https://www.youtube.com/@agussalimnasutionmandailing2/videos

Foto saya
UNTUK KE-GUBERNUR-AN SUMATERA UTARA DARI PENDIRI UM (UNIVERSITAS MANDAILING) FOR THE PROVINCIAL GOVERNOR OF SUMATERA UTARA FROM THE FOUNDER OF MU (MANDAILING UNIVERSITY)

Minggu, 28 Januari 2024

TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 17 MEI 2442 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 17 MEI 2442 MASEHI)


https://www.youtube.com/@agussalimnasutionmandailing2/videos

EVOLUSI PENDIDIKAN MANDAILING 418 (EMPAT RATUS DELAPAN BELAS) TAHUN DI TAHUN 2024


Arahan
dari 
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)

Agussalim, ST bin Abdur Rahim Nasution


17 Mei 2442 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,

May 17th, 2442 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,

KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES

DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,

MEMUTUSKAN :
Menetapkan : 
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.

Matrik 2a. Rekapitulasi Hasil Kegiatan Eksplorasi sampai Tahun N-1
Matrix 2a. Recapitulation of Exploration Activity Results up to Year N-1


Rekapitulasi Kegiatan Eksplorasi PT … *)

Recapitulation of PT (in Bahasa) Exploration Activities … *)

Blok/Prospek

Block / Lead

Nama

Name

 

(1)

 

 

Status Eksplorasi

Exploration Status

 

(2)

 

 

Luas

Wide

(ha)

(3)

 

 

Jenis/Metode Kegiatan Eksplorasi

Types/Methods of Exploration Activities

Studi Indraja

Indraja Studies

Jenis

Type

 

(4)

 

 

Luas

Wide

(ha)

(5)

 

 

Pemetaan

Mapping

Jenis

Type

 

(6)

 

 

Luas

Wide

(ha)

(7)

 

 

Survei Geokimia

Geochemical Survey

Jenis

Type

 

(8)

 

 

Jumlah

Amount

 

(9)

 

 

Luas

Wide

(ha)

(10)

 

 

Survei Geofisika

Geophysical Survey

Jenis

Type

 

(11)

 

 

Luas

Wide

(ha)

(12)

 

 

Sumur Uji

Test Well

Kedalaman

Depth

(m)

(13)

 

 

Luas

Wide

(ha)

(14)

 

 

Parit Uji

Test Trench

Kedalaman

Depth

(m)

(15)

 

 

Luas

Wide

(ha)

(16)

 

 

Pengeboran

Drilling

Spasi

Space

(m)

(17)

 

 

Jumlah

Amount

(titik)

(18)

 

 

Kedalaman

Depth

(m)

(19)

 

 

Analisis Conto

Example Analysis

Jenis Analisa

Type of Analysis

 

(20)

 

 

Jenis Conto

Example Type

 

(21)

 

 

Jumlah

Amount

 

(22)

 

 


Penjelasan matrik: 
1. Nama semua blok/prospek yang sudah dilakukan eksplorasi. 
2. Status tahap kegiatan eksplorasi masing-masing blok/prospek, antara lain: 
a) Reconnaissance (penyelidikan umum) 
b) Target definition (eksplorasi awal) 
c) Target testing (eksplorasi lanjut) 
d) Advance target (eksplorasi detil) 
e) Concept reserve definition (cadangan konseptual) 
f) Pre-feasibility study (pra studi kelayakan) 
g) Feasibility study (studi kelayakan) 
h) Konstruksi-operasi. 
3. Luas masing-masing blok/prospek. 
4. Jenis studi indraja yang dilakukan, seperti: Light Detection and Ranging (LIDAR), Land Satelite (LANDSAT), Satellite Pour l’Observtion de la Terre (SPOT), dan sebagainya. 
5. Luasan wilayah yang dilakukan studi indraja. 
6. Kegiatan pemetaan yang dilakukan, seperti: pemetaan geologi awal, pemetaan geologi detil, pemetaan topografi rona awal, pemetaan topografi setelah pemboran, dan sebagainya. 
7. Luasan wilayah yang dilakukan pemetaan. 
8. Kegiatan survei geokimia untuk mengetahui kadar (grade) conto batuan dan tanah, seperti: stream sediment, grab sample, chip sample, soil sample, dan sebagainya. 
9. Jumlah titik pengambilan conto. 
10. Luasan wilayah pengambilan conto.
11. Metode survei geofisika yang dilakukan untuk mengetahui anomali cebakan mineral, seperti: aeromagnetik, IP, CSMAT, seismik, dan sebagainya. 12. Luasan wilayah yang dilakukan untuk masing-masing metode survei geofisika. 
13. Total kedalaman sumur uji. 
14. Total luas bukaan sumur uji. 
15. Total kedalaman parit uji. 
16. Total luas bukaan parit uji. 
17. Spasi pengeboran yang dilakukan, baik untuk eksplorasi awal maupun eksplorasi detil. 
18. Total jumlah titik pengeboran yang dilakukan untuk masing-masing spasi pemboran. 
19. Total kedalaman pengeboran yang dilakukan untuk masing-masing spasi pengeboran. 
20. Jenis analisis conto, seperti analisis geokimia, XRD, petrografi, fluid inklusi, dan sebagainya. 
21. Jenis conto yang terdiri dari conto tanah, batuan, dan batuan inti bor. 
22. Jumlah conto untuk masing-masing analisis. 

