https://www.youtube.com/@agussalimnasutionmandailing2/videos

Foto saya
UNTUK KE-GUBERNUR-AN SUMATERA UTARA DARI PENDIRI UM (UNIVERSITAS MANDAILING) FOR THE PROVINCIAL GOVERNOR OF SUMATERA UTARA FROM THE FOUNDER OF MU (MANDAILING UNIVERSITY)

Rabu, 29 April 2026

30 Noember 2997, Kamis untuk ke-GUBERNUR-an SUMATERA UTARA dari Penjadwalan Linimasa UANM KS MET (Universitas Agussalim Nasution Mandailing Kuliah Sepanjang Masa Electronic Teleconference) Tahun 2997

 

Arahan

dari

Pendiri
UANM
(Universitas Agussalim Nasution Mandailing)
Agussalim, S.T. bin Abdur Rahim Nasution


Link video

Pihak Rektorat, Dekanat, Jurusan, Program Studi, staf pengajar, mahasiswa/mahasiswi, regeneratif The Greatest Generation, Generasi Boomer, Generasi X, Generasi Millenial, Gen Z, Gen Alpha, Gen Beta, Generasi Gamma, Generasi Delta, Generasi Epsilon, Generasi Zeta UANM (Universitas Agussalim Nasution Mandailing) yang saya banggakan,

The Rectorate, Deans, Departments, Study Programs, teaching staff, students, regenerative The Greatest Generation, Boomer Generation, Generation X, Millennial Generation, Gen Z, Gen Alpha, Beta Generation, Gamma Generation, Delta Generation, Epsilon Generation, Zeta Generation of ANMU (Agussalim Nasution Mandailing University) that I am proud of,

 

Kisi-Kisi Materi KUANMET (Kuliah Universitas Agussalim Nasution Mandailing Electronic Teleconfence)

 

untuk ke-GUBERNUR-an SUMATERA UTARA dari UANM (Universitas Agussalim Nasution Mandailing) dengan Misi Abadi untuk Perdamaian Abadi Dunia 

 

30 Nopember 2997, Kamis, untuk ke-GUBERNUR-an SUMATERA UTARA dari Penjadwalan Linimasa UANM KS MET (Universitas Agussalim Nasution Mandailing Kuliah Sepanjang Masa  Electronic Teleconference) Tahun 2997 (dua ribu sembilan ratus sembilan puluh tujuh) Masehi ke Saat Ini (Now) Tahun 2026, 971 (sembilan ratus tujuh puluh satu) tahun, secara Arus Mudik, dari Kota Medan Reinkarnasi Ilmu Asia ke Wajah Dunia Internasional Global Bumi, mewarisi Peradaban dengan Amal Jariyah (Ilmu yang Bermanfaat) sebagai Tanggung Jawab Moral Kita untuk Generasi ke Generasi Mendatang untuk Perdamaian Abadi Dunia khususnya untuk rakyat Provinsi Sumatera Utara

November 30th, 2997 Thursday, for the GOVERNOR of NORTH SUMATERA from the Timeline Scheduling of Agussalim Nasution Mandailing University Lecture Throughout Time Electronic Teleconference Year 2997 (two thousand and nine hundreds and ninety seven) AD to the Present (Now) Year 2026, 971 (nine hundreds and seventy one) years, through the Homecoming Flow, from the City of Medan Reincarnation of Asian Knowledge to the Face of the Global International World of the Earth, inheriting Civilization with Amal Jariyah (Beneficial Knowledge) as Our Moral Responsibility for Future Generations for Eternal World Peace especially for the people of North Sumatra Province

 

Universitas Agussalim Nasution Mandailing (UANM)

Fakultas Ilmu dan Teknologi Kebumian

Jurusan Teknik Pertambangan

Materi Kuliah

Kamis, 30 Nopember Tahun 2997 Masehi

Agussalim Nasution Mandailing University (ANMU)

The Faculty of Earth Sciences and Technology

The Mining Engineering Department

Lecture Material

Thursday, November 30th, Year 2997 AD

 

KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL

REPUBLIK INDONESIA

NOMOR 344.K/MB.01/MEM.B/2025

TENTANG

PEDOMAN TEKNIS PELAKSANAAN REKLAMASI DAN PASCATAMBANG

PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA

DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA

NUMBER 344.K/MB.01/MEM.B/2025

CONCERNING

TECHNICAL GUIDELINES FOR IMPLEMENTING RECLAMATION AND POST-MINING IN MINERAL AND COAL MINING BUSINESS ACTIVITIES

 

