimal yang harus dipenuhi dengan membandingkan pemenuhan persyaratan teknis sebagaimana tercantum dalam Lembar Data Pemilihan (LDP); 2) penawaran dinyatakan memenuhi persyaratan teknis sebagaimana tercantum dalam Lembar Data Pemilihan (LDP) apabila: a) metode pelaksanaan pekerjaan memenuhi persyaratan substantif yang ditetapkan dalam Dokumen Pemilihan dan diyakini menggambarkan penguasaan dalam menyelesaikan pekerjaan, meliputi: (1) tahapan/urutan pekerjaan dari awal sampai akhir secara garis besar dan uraian/cara kerja dari masing-masing jenis pekerjaan utama; (2) kesesuaian antara metode kerja dengan peralatan utama yang ditawarkan/diperlukan dalam pelaksanaan pekerjaan; (3) Kesesuaian antara metode kerja dengan spesifikasi/volume pekerjaan yang disyaratkan. Penilaian metode pelaksanaan tidak mengevaluasi jobmix/rincian/ campuran/komposisi material dari jenis pekerjaan. Dalam melakukan evaluasi terhadap metode pelaksanaan pekerjaan, Kelompok Kerja (Pokja) Pemilihan membandingkan antara metode kerja yang ditawarkan oleh peserta dengan metode kerja yang menjadi bagian persyaratan teknis yang telah ditetapkan oleh PPK (Pejabat Pembuat Komitmen) dengan cara menilai kesesuaian metode tersebut. Apabila tidak sesuai, Kelompok Kerja (Pokja) melakukan evaluasi berdasarkan kesesuaian metode kerja yang ditawarkan dengan peralatan utama, serta personel berdasarkan keahlian yang dapat dipertanggungjawabkan, b) Jangka waktu pelaksanaan pekerjaan yang ditawarkan tidak melampaui batas waktu sebagaimana tercantum dalam Lembar Data Pemilihan (LDP), c) peralatan utama yang ditawarkan sesuai dengan yang ditetapkan dalam Dokumen Pemilihan, dengan ketentuan: (1) yang dimaksud dengan peralatan utama adalah peralatan yang mendukung langsung dan sesuai kebutuhan untuk melaksanakan pekerjaan pekerjaan utama (major item), (2) jenis, kapasitas, dan jumlah yang disediakan untuk pelaksanaan pekerjaan, (3) kepemilikan peralatan utama adalah milik sendiri, sewa beli, dan/atau milik pihak lain dengan perjanjian Sewa bersyarat (bukan surat dukungan), (4) khusus pekerjaan dengan nilai HPS (Harga Perkiraan Sendiri) di atas Rp200.000.000.000,00 (dua ratus miliar rupiah), maka peralatan utama wajib milik sendiri atau dalam status Sewa Beli dengan ketentuan peralatan sudah dalam penguasaan peserta dan sudah ada bukti perjanjian sewa beli dengan tanggal perjanjian sebelum pemasukan penawaran, (5) evaluasi terhadap peralatan utama yang bersumber dari: (a) milik sendiri, dilakukan terhadap bukti kepemilikan peralatan [contoh STNK (Surat Tanda Nomor Kenderaan), BPKB (Buku Pemilik Kenderaan Bermotor), invoice]; (b) Sewa Beli, dilakukan terhadap bukti pembayaran Sewa Beli (contoh invoice uang muka, angsuran), (c) sewa, cukup terhadap kebenaran surat perjanjian sewa, (6) dalam hal jenis, kapasitas, komposisi dan jumlah peralatan minimal yang ditawarkan berbeda dengan yang tercantum dalam Dokumen Pemilihan, maka Kelompok Kerja (Pokja) Pemilihan akan membandingkan produktivitas alat tersebut berdasarkan metode pelaksanaan pekerjaan yang ditawarkan. Apabila perbedaan peralatan menyebabkan metode tidak dapat dilaksanakan atau produktivitas yang diinginkan tidak tercapai sesuai dengan target serta waktu yang dibutuhkan, maka dinyatakan tidak memenuhi persyaratan dan dapat digugurkan pada tahap evaluasi teknis, d) Personel manajerial yang ditawarkan sesuai dengan yang diperlukan dalam pelaksanaan pekerjaan, dengan ketentuan: (1). Personel manajerial yang disyaratkan meliputi jabatan: Manajer Pelaksanaan/ Proyek, Manajer Teknik, Manajer Keuangan, dan Ahli/Petugas K3 (Keselamatan dan Kesehatan Kerja), (2). untuk pekerjaan yang diperuntukkan bagi: (a) Usaha Kecil tidak mensyaratkan Tenaga Ahli; (b) Usaha Menengah dan Usaha Besar tidak mensyaratkan Tenaga Teknisi atau Analis dan Operator, (3). untuk pekerjaan yang memiliki tingkat risiko kecil, maka dapat mensyaratkan Petugas K3 (Keselamatan dan Kesehatan Kerja) atau Ahli K3 (Keselamatan dan Kesehatan Kerja) sedangkan untuk pekerjaan yang masuk dalam kategori risiko besar maka mensyaratkan Ahli K3 (Keselamatan dan Kesehatan Kerja), (4). Kompetensi personel manajerial meliputi tingkat pendidikan dan pengalaman bekerja sesuai jenis pekerjaan yang di-tender-kan, (5). Sertifikat Kompetensi Kerja tidak dievaluasi pada saat pemilihan, dibuktikan saat rapat persiapan penunjukan penyedia, (6). Pengalaman kerja yang dihitung adalah pengalaman sesuai dengan jenis pekerjaan yang ditenderkan (bukan berdasarkan jabatan yang ditawarkan), (7). Pengalaman kerja dihitung per tahun tanpa memperhatikan lamanya pelaksanaan konstruksi (dihitung berdasarkan Tahun Anggaran), e) bagian pekerjaan yang akan disubkontrakkan memenuhi ketentuan sebagai berikut: (1). Paket pekerjaan dengan nilai pagu anggaran di atas Rp25.000.000.000,00 (dua puluh lima miliar rupiah) sampai dengan Rp50.000.000.000,00 (lima puluh miliar rupiah) wajib mensubkontrakkan sebagian pekerjaan utama kepada penyedia jasa spesialis (apabila telah tersedia penyedia jasa spesialis), dan sebagian pekerjaan yang bukan pekerjaan utama kepada sub penyedia jasa Usaha Kecil, dan/atau (2). Paket pekerjaan dengan nilai pagu anggaran di atas Rp50.000.000.000,00 (lima puluh miliar rupiah) wajib mensubkontrakkan sebagian pekerjaan utama kepada penyedia jasa spesialis (apabila telah tersedia penyedia jasa spesialis) dan sebagian pekerjaan yang bukan pekerjaan utama kepada sub penyedia jasa Usaha Kecil. Peserta dalam penawarannya sudah menominasikan subpenyedia jasa spesialis (apabila telah tersedia penyedia jasa spesialis) dan subpenyedia jasa Usaha Kecil dari lokasi pekerjaan provinsi setempat, kecuali tidak tersedia subpenyedia jasa dari provinsi setempat yang dimaksud, dengan cara memilih perkerjaan yang disubkontrakkan sesuai yang tercantum dalam Lembar Data Pemilihan (LDP); (3). Penyedia tidak mensubkontrakkan seluruh pekerjaan utama, dan (4). Penyedia Usaha Kecil tidak mensubkontrakkan pekerjaan yang diperoleh, f) Dokumen Rencana Keselamatan Konstruksi (RKK) memenuhi persyaratan sebagaimana tercantum dalam Lembar Data Pemilihan (LDP), yang memuat: (1). manajemen risiko dan rencana tindakan (minimal sesuai identifikasi bahaya yang ditentukan PPK, Pejabat Pembuat Komitmen), meliputi: (a) Penjelasan manajemen risiko meliputi mengidentifikasi bahaya, menilai tingkat risiko, dan mengendalikan tingkat risiko, (b) Penjelasan rencana tindakan meliputi sasaran umum, sasaran khusus, dan Program K3 (Keselamatan dan Kesehatan Kerja), (2). tanda tangan wakil sah badan usaha, g) Dokumen lain yang disyaratkan (apabila ada) sebagaimana tercantum dalam Lembar Data Pemilihan (LDP), dengan ketentuan: (1) kriteria evaluasi diuraikan secara rinci dan terukur; (2) Persyaratan harus mempertimbangkan persaingan usaha yang sehat dan jangka waktu pemenuhan persyaratan, d. Kelompok Kerja (Pokja) Pemilihan dapat melakukan verifikasi lapangan dan/atau klarifikasi, khususnya kepada pabrikan/produsen/agen/ distributor material alat untuk menjamin konsistensi jenis material/alat serta kemampuan untuk menyediakan material/peralatan sesuai jadwal yang telah ditetapkan serta kebenaran penyewaan terhadap pelaksanaan pekerjaan; e. apabila dalam evaluasi teknis terdapat hal - hal yang tidak jelas atau meragukan, Kelompok Kerja (Pokja) Pemilihan melakukan klarifikasi dengan peserta. Dalam klarifikasi, peserta tidak diperkenankan mengubah substansi penawaran. Hasil verifikasi lapangan dan/atau klarifikasi dapat menggugurkan penawaran, f. Peserta yang dinyatakan lulus evaluasi teknis dilanjutkan dengan evaluasi harga, g. Apabila hanya ada 1 (satu) atau 2 (dua) peserta yang lulus evaluasi teknis, maka evaluasi tetap dilanjutkan dengan evaluasi harga; h. apabila dari 3 (tiga) penawaran terendah setelah koreksi aritmatik tidak ada yang memenuhi persyaratan teknis maka Kelompok Kerja (Pokja) Pemilihan dapat melakukan evaluasi penawaran terhadap penawar terendah berikutnya (apabila ada) dimulai dari evaluasi administrasi, i. apabila tidak ada peserta yang lulus evaluasi teknis maka tender dinyatakan gagal, dan j. Kelompok Kerja (Pokja) Pemilihan memasukkan hasil evaluasi teknis pada aplikasi Sistem Pengadaan Secara Elektronik (SPSE), termasuk alasan ketidaklulusan peserta dalam evaluasi teknis; 15. Evaluasi Harga: a. unsur-unsur yang perlu dievaluasi adalah hal-hal yang pokok atau penting, dengan ketentuan: 1) Total harga penawaran terkoreksi dibandingkan dengan nilai total HPS (Harga Perkiraan Sendiri): a) apabila total harga penawaran terkoreksi melebihi nilai total HPS (Harga Perkiraan Sendiri), dinyatakan gugur; dan b) apabila semua harga penawaran terkoreksi di atas nilai total HPS (Harga Perkiraan Sendiri), tender dinyatakan gagal, 2) apabila tidak menyampaikan perkiraan biaya penyelenggaraan keamanan dan kesehatan kerja serta Keselamatan Konstruksi maka dinyatakan gugur, 3) dalam hal bagian pekerjaan harga satuan maka harga satuan penawaran yang nilainya lebih besar dari 110% (seratus sepuluh perseratus) dari harga satuan yang tercantum dalam HPS (Harga Perkiraan Sendiri), dilakukan klarifikasi dengan ketentuan: a) apabila setelah dilakukan klarifikasi, ternyata harga satuan tersebut dinyatakan timpang maka harga satuan timpang hanya berlaku untuk volume sesuai dengan Daftar Kuantitas dan Harga. Jika terjadi penambahan volume terhadap pekerjaan yang harga satuannya dinyatakan timpang, maka pembayaran terhadap volume tersebut berdasarkan harga satuan hasil negosiasi; b) apabila setelah dilakukan klarifikasi, ternyata harga satuan tersebut dapat dipertanggungjawabkan/ sesuai dengan harga pasar maka harga satuan tersebut dinyatakan tidak timpang, 4) apabila terdapat mata pembayaran yang harganya nol atau tidak ditulis maka dilakukan klarifikasi, kegiatan tersebut harus tetap dilaksanakan. Harganya dianggap termasuk dalam harga pekerjaan lainnya, b. dilakukan evaluasi kewajaran harga dengan ketentuan sebagai berikut: 1) Evaluasi kewajaran harga dilakukan terhadap bagian pekerjaan lumsum dan bagian pekerjaan harga satuan; 2) klarifikasi terhadap hasil koreksi aritmatik, apabila ada koreksi/ perubahan; 3) Klarifikasi dalam hal penawaran Tingkat Komponen Dalam Negeri (TKDN) berbeda dibandingkan dengan perkiraan Kelompok Kerja (Pokja) Pemilihan (apabila mensyaratkan Tingkat Komponen Dalam Negeri, TKDN), 4) klarifikasi/evaluasi kewajaran harga apabila harga penawaran dibawah 80% (delapan puluh perseratus) HPS (Harga Perkiraan Sendiri) dengan ketentuan: a) Peserta menyampaikan Rincian Keluaran dan Harga (untuk bagian pekerjaan lumsum) dan Analisa Harga Satuan Pekerjaan (untuk bagian pekerjaan harga satuan), b) Rincian Keluaran dan Harga (untuk bagian pekerjaan lumsum) dan Analisa Harga Satuan Pekerjaan (untuk bagian pekerjaan harga satuan) hanya digunakan untuk evaluasi kewajaran harga penawaran dan tidak dapat digunakan sebagai dasar pengukuran dan pembayaran pekerjaan, c) meneliti dan menilai kewajaran harga satuan dasar meliputi harga upah, bahan, dan peralatan dari harga satuan penawaran sekurang - kurangnya pada setiap mata pembayaran utama, d) meneliti dan menilai kewajaran kuantitas/koefisien dari unsur upah, bahan, dan peralatan dalam Analisa Harga Satuan sekurang-kurangnya pada setiap pekerjaan utama, e) Hasil penelitian butir c) dan butir d) digunakan untuk menghitung kewajaran harga tanpa memperhitungkan keuntungan yang ditawarkan; f) Harga dalam Analisa Harga Satuan Pekerjaan dan Rincian Keluaran dan Harga yang dinilai wajar dan dapat dipertanggungjawabkan digunakan untuk menghitung total harga penawaran; g) Total harga sebagaimana dimaksud pada huruf f) dihitung berdasarkan: (1) volume yang ada dalam Daftar Kuantitas dan Harga, serta (2) keluaran (outputs) yang ada dalam Daftar Keluaran dan Harga, h) apabila total harga lebih kecil dari hasil evaluasi sebagaimana huruf g) tersebut, maka harga penawaran dinyatakan tidak wajar dan gugur harga, i) apabila total harga penawaran lebih besar dari hasil evaluasi sebagaimana huruf g) tersebut, maka harga penawaran dinyatakan wajar; j) apabila peserta tersebut ditunjuk sebagai pemenang tender, harus bersedia untuk menaikkan Jaminan Pelaksanaan menjadi 5% (lima perseratus) dari nilai total HPS (Harga Perkiraan Sendiri), dan k) apabila peserta yang bersangkutan tidak bersedia menaikkan nilai Jaminan Pelaksanaan menjadi sebesar 5% (lima perseratus) HPS (Harga Perkiraan Sendiri), penawarannya digugurkan serta dikenakan sanksi Daftar Hitam, c. memperhitungkan preferensi harga atas penggunaan produksi dalam negeri (apabila memenuhi persyaratan diberlakukannya preferensi harga) dengan ketentuan perhitungan Tingkat Komponen Dalam Negeri (TKDN) yang disampaikan oleh peserta berdasarkan penilaian sendiri (self assessment), dengan ketentuan: 1) Preferensi Harga untuk Barang/Jasa dalam negeri diberlakukan pada Pengadaan Barang/Jasa yang dibiayai rupiah murni tetapi hanya berlaku untuk Pengadaan Barang/Jasa bernilai diatas Rp1.000.000.000,00 (satu miliar rupiah), 2) Preferensi Harga hanya diberikan kepada Barang/Jasa dalam negeri dengan Tingkat Komponen Dalam Negeri (TKDN) lebih besar atau sama dengan 25% (dua puluh lima perseratus). Apabila peserta tidak menyampaikan formulir perhitungan Tingkat Komponen Dalam Negeri (TKDN) maka peserta dianggap tidak menginginkan diberlakukan preferensi harga bagi penawarannya dan tidak menggugurkan. Ketentuan dan tata cara penghitungan Tingkat Komponen Dalam Negeri (TKDN) merujuk pada ketentuan yang ditetapkan oleh Menteri yang membidangi urusan perindustrian dengan tetap berpedoman pada tata nilai Pengadaan Barang/Jasa, 3) Rumus penghitungan sebagai berikut:
The Secretary of The Bureau of Sale Results of The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time, The Division of Effort and Fund of The Neighborhood Leadership Assembly of The Great Mandailing Foundation to recommend to to recommend to The Department of Civil Engineering, The Faculty of Civil and Environmental Engineering; The Department of State Administrative Law, The Department of Law of Public and Development, The Department of Business Law, The Department of Economic Law, The Department of International Trade Law and The Department of State Financial Law, The Faculty of Law; The Department of Engineering and Vocational Education, The Department of Economic Education and The Department of Building Engineering Education, The Faculty of Teacher Training and Education Science; Management and Public Policy (State Administration Science) and Public Administration Science, The Faculty of Social Sciences & Political Sciences; Mu'amalah (Islamic Business Law), Islamic Finance and Syari'ah Economic Law, The Faculty of Sharia; The Department of Civil and Environmental Engineering, The Faculty of Agricultural Technology; The Department of Economics and Development Studies and The Department of Resource and Environmental Economics, The Faculty of Economics and Management; The Department of Planning and Public Policy and The Department of Islamic Business, The Faculty of Economics; The Department of Urban Studies + Planning, School of Architecture and Planning (SA+P); Civil and Environmental Engineering, School of  Engineering; MBA (Master of Business Administration) Program, Agussalim  Management; The  Department of Regional and City Planning, The School of Architecture, Planning, and Policy Development; and The Department of Management and Department of Entrepreneurship, The School of Business and Management of MU (Mandailing University) to update by understanding Circular Letter Number 10 / SE / M / 2018 concerning Enforcement of Standard of Selection Documents for the Procurement of Construction Services in the Context of Early Auction in the Ministry of Public Works and Public Housing for  Budget Year 2019, namely Annex I of Circular Letter of the Minister of Public Works and Public Housing Number 10 / SE / M / 2018 concerning the Enactment of the Standared of Selection Document for the Procurement of Construction Services in the Early Auction Framework at the Ministry of Public Works and Public Housing for  Fiscal Year 2019 namely Bid Opening and Evaluation, Bid Document Evaluation, 1. Evaluation of bids carried out with the lowest price system; 2. The Working Group evaluates the Bidding Document based on data uploaded in the Electronic Procurement System application, excluded for evaluation of the Bid Security carried out based on the original Bid Security document submitted; 3. The damaged electronic document data (after obtaining clarification from the Electronic Procurement Service) due to an error in the delivery of documents by the Service Provider, which resulted in the document being unable to be evaluated by the Election Working Group, the electronic document is declared not fulfilling conditions; 4. Before the evaluation of the offer, arithmetic correction is carried out provided that: a. Lumsum Work Section: 1) arithmetic correction is carried out without changing the total value of bid price for the Lumsum Work section, by adjusting the output of work listed in the Output and Price List as stated in the Bidding Document; 2) arithmetic corrections for bids that do not enclose a List of Outputs and Prices, the outputs of the offered work are set equal to those listed in the Bidding Document without changing the total value of the bids for the portion of Lumsum's work; 3) difference in numbers and letters of the offer price: a) if there is a difference between writing the bid price value between numbers and letters, the recognized value is the value in writing letters; b) if the bid in numbers is clearly written while in letters that are not clear and / or not meaningful and / or wrong, then the recognized value is the value in numerical writing; or c) if the bid in numbers and letters is unclear and / or not meaningful and / or wrong, then the offer is declared null, and b. Work Unit of Price Unit: 1) the volume of work listed in the Quantity and Price List is adjusted to those listed in the Bidding Document; 2) if there is an error resulting from the multiplication of the volume with the price of the work unit, it is corrected, provided that the price of the unit of work offered cannot be changed; 3) the type of work that is not given a unit price is considered to be included in the price of another work unit and the unit price on the Quantity and Price List remains left blank; 4) the type of work not listed in the Quantity and Price List is adjusted to the type of work listed in the selection document and the price of the said work unit is considered zero; 5. The arithmetic correction results can change the total value of the bid price so that the order of ranks can be higher or lower than the original ranking; 6. Bid after arithmetic correction that exceeds the total value of the Self Estimated Price is declared null and void; 7. If all bid prices after the arithmetic correction are above the total value of the Self Estimated Price, the tender is declared failed; 8. Based on the results of the arithmetic correction of the Election Working Group the order of the lowest bid; 9. if after an arithmetic correction there are less than 3 (three) bidders bid below the total value of the Self Estimated Price, the tender process will be continued by evaluating the offer;
10. After making arithmetic corrections, the Election Working Group checks the indication of conspiracy as the Instruction to Participant number 6; 11. After checking indications of conspiracy, the Election Working Group will evaluate the offer which includes: a. administrative evaluation; b. technical evaluation; and c. price evaluation; 12. General provisions in evaluating are as follows: a. election Working Groups are prohibited from adding, reducing, replacing, and / or changing the criteria and requirements set out in this Bidding Document; b. election Working Groups and / or participants are prohibited from adding, reducing, changing, and / or changing the contents of the Bid Documents; c. bid that meets the requirements is an offer that is in accordance with the technical terms, conditions, and specifications specified in this Bidding Document, without any important / principal deviations or conditional offers; d. important / principal deviations or conditional offers are: 1) deviations in the Bidding Documents from the Bidding Document that affect the scope, quality and results / performance of the work; and / or

