MENUJU BERDIRINYA UM (UNIVERSITAS MANDAILING)
TOWARDS THE ESTABLISHMENT OF MU (MANDAILING UNIVERSITY)
KISI-KISI KONTEN JURNAL ILMIAH UM (UNIVERSITAS MANDAILING)
TABLE OF SPECIFICATIONS OF THE SCIENTIFIC JOURNAL OF MU (MANDAILING UNIVERSITY)
JBAR MGB SM
(JURNAL BULANAN ANALISIS RISET MIKRON GEN BIOLOGIS SEPANJANG MASA)
THE MONTHLY JOURNAL OF RESEARCH ANALYSIS OF BIOLOGIC GEN MICRON OF ALL TIME
JBARSM April 2015
Arahan Pendiri& Ketum (Ketua Umum) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya
Referrals from The Founder & The General Chairman of The Central (Global) Leadership Assembly of The Great Mandailing Foundation
Agussalim, ST bin Abdur Rahim Nasution
Pasal 66
Article 66
(1) IUP Operasi
Produksi & IUPK Operasi Produksi yang telah berakhir masa berlakunya, tidak
menghilangkan kewajiban pemegang IUP Operasi Produksi & IUPK Operasi
Produksi untuk melaksanakan Pascatambang.
(1) The Mining Permit of Production Operation & The Especially Mining Permit of Production
Operation which has expired, does not eliminate the obligation of holders of The Mining
Permit of Production Operation & The Especially Mining Permit of Production
Operation to implement the Mine Closure.
(2) Dalam rangka
pelaksanaan Pascatambang sebagaimana dimaksud pada ayat (1), direktur jenderal
atas nama menteri, gubernur, atau Bupati/walikota sesuai dengan kewenangannya
menerbitkan surat mengenai pelaksanaan Pascatambang kepada pemegang IUP Operasi
Produksi & IUPK Operasi Produksi.
(2) In the framework of the implementation of the Post-Mining referred to in
paragraph (1), the director-general on behalf of the minister, governor or Regent/mayor in
accordance with their authority issuing The Letter on the implementation of the Post-Mining to holders of The Mining
Permit of Production Operation & The Especially Mining Permit of Production
Operation.
Bab x
Sanksi administratif
CHAPTER X
ADMINISTRATIVE SANCTIONS
Pasal 67
Article 67
(1) Pemegang IUP
Eksplorasi atau IUPK Eksplorasi yang melakukan pelanggaran ketentuan
sebagaimana dimaksud dalam Pasal 2 ayat (1), ayat (3), atau ayat (4), Pasal 3
ayat (1), Pasal 4, Pasal 6, Pasal 10, Pasal 11, Pasal 12, Pasal 13, Pasal 14,
Pasal 16, Pasal 17, Pasal 18, Pasal 19 ayat (3), Pasal 20 ayat (1), ayat (2),
atau ayat (5), Pasal 28, Pasal 29, Pasal 41 ayat (1) atau ayat (3), Pasal 42,
Pasal 46, atau Pasal 61 ayat (4) dikenakan sanksi administratif.
(1) Holders of The Mining Permit of Exploration & The Especially Mining Permit of Exploration
who violate the provisions referred to in Article 2 paragraph (1), paragraph
(3), or paragraph (4), Article 3, paragraph (1), Article 4, Article 6, Article
10, Article 11, Article 12, Article 13, Article 14, Article 16, Article 17,
Article 18, Article 19 paragraph (3), Article 20 paragraph (1), paragraph (2),
or paragraph (5), Article 28, Article 29, Article 41 paragraph (1) or
subsection (3), Article 42, Article 46, or Article 61 paragraph (4) shall be
subject to administrative sanctions.
(2) Pemegang IUP
Operasi Produksi atau IUPK Operasi Produksi yang melakukan pelanggaran
ketentuan sebagaimana dimaksud dalam Pasal 2 ayat (2), ayat (3), ayat (4), atau
ayat (5), Pasal 3 ayat (2), Pasal 15, Pasal 22 ayat (3), Pasal 23 ayat (1),
ayat (2), atau ayat (5), Pasal 25 ayat (3), Pasal 26 ayat (1), ayat (2), atau
ayat (5), Pasal 31,Pasal 32, Pasal 33, Pasal 34, Pasal 37, Pasal 38 ayat (1),
ayat (3), atau ayat (5), Pasal 39, Pasal 40, Pasal 41 ayat (1), ayat (2), atau
ayat (3), Pasal 43 ayat (1), ayat (5), atau ayat (6), Pasal 44, Pasal 45, Pasal
50, Pasal 56, Pasal 61 ayat (4), Pasal 62 ayat (2), Pasal 63, Pasal 64, atau
Pasal 65 dikenakan sanksi administratif.
(2) Holders of The Mining Permit of Production Operation or The Especially Mining Permit of Production
Operation who violate the provisions referred to in Article 2 paragraph (2),
paragraph (3), (4), or paragraph (5), Article 3 paragraph (2), Article 15,
Article 22 paragraph (3), Article 23 paragraph (1), paragraph (2), or paragraph
(5), Article 25 paragraph (3), Article 26 paragraph (1), paragraph (2), or
paragraph (5), Article 31, Article 32, Article 33, Article 34, Article 37, Article
38 paragraph (1), paragraph (3), or paragraph (5), Article 39, Article 40,
Article 41 paragraph (1), paragraph (2 ), or paragraph (3), Article 43
paragraph (1), paragraph (5), or paragraph (6), Article 44, Article 45, Article
50, Article 56, Article 61 paragraph (4), Article 62 paragraph (2 ), Article
63, Article 64, or Article 65 shall be subject to administrative sanctions.
Pasal 68
Article 68
(1) Sanksi
administratif sebagaimana dimaksud dalam Pasal 67 dapat berupa :
(1) The administrative sanctions as referred to in Article 67 may be :
a. Peringatan
tertulis;
a. Written warning;
b. Penghentian
sementara sebagian atau seluruh kegiatan pertambangan; dan/atau
b. Temporary suspension of part or all of mining activities; and/or
c. Pencabutan IUP
Eksplorasi, IUP Operasi Produksi, IUPK Eksplorasi, atau IUPK Operasi Produksi.
c. Revocation of The Mining Permit of Exploration, The Mining Permit of Production Operation, The Especially Mining Permit of Exploration, or The
Especially Mining Permit of Production Operations.
(2) Sanksi
administratif sebagaimana dimaksud pada ayat (1) diberikan oleh direktur
jenderal atas nama menteri, gubernur, atau Bupati/walikota sesuai dengan
kewenangannya.
(2) Administrative sanctions as referred to in paragraph (1) shall be
issued by the director general on behalf of the minister, governor or Regent/mayor in
accordance with their authority.
Pasal 69
Article 69
Sanksi
administratif berupa peringatan tertulis sebagaimana dimaksud dalam Pasal 68
ayat (1) huruf a diberikan paling banyak 3 (tiga) kali dengan jangka waktu
peringatan masing-masing 30 (tiga puluh) hari kalender.
Administrative sanctions in the form of a written warning as referred to in
Article 68 paragraph (1) letter a given at most three (3) times of the period of
each warning is thirty (30) calendar days.
Pasal 70
Article 70
(1) Dalam hal
pemegang IUP Eksplorasi, IUP Operasi Produksi, IUPK Eksplorasi, atau IUPK
Operasi Produksi, yang mendapat sanksi peringatan tertulis setelah berakhirnya
jangka waktu peringatan tertulis sebagaimana dimaksud dalam Pasal 69 belum
melaksanakan kewajibannya, dikenai sanksi administratif berupa penghentian
sementara sebagian atau seluruh kegiatan Pertambangan sebagaimana dimaksud
dalam Pasal 68 ayat (1) huruf b.
(1) In the case of holders of The Mining Permit of Exploration, The Mining Permit of Production Operation, The Especially Mining Permit of Exploration, The
Especially Mining Permit of Production Operations, who received a written warning
sanction after the expiry of the written warning as referred to in Article 69
has not carried out its obligations, shall be subject to administrative sanctions in the form of
temporary suspension of part or all of Mining activities referred to in Article
68 (1) b.
(2) Sanksi
administratif berupa penghentian sementara sebagian atau seluruh kegiatan
Pertambangan sebagaimana dimaksud pada ayat (1) dikenakan dalam jangka waktu
paling lama 90 (sembilan puluh) hari kalender.
(2) The administrative sanction in the form of temporary suspension of part
or all mining activities referred to in paragraph (1) shall be within a period
of ninety (90) calendar days.
Pasal 71
Article 71
Sanksi
administratif berupa pencabutan IUP Eksplorasi, IUP Operasi Produksi, IUPK Eksplorasi,
& IUPK Operasi Produksi, sebagaimana dimaksud dalam Pasal 68 ayat (1) huruf
c dikenakan kepada pemegang IUP Eksplorasi, IUP Operasi Produksi, IUPK
Eksplorasi, & IUPK Operasi Produksi yang tidak melaksanakan kewajiban
sampai dengan berakhirnya jangka waktu pengenaan sanksi penghentian sementara
sebagian atau seluruh kegiatan pertambangan sebagaimana dimaksud dalam Pasal
70.
