https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN LOKAL MANDAILING UNTUK RENTANGAN TAHUN 2445 - 2024 = 421 (EMPAT RATUS DUA PULUH SATU) TAHUN MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA KE PERUBAHAN WAJAH PERADABAN BARU PERDAMANIAN ABADI DUNIA INTERNASIONAL GLOBAL BUMI
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
21 Oktober 2445 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
October 21st, 2445 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (Mandailing University) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIB. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN MINERAL BUKAN LOGAM (halaman 248)
IIB. FORMAT FOR PREPARATION OF WORK PLAN AND BUDGET FOR MINING BUSINESS LICENSE HOLDERS IN PRODUCTION OPERATION ACTIVITIES OF NON-METALLIC MINERALS (page 248)
Matrik 14 Realisasi Inventori Mineral Bukan Logam Tahun (N-1)
Matrix 14 Realization of
Non-Metallic Mineral Inventory Year (N-1)
Matrik 14a. Realisasi Inventori Hasil Penambangan (sama dengan logam)
Matrix 14a. Mining Inventory
Realization (same as metal)
No. Number |
Bulan Month |
Realisasi Tahun (N-1) Year
Realization (N-1) |
|||||
Stockpile
1 |
Stockpile
2 |
Stockpile
3 |
|||||
Volume (Satuan) Volume
(Unit) |
Kadar (Satuan) Level
(Unit) |
Volume (Satuan) Volume
(Unit) |
Kadar (Satuan) Level
(Unit) |
Volume (Satuan) Volume
(Unit) |
Kadar (Satuan) Level
(Unit) |
||
|
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
(7) |
A |
Kapasitas Maksimum Maximum Capacity |
|
|
|
|
|
|
B |
Stock Akhir Tahun Sebelumnya (per 31 Desember N-2) Previous Year End Stock (as of
December 31 N-2) |
|
|
|
|
|
|
1 |
Januari January |
|
|
|
|
|
|
2 |
Februari February |
|
|
|
|
|
|
3 |
Maret March |
|
|
|
|
|
|
|
… |
|
|
|
|
|
|
11 |
November November |
|
|
|
|
|
|
12 |
Desember December |
|
|
|
|
|
|
Penjelasan Matrik:
1.
Jumlah dan penamaan stockpile disesuaikan dengan masing-masing perusahaan
2.
Klasifikasi stockpile berdasarkan
tingkat kadar mineral dalam bijih (low
grade, medium grade dan high grade)
Matrix Explanation:
1. The number and naming of stockpiles are
adjusted to each company
2. Classification of stockpiles based on the
level of mineral content in the ore (low grade, medium grade and high grade)
Sumber
(source) :
Google Translate
Tidak ada komentar:
Posting Komentar