2) offer from participants with additional requirements other than provisions and conditions that will lead to unfair business competition and / or unfairness, e. election Working Groups are prohibited from aborting bids with reasons: 1) Participants are not active / not opening the Electronic Procurement System and / or not asking at the time of giving an explanation; and / or 2) errors that are not substantial, are errors that do not affect the evaluation results, f. the parties are prohibited from influencing or intervening in the Election Working Group during the evaluation process; g. if the evaluation shows evidence of unfair business competition and / or joint arrangements (indications of collusion / conspiracy) between participants, Election Working Group, Working Unit of Goods / Services Procurement, The Commitment Making Officer and / or other parties involved, with the aim of winning one of the participants, then: 1) participants who are designated as potential winners and other participants involved are subject to sanctions on the Black List; 2) members of the Election Working Group, The Commitment Making Officials and / or other parties involved in conspiracy are subject to sanctions in accordance with the provisions of the legislation; 3) the evaluation process is continued by setting other participants who are not involved (if any); and 4) if there are no other participants as referred to in number 3), the tender is declared to have failed, and h. if the indication of conspiracy is fulfilled, then the participant is aborted at the evaluation stage of administrative, technical, and / or qualification; 13. Administrative Evaluation: a. evaluation of administrative data is carried out on matters that are not / have not been assessed at the time of qualification assessment, b. the offer is stated to have fulfilled administrative requirements, if: 1) the substantial conditions requested based on the Bidding Document are fulfilled, namely by attaching: a) Bid Letter; b) Original Offer Guarantee (if required); c) Joint Operation Agreement (if Operation Cooperation); d) Technical Bidding Documents; e) Price Bid Documents, 2) Bid Letter fulfills the following conditions: a) dated; b) the validity period of the Bid Letter is not less than the time as stated in the Election Data Sheet, provided that: i. if there are differences in writing between numbers and letters, the period recognized is written letters; ii. if the written number is clear while the value in letters is not clear / meaningless / wrong, then the period recognized is written in numbers; or iii. if what is written in numbers and in letters is not clear / meaningless / wrong, then the bidder is declared null, typing error in writing the name of the Working Group and / or package name, then it cannot be declared null and void; and d) in the event of a date error, if the error does not cause the validity period of the offer letter to be less than the time stated in the Election Data Sheet then it cannot be declared null, 3) Original Offer Guarantee (if required) meets the following conditions : a) in the case of Construction work with an value of Self Estimated Price above Rp.10,000,000,000.00 (ten billion rupiahs) up to Rp.100,000,000,000.00 (one hundred billion rupiahs), issued by: a). 1. Commercial Banks; a) .2. Guarantee Company; a) .3. Insurance company; a) .4. Special institutions that run businesses in the fields of financing, guarantees, and insurance to encourage Indonesian exports in accordance with the provisions of laws and regulations in the field of Indonesian export financing Institutions; or a) .5. Consortium of general insurance companies / consortium of guarantee institutions / consortium of guarantee companies that have suretyship programs, letters a.2 to a.5 has been determined / obtained a recommendation from the Financial Services Authority, b) in the case of Construction work with value of Self Estimated Price above Rp. 100,000,000,000.00 (one hundred billion rupiah) issued by: a) .5.1. Commercial banks; or a) .5.2. Consortium of general insurance companies / consortium of guarantee companies / consortium of institutions of guarantee that have suretyship programs; letter b.2 has been determined / obtained a recommendation from the Financial Services Authority, c) The validity period is not less than specified in the Bidding Document; d) the validity period is stated in numbers and letters, with the following provisions: (1) if there is a writing difference between numbers and letters, the validity period recognized is written letters; (2) if what is written in clear numbers while in letters that are not clear / meaningless / wrong, then what is recognized is the validity period written in numbers; or (3) if the numbers and letters are not clear / meaningless / wrong, then it is declared null and void, e) the name stated in the Bid Security letter is the same as the participant's name; f) the value of the Bid Security is not less than the guarantee value specified in the Bidding Document; g) the amount of the Bid Security is stated in numbers and letters, with the following provisions: (1) if there are differences in writing between numbers and letters, the recognized value is written letters; (2) if what is written in clear numbers while in letters that are not clear / meaningless / wrong, then what is recognized is the value written in numbers; or (3) if the numbers and letters are not clear / meaningless / wrong, then the offer is declared null and void, h) the name of the Election Working Group that accepts the Bid Security is the same as the name of the Election Working Group which holds a Tender; i) work package that is guaranteed to be the same as the tendered work package; j) Bid Security must be able to be disbursed unconditionally in the amount of the Guarantee within no later than 14 (fourteen) working days, after a statement of default from the Working Group of Election is received by the Guarantee Issuer; k) Bid Security under the name of the Joint Operation must be written on behalf of the Joint Operation, and l) the substance and validity / authenticity of the Bid Security has been confirmed and clarified in writing by the Election Working Group to the issuer of the guarantee if it is less clear and dubious, 4) The Agreement of Operational Cooperation meets the following requirements: a) includes the name of the Joint Operation in accordance with the qualification form document; b) include the name of the leadfirm company and member of Operational Cooperation; c) include capital sharing from each company; d) include the name of the individual of party representing the Joint Operation; and e) signed by prospective of participants of Operational Cooperation, c. The Election Working Group can carry out clarification / confirmation in writing of matters that are less clear and doubtful but may not change the substance; d. administrative evaluation produces two conclusions, namely fulfilling administrative requirements or not meeting administrative requirements; e. Participants who fulfill administrative requirements are followed by technical evaluation; f. if of the lowest 3 (three) offers that do not meet the administrative requirements, the Election Working Group shall carry out administrative evaluation of the next lowest bidder (if any); g. if there is only 1 (one) or 2 (two) participants who fulfill administrative requirements, then the evaluation will continue with a technical evaluation; and h. if there are no participants who meet the administrative requirements, then the tender is declared failed; 14. Technical Evaluation: a. technical evaluation is carried out on participants who meet administrative requirements; b. technical evaluated elements in accordance with those stipulated as listed in the Election Data Sheet; c. technical evaluation is carried out with a knockout system with the following provisions: 1) The Election Working Group assesses the minimum technical requirements that must be met by comparing the fulfillment of technical requirements as stated in the Election Data Sheet; 2) the offer is stated as fulfilling the technical requirements as stated in the Election Data Sheet if: a) the method of carrying out the work fulfills the substantive requirements specified in the Bidding Document and is believed to describe mastery in completing work, including: (1) Stages / sequence of work from the start to the end in broad outline and description / workings of each type of main work; (2) conformity between work methods and the main equipment offered / needed in the execution of work; (3) conformity between work methods and specifications / volume of work required. Assessment of implementation methods Assessment of implementation methods does not evaluate jobmix / details / mix / material composition of the type of work. In evaluating the method of carrying out work, the Working Group of Election compares the work methods offered by participants with work methods that are part of the technical requirements set by The Commitment Making Officials by assessing the suitability of the method. If it is not appropriate, the Working Group conducts an evaluation based on the suitability of work methods offered with the main equipment, as well as personnel based on accountable expertise, b) the period of execution of the work offered does not exceed the deadline as stated in the Election Data Sheet, c) the main equipment offered in accordance with those specified in the Bidding Document, with the following provisions: (1) the meaning of the main equipment is equipment that supports directly and according to the need to carry out the major work (major item); (2) type, capacity, and amount provided for the execution of work; (3) ownership of the main equipment is self-owned, leased purchase, and / or owned by another party with a conditional Rental agreement (not a letter of support), (4) specifically for work with value of Self Estimated Price above Rp. 200,000,000,000 00 (two hundred billion rupiahs), then the main equipment must be self-owned or in the status of Buy Lease with the provisions of the equipment already in the mastery of the participant and there is already proof of the buy lease agreement with the date of the agreement before the submission of the offer, (5) evaluation of the main equipment sourced from: (a) self-owned, carried out on proof of ownership of equipment [example, Vehicle Registration Certificate, Motorized Vehicle Ownership