Administrative sanctions such as revocation of The Mining
Permit of Exploration, The Mining Permit of Production Operation, The Especially Mining Permit of Exploration
& The Especially Mining Permit of Production Operations as referred to in Article 68 paragraph (1) letter c imposed on
holders of The Mining Permit of Exploration, The Mining Permit of Production Operation, The Especially Mining Permit of Exploration
& The Especially Mining Permit of Production Operations that do not implement obligations
until the expiration of the imposition of temporary suspension of part or all of mining
activities referred to in Article 70.
BAB XI
KETENTUAN
PERALIHAN
CHAPTER XI
TRANSITIONAL PROVISIONS
Pasal 72
Article 72
(1) Rencana
Reklamasi dan/atau rencana Pascatambang yang telah disetujui oleh menteri,
gubernur, atau Bupati/walikota sesuai dengan kewenangannya sebelum berlakunya
Peraturan Menteri ini, dinyatakan tetap berlaku & pelaksanaannya wajib disesuaikan dengan Peraturan
Menteri ini paling lambat 1 (satu) tahun sejak Peraturan Menteri ini
diundangkan.
(1) Reclamation Plan and/or the Mine Closure plan which has been approved
by the minister, governor or Regent/mayor in accordance with the authority before the
entry into force of this Minister's Regulation, shall remain valid & and its
implementation must be adjusted with this Minister's Regulation no later than 1 (one) year from the This
Ministerial Decree promulgated.
(2) Rencana
Reklamasi dan/atau rencana Pascatambang yang disampaikan oleh pemegang IUP
Operasi Produksi, Kontrak Karya, & Perjanjian Karya Pengusahaan
Pertambangan Batubara & belum mendapatkan persetujuan sebelum berlakunya
Peraturan Menteri ini, wajib diproses sesuai dengan ketentuan dalam Peraturan
Menteri ini.
(2) Reclamation Plan and/or the Mine Closure plan submitted by holders of The Mining
Permit of Production Operation, COW (Contract of Work), and Coal Mining Agreement & has not been
approved before the entry into force of this Minister's Regulation, shall be processed in accordance with the provisions of
this Minister's Regulation.
Pasal 73
Article 73
Pemegang IUP
Operasi Produksi, Kontrak Karya, & Perjanjian Karya Pengusahaan
Pertambangan Batubara yang telah menempatkan Jaminan Reklamasi atau Jaminan
Pascatambang sebelum berlakunya Peraturan Menteri ini, bentuk jaminannya wajib
disesuaikan dengan ketentuan dalam Peraturan Menteri ini paling lambat 1 (satu)
tahun sejak Peraturan Menteri ini diundangkan.
Holders of The Production
Operation, COW (Contract of Work), & Coal Mining Agreement which has been put Reclamation
Guarantee or Post-Mining Reclamation Guarantee prior to the enactment of this Minister's Regulation, in
the form of the guarantee shall be adjusted to the provisions of this Minister's Regulation no
later than 1 (one) year from the promulgation of this Minister's Regulation.
BAB XII
KETENTUAN PENUTUP
CHAPTER XII
CLOSING REGULATION
Pasal 74
Article 74
Pada saat
Peraturan Menteri ini mulai berlaku, Peraturan Menteri Energi & Sumber Daya
Mineral Nomor 18 Tahun 2008 tanggal 29 Mei 2008 tentang Reklamasi &
Penutupan Tambang, dicabut & dinyatakan tidak berlaku.
At the time this Minister's Regulation comes into force, the Minister of Energy and
Mineral Resources No. 18 of 2008 dated May 29th, 2008 on Reclamation & Mining Closure,
revoked & declared no longer valid.
Pasal 75
Article 75
Peraturan Menteri
ini mulai berlaku pada tanggal diundangkan.
This Minister's Regulation comes into force on the date of promulgation.
Agar setiap orang
mengetahuinya, memerintahkan pengundangan Peraturan Menteri ini dengan
penempatannya dalam Berita Negara Republik Indonesia.
For public cognizance, this Ministerial Regulation shall be promulgated in
the State Gazette of the Republic of Indonesia.
Ditetapkan di
Jakarta
Pada tanggal 28
Februari 2014
Enacted in Jakarta
On February 28th, 2014
Menteri Energi
& Sumber Daya Mineral
Republik
Indonesia,
Minister of Energy & Mineral Resources of Republic Of Indonesia,
ttd
Signed
JERO WACIK
Berita Negara
Republik Indonesia Tahun 2014 Nomor 274
News of the Republic of Indonesia of Year 2014 Number 274
LAMPIRAN I
ANNEX I
Peraturan menteri energi & sumber daya mineral republik
indonesia Nomor 07 tahun 2014
THE MINISTER'S REGULATION OF ENERGY & MINERAL RESOURCES OF THE REPUBLIC OF
INDONESIA NUMBER 07 YEAR 2014
Tentang
ABOUT
Pelaksanaan reklamasi & pascatambang pada kegiatan usaha
pertambangan mineral & batubara
IMPLEMENT RECLAMATION & POST MINING OF ACTIVITY AT MINING MINERAL & COAL
Pedoman penyusunan rencana reklamasi tahap eksplorasi
GUIDELINES FOR COMPOSE EXPLORATION STAGE RECLAMATION PLAN
Kerangka penyusunan dokumen rencana reklamasi tahap eksplorasi :
FRAMEWORK OF PLAN OF DOCUMENTS PREPARATION OF RECLAMATION OF PHASE OF EXPLORATION :
A. Kata pengantar.
A. INTRODUCTION.
B. DAFTAR
ISI.
B. TABLE OF CONTENTS.
C. BATANG TUBUH.
C. STEM OF BODY.
BAB I PENDAHULUAN.
CHAPTER I INTRODUCTION.
Bab ini mencakup uraian
singkat meliputi :
This chapter includes a brief description include :
1. Status pemegang
IUP atau IUPK.
1. Status of holder of The Mining Permit or The Especially Mining Permit.
a. Identitas
pemegang IUP atau IUPK (nama badan usaha/koperasi/perseorangan, alamat lengkap,
penanggung jawab rencana atau kegiatan).
a. Identity of holder of The Mining Permit or The Especially Mining Permit (name of
business entities / cooperatives / individual, full address, person in charge
of the plan or activity).
b. Uraian singkat
mengenai status perizinan (nomor, tanggal diterbitkan, masa berlaku, status
PMA/PMDN IUP atau IUPK).
b. A brief description of the status of licenses (number, date of issuance,
validity period, status of foreign / domestic investment of The
Mining Permit or The Especially Mining Permit).
2. Luas wilayah
IUP atau IUPK.
2. The total area of The Mining Permit or The Especially Mining Permit.
Uraian luas
wilayah dalam IUP atau IUPK yang direncanakan untuk kegiatan Eksplorasi.
Description of total area in The Mining Permit or The Especially Mining Permit planned for
exploration activities.
3. Persetujuan
Dokumen Lingkungan Hidup.
3. Approval of Environmental Document.
Uraian persetujuan
Dokumen Lingkungan Hidup dari instansi yang berwenang (nomor, tanggal, nama
instansi).
Description of Environmental Document from approval of authorized institutions (number, date, name
of institution).
4. Lokasi &
kesampaian wilayah.
4. The location & accomplished territory.
a. Uraian singkat
mengenai lokasi kegiatan Eksplorasi (desa, kecamatan, kabupaten/kota, provinsi,
posisi geografis) dilengkapi dengan peta situasi lokasi dengan ketelitian peta
skala minimal 1 : 25.000 (satu dibanding dua puluh lima ribu).
a. A brief description of the location of exploration activities (village,
sub-district, district/municipal, provincial, geographical position) is
equipped with a map of location situation to the nearest of map of scale of at least 1: 25,000 (one more than twenty-five
thousand).
b. Uraian singkat
mengenai sarana transportasi dari & ke lokasi kegiatan Eksplorasi.
b. A brief description of the means of transport from & to the
location of exploration activities.
5. Tata guna lahan
sebelum & sesudah kegiatan Eksplorasi.
5. Land use before & after exploration activities.
BAB II RENCANA
PEMBUKAAN LAHAN.
CHAPTER II PLAN OPENING OF LAND.
Bab ini mencakup
rencana pembukaan lahan selama kurun waktu Eksplorasi yang meliputi :
This chapter includes land clearing plan during the period of Exploration
that includes :
1. Kegiatan
Eksplorasi.
1. Exploration.
a. Uraian mengenai
kegiatan lapangan yang dilakukan, terdiri atas pemetaan geologi, pemetaan
topografi, penyelidikan geofisika, penyelidikan geokimia, pembuatan sumur uji, parit uji, pemboran,
pembuatan terowongan, & lain sebagainya.
a. Description of field activities were conducted, consisting of geological
mapping, topographic mapping, geophysics investigation, geochemical investigation, test wells making, trench
testing making, drilling, tunneling, & so forth.
b. Uraian mengenai
metode yang akan digunakan (geologi, geofisika seperti polarisasi terimbas,
potensial diri, seismik, gaya berat, geomagnet, sounding, side scan sonar
& lain sebagainya, geokimia endapan sungai, & batuan, parit uji, sumur
uji, pemboran) & peralatan yang akan digunakan dalam kegiatan eksplorasi,
b. Description of the methods to be used (geology, geophysics, such as
polarization induced, self potential, seismic, gravity, geomagnetic, sounding,
side scan sonar & so forth, geochemical of stream sediment, & rock, testing trench, test wells, drilling) & equipment which will
be used in exploration activities,
c. Uraian mengenai
lokasi & luas lahan yang digunakan untuk melakukan kegiatan pada setiap
metode.
c. A description of the location & the area of land used to perform activities on each
method.
