Arahan
dari
Pendiri
UANM
(Universitas Agussalim Nasution Mandailing)
Agussalim, S.T. bin Abdur Rahim Nasution
Pihak
Rektorat, Dekanat, Jurusan, Program Studi, staf pengajar, mahasiswa/mahasiswi,
regeneratif The Greatest Generation,
Generasi Boomer, Generasi X, Generasi
Millenial, Gen Z, Gen Alpha, Gen Beta UANM (Universitas Agussalim Nasution
Mandailing) yang saya banggakan,
The Rectorate, Deans, Departments,
Study Programs, teaching staff, students, regenerative The Greatest Generation,
Boomer Generation, Generation X, Millennial Generation, Gen Z, Gen Alpha, Gen
Beta of ANMU (Agussalim Nasution Mandailing University) that I am proud of,
Kisi-Kisi
Materi KUANMET (Kuliah Universitas Agussalim
Nasution Mandailing Electronic
Teleconfence)
untuk
ke-GUBERNUR-an SUMATERA UTARA dari UANM (Universitas Agussalim Nasution
Mandailing) dengan Misi Abadi untuk Perdamaian Abadi Dunia
19 Juni 2998, Selasa, untuk
ke-GUBERNUR-an SUMATERA UTARA dari Penjadwalan Linimasa UANM KS MET
(Universitas Agussalim Nasution Mandailing Kuliah Sepanjang Masa Electronic
Teleconference) Tahun 2998 (dua ribu sembilan
ratus sembilan puluh delapan) Masehi ke Saat Ini (Now) Tahun
2026, 972 (sembilan ratus tujuh puluh dua) tahun, secara Arus Mudik, dari Kota
Medan Reinkarnasi Ilmu Asia ke Wajah Dunia Internasional Global Bumi, mewarisi
Peradaban dengan Amal Jariyah (Ilmu yang Bermanfaat) sebagai Tanggung Jawab
Moral Kita untuk Generasi ke Generasi Mendatang untuk Perdamaian Abadi Dunia
khususnya untuk rakyat Provinsi Sumatera Utara
June 19th,
2998 Tuesday,
for the GOVERNOR of NORTH SUMATERA from the Timeline Scheduling of Agussalim
Nasution Mandailing University Lecture Throughout Time Electronic
Teleconference Year 2998 (two thousand and nine
hundreds and ninety eight) AD to the Present (Now) Year 2026, 972 (nine hundreds and seventy two) years, through the Homecoming Flow, from the City of Medan
Reincarnation of Asian Knowledge to the Face of the Global International World
of the Earth, inheriting Civilization with Amal Jariyah (Beneficial Knowledge)
as Our Moral Responsibility for Future Generations for Eternal World Peace
especially for the people of North Sumatra Province
Universitas Agussalim Nasution
Mandailing (UANM)
Fakultas Ilmu dan Teknologi Kebumian
Jurusan Teknik Pertambangan
Materi Kuliah
Selasa, 19
Juni Tahun 2998
Masehi
Agussalim Nasution Mandailing
University (ANMU)
The Faculty of Earth Sciences and
Technology
The Mining Engineering Department
Lecture Material
Tuesday, June 19th,
Year 2998 AD
KEPUTUSAN
MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK
INDONESIA
NOMOR:
341.K/MB.01/MEM.B/2025
TENTANG
PEDOMAN
TEKNIS PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN
ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE
MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA
NUMBER:
341.K/MB.01/MEM.B/2025
CONCERNING
TECHNICAL
GUIDELINES FOR THE PREPARATION, EVALUATION, AND APPROVAL OF WORK PLANS AND
BUDGETS IN MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA
BY THE GRACE OF
GOD ALMIGHTY
MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
MINISTER OF
ENERGY AND MINERAL RESOURCES
OF REPUBLIC OF
INDONESIA
LAMPIRAN III
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR :
341.K/MB.01/MEM.B/2025
TANGGAL :
14 Oktober 2025
TENTANG
PEDOMAN TEKNIS PELAKSANAAN PENYUSUNAN, EVALUASI, DAN
PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN
MINERAL DAN BATUBARA (halaman 54)
APPENDIX III
DECISION OF THE