Jika nama blok/prospek lebih dari 1 (satu), kegiatan jenis/metode kegiatan eksplorasi ditambahkan baris baru. 

Keterangan: 
*) Rekapitulasi dari awal tahun tahap kegiatan eksplorasi sampai dengan tahun N-1 

Matrix explanation:
1. Names of all blocks/prospects that have been explored.
2. Status of exploration activity stages for each block/prospect, including:
a) Reconnaissance (general investigation)
b) Target definition (initial exploration)
c) Target testing (further exploration)
d) Advance target (detailed exploration)
e) Concept reserve definition (conceptual reserve)
f) Pre-feasibility study (pre-feasibility study)
g) Feasibility study (feasibility study)
h) Construction-operations.
3. The area of each block/prospect.
4. Types of sensory studies carried out, such as: Light Detection and Ranging (LIDAR), Land Satellite (LANDSAT), Satellite Pour l'Observation de la Terre (SPOT), and so on.
5. The size of the area where the sensory study was carried out.
6. Mapping activities carried out, such as: initial geological mapping, detailed geological mapping, preliminary topographic mapping, topographic mapping after drilling, and so on.
7. The size of the area being mapped.
8. Geochemical survey activities to determine the grade of rock and soil samples, such as: stream sediment, grab samples, chip samples, soil samples, and so on.
9. Number of sampling points.
10. The size of the sampling area
11. Geophysical survey methods carried out to determine mineral deposit anomalies, such as: aeromagnetic, IP, CSMAT, seismic, and so on.
12. The area used for each geophysical survey method.
13. Total depth of test well.
14. Total area of test well openings.
15. Total depth of test trench.
16. Total area of test trench openings.
17. Spacing of drilling carried out, both for initial exploration and detailed exploration.
18. Total number of drilling points carried out for each drilling space.
19. Total drilling depth carried out for each drilling space.
20. Types of sample analysis, such as geochemical analysis, XRD, petrography, fluid inclusions, and so on.
21. Types of samples consisting of soil, rock and drill core samples.
22. Number of samples for each analysis.

If the name of the block/prospect is more than 1 (one), the activity type/exploration activity method is added to a new line.

Information :
*) Recapitulation from the beginning of the exploration activity stage to year N-1

sumber (source) :
Google Translate

TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 10 MEI 2442 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 10 MEI 2442 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos

EVOLUSI PENDIDIKAN MANDAILING 418 (EMPAT RATUS DELAPAN BELAS) TAHUN DI TAHUN 2024


Arahan
dari 
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)

Agussalim, ST bin Abdur Rahim Nasution


10 Mei 2442 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,

May 10th, 2442 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,

KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES

DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,

MEMUTUSKAN :
Menetapkan : 
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.


Matrik 1. Legalitas
Matrix 1. Legality

No.

Number

URAIAN

DESCRIPTION

KETERANGAN

INFORMATION

1.

Nama Perusahaan

Company Name

 

2.

NPWP Perusahaan

Company NPWP (in Bahasa)

 

3.

Nomor SK IUP/IUPK

IUP/IUPK SK (in Bahasa) number

 

4.

Kode WIUP/WIUPK

WIUP/WIUPK (in Bahasa) code

 

5.

Golongan Mineral Logam

Metal Mineral Group

 

6.