2. Jalan.
2. Road.
Uraian mengenai
lokasi & luas lahan yang dibuka untuk pembuatan jalan.
A description of the location & area of land cleared for road construction.
3. Fasilitas
penunjang.
3. Supporting facilities.
Uraian mengenai
luas lahan & lokasi yang dibuka untuk digunakan sebagai perumahan (camp atau flying), bengkel, & fasilitas penunjang lainnya.
A description of the land & the location was opened for use as housing (camp or
flying), workshops, & other supporting facilities.
BAB III PROGRAM
REKLAMASI
CHAPTER III PROGRAM OF RECLAMATION
Bab ini mencakup
program Reklamasi tahap Eksplorasi terhadap lahan yang terganggu selama kurun
waktu Eksplorasi yang dirinci setiap tahun yang meliputi :
This chapter includes program of Reclamation of the Exploration
phase of disturbed land during the period of Exploration specified every year which include :
1. Lahan yang akan
direklamasi.
1. Land to be reclaimed.
Uraian mengenai
tahapan kegiatan Reklamasi pada lokasi & luas lahan terganggu yang akan
direklamasi meliputi :
The description of the stages of Reclamation activities at the location & area of
disturbed land will be reclaimed include :
a. Penataan
permukaan tanah (bekas kegiatan Eksplorasi & bekas fasilitas penunjang
Eksplorasi);
a. Structuring the surface of the ground (the former of Exploration
& former of Exploration supporting facilities);
b. Penimbunan
kembali lahan bekas kegiatan Eksplorasi (bekas lubang bor, kolam pemboran,
sumur uji, & parit uji).
b. Backfilling of mined land of Exploration activities (former of boreholes,
pond of drilling, testing well, & test trenches).
c. Pengendalian
erosi & pengelolaan air.
c. Erosion control & water management.
2. Teknik &
peralatan yang digunakan dalam Reklamasi.
2. Techniques & equipment used in Reclamation.
Uraian mengenai
teknik & peralatan yang digunakan untuk Reklamasi lahan.
The description of the techniques & equipment used for land Reclamation.
3. Revegetasi.
3. Revegetation.
Uraian mengenai
jenis tanaman & jumlah tanaman, jarak tanam, lokasi, & luas lahan yang
akan direvegetasi.
A description of the types of plants & the number of plants, plant spacing, location, & land area that will be
revegetated.
4. Pemeliharaan.
4. Maintenance.
Uraian mengenai
pemeliharaan lahan yang telah direklamasi, pemupukan, serta pemberantasan hama
& penyakit tumbuhan.
A description of the maintenance of the land has been reclaimed,
fertilization, and controlling pest and plant diseases.
BAB IV KRITERIA
KEBERHASILAN
CHAPTER IV CRITERIA FOR SUCCESS
Uraian mengenai
kriteria keberhasilan yang akan dicapai meliputi standar keberhasilan
penatagunaan lahan, revegetasi, & penyelesaian akhir.
A description of the criteria for success to be achieved include the
standard of success of land use, revegetation, & final settlement.
BAB V RENCANA
BIAYA REKLAMASI
CHAPTER V PLANS COST OF RECLAMATION
Bab ini memuat
rencana biaya yang diperlukan untuk mereklamasi lahan terganggu dirinci untuk
setiap tahun selama kurun waktu Eksplorasi.
This chapter contains the plan costs required to reclaim disturbed land
specified for each year during the period of Exploration.
Perhitungan biaya
Reklamasi terdiri atas :
Calculation of Reclamation costs consists of :
1. Biaya langsung.
1. Direct costs.
Uraian mengenai
biaya yang perlu dihitung dalam penyusunan rencana biaya Reklamasi yang
meliputi :
Description of the costs that need to be counted in the preparation of cost
plans of Reclamation which includes :
a. Biaya
penatagunaan lahan yang terdiri atas biaya :
a. Cost of land stewardship which consists of the cost of :
1). Penataan
permukaan tanah.
1). Structuring the surface of the ground.
2). Penimbunan
lahan bekas kegiatan Eksplorasi.
2). Hoarding former of land of Exploration activities.
3). Pengendailian
erosi & pengendalian air.
3). Erosion control & water control.
b. Biaya
revegetasi yang terdiri atas biaya :
b. Revegetation costs consist of the cost of :
1). Analisis
kualitas tanah;
1). Analysis of soil quality;
2) Pemupukan;
2) Fertilization;
3) Pengadaan
bibit;
3) Procurement of seedlings;
4) Penanaman;
4) Planting;
5) Pemeliharaan
tanaman.
5) Maintenance of the plant.
2. Biaya tidak
langsung.
2. Indirect costs.
Uraian mengenai
biaya yang harus dimasukkan dalam perhitungan Reklamasi & sedapat mungkin
ditetapkan dengan menggunakan standar acuan yang ditentukan sebagai berikut :
Description of the costs that should be included in the calculation of
Reclamation & wherever possible are established using the reference standard is
determined as follows :
a. Biaya
mobilisasi & demobilisasi alat sebesar 2,5% (dua koma lima persen) dari
biaya langsung atau berdasarkan perhitungan.
a. Mobilization & demobilization costs appliance of 2.5% (two point five
percent) of direct costs or by calculation.
b. Biaya
perencanaan Reklamasi sebesar 2% (dua persen) sampai dengan 10% (sepuluh
persen) dari biaya langsung;
b. Reclamation planning fee of 2% (two percent) to 10% (ten percent) of
direct costs;
c. Biaya
administrasi & keuntungan pihak ketiga sebagai pelaksana Reklamasi tahap
Eksplorasi sebesar 3% (tiga persen) sampai 14% (empat belas persen) dari biaya
langsung;
c. Administrative costs & profit of third parties as executor of Reclamation of Exploration phase of 3% (three percent) to 14% (fourteen
percent) of the direct cost;
d. Biaya supervisi
sebesar 2% (dua persen) sampai dengan 7% (tujuh persen) dari biaya langsung.
d. Supervision fee of 2% (two percent) to 7% (seven percent) of direct
costs.
3. Total biaya.
3. The total of cost.
Uraian mengenai
total biaya langsung ditambah dengan biaya tidak langsung & biaya tersebut
sudah harus memperhitungkan pajak yang berlaku & dibuat dalam mata uang Rupiah atau Dolar Amerika Serikat.
Description of the total of direct costs plus indirect costs & the cost of
the already must take into account any applicable taxes & are made in
rupiah or US Dollars.
D. DAFTAR
LAMPIRAN.
D. APPENDIX LIST.
1. Peta situasi
rencana pembukaan lahan dengan ketelitian peta skala minimal 1:10.000 (satu
banding sepuluh ribu).
1. Map of the situation of land clearing plan with precision of map in scale of at
least 1: 10,000 (one in ten thousand).
2. Peta situasi
rencana Reklamasi dengan ketelitian peta skala minimal 1:10.000 (satu banding
sepuluh ribu).
2. Map of the situation of Reclamation plan with precision of map in scale of at
least 1: 10,000 (one in ten thousand).
Keterangan :
Jika wilayahnya sangat
luas dan/atau terdiri dari beberapa blok Eksplorasi, sehingga tidak dapat
digambarkan dalam 1 (satu) peta untuk setiap tahun, maka dapat digambarkan
dalam beberapa lembar peta & dilengkapi dengan peta indeks.
Specification :
If the area is very extensive and/or consists of several Exploration
blocks, so it can not be described in 1 (one) map for each year, then it can be
described in a few pieces of the map & is equipped with an index map.
E. DAFTAR TABEL.
E. LIST OF TABLES.
1. Tabel 1 Rencana
Reklamasi Tahap Eksplorasi.
1. Table 1 Exploration Phase Reclamation Plan.
2. Tabel 2 Rencana
Biaya Reklamasi Tahap Eksplorasi.
2. Table 2 Plan of Reclamation Cost of Phase of Exploration.
TABEL 1
RENCANA REKLAMASI
TAHAP EKSPLORASI
PERIODE TAHUN :
......... s.d. ........*)
TABLE 1
RECLAMATION PLAN OF EXPLORATION STAGE
YEAR: ......... s.d. ........ *)
Keterangan :
Specification:
*) contoh
*) Example
Referensi :
Reference :
1. Peraturan
Menteri Energi & Sumber Daya Mineral Nomor : 07 Tahun 2014 tentang
Pelaksanaan Reklamasi & Pascatambang pada Kegiatan Usaha Pertambangan
Mineral & Batubara, Direktorat Jenderal Mineral & Batubara, Direktorat
Teknik & Lingkungan Mineral & Batubara.
1. Regulation of the Minister of Energy and Mineral Resources Number 07
Year 2014 on the Implementation of Reclamation and Mine Closure on Business
Activities of Mineral and Coal, Directorate General of Mineral and Coal,
Engineering & Environment Directorate of Mineral & Coal.