Book, invoice]; (b) Buy Rental, made on proof of payment for Buy Lease (e.g. invoice for down payment, installments); (c) rent, sufficient to the truth of the lease agreement, (6) in terms of the type, capacity, composition and number of minimum equipment offered different from those listed in the Bidding Document, the Election Working Group will compare the productivity of the tool based on the method of carrying out the work offered. If the difference in equipment causes the method cannot be implemented or the desired productivity is not achieved in accordance with the target and the time needed, then it is declared not meeting the requirements and can be aborted at the technical evaluation stage, d) managerial Personnel offered in accordance with what is needed in carrying out work, with the following provisions: (1). the managerial Personnel required include positions: Implementation / Project Manager, Technical Manager, Financial Manager, and Expert / Officer of Occupational Safety and Health, (2). for work intended for: (a) Small Businesses do not require experts; (b) Medium and Large Businesses do not require Technicians or Analysts and Operators, (3). for occupations that have a small level of risk, they can require Officer of Occupational Safety and Health or Experts of Occupational Safety and Health while work that falls into the large risk category requires Experts of Occupational Safety and Health, (4 ) The competence of managerial personnel includes the level of education and experience of working according to the type of work being tendered, (5). The Work Competency Certificate is not evaluated at the time of election, evidenced at the provider appointment preparation meeting, (6). The work experience calculated is experience according to the type of work tendered (not based on the position offered), (7). Work experience is calculated per year regardless of the duration of construction (calculated based on the Budget Year), e) the portion of work to be subcontracted meets the following conditions: (1). Work packages with a budget ceiling value of more than Rp. 25,000,000,000.00 (twenty five billion rupiahs) up to Rp. 50,000,000,000.00 (fifty billion rupiahs) are required to subcontract a portion of the main work to specialist service providers (if available specialist service providers), and a portion of work that is not a main job to a Small Business service sub provider, and / or (2). Work packages with a budget ceiling value of more than Rp 50,000,000,000 (fifty billion rupiahs) are required to subcontract a portion of the main work to specialist service providers (if specialist service providers are available) and part of the work that is not the main job to the Small Business service sub-provider. The participant in the offer has nominated a sub-provider of specialist service (if a specialist service provider is available) and a Small Business service sub-provider from the local provincial work location, unless there are no service sub-providers available from the local province in question, by selecting subcontracted work according to the Election Data Sheet; (3). The Provider does not subcontract all major works, and (4). The Small Business Provider does not subcontract the work obtained, f) The Document of Construction Safety Plan meets the requirements as listed in the Election Data Sheet, which contains: (1). risk management and action plans (at a minimum according to the identification of hazards determined by the Commitment Making Officials, include: (a) Explanation of risk management including identifying hazards, assessing the level of risk, and controlling the level of risk, specific targets, and Program of Occupational Safety and Health, (2). signature of the legal representative of the business entity, g) other Documents required (if any) as listed in the Election Data Sheet, with the following provisions: (1) evaluation riteria described in detail and measured; (2) Requirements must consider fair business competition and the period of fulfillment of requirements, d. The Election Working Group can carry out field verification and / or clarification, especially to manufacturers / producers / agents / material distributors / tools to ensure the consistency of material types / tools and the ability to provide materials / equipment according to a predetermined schedule and the correctness of leasing to work implementation; e. if there are unclear or dubious matters in the technical evaluation, the Election Working Group will clarify with the participants. In clarification, participants may not change the substance of the offer. The results of field verification and / or clarification can abort the offer, f. Participants who have passed the technical evaluation are followed by price evaluations, g. if there is only 1 (one) or 2 (two) participants who pass the technical evaluation, then the evaluation will continue with price evaluation; h. if of the 3 (three) lowest bids after arithmetic correction does not meet the technical requirements, the Election Working Group can conduct bid evaluation on the next lowest bidder (if any) starting from the administrative evaluation, i. if no participant has passed the technical evaluation, the tender is declared to have failed; and J. The Election Working Group includes the results of technical evaluations in the application of the Electronic Procurement System, including the reasons for the participants' failure in technical evaluation; 15. Price Evaluation: a. the elements that need to be evaluated are the main or important things, provided that: 1) the Total of offer price is corrected compared to the total value of the Self Estimated Price: a) if the total of bid price is corrected exceeds the total value of Self Estimated Price, disqualified; and b) if all the bid prices are corrected above the total value of the Self Estimated Price, the tender is declared failed, 2) if it does not submit the cost estimated of carrying out safety and health and Construction Safety, it is declared null, 3) in terms of parts of work of unit price, offer unit price of value greater than 110% (one hundred and ten percent) of the unit price listed in the Self Estimated Price, clarification is carried out provided that: a) if after the clarification is carried out, it turns out that the unit price is lame, then the unit price is lame only applies to volume in accordance with the Quantity and Price List. If there is an increase in volume of work whose unit price is declared unbalanced, then the payment for that volume is based on the unit price of the negotiation result; b) if after clarification, the unit price can be accounted for / in accordance with the market price, the unit price is declared unbalanced, 4) if there is a payment item that is zero or not written then clarification is taken, the activity must continue. The price is considered to be included in the price of other jobs, b. evaluation of price fairness is carried out with the following conditions: 1) evaluation of the fairness of prices is carried out on the lump sum work section and the unit price work section; 2) clarification of the results of arithmetic corrections, if there are corrections / changes; 3) The clarification in terms of bidding for Domestic Component Levels differs from the estimates of the Election Working Group (if it requires a Domestic Component Level), 4) clarification / evaluation of the fairness of prices if the bid price is below 80% (eighty percent) of the Self Estimated Price with the following provisions:  a) Participants submit Output and Price Details (for lump sum jobs) and Work Unit Price Analysis (for unit price work), b) Output and Price Details (for lump sum work) and Work Unit Price Analysis (for part of unit price work) only used to evaluate the fairness of the bid price and cannot be used as a basis for measurement and payment of work, c) researching and assessing the fairness of the base unit price including the price of wages, materials and equipment from the minimum unit price of at least each major payment item, d) research and assess the fairness of the quantity / coefficient of the elements of wages, materials, and equipment in Unit Price Analysis at least for each main job, e) the results of research item c) and point d) are used to calculate the fairness of prices without taking into account the benefits offered, f) Prices in Job Unit Price Analysis and Output and Price Details that are considered reasonable and accountable are used to calculate the total of bid price, g) The total price as referred to in letter f) is calculated based on: (1) the volume contained in the Quantity and Price List, and (2) outputs in the Output and Price List, h) if the total of price is smaller than the evaluation result as in letter g), the bid price is declared to be an invalid and fall in price, i) if the total of bid price is greater than the evaluation result as in letter g), then the bid price is declared reasonable, j) if the participant is appointed as the winner of the tender, it must be willing to increase the Implementation Guarantee to 5% (five percent) of the total value of the Self Estimated Price, and k) if the participant is not willing to increase the value of the Implementation Guarantee to be 5% (five percent) of the Self Estimated Price, the offer is aborted and is subject to sanctions from the Black List, c. take into account the price preference for domestic production use (if it meets the requirements for the application of price preferences) with the calculation provisions of the Domestic Component Level delivered by the participant based on self-assessment, with the following provisions: 1) Price Preference for Goods / Services in the country applies to Procurement of goods / services financed by pure rupiah, but only applies to the procurement of goods / services with worth more than Rp1,000,000,000.00 (one billion rupiah), 2) Price preference is only given to domestic goods / services with a Domestic Component Level greater than or equal to 25% (twenty five percent). If the participant does not submit the calculation form for the Domestic Component Level, the participant is deemed not to want the price preference to be applied for the offer and not abort. Provisions and procedures for calculating Domestic Component Level refer to the provisions stipulated by the Minister in charge of industrial affairs while still adhering to the value of goods / services procurement, 3) Calculation formula as follows:




4) Nilai penawaran dengan komitmen Tingkat Komponen Dalam Negeri (TKDN) tertinggi akan diberikan preferensi harga maksimum (7,5% untuk pekerjaan konstruksi dan 25% untuk barang/jasa), sementara untuk nilai penawaran dengan nilai komitmen yang lain dihitung secara proporsional, dengan rumus sebagai berikut:
4) The bidding value with the commitment of the highest Domestic Component Level will be given a maximum price preference (7.5% for construction work and 25% for goods / services), while the bid value with other commitment values is calculated proportionally, with formula as follows:


NPHt : nilai untuk peserta dengan penawaran komitmen Tingkat Komponen Dalam Negeri (TKDN) tertinggi
NPHn : Nilai untuk peserta dengan penawaran komitmen Tingkat Komponen Dalam Negeri (TKDN) dibawahnya
PBt : Harga penawaran dengan komitmen Tingkat Komponen Dalam Negeri (TKDN) tertinggi
PBn : Harga penawaran dengan komitmen Tingkat Komponen Dalam Negeri (TKDN) dibawahnya
Phmaks : Preferensi harga maksimal,
NPHt (in Bahasa): value for participants with the bid commitment for The highest Domestic Component Level
NPHn (in Bahasa) : Value for participants with a commitment to offer Domestic Component Levels below it
PBt (in Bahasa): Bid price with the commitment of the highest Domestic Component Level
PBn (in Bahasa) : Bid price with the commitment of the highest Domestic Component Level below it
Phmaks: Maximum price preference,  

