Arahan
dari
Pendiri
UANM
(Universitas Agussalim Nasution Mandailing)
Agussalim, S.T. bin Abdur Rahim Nasution
Pihak
Rektorat, Dekanat, Jurusan, Program Studi, staf pengajar, mahasiswa/mahasiswi,
regeneratif The Greatest Generation,
Generasi Boomer, Generasi X, Generasi
Millenial, Gen Z, Gen Alpha, Gen Beta, Generasi Gamma, Generasi Delta, Generasi
Epsilon, Generasi Zeta UANM (Universitas Agussalim Nasution Mandailing) yang
saya banggakan,
The Rectorate, Deans, Departments,
Study Programs, teaching staff, students, regenerative The Greatest Generation,
Boomer Generation, Generation X, Millennial Generation, Gen Z, Gen Alpha, Beta
Generation, Gamma Generation, Delta Generation, Epsilon Generation, Zeta
Generation of ANMU (Agussalim Nasution Mandailing University) that I am proud
of,
Kisi-Kisi
Materi KUANMET (Kuliah Universitas Agussalim
Nasution Mandailing Electronic
Teleconfence)
untuk
ke-GUBERNUR-an SUMATERA UTARA dari UANM (Universitas Agussalim Nasution
Mandailing) dengan Misi Abadi untuk Perdamaian Abadi Dunia
27 Desember 2997, Rabu, untuk
ke-GUBERNUR-an SUMATERA UTARA dari Penjadwalan Linimasa UANM KS MET
(Universitas Agussalim Nasution Mandailing Kuliah Sepanjang Masa Electronic
Teleconference) Tahun 2997 (dua ribu sembilan
ratus sembilan puluh tujuh) Masehi ke Saat Ini (Now) Tahun
2026, 971 (sembilan ratus tujuh puluh satu) tahun, secara Arus Mudik, dari Kota
Medan Reinkarnasi Ilmu Asia ke Wajah Dunia Internasional Global Bumi, mewarisi
Peradaban dengan Amal Jariyah (Ilmu yang Bermanfaat) sebagai Tanggung Jawab
Moral Kita untuk Generasi ke Generasi Mendatang untuk Perdamaian Abadi Dunia
khususnya untuk rakyat Provinsi Sumatera Utara
December 27th,
2997 Wednesday,
for the GOVERNOR of NORTH SUMATERA from the Timeline Scheduling of Agussalim
Nasution Mandailing University Lecture Throughout Time Electronic
Teleconference Year 2997 (two thousand and nine
hundreds and ninety seven) AD to the Present (Now) Year 2026, 971 (nine hundreds and seventy one) years, through the Homecoming Flow, from the City of Medan
Reincarnation of Asian Knowledge to the Face of the Global International World
of the Earth, inheriting Civilization with Amal Jariyah (Beneficial Knowledge)
as Our Moral Responsibility for Future Generations for Eternal World Peace
especially for the people of North Sumatra Province
Universitas Agussalim Nasution
Mandailing (UANM)
Fakultas Ilmu dan Teknologi Kebumian
Jurusan Teknik Pertambangan
Materi Kuliah
Rabu, 27 Desember
Tahun 2997
Masehi
Agussalim Nasution Mandailing
University (ANMU)
The Faculty of Earth Sciences and
Technology
The Mining Engineering Department
Lecture Material
Wednesday, December 27th,
Year 2997 AD
KEPUTUSAN
MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK
INDONESIA
NOMOR
344.K/MB.01/MEM.B/2025
TENTANG
PEDOMAN
TEKNIS PELAKSANAAN REKLAMASI DAN PASCATAMBANG
PADA
KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF THE
REPUBLIC OF INDONESIA
NUMBER 344.K/MB.01/MEM.B/2025
CONCERNING
TECHNICAL GUIDELINES FOR IMPLEMENTING RECLAMATION AND
POST-MINING IN MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN
RAHMAT TUHAN YANG MAHA ESA
BY THE GRACE OF GOD ALMIGHTY
MENTERI
ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF
INDONESIA
LAMPIRAN I