TABEL 2
RENCANA BIAYA
REKLAMASI TAHAP EKSPLORASI
PERIODE TAHUN :
......... s.d. ........*)
TABLE 2
PLAN OF RECLAMATION COSTS OF EXPLORATION STAGE
YEAR: ......... to ........ *)
*) contoh
Tentang
5. Tata guna lahan sebelum & sesudah kegiatan tahap Operasi Produksi.
Uraian mengenai tata guna lahan sebelum & sesudah dilakukan kegiatan Operasi Produksi.
Uraian mengenai total biaya langsung ditambah dengan biaya tidak langsung & biaya tersebut sudah harus memperhitungkan pajak yang berlaku & dibuat dalam mata uang Rupiah atau Dolar Amerika Serikat.
1. Tabel 1 Rencana Reklamasi Tahap Operasi Produksi.
PLAN OF RECLAMATION COSTS OF EXPLORATION STAGE
YEAR: ......... to ........ *)
Keterangan :
Specification :
*) contoh
*) Example
**1) besarnya 2,5%
dari biaya langsung berdasarkan perhitungan
** 1) the amount of 2.5% of the direct cost based
calculation
**2) besarnya 2% -
10% dari biaya langsung
** 2) the amount of 2% - 10% of the direct costs
**3) besarnya 3% -
14% dari biaya langsung
** 3) the amount of 3% - 14% of the direct costs
**4) besarnya 2% -
7% dari biaya langsung
** 4) the amount of 2% - 7% of direct costs
Lampiran ii
ANNEX II
Peraturan menteri energi & sumber daya mineral republik
indonesia
Nomor 07 tahun 2014
THE REGULATION OF MINISTER OF ENERGY & MINERAL
RESOURCES OF THE REPUBLIC OF INDONESIA NUMBER 07 YEAR 2014
Tentang
ABOUT
Pelaksanaan reklamasi & pascatambang pada kegiatan usaha
pertambangan mineral & batubara
RECLAMATION ACTIVITY & POST-MINING AT MINERAL & COAL MINING
Pedoman penyusunan rencana reklamasi tahap operasi produksi
GUIDELINES OF RECLAMATION PLAN OF PRODUCTION OPERATION STAGE
Kerangka penyusunan dokumen rencana reklamasi tahap operasi produksi
FRAMEWORK OF DOCUMENTS PREPARATION OF RECLAMATION PLAN
OF PRODUCTION OPERATION STAGE
A. Kata pengantar
A. INTRODUCTION
B. Daftar isi
B. TABLE OF CONTENTS
C. Batang tubuh
C. ROD OF BODY
Bab i pendahuluan
CHAPTER I INTRODUCTION
Bab ini mencakup
uraian singkat meliputi :
This chapter includes a brief description include
:
1. Status pemegang
IUP & IUPK.
1. Status of holder of The Mining Permit & The
Especially Mining Permit.
a. Identitas
pemegang IUP atau IUPK (nama badan usaha / koperasi / perseorangan, alamat
lengkap, penanggung jawab rencana atau kegiatan).
a. Identity of holder of The Mining Permit or The
Especially Mining Permit (name of entities of business / cooperatives /
individual, full address, person in charge of the plan or activity).
b. Uraian singkat
mengenai status perizinan (nomor, tanggal diterbitkannya, masa berlaku, status
PMA/PMDN IUP atau IUPK).
b. A brief description of the status of licenses
(number, date of issuance, validity period, status of foreign / domestic
investment The Mining Permit or The Especially Mining Permit).
2. Luas wilayah
IUP atau IUPK & fasilitas penunjang di luar wilayah IUP atau IUPK (project area).
2. The total area of The Mining Permit or The
Especially Mining Permit and supporting facilities outside The Mining Permit or
The Especially Mining Permit (project area).
a. Uraian luas
wilayah dalam IUP atau IUPK yang direncanakan untuk kegiatan Operasi Produksi
& fasilitas penunjang;
a. Description of area in The Mining Permit or The
Especially Mining Permit planned for Production Operation& support
facilities;
b. Uraian luas
fasilitas penunjang di luar wilayah IUP atau IUPK yang digunakan untuk menunjang
kegiatan Operasi Produksi (project area).
b. Broad Outline of supporting facilities outside
The Mining Permit or The Especially Mining Permit used to support the
activities of Production Operations (project area).
3. Persetujuan
Dokumen Lingkungan Hidup.
3. Approval of Environmental Document.
Uraian persetujuan
Dokumen Lingkungan Hidup dari instansi yang berwenang (nomor, tanggal, nama
instansi).
Description of Environmental Document approval of
authorized institutions (number, date, name of institution).
4. Lokasi &
kesampaian wilayah.
4. The location & accomplished territory.
a. Uraian singkat
mengenai lokasi kegiatan Operasi Produksi (desa, kecamatan, kabupaten/kota,
provinsi, posisi geografi) dilengkapi dengan peta situasi lokasi tambang dengan
ketelitian peta skala minimal 1:25.000 (satu dibanding dua puluh lima ribu);
a. A brief description of the location of
Production Operations (village, sub-district, district / municipal, provincial,
geographical position) is equipped with a map of the mine situation with
precision of map in scale of at least 1: 25,000 (one more than twenty-five
thousand);
b. Uraian singkat
mengenai sarana transportasi dari dan ke lokasi kegiatan Operasi Produksi.
b. A brief description of the means of
transportation to and from the location of Production Operations.
5. Tata guna lahan sebelum & sesudah kegiatan tahap Operasi Produksi.
5. Land use before & after the activities of
production operation stage.
Uraian mengenai tata guna lahan sebelum & sesudah dilakukan kegiatan Operasi Produksi.
A description of the land use before & after
the activities of production operation.
BAB II RENCANA
PEMBUKAAN LAHAN.
CHAPTER II PLAN OPENING OF LAND.
Bab ini mencakup
rencana pembukaan lahan untuk kurun waktu 5 (lima) tahun atau sesuai dengan
umur tambang yang meliputi :
This chapter includes land clearing plan for a
period of 5 (five) years or in accordance with a mine life which include:
1. Area
penambangan.
1. The mining area.
a. Uraian mengenai
lokasi & luas penyebaran cadangan, metode penambangan, peralatan yang
digunakan, lokasi, & luas lahan yang digunakan untuk Penambangan;
a. A description of the location & broad of dissemination
of reserves, mining methods, equipment used, the location, & the area of
land used for mining;
b. Uraian mengenai
rencana produksi, stripping ratio, dan lain-lain.
b. A description of the production plan, stripping
ratio, and others.
2. Timbunan.
2. Fill.
a. Uraian mengenai
lokasi & luas lahan yang digunakan untuk :
a. A description of the location & the area of
land used for:
1) Penimbunan
tanah zona pengakaran;
1) Piling soil of rooting zone;
2) Penimbunan
batuan samping dan/atau tanah/batuan penutup di dalam & di luar tambang.
2) Accumulation
ofside rock and/or cover soil/rock inside & outside the mine.
b. Uraian mengenai
luas lahan & lokasi yang digunakan untuk penimbunan komoditas tambang;
b. A description of the land area & the
locations used for hoarding mining commodities;
c. Uraian mengenai
lokasi & luas lahan yang digunakan untuk penimbunan/penyimpanan limbah
fasilitas penunjang.
c. A description of the location & the area of
land used for landfilling / waste storage of supporting facilities.
3. Jalan.
3. Road.
Uraian mengenai
lokasi & luas lahan yang dibuka untuk pembuatan jalan tambang dan/atau
jalan angkut.
A description of the location & area of land
cleared for mining road construction and/or road of transport.
4. Kolam sedimen.
4. Sediment swimming.
Uraian mengenai
lokasi & luas lahan yang dibuka untuk pembuatan kolam sedimen.
A description of the location & size of land
opened for the manufacture of sediment pond.
5. Fasilitas
penunjang.
5. Supporting facilities.
Uraian mengenai
lokasi & luas lahan yang dibuka untuk digunakan sebagai instalasi &
fasilitas pengolahan dan/atau pemurnian, kantor, perumahan (camp atau flying camp), bengkel, & fasilitas penunjang lainnya.
A description of the location & area of land
cleared for use as plant & facilities of processing and/or purification,
office, residential (camp or flying camp), workshops, & other supporting
facilities.
BAB III PROGRAM
REKLAMASI
CHAPTER III PROGRAM OF RECLAMATION
Bab ini mencakup
program Reklamasi tahap Operasi Produksi terhadap lahan yang terganggu dalam
jangka waktu 5 (lima) tahun atau sesuai dengan umur tambang yang dirinci setiap
tahun yang meliputi :
This chapter includes program of Reclamation of
Production Operation stage of the disturbed land within a period of 5 (five)
years or in accordance with a mine life specified every year which include:
1. Lahan yang akan
direklamasi.
1. Land to be reclaimed.
Uraian mengenai tahapan
kegiatan Reklamasi pada lokasi & luas lahan terganggu yang akan direklamasi
meliputi :
The description of the stages of Reclamation
activities at the location & area of disturbed land will be reclaimed
include:
a. Lahan bekas
tambang.
a. Mined land.
b. Penimbunan
batuan samping dan/atau tanah/batuan penutup di luar tambang;
b. Dump side rock and/or cover soil/rock outside
the mine;
c. Jalan tambang
dan/atau jalan angkut yang tidak digunakan lagi.
c. Mining roads and/or transport road are not used
again.
d. Bekas kolam
sedimen; dan
d. Former sediment pond; and
e. Fasilitas
penunjang lainnya.
e. Other supporting facilities.