5) dalam hal terdapat 2 (dua) atau lebih penawaran dengan HEA (Harga Evaluasi Akhir) yang sama, penawar dengan Tingkat Komponen Dalam Negeri (TKDN) terbesar adalah sebagai pemenang, 6) pemberian Preferensi Harga tidak mengubah Harga Penawaran dan hanya digunakan oleh Kelompok Kerja (Pokja) Pemilihan untuk keperluan perhitungan HEA (Harga Evaluasi Akhir) guna menetapkan peringkat pemenang tender, d. apabila terdapat calon pemenang memiliki harga penawaran yang sama, maka Kelompok Kerja (Pokja) Pemilihan memilih peserta yang mempunyai Kemampuan Dasar (KD) lebih besar dan hal ini dicatat dalam Berita Acara Hasil Tender, e. apabila dalam evaluasi ditemukan bukti harga tidak wajar akibat terjadinya persaingan usaha tidak sehat dan/atau terjadi pengaturan bersama (kolusi/persekongkolan) sebagaimana ketentuan peraturan dan perundangundangan, maka tender dinyatakan gagal dan peserta yang terlibat dikenakan sanksi Daftar Hitam, f. apabila dalam evaluasi harga terdapat hal - hal yang kurang jelas atau meragukan, Kelompok Kerja (Pokja) Pemilihan dapat melakukan klarifikasi dengan peserta. Dalam klarifikasi, peserta tidak diperkenankan mengubah substansi penawaran. Hasil verifikasi lapangan dan/atau klarifikasi dapat menggugurkan penawaran, g. apabila dalam evaluasi kewajaran harga (apabila ada) dalam hal klarifikasi, peserta tidak hadir sehingga tahapan-tahapan Evaluasi Kewajaran Harga tidak dapat dilaksanakan, maka penawaran digugurkan, h. undangan klarifikasi evaluasi kewajaran harga (apabila ada) disampaikan tertulis secara elektronik dan/atau non elektronik kepada data kontak penyedia yang terdapat pada daftar isian kualifikasi, i. dalam hal peserta tidak hadir karena tidak dapat mengakses data kontak (misal akun email atau no telepon), tidak dapat dibuka/dihubungi, tidak sempat mengakses atau alasan teknis apapun dari sisi penyedia, maka risiko sepenuhnya ada pada peserta; j. apabila dari 3 (tiga) penawaran terendah setelah koreksi aritmatik ada yang tidak memenuhi evaluasi harga maka Kelompok Kerja (Pokja) Pemilihan dapat melakukan evaluasi terhadap penawar terendah berikutnya (apabila ada) dimulai dari evaluasi administrasi, k. apabila hanya ada 1 (satu) atau 2 (dua) peserta yang lulus evaluasi harga, maka evaluasi dilanjutkan dengan evaluasi kualifikasi, dan l. apabila tidak ada peserta yang lulus evaluasi harga maka tender dinyatakan gagal; dan 16. Kelompok Kerja (Pokja) Pemilihan menyusun urutan 3 (tiga) penawaran sebagai calon pemenang dan calon pemenang cadangan 1 dan 2 (apabila ada).
5) in the event there are 2 (two) or more bids with the same Final Evaluation Price, the biggest bidder with the Domestic Component Level is the winner, 6) the giving of the Price Preference does not change the Bid Price and is only used by the Election Working Group for the purposes of calculating the Final Evaluation Price in order to determine the tender winner's ranking, d. if there are potential winners who have the same bid price, the Election Working Group chooses participants who have greater Basic Capability and this is recorded in the Minutes of Tender Results, e. if in evaluating found evidence of unreasonable prices due to unfair business competition and / or joint arrangements (collusion / conspiracy) as stipulated in regulations and legislation, then the tender is declared failed and the participants involved are subject to sanctions of the Black List, f. if in price evaluation there are things that are unclear or doubtful, the Election Working Group can clarify with the participants. In clarification, participants may not change the substance of the offer. The results of field verification and / or clarification can abort the offer, g. if in evaluating the fairness of the price (if any) in terms of clarification, the participant is not present so that the stages of the Fairness of Price Evaluation cannot be carried out, the offer is aborted, h. invitation to clarify evaluation of fairness of prices (if any) submitted electronically and / or non-electronically to the provider contact data contained in the qualification checklist, i. in the event that the participant is not present because he cannot access contact data (e.g. e-mail or telephone number), cannot be opened / contacted, does not have time to access or any technical reason from the provider side, the risk is entirely with the participant, j. if of the 3 (three) lowest bids after arithmetic correction there are those that do not meet the price evaluation, the Election Working Group can evaluate the next lowest bidder (if any) starting from the administrative evaluation, k. if there is only 1 (one) or 2 (two) participants who pass the price evaluation, then the evaluation will continue with evaluation of qualifications, and l. if no participant has passed the price evaluation, the tender is declared to have failed; and 16. Election Working Groups constitute a sequence of 3 (three) bids as potential winners and alternative potential winners 1 and 2 (if any).


