https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN LOKAL MANDAILING UNTUK RENTANGAN TAHUN 2446 - 2024 = 422 (EMPAT RATUS DUA PULUH DUA) TAHUN MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA KE PERUBAHAN WAJAH PERADABAN BARU PERDAMAIAN ABADI DUNIA INTERNASIONAL GLOBAL BUMI
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
09 Juni 2446 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
June 09th, 2446 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (Mandailing University) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIC. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI
PRODUKSI GOLONGAN BATUAN (Halaman 330)
IIC. FORMAT FOR PREPARATION OF
WORK PLAN AND BUDGET FOR MINING BUSINESS LICENSE HOLDERS IN THE PRODUCTION
OPERATION ACTIVITY STAGE OF ROCK GROUPS (Page 330)
SISTEMATIKA SYSTEMATICS |
URAIAN DESCRIPTION |
||||
DAFTAR ISI LIST OF CONTENTS |
|
||||
DAFTAR GAMBAR LIST OF FIGURES |
|
||||
DAFTAR TABEL LIST OF TABLES |
|
||||
DAFTAR LAMPIRAN APPENDIX LIST |
|
||||
|
1.1. |
Latar Belakang Background |
berisi gambaran umum profil perusahaan, peta kesampaian daerah, bagan
struktur organisasi (head office dan site) mulai dari pengurus perusahaan (management) hingga tingkat pelaksana contains a general description
of the company profile, regional delivery map, organizational structure chart
(head office and site) starting from company management to the implementation
level |
||
|
1.2. |
Legalitas dan Pemasangan Tanda Batas Legality and Installation of
Boundary Signs |
Format 1.2 disusun dengan matrik 1, Bagan 2a, dan matrik 2b Format 1.2 is arranged with
matrix 1, Chart 2a, and matrix 2b |
||
BAB II PERSETUJUAN DAN REALISASI RKAB TAHUN N-1 SERTA RKAB TAHUN N CHAPTER II APPROVAL AND
REALIZATION OF THE WORK PLAN AND BUDGET FOR YEAR N-1 AND THE WORK PLAN AND
BUDGET FOR YEAR N |
|
||||
|
2.1. |
Sumber Daya dan Cadangan Resources and Reserves |
Format 2.1 disusun dengan matrik 3 Format 2.1 is composed of
matrix 3 |
||
|
2.2. |
Kegiatan Penambangan Mining Activities |
|
||
|
|
2.2.1. |
Metode Penambangan Mining Methods |
berisikan tentang metode penambangan yang digunakan; contains information about the
mining methods used; |
|
|
|
2.2.2. |
Pengupasan dan Penimbunan Overburden
/ Batuan Penutup*) Stripping and Filling of
Overburden / Overburden Rock*) |
Format 2.2.2 disusun dengan matrik 4, 5a, 5b Format 2.2.2 is composed of
matrices 4, 5a, 5b |
|
|
|
2.2.3. |
Produksi Batuan Rock Production |
Format 2.2.3 disusun dengan matrik 6 Format 2.2.3 is composed of a
6-matrix |
|
|
|
2.2.4. |
Biaya Penambangan Mining Costs |
Format 2.2.4 disusun dengan matrik 7 Format 2.2.4 is composed of
matrix 7 |
|
|
2.3. |
Pengolahan Processing |
|
||
|
|
2.3.1. |
Metode Pengolahan Processing Method |
berisikan tentang metode pengolahan yang digunakan contains information about the
processing methods used |
|
|
|
2.3.2. |
Hasil Pengolahan Processing Results |
Format 2.3.2 dan 2.3.3 disusun dengan matrik 8 Formats 2.3.2 and 2.3.3 are
arranged with a matrix of 8 |
|
|
|
2.3.3 |
Recovery Pengolahan *) Processing Recovery *) |
||
|
|
2.3.4 |
Daftar Peralatan Pengolahan Processing Equipment List |
Format 2.3.4 disusun dengan matrik 9 Format 2.3.4 is composed of a 9
matrix |
|
|
|
2.3.5 |
Biaya Pengolahan Processing Fee |
Format 2.3.5 disusun dengan matrik 10a Format 2.3.5 is arranged with
matrix 10a |
|
|
2.4. |
Pemasaran dan Persediaan (Inventory) Marketing and Inventory |
|
||
|
|
2.4.1 |
Pemasaran dan Persediaan (Inventory) Marketing and Inventory |
Format 2.4.1 disusun dengan matrik 11, 11a dan 11b Format 2.4.1 is composed of
matrices 11, 11a and 11b |
|
|
|
2.4.2 |
Biaya Pemasaran dan Persediaan (Inventory)
*) Marketing and Inventory Costs
*) |
format 2.4.2 disusun dengan matrik 10b format 2.4.2 is arranged with