2. Teknik &
peralatan yang akan digunakan dalam Reklamasi.
2. Techniques & equipment to be used in
Reclamation.
Uraian mengenai
teknik & peralatan yang digunakan untuk Reklamasi lahan.
The description of the techniques & equipment
used for land Reclamation.
3. Penatagunaan
lahan.
3. The land-use plans.
Uraian mengenai
rencana kegiatan penatagunaan lahan pada lahan bekas tambang & di luar
bekas tambang, meliputi lokasi & luas serta uraian mengenai jenis, lokasi
asal material, & volume sumber material pengisi (apabila dilakukan back filling).
A description of the plan of land use activities
on mined land & outside the former quarry, includes the location & area
as well as a description of the type, the location of origin of material, &
the volume of filler material source (if done back filling).
4. Revegetasi.
4. revegetation.
Uraian mengenai
jenis tanaman & jumlah tanaman, jarak tanam, lokasi, & luas lahan yang
akan direvegetasi.
A description of the types of plants & the
number of plants, plant spacing, location, & land that will be revegetated.
5. Pekerjaan sipil
sesuai peruntukan lahan Pascatambang.
5. Civil Work appropriate land use of Post-Mining.
Uraian mengenai
kegiatan penatagunaan lahan beserta lokasi & luasannya yang peruntukannya
bukan revegetasi (contoh : area permukiman, kawasan industri, pariwisata, &
lain-lain).
A description of the activities of land use and
its location & its range is not intended revegetation (eg, residential
areas, industrial zones, tourism, & others).
6. Rencana
pemanfaatan lubang bekas tambang (void).
6. Plan for the use of pits (void).
Uraian detil
mengenai rencana Reklamasi pada lahan bekas tambang berupa lubang bekas tambang
(void) yang meliputi :
Detailed description of the plan on mined land
Reclamation in the form of pits (voids) which includes:
a. Stabilisasi
lereng;
a. Slope stabilization;
b. Pengamanan
lubang bekas tambang (void);
b. Securing pits (void);
c. Pemulihan &
pemantauan kualitas air serta pengelolaan air dalam lubang bekas tambang (void) sesuai dengan peruntukannya; dan
c. Recovery & monitoring of water quality and
water management in the pits (voids) in accordance with its designation; and
d. Pemeliharaan
lubang bekas tambang (void).
d. Maintenance of pits (void).
7. Pemeliharaan.
7. Maintenance.
Uraian mengenai
pemeliharaan lahan yang telah direklamasi, pemupukan, pemberantasan hama &
penyakit tumbuhan, serta upaya menjaga kestabilan lereng.
A description of the maintenance of the land has
been reclaimed, fertilization, control of pest & plant diseases, as well as
efforts to maintain the stability of the slope.
BAB IV KRITERIA
KEBERHASILAN.
CHAPTER IV CRITERIA FOR SUCCESS.
Uraian mengenai
kriteria keberhasilan Reklamasi meliputi standar keberhasilan penatagunaan
lahan, revegetasi, pekerjaan sipil, & penyelesaian akhir.
A description of the success criteria of
Reclamation include standards of success of land use, revegetation, civil
works, & final settlement.
BAB V RENCANA
BIAYA REKLAMASI.
CHAPTER V PLANS RECLAMATION COSTS.
Bab ini memuat
rencana biaya yang diperlukan untuk mereklamasi lahan yang terganggu dirinci
untuk setiap tahun untuk jangka waktu 5 (lima) tahun atau sesuai dengan umur
tambang.
This chapter contains the plan of costs required
to reclaim disturbed land specified for each year for a period of 5 (five)
years or in accordance with a mine life.
Perhitungan biaya
Reklamasi terdiri atas :
Calculation of Reclamation costs consists of :
1. Biaya langsung.
1. Direct costs.
Uraian mengenai
biaya yang perlu dihitung dalam penyusunan rencana biaya Reklamasi yang
meliputi :
Description of the costs that need to be counted in
the preparation of cost plans of Reclamation which includes :
a. Biaya
penatagunaan lahan, terdiri atas biaya :
a. Cost of land use, consisting of the cost of :
1) Penataan
permukaan tanah;
1) Arrangement of the soil surface;
2) Penebaran tanah
pucuk;
2) Spreading of top soil;
3) Pengendalian
erosi & pengelolaan air.
3) Control of erosion & water management.
b. Biaya
revegetasi, terdiri atas biaya :
b. Revegetation costs, consisting of costs :
1) Analisis
kualitas tanah;
1) Analysis of soil quality;
2) Pemupukan;
2) Fertilization;
3) Pengadaan
bibit;
3) Procurement of seedlings;
4) Penanaman;
4) Planting;
5) Pemeliharaan
tanaman.
5) Maintenance of the plant.
c. Biaya
pencegahan & penanggulangan air asam tambang.
c. The cost of prevention & mitigation of acid
mine drainage.
d. Biaya pekerjaan
sipil sesuai peruntukan lahan Pascatambang; dan/atau
d. The cost of civil works corresponding land
use of Mine Closure; and/or
e. Biaya
pemanfaatan lubang bekas tambang (void),
terdiri atas biaya :
e. Costs of utilization of pits (void), consists
of the cost of :
1) Stabilisasi
lereng;
1) Stabilization of the slope;
2) Pengamanan
lubang bekas tambang (void);
2) Security pits (void);
3) Pemulihan &
pemantauan kualitas air serta pengelolaan air dalam lubang bekas tambang (void) sesuai dengan peruntukannya; dan
3) Restoration & monitoring of water quality
& water management in the pits (voids) in accordance with its designation;
and
4) Pemeliharaan
lubang bekas tambang (void).
4) Maintenance of pits (void).
2. Biaya tidak
langsung.
2. Indirect costs.
Uraian mengenai
biaya yang harus dimasukkan dalam perhitungan Reklamasi & sedapat mungkin
ditetapkan dengan menggunakan standar acuan yang ditentukan sebagai berikut :
Description of the costs that should be included
in the calculation of Reclamation & wherever possible are established using
the reference standard is determined as follows:
a. Biaya
mobilisasi & demobilisasi alat sebesar 2,5% (dua koma lima persen) dari
biaya langsung atau berdasarkan perhitungan.
a. Mobilization & demobilization costs of
appliance of 2.5% (two point five percent) of direct costs or by calculation.
b. Biaya
perencanaan Reklamasi sebesar 2% (dua persen) sampai dengan 10% (sepuluh
persen) dari biaya langsung;
b. Reclamation planning fee of 2% (two percent) to
10% (ten percent) of direct costs;
c. Biaya
administrasi & keuntungan pihak ketiga sebagai pelaksana Reklamasi tahap
Operasi Produksi sebesar 3% (tiga persen) sampai dengan 14% (empat belas
persen) dari biaya langsung;
c. Administrative costs & profit of third
parties as the executor of Reclamation of stage of Production Operation at 3%
(three percent) to 14% (fourteen percent) of direct costs;
d. Biaya supervisi
sebesar 2% (dua persen) sampai dengan 7% (tujuh persen) dari biaya langsung.
d. Supervision fee of 2% (two percent) to 7%
(seven percent) of direct costs.
3. Total Biaya.
3. Total Cost.
Uraian mengenai total biaya langsung ditambah dengan biaya tidak langsung & biaya tersebut sudah harus memperhitungkan pajak yang berlaku & dibuat dalam mata uang Rupiah atau Dolar Amerika Serikat.
Description of the total direct costs plus
indirect costs & the cost of the already must take into account any
applicable taxes & are made in Rupiah or US Dollar.
D. DAFTAR
LAMPIRAN.
D. APPENDIX LIST.
1. Peta situasi
rencana pembukaan lahan dengan ketelitian peta skala minimal 1:10.000 (satu
banding sepuluh ribu);
1. Map of the situation of land clearing plan with
precision of map in scale of at least 1: 10,000 (one in ten thousand);
2. Peta situasi
rencana reklamasi dengan ketelitian peta skala minimal 1:10.000 (satu banding
sepuluh ribu).
2. Map of the situation of Reclamation plan with
precision of map in scale of at least 1: 10,000 (one in ten thousand).
Keterangan :
Specification :
Jika wilayahnya
sangat luas dan/atau terdiri dari beberapa blok penambangan/produksi, sehingga
tidak dapat digambarkan dalam 1 (satu) peta untuk setiap tahun, maka dapat
digambarkan dalam beberapa lembar peta & dilengkapi dengan peta indeks.
If the area is very extensive and /or consists of
several blocks of mining / production, so it can not be described in 1 (one)
map for each year, then it can be described in a few pieces of the map & is
equipped with an index map.
E. DAFTAR TABEL.
E. LIST OF TABLES.
1. Tabel 1 Rencana Reklamasi Tahap Operasi Produksi.
1. Table 1 Production Operations Phase Reclamation
Plan.
2. Tabel 2 Rencana
Biaya Reklamasi Tahap Operasi Produksi.
2. Table 2 Reclamation Fee Plan of Phase of
Production Operations.