Penjadwalan KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) Tahun 2414 (dua ribu empat ratus empat belas) Masehi.

Scheduling The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference in 2414 (two thousand and four hundreds and fourteen) AD.

04 Januari 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Manajemen Agribisnis, Fakultas Pertanian UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Manajemen Agribisnis, Fakultas Pertanian UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4848 / Desember / 2413.
January 04th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Agribusiness Management, The Faculty of Agriculture of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Agribusiness Management, The Faculty of Agriculture of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4848 / December / 2413.

11 Januari 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Ilmu Hama dan Penyakit Tumbuhan, Fakultas Pertanian UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Ilmu Hama dan Penyakit Tumbuhan, Fakultas Pertanian UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4848 / Desember / 2413.
January 11th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Sciences of Pests and Diseases of Plant (Plant Protection), The Faculty of Agriculture of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Sciences of Pests and Diseases of Plant (Plant Protection), The Faculty of Agriculture of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4848 / December / 2413.

18 Januari 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Fitopatologi, Fakultas Pertanian UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Fitopatologi, Fakultas Pertanian UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4848 / Desember / 2413.
January 18th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Phytopathology, The Faculty of Agriculture of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Phytopathology, The Faculty of Agriculture of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4848 / December / 2413.

25 Januari 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Ekonomi Pertanian, Fakultas Pertanian UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Ekonomi Pertanian, Fakultas Pertanian UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4848 / Desember / 2413.
January 25th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Agricultural Economic, The Faculty of Agriculture of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Agricultural Economic, The Faculty of Agriculture of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4848 / December / 2413.

01 Februari 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Agronomi, Fakultas Pertanian UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Agronomi, Fakultas Pertanian UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4849 / Januari / 2414.
February 01st, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Agronomy, The Faculty of Agriculture of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Agronomy, The Faculty of Agriculture of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4849 / January / 2414.

08 Februari 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Arsitektur Lansekap, Fakultas Pertanian UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Arsitektur Lansekap, Fakultas Pertanian UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4849 / Januari / 2414.
February 08th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Landscape Architecture, The Faculty of Agriculture of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Landscape Architecture, The Faculty of Agriculture of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4849 / January / 2414.

15 Februari 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Manajemen Sumber Daya Lahan, Fakultas Pertanian UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Manajemen Sumber Daya Lahan, Fakultas Pertanian UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4849 / Januari / 2414.
February 15th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Land Resource Management, The Faculty of Agriculture of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Land Resource Management, The Faculty of Agriculture of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4849 / January / 2414.

22 Februari 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Teknologi Hasil Pertanian, Fakultas Pertanian UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Teknologi Hasil Pertanian, Fakultas Pertanian UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4849 / Januari / 2414.
February 22nd, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Agricultural Products Technology, The Faculty of Agriculture of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Agricultural Products Technology, The Faculty of Agriculture of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4849 / January / 2414.

01 Maret 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Sosial Ekonomi Pertanian (Agrobisnis), Fakultas Pertanian UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Sosial Ekonomi Pertanian (Agrobisnis), Fakultas Pertanian UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4850 / Februari / 2414.
March 01st, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Agricultural Socio-Economic (Agribusiness), The Faculty of Agriculture of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Agricultural Socio-Economic (Agribusiness), The Faculty of Agriculture of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4850 / February / 2414.

08 Maret 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Penyuluhan dan Komunikasi Pertanian, Fakultas Pertanian UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Penyuluhan dan Komunikasi Pertanian, Fakultas Pertanian UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4850 / Februari / 2414.
March 08th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Agricultural Counseling and Communication, The Faculty of Agriculture of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Agricultural Counseling and Communication, The Faculty of Agriculture of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4850 / February / 2414.

15 Maret 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Mikrobiologi Pertanian, Fakultas Pertanian UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Mikrobiologi Pertanian, Fakultas Pertanian UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4850 / Februari / 2414.
March 15th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Agricultural Microbiology, The Faculty of Agriculture of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Agricultural Microbiology, The Faculty of Agriculture of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4850 / February / 2414.

22 Maret 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Manajemen Sumber Daya Perikanan, Fakultas Pertanian UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Manajemen Sumber Daya Perikanan, Fakultas Pertanian UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4850 / Februari / 2414.
March 22nd, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Fisheries Resources Management, The Faculty of Agriculture of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Fisheries Resources Management, The Faculty of Agriculture of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4850 / February / 2414.

29 Maret 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Ilmu Tanah, Fakultas Pertanian UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Ilmu Tanah, Fakultas Pertanian UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4850 / Februari / 2414.
March 29th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Soil Science, The Faculty of Agriculture of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Soil Science, The Faculty of Agriculture of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4850 / February / 2414.

05 April 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Budidaya Perikanan, Fakultas Pertanian UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Budidaya Perikanan, Fakultas Pertanian UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4851 / Maret / 2414.
April 05th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Aquaculture, The Faculty of Agriculture of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Aquaculture, The Faculty of Agriculture of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4851 / March / 2414.

12 April 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Agronomi dan Hortikultura, Fakultas Pertanian UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Agronomi dan Hortikultura, Fakultas Pertanian UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4851 / Maret / 2414.
April 12th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Agronomy and Horticulture, The Faculty of Agriculture of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Agronomy and Horticulture, The Faculty of Agriculture of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4851 / March / 2414.

19 April 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Fakultas Pertanian UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Fakultas Pertanian UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4851 / Maret / 2414.
April 19th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Faculty of Agriculture of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Faculty of Agriculture of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4851 / March / 2414.

26 April 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Ilmu Kedokteran dan Kesehatan, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Ilmu Kedokteran dan Kesehatan, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4851 / Maret / 2414.
April 26th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Sciences of Medicine and Health, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Sciences of Medicine and Health, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4851 / March / 2414.

03 Mei 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Keperawatan, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Keperawatan, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4852 / April / 2414.
May 03rd, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Nursing, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Nursing, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4852 / April / 2414.

10 Mei 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Ilmu Pendidikan Kedokteran, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Ilmu Pendidikan Kedokteran, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4852 / April / 2414.
May 10th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Medical Education Sciences, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Medical Education Sciences, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4852 / April / 2414.

17 Mei 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Ilmu Kesehatan Masyarakat, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Ilmu Kesehatan Masyarakat, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4852 / April / 2414.
May 17th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Public Health Sciences, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Public Health Sciences, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4852 / April / 2414.

24 Mei 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Ilmu Kedokteran Tropis, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Ilmu Kedokteran Tropis, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4852 / April / 2414.
May 24th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Tropical Medicine Science, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Tropical Medicine Science, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4852 / April / 2414.

31 Mei 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Ilmu Kedokteran Klinik, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Ilmu Kedokteran Klinik, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4852 / April / 2414.
May 31st, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Clinic Medical Sciences, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Clinic Medical Sciences, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4852 / April / 2414.

07 Juni 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Ilmu Kedokteran Dasar, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Ilmu Kedokteran Dasar, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4853 / Mei / 2414.
June 07th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Basic Medical Science, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Basic Medical Science, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4853 / May / 2414.

14 Juni 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Urologi, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Urologi, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4853 / Mei / 2414.
June 14th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Urology, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Urology, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4853 / May / 2414.

21 Juni 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Radiologi, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Radiologi, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4853 / Mei / 2414.
June 21st, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Radiology, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Radiology, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4853 / May / 2414.

28 Juni 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Patologi Klinik, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Patologi Klinik, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4853 / Mei / 2414.
June 28th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Clinical Pathology, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Clinical Pathology, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4853 / May / 2414.

05 Juli 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Patologi Anatomi, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Patologi Anatomi, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4854 / Juni / 2414.
July 05th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Anatomy Pathology, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Anatomy Pathology, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4854 / June / 2414.

12 Juli 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Obstetri dan Ginekologi, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Obstetri dan Ginekologi, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4854 / Juni / 2414.
July 12th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Obstetric and Gynecology, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Obstetric and Gynecology, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4854 / June / 2414.

19 Juli 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Orthopedi dan Traumatologi, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Orthopedi dan Traumatologi, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4854 / Juni / 2414.
July 19th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Orthopedic and Traumatology, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Orthopedic and Traumatology, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4854 / June / 2414.

26 Juli 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Mikrobiologi Klinik, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Mikrobiologi Klinik, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4854 / Juni / 2414.
July 26th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Clinical Microbiology, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Clinical Microbiology, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4854 / June / 2414.

02 Agustus 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Ilmu Penyakit Saraf/Nerologi, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Ilmu Penyakit Saraf/Nerologi, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4855 / Juli / 2414.
August 02nd, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Neurology / Nerology, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Neurology / Nerology, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4855 / July / 2414.