MINISTER OF ENERGY AND MINERAL RESOURCES
OF REPUBLIC OF
INDONESIA
NUMBER : 341.K/MB.01/MEM.B/2025
DATE : October 14th,
2025
CONCERNING
TECHNICAL
GUIDELINES FOR THE PREPARATION, EVALUATION, AND APPROVAL OF WORK PLANS AND
BUDGETS IN MINERAL AND COAL MINING BUSINESS ACTIVITIES (page 54)
B. FORMAT EVALUASI RKAB TAHAP KEGIATAN OPERASI PRODUKSI UNTUK
PERMOHONAN YANG DIAJUKAN OLEH PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI,
PEMEGANG IUPK TAHAP KEGIATAN OPERASI PRODUKSI, ATAU PEMEGANG IUPK SEBAGAI
KELANJUTAN OPERASI KONTRAK/PERJANJIAN (halaman 55)
B. EVALUATION FORMAT
FOR WORK PLAN AND COST BUDGET FOR THE PRODUCTION OPERATION ACTIVITY STAGE FOR
APPLICATIONS SUBMITTED BY MINING BUSINESS PERMIT HOLDERS FOR THE PRODUCTION
OPERATION ACTIVITY STAGE, SPECIAL MINING BUSINESS PERMIT HOLDERS FOR THE
PRODUCTION OPERATION ACTIVITY STAGE, OR SPECIAL MINING BUSINESS PERMIT HOLDERS
AS A CONTINUATION OF CONTRACT/AGREEMENT OPERATIONS (page 55)
|
No. Number |
Aspek Aspect |
Kriteria Evaluasi Evaluation
Criteria |
Keterangan Information |
|
|
4 |
Penimbunan Overburden
(OB)/Batuan Penutup Overburden (OB)/Overburden Rock
Filling |
Lokasi penimbunan Overburden
OB/Batuan penutup tercantum dalam dokumen Studi Kelayakan dan/atau dokumen
lingkungan hidup The location of the Overburden
OB/Overburden Rock stockpiling is listed in the Feasibility Study document
and/or environmental documents. |
Matrik 4 Lampiran II Matrix 4 Appendix II |
|
|
5 |
Pengolahan dan/atau Pemurnian Processing and/or Refining |
Golongan Mineral: Rencana input Pengolahan
dan/atau Pemurnian maksimal sesuai dengan rencana produksi penambangan,
persediaan awal (inventori) bijih, dan pembelian (khusus untuk IUP
terintegrasi) Mineral Group: The maximum planned Processing
and/or Refining input is in accordance with the mining production plan, initial
ore inventory, and purchases (specifically for Integrated Mining Business
Permits). |
Matrik 6 Lampiran II Matrix 6 Appendix II |
|
|
6 |
Keselamatan Pertambangan Mining Safety |
Memiliki: Own: |
Matrik 1 Lampiran II Matrix 1 Appendix II |
|
|
1. |
Kepala Teknik Tambang; Head of Mining Engineering; |
|||
|
2. |
Kepala Teknik Tambang Sementara; atau Temporary Head of Mining
Engineering; or |
|||
|
3. |
Pejabat Sementara Kepala Teknik Tambang, Acting Head of Mining
Engineering, |
|||
|
yang telah mendapatkan pengesahan dan masih berlaku. which has received approval and
is still valid. |
||||
|
7 |
Lingkungan Environment |
Bukti penempatan jaminan reklamasi tahun N-1 sesuai dengan rencana
reklamasi yang telah disetujui pada tahap kegiatan Operasi Produksi. Evidence of placement of
reclamation guarantee for year N-1 in accordance with the reclamation plan
approved at the Production Operation activity stage. |
Penempatan Jaminan Reklamasi ditempatkan sesuai dengan ketentuan
peraturan perundang-undangan (sesuai persyaratan di Permen ESDM Nomor 17 Tahun
2025). Placement of Reclamation
Guarantee is placed in accordance with the provisions of laws and regulations
(in accordance with the requirements in Regulation of the Minister of Energy
and Mineral Resources Number 17 of 2025). |
|
MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
MINISTER
OF ENERGY AND MINERAL RESOURCES OF OF THE REPUBLIC OF INDONESIA
ttd.
signed.
BAHLIL
LAHADALIA
Agussalim, S.T. bin Abdur Rahim Nasution
Pendiri
UANM
(Universitas Agussalim Nasution Mandailing)
The
Founder
of
ANMU
(Agussalim
Nasution Mandailing University)
Tidak ada komentar:
Posting Komentar