TABEL 1
RENCANA REKLAMASI
TAHAP OPERASI PRODUKSI
PERIODE TAHUN :
....... s.d. .......*)
TABLE 1
RECLAMATION PLAN OF STAGE OF PRODUCTION OPERATIONS
YEAR
PERIOD : ....... to ....... *)
TABEL 2
RENCANA BIAYA
REKLAMASI TAHAP OPERASI PRODUKSI
PERIODE TAHUN :
....... s.d. ...... *)
TABLE 2
PLAN OF RECLAMATION OF PRODUCTION OPERATION STAGE
YEAR PERIOD: ....... to ...... *)
Keterangan :
Specification :
*) contoh
*) Example
**1) besarnya 2,5%
dari biaya langsung atau berdasarkan perhitungan.
** 1) the amount of 2.5% of the direct costs or by calculation.
**2) besarnya 2% -
10% dari biaya langsung
** 2) the amount of 2% - 10% of the direct costs
**3) besarnya 3% -
14% dari biaya langsung.
** 3) the amount of 3% - 14% of direct costs.
**4) besarnya 2% -
7% dari biaya langsung
** 4) the amount of 2% - 7% of direct costs
Lampiran iii
APPENDIX III
Peraturan menteri energi & sumber daya mineral republik
indonesia Nomor 07 tahun 2014
THE REGULATION OF MINISTER OF ENERGY & MINERAL RESOURCES OF THE REPUBLIC OF
INDONESIA NUMBER 07 YEAR 2014
Tentang
ABOUT
Pelaksanaan reklamasi & pascatambang pada kegiatan usaha
pertambangan mineral & batubara
IMPLEMENT RECLAMATION & POST-MINING AT MINERAL & COAL
MINING
Pedoman penyusunan rencana pascatambang
GUIDELINES OF COMPILATION OF MINE CLOSURE PLAN
Kerangka penyusunan dokumen rencana pascatambang
FRAMEWORK OF COMPILATION OF POST-MINING PLAN DOCUMENTS
A. Kata pengantar.
A. INTRODUCTION.
B. Intisari.
B. ABSTRACT.
C. Daftar isi.
C. CONTENTS LIST.
D. Batang tubuh.
D. STEM OF BODY.
Bab i pendahuluan
CHAPTER I INTRODUCTION
1. Latar belakang,
meliputi,
1. Background, covers,
a. Identitas pemegang
IUP atau IUPK (nama badan usaha / koperasi / perseorangan, alamat lengkap,
penanggung jawab rencana atau kegiatan).
a. Identity of holder of The Mining Permit or The Especially Mining Permit (name of
business entities / cooperatives / individual, full address, person in charge
of the plan or activity).
b. Uraian singkat
mengenai peraturan perundang-undangan yang berkaitan dengan kegiatan
Pascatambang; dan
b. A brief description of the legislation relating to the Mine Closure
activities; and
c. Uraian singkat
mengenai status perizinan (nomor, tanggal diterbitkannya, masa berlaku, status
PMA/PMDN IUP atau IUPK).
c. A brief description of the status of
licenses (number, date of issuance, validity period, status of foreign /
domestic investment of The Mining Permit or The
Especially Mining Permit).
d. Maksud &
tujuan.
d. Intent and purpose.
e. Pendekatan
& ruang lingkup.
e. Approach and scope.
BAB II PROFIL
WILAYAH.
CHAPTER II PROFILE OF AREAS.
Sekurang-kurangnya
meliputi hal-hal sebagai berikut :
At least include the following matters :
1. Lokasi &
kesampaian wilayah.
1. Location & accomplished territory.
a. Uraian singkat
mengenai lokasi kegiatan Operasi Produksi (desa, kecamatan, kabupaten/kota,
provinsi, & posisi geografi), dilengkapi dengan peta situasi lokasi tambang
dengan ketelitian peta skala minimal 1:25.000 (satu banding dua puluh lima
ribu); dan
a. A brief description of the location of Production Operations (village,
sub-district, district/municipal, provincial, & geographic position), equipped with a map of the mine location situation with
precision of map in scale of at least 1: 25,000 (one to twenty five thousand); and
b. Uraian singkat
mengenai sarana perhubungan dari dan ke lokasi kegiatan Operasi Produksi.
b. A brief description of the means of transportation to and from the
location of Production Operations.
2. Kepemilikan
& peruntukan lahan.
2. Ownership & land use.
Uraian rinci
mengenai status kepemilikan & peruntukan lahan di dalam WIUP atau WIUPK
dilengkapi dengan peta peruntukan lahan dengan skala minimal 1:25.000 (satu
dibanding dua puluh lima ribu).
A detailed description of the status of ownership & land use in The Area of
Mining Permit or The Area of Especially Mining Permit equipped with maps of land use with a minimum scale of
1: 25,000 (one more than twenty-five thousand).
3. Rona lingkungan
awal.
3. "Rona (in Bahasa)" of early environment.
Uraian rinci
mengenai rona lingkungan hidup awal yang diperkirakan terkena dampak serta
telaahan komponen lingkungan yang terkena dampak, meliputi :
A detailed description of the initial environmental baseline studied as well as estimated affected and
component research of environmental affected, include :
a. Peruntukan
lahan;
a. Land use;
b. Morfologi
dilengkapi peta dengan ketelitian peta skala minimal 1:25.000 (satu banding dua
puluh lima ribu);
b. Morphology is equipped with map with a precision of map in scale of at least 1: 25,000 (one to twenty five
thousand);
c. Air permukaan
(sungai, danau, & rawa);
c. Surface water (rivers, lakes, & swamps);
d. Air tanah;
d. Groundwater;
e. Biologi akuatik
& teresterial; dan
e. Aquatic & terrestrial biology; and
f. Sosial, budaya,
& ekonomi (demografi, mata pencaharian, kesehatan, pendidikan, dan
lain-lain).
f. Social, cultural, & economic (demographic, livelihood, health, education,
etc.).
4. Kegiatan lain
di sekitar tambang.
4. Other activities in the vicinity of the mine.
Uraian rinci
mengenai kegiatan lain yang berada di sekitar tambang dilengkapi dengan peta
situasi dengan skala minimal 1:25.000 (satu banding dua puluh lima ribu).
A detailed description of the other activities that are in the vicinity of
the mine is equipped with a map of the situation with a minimum scale of 1:
25,000 (one to twenty five thousand).
BAB III DESKRIPSI
KEGIATAN PERTAMBANGAN.
CHAPTER III DESCRIPTION OF MINING ACTIVITIES.
1. Keadaan
cadangan awal.
1. The state of early reserve.
Uraian rinci
mengenai cadangan komoditas tambang pada awal kegiatan dan/atau pada saat
dokumen ini disusun yang meliputi penyebaran, jumlah, kadar dan klasifikasi,
serta karakteristik geokimia batuan samping dan/atau tanah/batuan penutup.
A detailed description of the mining commodity reserves at the start of activities and/or at
the time of documen wrote that includes deployment, quantity, grade and classification, as well as
the geochemical characteristics of the rock side and/or cover soil/rock.
2. Sistem &
Metode Penambangan.
2. The System & Method of Mining.
Uraian rinci
mengenai sistem & metode penambangan, persiapan penambangan, jadwal
penambangan, tingkat produksi & umur tambang, penanganan tanah zona
pengakaran, batuan samping dan/atau tanah/batuan penutup, & air asam
tambang serta upaya pengendalian erosi dan sedimentasi.
A detailed description of the system & method of mining, preparation of mining, mining
schedules, production levels & the life of mine, handling rooting zone ground, next to the
rock and/or cover soil/rock cover, & acid mine drainage and erosion and sedimentation control
measures.
3. Pengolahan
dan/atau pemurnian.
3. Processing and/or purification.
Uraian rinci
mengenai kegiatan pengolahan dan/atau pemurnian komoditas tambang yang meliputi
proses, jenis, & jumlah pemakaian reagen, serta jumlah & upaya
pengendalian erosi & sedimentasi.
A detailed description of the activities of processing and/or purification of mining commodities which include
process, type, & number of reagent usage, as well as the number & efforts to
control erosion & sedimentation.
4. Fasilitas
penunjang.
4. Supporting facilities.
Uraian rinci
mengenai fasilitas penunjang yang telah dan/atau akan dibangun, antara lain
kantor, mess, gudang, sekolah, rumah sakit / poliklinik, laboratorium,
transmisi tegangan tinggi, tangki bahan bakar minyak, tempat ibadah, jembatan,
jalan, tangki air, pelabuhan/dermaga, bandara, rel kereta api, jalur kabel,
jalur pipa, jalur conveyor, dam/bendungan,
beserta informasi lokasi, ukuran, konstruksi serta dilengkapi peta situasi
dengan skala minimal 1:25.000 (satu banding dua puluh lima ribu).
A detailed description of the support facilities that have been and/or will
be built, among other offices, living quarters, warehouses, schools, hospitals
/ clinics, laboratories, high-voltage transmission, fuel oil tanks, places of
worship, bridges, roads, water tanks, harbor / docks, airports, railroads,
cable lines, pipelines, conveyor lines, dam, along with information about the location, size,
construction and equipped with the situation map in scale of at
least 1: 25,000 (one to twenty five thousand).
BAB IV RONA
LINGKUNGAN AKHIR LAHAN PASCATAMBANG.
CHAPTER IV FINAL ENVIRONMENTAL BASELINE OF POST-MINING LAND.
1. Keadaan
cadangan tersisa.
1. The state of the remaining reserves.
Uraian rinci
mengenai cadangan komoditas tambang yang tersisa setelah umur tambang berakhir
sebelum daerah tersebut ditinggalkan;
A detailed description of the mines commodity reserves in remaining after mine life ends before the area is
abandoned;
2. Peruntukan
lahan.