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR :
344.K/MB.01/MEM.B/2025
TANGGAL :
23 Oktober 2025
TENTANG
PEDOMAN TEKNIS PELAKSANAAN REKLAMASI DAN PASCATAMBANG
PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
APPENDIX I
DECISION OF THE
MINISTER OF ENERGY AND MINERAL RESOURCES
OF REPUBLIC OF
INDONESIA
NUMBER : 344.K/MB.01/MEM.B/2025
DATE : October 23rd,
2025
CONCERNING
TECHNICAL
GUIDELINES FOR IMPLEMENTING RECLAMATION AND POST-MINING IN MINERAL AND COAL
MINING BUSINESS ACTIVITIES
PEDOMAN PENGELOLAAN
REKLAMASI DAN PASCATAMBANG
PADA KEGIATAN USAHA
PERTAMBANGAN MINERAL DAN BATUBARA
DI WILAYAH DARAT DAN
LAUT
GUIDELINES FOR RECLAMATION AND POST-MINING MANAGEMENT
IN MINERAL AND COAL MINING BUSINESS ACTIVITIES
IN LAND AND MARINE AREAS
C. KEGIATAN (halaman 7)
C.
ACTIVITIES (page 7)
9. PELAKSANAAN REKLAMASI DAN PASCATAMBANG (halaman 48)
9. IMPLEMENTATION OF
RECLAMATION AND POST-MINING (page 48)
b. Pelaksanaan Reklamasi
2) Pelaksanaan Reklamasi tahap kegiatan Operasi Produksi
a) Pemegang IUP tahap kegiatan Operasi Produksi atau pemegang
IUPK tahap kegiatan Operasi Produksi wajib melaksanakan Reklamasi yang telah
disetujui;
b) Pelaksanaan Reklamasi tahap kegiatan Operasi Produksi
dilakukan segera setelah kegiatan berakhir;
c) Dalam hal lahan pada huruf b) di atas direncanakan untuk
digunakan kembali, pemegang IUP tahap kegiatan Operasi Produksi atau pemegang
IUPK tahap kegiatan Operasi Produksi wajib melakukan pengendalian kualitas air
permukaan, erosi, dan sedimentasi; dan
d) Dalam hal terdapat realisasi bukaan lahan pada tahun
tertentu yang melebihi rencana bukaan lahan pada tahun tertentu yang telah
disetujui dalam dokumen rencana Reklamasi tahap kegiatan Operasi Produksi,
kelebihan bukaan lahan tersebut wajib dijaminkan melalui mekanisme perubahan
rencana Reklamasi tahap kegiatan Operasi Produksi yang telah disetujui atau
dalam penyusunan rencana Reklamasi tahap kegiatan Operasi Produksi periode
berikutnya.
b. Implementation of
Reclamation
2) Implementation of
Reclamation during the Production Operations phase
a) Holders of Mining
Business Permits during the Production Operations phase or holders of Special
Mining Business Permits during the Production Operations phase are required to
implement the approved Reclamation;
b) Reclamation during
the Production Operations phase is carried out immediately after the activity
ends;
c) If the land referred
to in letter b) above is planned for reuse, holders of Mining Business Permits
during the Production Operations phase or holders of Mining Business Permits
during the Production Operations phase are required to control surface water
quality, erosion, and sedimentation; and
d) If land clearing in
a given year exceeds the land clearing plan approved in the Reclamation plan
for the Production Operations phase, the excess land clearing must be secured
through a mechanism to amend the approved Reclamation plan for the Production
Operations phase or in the preparation of the Reclamation plan for the next
Production Operations phase.
Agussalim, S.T. bin Abdur Rahim Nasution
Pendiri
UANM
(Universitas Agussalim Nasution Mandailing)
The
Founder
of
ANMU
(Agussalim
Nasution Mandailing University)
Tidak ada komentar:
Posting Komentar