DENGAN RAHMAT TUHAN YANG MAHA ESA

BY THE GRACE OF GOD ALMIGHTY

 

MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA

MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA

 

LAMPIRAN I

KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL

REPUBLIK INDONESIA

NOMOR               : 344.K/MB.01/MEM.B/2025

TANGGAL            : 23 Oktober 2025

TENTANG

PEDOMAN TEKNIS PELAKSANAAN REKLAMASI DAN PASCATAMBANG PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA

APPENDIX I

DECISION OF THE MINISTER OF ENERGY AND MINERAL RESOURCES

OF REPUBLIC OF INDONESIA

NUMBER             : 344.K/MB.01/MEM.B/2025

DATE                    : October 23rd, 2025

CONCERNING

TECHNICAL GUIDELINES FOR IMPLEMENTING RECLAMATION AND POST-MINING IN MINERAL AND COAL MINING BUSINESS ACTIVITIES

 

PEDOMAN PENGELOLAAN REKLAMASI DAN PASCATAMBANG

PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA

DI WILAYAH DARAT DAN LAUT

GUIDELINES FOR RECLAMATION AND POST-MINING MANAGEMENT

IN MINERAL AND COAL MINING BUSINESS ACTIVITIES

IN LAND AND MARINE AREAS

 

C. KEGIATAN (halaman 7)

C. ACTIVITIES (page 7)

 

10. PELAPORAN DAN PENCAIRAN JAMINAN REKLAMASI DAN JAMINAN PASCATAMBANG (halaman 51)

10. REPORTING AND DISBURSEMENT OF RECLAMATION GUARANTEES AND POST-MINING GUARANTEES (page 51)

 

b. Pelaporan Pascatambang dan Pencairan Jaminan Pascatambang

Pelaporan Pascatambang dan Pencairan Jaminan Pascatambang wilayah darat diatur sebagai berikut:

3) Format penyusunan Laporan Triwulan Pelaksanaan Pascatambang IUP tahap kegiatan Operasi Produksi atau IUPK tahap kegiatan Operasi Produksi Pertambangan Mineral bukan logam dan batuan dengan umur tambang ≤5 (kurang dari atau sama dengan lima) tahun tercantum dalam format 21.

b. Post-Mining Reporting and Disbursement of Post-Mining Guarantees

Post-Mining Reporting and Disbursement of Post-Mining Guarantees for onshore areas are regulated as follows:

3) The format for preparing the Quarterly Post-Mining Implementation Report for Mining Business Permits at the Production Operation stage or Special Mining Business Permits at the Production Operation stage for non-metallic minerals and rocks with a mine life of ≤5 (less than or equal to five) years is listed in format 21.

 

Format 21.

Format penyusunan Laporan Triwulan Pelaksanaan Pascatambang

(halaman 62)

Format 21.

Format for Preparing Quarterly Post-Mining Implementation Reports

(page 62)

 

Format

Keterangan

Information

KATA PENGANTAR

FOREWORD

Ditandatangani oleh Direksi

Signed by the Board of Directors

DAFTAR ISI

LIST OF CONTENTS

 

BATANG TUBUH

TORSO

 

BAB I

CHAPTER I

PENDAHULUAN

INTRODUCTION

Uraian singkat mengenai kemajuan pekerjaan Pascatambang.

A brief description of the progress of Post-mining work.

BAB II

CHAPTER II

PELAKSANAAN PASCATAMBANG

POST-MINING IMPLEMENTATION

 

2.1.

Pembongkaran dan Reklamasi pada lahan bekas tambang dan lahan di luar bekas tambang.

Demolition and Reclamation on former mining land and land outside former mining areas.

 

 

2.1.1.

Tambang

Mine

Uraian rinci mengenai lokasi dan luas pelaksanaan Pascatambang pada lahan bekas tambang.

Detailed description of the location and extent of post-mining implementation on ex-mining land.

 

2.1.2

Timbunan

Heap

Uraian rinci mengenai lokasi dan

luas pelaksanaan Pascatambang

pada lahan bekas:

Detailed description of the location and extent of post-mining implementation on former land:

a.

Timbunan tanah pucuk

Topsoil embankment

b.

Timbunan batuan penutup di luar tambang

Overburden pile outside the mine

c.