2. Appropriation of land.
Uraian rinci
mengenai peruntukan lahan setelah umur tambang berakhir.
A detailed description of the land use after the end of mine life.
3. Morfologi.
3. Morphology.
Uraian rinci
mengenai prediksi kondisi morfologi akhir setelah umur tambang berakhir.
A detailed description of the predictions of the end morphological
conditions after the mine life ends.
4. Air permukaan
& air tanah.
4. Surface water & groundwater.
Uraian rinci
mengenai prediksi kondisi kualitas air sungai, danau, rawa, dan kondisi air
tanah setelah umur tambang berakhir.
A detailed description of the prediction of water quality conditions of the
river, lakes, wetlands, and groundwater conditions after the end of mine life.
5. Biologi akuatik
& teresterial.
5. Biology of aquatic & terrestrial.
a. Uraian rinci
mengenai prediksi kondisi flora akuatik & teresterial setelah umur tambang
berakhir; dan
a. A detailed description of the predictions of the aquatic & terrestrial
flora conditions after the end of mine life; and
b. Uraian rinci
mengenai prediksi kondisi fauna akuatik & teresterial setelah umur tambang
berakhir.
b. A detailed description of the predictions of aquatic & terrestrial
fauna condition after the end of mine life.
6. Sosial, budaya,
& ekonomi.
6. Social, cultural, & economic.
Uraian rinci
mengenai prediksi kondisi sosial, budaya, & ekonomi masyarakat setempat
pada saat umur tambang berakhir.
A detailed description of the predictions of social, cultural, & economic of community
during mine life ends.
BAB V HASIL
KONSULTASI DENGAN PEMANGKU KEPENTINGAN (STAKEHOLDER)
CHAPTER V RESULTS OF CONSULTATION WITH STAKEHOLDERS
Uraian rinci
mengenai konsultasi (tanggapan, saran, pendapat, & pandangan) dengan pihak
yang berkepentingan terhadap rencana Pascatambang, termasuk rencana alih
pengelolaan fasilitas tambang kepada Pemangku Kepentingan & perubahan
rencana peruntukan lahan.
A detailed description of the consultation (comments, suggestions,
opinions, & views) with interested parties on Mine Closure plans, including the plan
over the management of mining facilities to Stakeholders & change the
land use plan.
BAB VI PROGRAM
PASCATAMBANG.
CHAPTER VI PROGRAM OF POST-MINING.
1. Reklamasi pada
lahan bekas tambang & lahan di luar bekas tambang.
1. reclamation on mined land & land outside the former quarry.
a. Tapak bekas
tambang.
a. Tread of former quarry.
Uraian rinci
mengenai rencana lokasi & luas lahan tapak bekas tambang yang akan ditutup
yang meliputi kegiatan :
A detailed description of the planned of location & land area of footprint of ex-mining to be closed which includes the
following activities :
1) Pembongkaran
fasilitas tambang;
1) Demolition of mine facilities;
2) Reklamasi lahan
bekas fasilitas tambang;
2) Reclamation of land of former mine facilities;
3) Pembongkaran
& Reklamasi jalan tambang;
3) Demolition & Reclamation of mining road;
4) Reklamasi lahan
bekas tambang permukaan;
4) Reclamation of surface mined land;
5) Reklamasi lahan
bekas kolam pengendap; dan
5) Reclamation of land of former settling ponds; and
6) Pengamanan
semua lahan bekas tambang dengan sistem tambang bawah tanah yang berpotensi
bahaya terhadap manusia (shaft, raise, stope, adit, decline, pit, tunnel, final void, dan lain-lain).
6) Securing all mined lands with a system of underground mine in potential be danger to
humans (shafts, raises, stope, adit, decline, pit, tunnel, the final void, and
others).
b. Fasilitas
pengolahan dan/atau pemurnian.
b. Facilities of processing and/or purification.
Uraian rinci
mengenai rencana lokasi & luas lahan pada fasilitas pengolahan dan/atau pemurnian
yang meliputi kegiatan :
A detailed description of the location plan & land area at facilities of processing and/or purification which includes the following
activities :
1) Pembongkaran
fasilitas pengolahan dan/atau pemurnian;
1) Demolition of facilities of processing and/or purification;
2) Reklamasi lahan
bekas fasilitas pengolahan dan/atau pemurnian;
2) Reclamation of the former land of facilities of processing and/or purification;
3) Reklamasi lahan
bekas kolam tailing & upaya
stabilisasinya;
3) Reclamation of the former land of the tailings pond & its
stabilization efforts;
4) Reklamasi lahan
bekas timbunan komoditas tambang;
4) Reclamation of former land of mining commodities heap;
5) Pemulihan
(remediasi) tanah yang terkontaminasi bahan kimia, minyak, serta bahan
berbahaya & beracun & limbah bahan berbahaya & beracun.
5) Recovery (remediation) of contaminated soil of chemicals, oil
& hazardous and toxic materials & hazardous & toxic materials waste.
c. Fasilitas
penunjang.
c. Supporting facilities.
Uraian rinci
mengenai rencana lokasi & luas lahan serta kegiatan yang meliputi :
A detailed description of the planned
location & land area as well as activities that include :
1) Reklamasi lahan
bekas landfill;
1) Reclamation of former land of landfill;
2) Pembongkaran
sisa-sisa bangunan, transmisi listrik, pipa, pelabuhan (udara & air), &
fasilitas lainnya;
2) Demolition of the remains of buildings, power transmission, pipelines,
ports (air & water), & other facilities;
3) Reklamasi lahan
bekas bangunan, transmisi listrik, pipa, pelabuhan (udara & air), &
fasilitas lainnya;
3) Reclamation of former land buildings, power transmission, pipelines, ports (air & water), and
other facilities;
4) Pembongkaran
peralatan, mesin, tangki bahan bakar minyak, & pelumas;
4) Demolition of equipment, machines, tanks of fuel, & lubricants;
5) Penanganan sisa
bahan bakar minyak, pelumas, serta bahan kimia;
5) Handling of residual of fuel oil, lubricants, and chemicals;
6) Reklamasi lahan
bekas sarana transportasi;
6) Reclamation of used land of means of transport;
7) Reklamasi lahan
bekas bangunan & fondasi beton; dan
7) Reclamation of used land of building & concrete foundation; and
8) Pemulihan
(remediasi) tanah yang terkontaminasi bahan kimia, minyak, serta bahan
berbahaya & beracun & limbah bahan berbahaya & beracun.
8) Recovery (remediation) of contaminated soil of chemicals, oil
and hazardous & toxic materials & hazardous and toxic materials waste.
2. Pengembangan,
sosial, budaya, & ekonomi.
2. The development, social, cultural, & economic.
a. Uraian mengenai
penanganan pengurangan & pemutusan hubungan kerja, bimbingan, & bantuan
untuk pengalihan pekerjaan bagi karyawan; dan
a. The description of the handling of the reduction & termination of
employment, guidance, & assistance for the transfer of work for employees; and
b. Pengembangan
usaha alternatif untuk masyarakat lokal yang disesuaikan dengan program sosial,
budaya, & ekonomi.
b. Development of alternative business development for local communities that are
tailored to the programs of social, culture, & economy.
3. Pemeliharaan.
3. Maintenance.
Uraian rinci
mengenai pemeliharaan terhadap tapak bekas tambang, lahan bekas fasilitas
pengolahan dan/atau pemurnian, & lahan bekas fasilitas penunjang.
A detailed description of the maintenance of the former mine site, the
former land of facilities of processing and/or purification, & former land of supporting
facilities.
PEMANTAUAN.
MONITORING.
Uraian rinci
mengenai program & prosedur pemantauan, termasuk lokasi, metode, &
frekuensi pemantauan, pencatatan hasil pemantauan serta pelaporannya mengenai :
A detailed description of the program & monitoring procedures, including location, method, & frequency of
monitoring, recording the results of monitoring and reporting on :
1. Kestabilan
fisik.
1. Physical Stability.
Uraian mengenai
pemantauan kestabilan lereng, keamanan bangunan pengendali erosi &
sedimentasi, penimbunan material penutup, serta fasilitas lain.
A description of the monitoring slope stability, building
security of control of erosion & sedimentation, stockpiling cover material, as well as
other amenities.
2. Air permukaan
& air tanah.
2. Surface water and groundwater.
Uraian mengenai
pemantauan terhadap kualitas air sungai, air sumur di sekitar lokasi bekas
tambang, sumur pantau, air di dalam bekas tambang & lain-lain.
A description of the monitoring of the quality of river water, well water
around the site of the former mine, monitoring wells, the water in the former
mine & others.
3. Biologi akuatik
& teresterial.
3. Biology of aquatic and terrestrial.
Uraian mengenai
pemantauan terhadap flora & fauna akuatik & teresterial.
A description of the monitoring of the flora & fauna of
aquatic & terrestrial.
4. Sosial, budaya, & ekonomi.
4. Social, culture, & economy.
Uraian mengenai
pemantauan sosial, budaya & ekonomi (demografi, mata pencaharian,
kesehatan, pendidikan, & lain-lain).
A description of the monitoring of social, cultural & economic
(demographic, livelihood, health, education, & others).