10b matrix |
|
|
2.5. |
Perlindungan Lingkungan Environmental Protection |
|
||
|
|
2.5.1 |
Kegiatan Pengelolaan dan Pemantauan Lingkungan (Kegiatan Pengelolaan
dan Pemantauan Lingkungan, Pembukaan dan Reklamasi Lahan) Environmental Management and
Monitoring Activities (Environmental Management and Monitoring Activities,
Land Clearing and Reclamation) |
Format 2.5.1 disusun dengan matrik 12, 13, 14, dan 15 Format 2.5.1 is arranged with
matrices 12, 13, 14, and 15 |
|
|
|
2.5.2 |
Biaya Pengelolaan dan Pemantauan Lingkungan Environmental Management and
Monitoring Costs |
Format 2.5.2 disusun dengan matrik 16 Format 2.5.2 is composed of a
16-matrix |
|
|
2.6. |
Keselamatan Pertambangan Mining Safety |
|
||
|
|
2.6.1 |
Statistik Keselamatan Pertambangan Mining Safety Statistics |
Format 2.6.1 disusun dengan matrik 17 Format 2.6.1 is composed of
matrix 17 |
|
|
|
2.6.2 |
Rencana dan Realisasi Penggunaan Bahan Peledak, Gudang Bahan Peledak,
dan Peledakan Tidur Plans and Realization of Use of
Explosives, Explosives Warehouses, and Sleeping Blasting |
Format 2.6.2 disusun dengan matrik 18a Format 2.6.2 is composed of
matrix 18a |
|
|
|
2.6.3 |
Rencana dan Realisasi Penggunaan Bahan Bakar Cair Plans and Realization of Liquid
Fuel Use |
Format 2.6.3 disusun dengan matrik 18b Format 2.6.3 is composed of
matrix 18b |
|
|
|
2.6.4 |
Rencana Pembangunan Tempat Penimbunan Bahan Bakar Cair Liquid Fuel Storage Site
Development Plan |
Format 2.6.4 disusun dengan matrik 18c Format 2.6.4 is composed of 18c
matrix |
|
|
|
2.6.5 |
Rencana Pengujian kelayakan Peralatan dan/atau Instalasi Equipment and/or Installation
Suitability Testing Plan |
Format 2.6.5 disusun dengan matrik 18d Format 2.6.5 is composed of 18d
matrix |
|
|
|
2.6.6. |
Rencana dan Realisasi Program dan Biaya Keselamatan Pertambangan Mining Safety Program and Cost
Plan and Realization |
Format 2.6.6.disusun dengan matrik 18e Format 2.6.6.composed with
matrix 18e |
|
|
2.7. |
Standardisasi dan Usaha Jasa Pertambangan Standardization and Mining
Services Business |
|
||
|
|
2.7.1. |
Standardisasi Standardization |
Format 2.7.1 disusun Format 2.7.1 is compiled |
|
|
|
2.7.2. |
Usaha Jasa Pertambangan Mining Services Business |
|
|
|
2.8. |
Tenaga Kerja dan Pengembangan Sumber Daya Manusia Labor and Human Resources
Development |
|
||
|
|
2.8.1. |
Penggunaan Tenaga Kerja Use of Labor |
Format 2.8.1 disusun dengan matrik 20a Format 2.8.1 is composed of 20a
matrix |
|
|
|
2.8.2. |
Pelatihan Tenaga Kerja Workforce Training |
Format 2.8.2 disusun dengan matrik 20b Format 2.8.2 is arranged with
matrix 20b |
|
|
|
2.8.3. |
Rencana Penggunaan Tenaga Kerja Asing Plans for Using Foreign Workers |
Format 2.8.3 disusun dengan matrik 20c Format 2.8.3 is composed of 20c
matrix |
|
|
2.9. |
Rencana dan Realisasi Pengembangan dan Pemberdayaan Masyarakat Tahun
(N-1) dan Rencana Tahun (N) sampai dengan Tahun (N+2) Community Development and
Empowerment Plan and Realization for Year (N-1) and Plan for Year (N) up to
Year (N+2) |
Format 2.8. disusun dengan matrik 21 Format 2.8. is arranged with
matrix 21 |
||
|
3.0. |
Keuangan dan Penerimaan Negara State Finance and Revenue |
|
||
|
|
3.0.1. |
Keuangan Finance |
Format 301 disusun dengan matrik 22, 22a, 22b, 22c, 22d, 22f dan 22g Format 301 is arranged with
matrices 22, 22a, 22b, 22c, 22d, 22f and 22g |
|
|
|
3.0.2 |
Penerimaan Negara State Revenue |
format 2.13.2 disusun dengan matrik 22e format 2.13.2 is arranged with
a 22e matrix |
|
LAMPIRAN-LAMPIRAN APPENDICES |
|
||||
Surat Pengesahan KTT/KTT Sementara/Pjs. KTT Letter of Approval of Head of
Mining Engineering / Temporary Head of Mining Engineering / Temporary Acting
Head of Mining Engineering |
|
||||
Sumber (source) :
Google Translate
Tidak ada komentar:
Posting Komentar