Timbunan komoditas tambang

Mining commodity stockpiles

 

2.1.3.

Jalan

 

Uraian rinci mengenai lokasi dan luas pelaksanaan Pascatambang pada lahan bekas jalan

Detailed description of the location and extent of post-mining implementation on former road land

 

2.1.4.

Kolam Sedimen

Sediment Pond

Uraian rinci mengenai lokasi dan luas pelaksanaan Pascatambang pada lahan bekas kolam sedimen

Detailed description of the location and extent of post-mining implementation on former sediment pond land

 

2.1.5.

Pengamanan Lahan Bekas Tambang

Securing Former Mining Land

pengamanan semua lahan bekas tambang yang berpotensi bahaya terhadap manusia (shaft, raise, stope, adit, decline, pit, tunnel, final void, dan lain-lain).

securing all ex-mining land that is potentially dangerous to humans (shaft, raise, stope, adit, decline, pit, tunnel, final void, etc.).

2.2.

Fasilitas Pengolahan dan/atau Pemurnian

Processing and/or Refining Facilities

a.

Uraian rinci mengenai lokasi dan luas pelaksanaan Pascatambang pada lahan bekas:

Detailed description of the location and extent of post-mining implementation on former land:

1)

fasilitas pengolahan dan/atau pemurnian;

processing and/or refining facilities;

2)

kolam tailing dan upaya stabilisasinya;

tailings ponds and their stabilization efforts;

b.

pemulihan (remediasi) tanah yang terkontaminasi bahan kimia, minyak, serta bahan berbahaya dan beracun dan limbah bahan berbahaya dan beracun;

remediation of land contaminated with chemicals, oil, hazardous and toxic materials and hazardous and toxic waste;

2.3.

Fasilitas Penunjang

Supporting Facilities

a.

Uraian rinci mengenai lokasi dan luas pelaksanaan Pascatambang pada lahan bekas :

Detailed description of the location and extent of post-mining implementation on former land:

1)

Mess dan Kantor

Mess and Office

2)

Fasilitas peribadatan

Worship facilities

3)

Klinik

Clinic

4)

Tanki BBC

Liquid Fuel Tank

5)

Gudang Handak

Explosives Warehouse

6)

Gudang

Warehouse

7)

Workshop

8)

TPS LB3

Temporary Disposal Site for Hazardous and Toxic Waste

9)

Pelabuhan

Harbor

10)

Rumah Genset

Generator House

11)

Landfill

12)

Nursery

13)

dan lain-lain

and others

b.

pemulihan (remediasi) tanah yang terkontaminasi bahan kimia, minyak, serta bahan berbahaya dan beracun dan limbah bahan berbahaya dan beracun.

remediation of land contaminated with chemicals, oil, hazardous and toxic materials and hazardous and toxic waste.

2.4.

Pengembangan sosial, budaya, dan ekonomi

Social, cultural and economic development

Dikecualikan untuk Laporan Pascatambang mineral bukan logam dan batuan dengan umur tambang ≤5 tahun

Excluded for Post-mining Reports of non-metallic minerals and rocks with a mine life of ≤5 years

 

2.4.1.

Uraian ringkas mengenai penanganan pengurangan dan pemutusan hubungan kerja, bimbingan, dan bantuan untuk pengalihan pekerjaan bagi karyawan;

A brief description of the handling of reductions and terminations of employment, guidance and assistance for job transfer for employees;

 

 

2.4.2.

Uraian ringkas mengenai pengembangan usaha alternatif untuk masyarakat lokal yang disesuaikan dengan program sosial, budaya, dan ekonomi.

A brief description of alternative business development for local communities that is tailored to social, cultural and economic programs.

 

 

 

 

Agussalim, S.T. bin Abdur Rahim Nasution
Pendiri
UANM
(Universitas Agussalim Nasution Mandailing)

The Founder

of

ANMU

(Agussalim Nasution Mandailing University)

 

Tidak ada komentar:

Posting Komentar

30 Noember 2997, Kamis untuk ke-GUBERNUR-an SUMATERA UTARA dari Penjadwalan Linimasa UANM KS MET (Universitas Agussalim Nasution Mandailing Kuliah Sepanjang Masa Electronic Teleconference) Tahun 2997

  Arahan dari Pendiri UANM (Universitas Agussalim Nasution Mandailing) Agussalim, S.T. bin Abdur Rahim Nasution Link video https://...