BAB VIII
ORGANISASI.
CHAPTER VIII ORGANIZATION.
Uraian rinci
mengenai :
A detailed description about :
1. Organisasi; dan
1. Organization; and
2. Jadwal
pelaksanaan Pascatambang.
2. Post-Mining implementation schedule.
BAB IX KRITERIA
KEBERHASILAN PASCATAMBANG
CHAPTER IX CRITERIA FOR SUCCESS OF POST MINING
Uraian mengenai
kriteria keberhasilan yang akan dicapai pada kegiatan Pascatambang yang
meliputi standar keberhasilan pada tapak bekas tambang, fasilitas pengolahan
dan/atau pemurnian, fasilitas penunjang, & pemantauan.
A description of the criteria for success to be achieved in the Post-Mining
activities that include standard of success at the former mine site, facilities of
processing and/or purification, supporting facilities, & monitoring.
BAB X RENCANA
BIAYA PASCATAMBANG.
CHAPTER X PLAN OF COSTS OF POST-MINING.
Bab ini memuat
rencana biaya yang diperlukan untuk melaksanakan pekerjaan Pascatambang.
This chapter contains the plan of cost necessary to carry out the job of Mine Closure.
Perhitungan biaya
Pascatambang terdiri atas :
Mine Closure cost calculation consists of :
1. Biaya langsung.
1. Direct costs.
Uraian mengenai
biaya yang perlu dihitung dalam penyusunan rencana biaya Pascatambang yang
meliputi :
Description of the costs that need to be calculated in planning the Mine
Closure costs include :
a. Biaya pada
tapak bekas tambang, terdiri atas biaya :
a. Costs on the former mine site, consists of the cost of :
1) Pembongkaran
fasilitas tambang;
1) Demolition of mine facilities;
2) Reklamasi lahan
bekas fasilitas tambang;
2) Reclamation of land of former mine facilities;
3) Pembongkaran
& Reklamasi jalan tambang;
3) Demolition & Reclamation of mining road;
4) Reklamasi
tambang permukaan (pit, waste dump);
4) Reclamation of surface mine (pit, waste dumps);
5) Reklamasi lahan
bekas kolam pengendap;
5) Reclamation of land of former of settling ponds;
6) Pengamanan
semua lahan bekas tambang dengan sistem tambang bawah tanah yang berpotensi
bahaya terhadap manusia (shaft, raise, stope, adit, decline, tunnel, dan lain-lain).
6) Securing all mined lands with a system of underground mine in potential be danger to
humans (shafts, raises, stope, adit, decline, tunnel, etc.).
b. Biaya pada
fasilitas pengolahan dan/atau pemurnian, terdiri atas biaya :
b. The cost of the facilities of processing and/or purification, consists of the cost of :
1) Pembongkaran
fasilitas pengolahan dan/atau pemurnian;
1) Demolition of facilities of processing and/or purification;
2) Reklamasi lahan
bekas fasilitas pengolahan dan/atau pemurnian;
2) Reclamation of the former land of facilities of processing and/or purification;
3) Reklamasi lahan
bekas kolam tailing & upaya
stabilisasinya;
3) Reclamation of the former land of the tailings pond & its stabilization
efforts;
4) Reklamasi lahan
bekas timbunan komoditas tambang;
4) Reclamation of former land of mining commodities heap;
5) Pemulihan
(remediasi) tanah yang terkontaminasi bahan kimia, minyak, serta bahan
berbahaya & beracun & limbah bahan berbahaya & beracun.
5) Recovery (remediation) of contaminated soil of chemicals, oil and hazardous & toxic
materials & hazardous and toxic materials waste.
c. Biaya &
fasilitas penunjang, terdiri atas biaya :
c. Costs & supporting facilities, consisting of the cost of :
1) Pembongkaran
sisa bangunan, transmisi listrik, pipa, pelabuhan (udara & air), &
fasilitas lainnya.
1) Demolition of the remaining of buildings, power transmission, pipelines, ports (air & water), & other
facilities.
2) Pembongkaran
peralatan, mesin, serta tanki bahan bakar minyak & pelumas;
2) Demolition of tools, machines, as well as fuel tanks & lubricating
oils;
3) Reklamasi lahan
bekas landfill;
3) Reclamation of former land of landfill;
4) Reklamasi lahan
bekas bangunan, transmisi listrik, pipa, pelabuhan (udara & air), &
fasilitas lainnya;
4) Reclamation of former land of buildings, power transmission, pipelines, ports (air & water), and
other facilities;
5) Reklamasi lahan
bekas sarana transportasi;
5) Reclamation of used land of means of transport;
6) Reklamasi lahan
bekas bangunan & fondasi beton;
6) Reclamation of used land of building & concrete foundation;
7) Penanganan sisa
bahan bakar minyak, pelumas, serta bahan kimia;
7) Handling of residual of fuel oil, lubricants, and chemicals;
8) Pemulihan
(remediasi) tanah yang terkontaminasi bahan kimia, minyak, serta bahan
berbahaya & beracun & limbah bahan berbahaya & beracun.
8) Recovery (remediation) of contaminated soil of chemicals, oil
and hazardous & toxic materials & hazardous & toxic materials waste.
d. Pengembangan
sosial, budaya, & ekonomi;
d. Development of social, culture, & economics;
e. Pemeliharaan;
e. Maintenance;
f. Pemantauan.
f. Monitoring.
2. Biaya tidak
Langsung.
2. Indirect Costs.
Uraian mengenai
biaya yang harus dimasukkan dalam perhitungan Pascatambang & sedapat
mungkin ditetapkan dengan menggunakan standar acuan yang ditentukan sebagai
berikut :
Description of the costs that should be included in the calculation of Mine
Closure & wherever possible are established using a reference standard which is
defined as follows :
a. Biaya
mobilisasi & demobilisasi alat sebesar 2,5% (dua koma lima persen) dari
biaya langsung atau berdasarkan perhitungan;
a. Mobilization & demobilization costs in appliance of 2.5% (two point five percent) of direct
costs or by calculation;
b. Biaya
perencanaan Pascatambang sebesar 2% (dua persen) sampai 10% (sepuluh persen)
dari biaya langsung;
b. Mine Closure planning costs of 2% (two percent) to 10% (ten percent) of
direct costs;
c. Biaya
administrasi & keuntungan pihak ketiga
sebagai pelaksana Pascatambang sebesar 3% sampai dengan 14% (empat belas
persen) dari biaya langsung; dan
c. Cost of administrative & profit of third parties as executor of Mine Closure by
3% to 14% (fourteen percent) of direct costs; and
d. Biaya supervisi
sebesar 2% (dua persen) sampai dengan 7% (tujuh persen) dari biaya langsung.
d. Supervision fee of 2% (two percent) to 7% (seven percent) of direct
costs.
3. Total biaya.
3. The total cost.
Uraian mengenai
total biaya langsung ditambah dengan biaya tidak langsung & biaya tersebut
sudah harus memperhitungkan pajak yang berlaku & dibuat dalam mata uang
Rupiah atau Dolar Amerika Serikat.
Description of the total direct costs plus indirect costs & the cost of
the already must take into account any applicable taxes & are made in
Rupiah or US Dollar.
E. DAFTAR
LAMPIRAN.
E. APPENDIX LIST.
1. Peta situasi
rona awal, dengan skala minimal 1:25.000 (satu banding dua puluh lima ribu);
1. Map of the baseline situation, with a minimum scale of 1: 25,000 (one to
twenty five thousand);
2. Peta situasi
lokasi pertambangan, dengan skala minimal 1:25.000 (satu banding dua puluh lima
ribu);
2. Map of mine site situations, with a minimum scale of 1: 25,000 (one to twenty five
thousand);
3. Peta situasi
rona awal Pascatambang, dengan skala minimal 1:25.000 (satu banding dua puluh
lima ribu);
3. Map of early baseline situation of Post-Mining, with a minimum scale of 1: 25,000 (one to twenty five thousand);
4. Peta situasi
rencana rona akhir Pascatambang, dengan skala minimal 1:25.000 (satu banding
dua puluh lima ribu);
4. Map the final baseline plan situation of Mine Closure,
with a minimum scale of 1: 25,000 (one to twenty five thousand);
5. Peta lokasi
pemantauan, dengan skala minimal 1:10.000 (satu banding sepuluh ribu).
5. Map of the location of monitoring, with a minimum scale of 1: 10,000
(one in ten thousand).
F. DAFTAR TABEL.
F. LIST OF TABLES.
Rencana &
biaya Pascatambang.
Plan and costs of Mine Closure.
Referensi :
Reference :
1. Peraturan
Menteri Energi & Sumber Daya Mineral Nomor : 07 Tahun 2014 tentang
Pelaksanaan Reklamasi & Pascatambang pada Kegiatan Usaha Pertambangan
Mineral & Batubara, Direktorat Jenderal Mineral & Batubara, Direktorat
Teknik & Lingkungan Mineral & Batubara.
1. Regulation of the Minister of Energy and Mineral Resources Number 07
Year 2014 on the Implementation of Reclamation and Mine Closure on Business
Activities of Mineral and Coal, Directorate General of Mineral and Coal,
Engineering & Environment Directorate of Mineral & Coal.
Roburan Lombang, April 1, 2015.
Roburan Lombang, April,
01st 2015
Tidak ada komentar:
Posting Komentar