Jangka Waktu IUP/IUPK

Period of IUP/IUPK (in Bahasa)

Mulai ... s.d ... (tanggal/bulan/tahun)

From ... to ... (date/month/year)

7.

Kepala Teknik Tambang

Head of Mining Engineering

Nama:

Nomor Surat Pengesahan:

Tanggal Surat Pengesahan:

Name:

Probate Number:

Date of Confirmation Letter:

8.

Luas Wilayah IUP/IUPK

Area of IUP/IUPK (in Bahasa)

Kawasan Hutan (ha)

Forest Area (ha)

Bukan Kawasan Hutan (ha)

Not Forest Area (ha)

 

 

HK *)

HL **)

HP ***)

 

 

 

 

 

 

 

9.

Total Luas Wilayah IUP/IUPK

Total Area of IUP/IUPK (in Bahasa)

ha

10.

Luas Project Area ****)

Project Area ****)

ha

11.

Ijin Pinjam Pakai Kawasan Hutan (IPPKH) *****)

Borrow-to-Use Forest Area Permit (IPPKH in Bahasa) *****)

No.

Number

 

 

Tanggal

Date

 

 

Luas

Wide

...                                                ha

 

 

Jangka Waktu

Time Period

mulai ... s.d ... (Tanggal/Bulan/Tahun)

from ... to ... (Date/Month/Year)

12.

Pemegang Saham

Shareholders

1. … : … %

2. … : … %

13.

Susunan Pengurus

Board of Management

Direksi:

Directors:

1. …

2. …

Komisaris:

Commissioner:

1. …

2. …

   

Keterangan:

*)          Hutan Konservasi (Taman Nasional, Cagar Alam, Suaka Alam, dan lain lain) yang dilarang untuk melakukan kegiatan usaha pertambangan

**)        Hutan Lindung

***)      Hutan Produksi (Terbatas, Tetap, Konversi)

****)    Luas area di luar Wilayah IUP/IUPK yang digunakan dan mendapatkan persetujuan, jika berada dalam WIUP/WIUPK lain wajib membuat perjanjian permanfaatan lahan

*****)  Jika IPPKH masih dalam proses pengurusan agar mencantumkan nomor surat korespondensi dengan instansi terkait

Information:

*)           Conservation Forests (National Parks, Nature Reserves, Nature Reserves, etc.) which are prohibited from carrying out mining business activities

**)        Protected forest

***)      Production Forest (Limited, Permanent, Conversion)

****)   The area outside the IUP/IUPK (in Bahasa) area that is used and has received approval, if it is in another WIUP/WIUPK (in Bahasa), you must make a land use agreement

*****) If the IPPKH (in Bahasa) is still in the processing process, please include the number of the correspondence letter with the relevant agency

 

Keterangan:

*)          Hutan Konservasi (Taman Nasional, Cagar Alam, Suaka Alam, dan lain lain) yang dilarang untuk melakukan kegiatan usaha pertambangan

**)        Hutan Lindung

***)      Hutan Produksi (Terbatas, Tetap, Konversi)

****)    Luas area di luar Wilayah IUP/IUPK yang digunakan dan mendapatkan persetujuan, jika berada dalam WIUP/WIUPK lain wajib membuat perjanjian permanfaatan lahan

*****)  Jika IPPKH masih dalam proses pengurusan agar mencantumkan nomor surat korespondensi dengan instansi terkait

Information:

*)           Conservation Forests (National Parks, Nature Reserves, Nature Reserves, etc.) which are prohibited from carrying out mining business activities

**)        Protected forest

***)      Production Forest (Limited, Permanent, Conversion)

****)   The area outside the IUP/IUPK (in Bahasa) area that is used and has received approval, if it is in another WIUP/WIUPK (in Bahasa), you must make a land use agreement

*****) If the IPPKH (in Bahasa) is still in the processing process, please include the number of the correspondence letter with the relevant agency


sumber (source) :

Google Translate

15 Nopember 2996, Selasa untuk ke-GUBERNUR-an SUMATERA UTARA dari Penjadwalan Linimasa UANM KS MET (Universitas Agussalim Nasution Mandailing Kuliah Sepanjang Masa Electronic Teleconference) Tahun 2997

  MAGNUM OPUS Arahan dari Pendiri UANM (Universitas Agussalim Nasution Mandailing) Agussalim, S.T. bin Abdur Rahim Nasution Link ...