09 Agustus 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Penyakit Jantung dan Pembuluh Darah, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Penyakit Jantung dan Pembuluh Darah, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4855 / Juli / 2414.
August 09th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Disease of Heart and Blood Vessels, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Disease of Heart and Blood Vessels, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4855 / July / 2414.

16 Agustus 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Ilmu Penyakit Dalam, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Ilmu Penyakit Dalam, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4855 / Juli / 2414.
August 16th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Internal Medicine Science, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Internal Medicine Science, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4855 / July / 2414.

23 Agustus 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Ilmu Kesehatan Penyakit Mata, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Ilmu Kesehatan Penyakit Mata, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4855 / Juli / 2414.
August 23rd, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Eye Disease Health Sciences, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Eye Disease Health Sciences, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4855 / July / 2414.

30 Agustus 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Ilmu Kesehatan Otolaringologi - THT-KL (Telinga Hidung Tenggorokan – Kepala Leher), Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Ilmu Kesehatan Otolaringologi - THT-KL (Telinga Hidung Tenggorokan – Kepala Leher), Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4855 / Juli / 2414.
August 30th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Health Science of Otolaryngology - Throat Ear Nose – Head Neck, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Health Science of Otolaryngology - Throat Ear Nose – Head Neck, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4855 / July / 2414.

06 September 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Kesehatan Kulit dan Kelamin, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Kesehatan Kulit dan Kelamin, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4856 / Agustus / 2414.
September 06th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Skin and Gender Health, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Skin and Gender Health, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4856 / August / 2414.

13 September 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Kesehatan Anak, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Kesehatan Anak, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4856 / Agustus / 2414.
September 13th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Children's Health, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Children's Health, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4856 / August / 2414.

20 September 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Ilmu Kedokteran Jiwa, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Ilmu Kedokteran Jiwa, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4856 / Agustus / 2414.
September 20th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Mental Medicine Science, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Mental Medicine Science, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4856 / August / 2414.

27 September 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Kedokteran Forensik dan Mediko Legal, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Kedokteran Forensik dan Mediko Legal, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4856 / Agustus / 2414.
September 27th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Forensic Medicine and Legal Medic, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Forensic Medicine and Legal Medic, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4856 / August / 2414.

04 Oktober 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Bedah Syaraf, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Bedah Syaraf, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4857 / September / 2414.
October 04th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Neurosurgery, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Neurosurgery, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4857 / September / 2414.

11 Oktober 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Bedah Anak, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Bedah Anak, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4857 / September / 2414.
October 11th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Child Surgery, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Child Surgery, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4857 / September / 2414.

18 Oktober 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Ilmu Bedah, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Ilmu Bedah, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4857 / September / 2414.
October 18th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Surgery Science, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Surgery Science, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4857 / September / 2414.

25 Oktober 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Amnesti dan Reanimasi, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Amnesti dan Reanimasi, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4857 / September / 2414.
October 25th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Amnesty and Reanimation, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Amnesty and Reanimation, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4857 / September / 2414.

01 Nopember 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Gizi Kesehatan, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Gizi Kesehatan, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4858 / Oktober / 2414.
November 01st, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Health Nutrition, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Health Nutrition, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4858 / October / 2414.

08 Nopember 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Pendidikan Dokter, Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Pendidikan Dokter, Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4858 / Oktober / 2414.
November 08th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Medical Doctor Education, The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Medical Doctor Education, The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4858 / October / 2414.

15 Nopember 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Fakultas Kedokteran UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Fakultas Kedokteran UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4858 / Oktober / 2414.
November 15th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Faculty of Medicine of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Faculty of Medicine of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4858 / October / 2414.

22 Nopember 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Biokimia, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Biokimia, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4858 / Oktober / 2414.
November 22nd, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Biochemistry, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Biochemistry, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4858 / October / 2414.

29 Nopember 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Ilmu Komputer, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Ilmu Komputer, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4858 / Oktober / 2414.
November 29th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Computer Science, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Computer Science, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4858 / October / 2414.

06 Desember 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Biologi, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Biologi, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4859 / Nopember / 2414.
December 06th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Biology, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Biology, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4859 / November / 2414.

13 Desember 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Meteorologi Terapan, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Meteorologi Terapan, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4859 / Nopember / 2414.
December 13th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Applied Meteorology, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Applied Meteorology, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4859 / November / 2414.

20 Desember 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Statistika, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Statistika, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4859 / Nopember / 2414.
December 20th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Statistic, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Statistic, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4859 / November / 2414.

27 Desember 2414 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Efek-Efek Ganda (Multiplier Effects) terhadap masyarakat luas keberadaan Jurusan Kimia, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing) sebagai Penelitian untuk Tugas Akhir (TA) untuk Gelar Ahli Pratama (AP, Diploma-I, D-I), Tugas Akhir (TA) untuk Gelar Ahli Muda (AMa, Diploma-II, D-II), Paper atau Tugas Akhir (TA) untuk Proyek Akhir (PA) untuk Gelar Ahli Madya (AMd, Diploma-III, D-III), Tugas Akhir (TA) untuk Gelar Ahli (A, Diploma-IV, D-IV), Skripsi untuk Gelar Sarjana (Strata-1, S-1), Tesis untuk Gelar Master (Strata-2, S-2), Disertasi untuk Gelar Doktor (Strata-3, S-3), & Promosi Guru Besar (Profesor) mahasiswa Jurusan Kimia, Fakultas Matematika dan Ilmu Pengetahuan Alam (FMIPA) UM (Universitas Mandailing)” yang terdapat dalam JBAR MGB SM (Jurnal Bulanan Analisis Riset Mikron Gen Biologis Sepanjang Masa) Nomor : 4859 / Nopember / 2414.
December 27th, 2414 AD, Material of The Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference “Existence of Multiplier Effects to the wider community of the existence of The Department of Chemistry, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University) as The Research of Final Project for Degree of Pratama Expert (AP, Diploma-I, D-I), Final Project for Degree of Young Expert (AMa, Diploma-II, D-II), Paper or Final Project for Degree of Madya Expert (AMd, Diploma-III, D-III), Final Project for Degree of Expert (A, Diploma-IV, D-IV), Essay/Thesis for Undergraduate Program for Bachelor Degree (Strata-1, S-1), Thesis for Master (Strata-2, S-2), Dissertation for Degree of PhD (Philosophy of Doctor) [Strata-III, S-3], and Promoter of Professor for students of The Department of Chemistry, The Faculty of Mathematic and Natural Sciences of MU (Mandailing University)" contained in The Monthly Journal of Research Analysis of Biological Genetic Micron of All Time Number : 4859 / November / 2414.


Sumber-sumber (sources) :

01.  Surat Edaran Nomor 10/SE/M/2018 tentang Pemberlakuan Standar Dokumen Pemilihan Pengadaan Jasa Konstruksi Dalam Rangka Lelang Dini di Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk Tahun Anggaran 2019.
02. Circular Letter Number 10 / SE / M / 2018 concerning Enforcement of the Selection Document Standard for Procurement of Construction Services in the Context of Early Auction in the Ministry of Public Works and Public Housing for  Budget Year 2019.
02.  Google Translate.


Banggua, Desa Roburan Lombang, 01 Juni 2031
Banggua, Desa Roburan Lombang, June 01st, 2031

Tidak ada komentar:

Posting Komentar

TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 05 DECEMBER 2443 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 05 DESEMBER 2443 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos EVOLUSI PENDIDIKAN MANDAILING 419 (EMPAT RATUS SEMBILAN BELAS) TAHUN DI TAHUN 2...