https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN LOKAL MANDAILING UNTUK RENTANGAN TAHUN 2446 - 2024 = 422 (EMPAT RATUS DUA PULUH DUA) TAHUN MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA KE PERUBAHAN WAJAH PERADABAN BARU PERDAMAIAN ABADI DUNIA INTERNASIONAL GLOBAL BUMI
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
02 Juni 2446 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
June 02nd, 2446 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (Mandailing University) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIB. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN MINERAL BUKAN LOGAM (halaman 248)
IIB. FORMAT FOR PREPARATION OF WORK PLAN AND BUDGET FOR MINING BUSINESS LICENSE HOLDERS IN PRODUCTION OPERATION ACTIVITIES OF NON-METALLIC MINERALS (page 248)
Matrik 28. Rencana Strategis Lima Tahun
Matrix 28. Five Year Strategic
Plan
No. Number |
KEGIATAN ACTIVITY |
Tahun (N) Year
(N) |
Tahun (N+1) Year
(N+1) |
Tahun (N+2) Year
(N+2) |
Tahun (N+3) Year
(N+3) |
Tahun (N+4) Year
(N+4) |
|
1 |
KEGIATAN EKSPLORASI EXPLORATION ACTIVITIES |
|
|
|
|
|
|
a |
Lokasi (nama prospek) Location (prospect name) |
|
|
|
|
|
|
b |
Biaya (Rp/USD) Fee (Rp/USD) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
PRODUKSI PRODUCTION |
|
|
|
|
|
|
a |
Penambangan (Ton) Mining (Tons) |
|
|
|
|
|
|
b |
Pengolahan (Ton) Processing (Tons) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3 |
PEMASARAN (Ton) MARKETING (Tons) |
|
|
|
|
|
|
|
- |
Dalam Negeri Domestic |
|
|
|
|
|
|
- |
Ekspor Export |
|
|
|
|
|
|
|
|
|
|
|
|
|
4 |
LINGKUNGAN ENVIRONMENT |
|
|
|
|
|
|
|
Total Luas Bukaan Lahan Total Area of Land Openings |
|
|
|
|
|
|
|
Total Luas Reklamasi*) Total Reclamation Area*) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5 |
KESELAMATAN PERTAMBANGAN MINING SAFETY |
|
|
|
|
|
|
|
Target penurunan Frequency Rate (FR) Frequency Rate (FR) reduction
target |
|
|
|
|
|
|
|
Target penurunan Severity Rate (SR) Severity Rate (SR) reduction
target |
|
|
|
|
|
|
|
Peningkatan Persentase Penerapan SMKP (%) Increase in Percentage of
Implementation of Mining Safety Management System (%) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6 |
TENAGA KERJA LABOR |
|
|
|
|
|
|
|
Lokal Local |
|
|
|
|
|
|
|
Nasional National |
|
|
|
|
|
|
|
Asing Foreign |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7 |
INVESTASI (Rp/USD) INVESTMENT (Rp/USD) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8 |
KEUANGAN DAN PENERIMAAN NEGARA STATE FINANCE AND REVENUE |
|
|
|
|
|
|
|
Pajak Tax |
|
|
|
|
|
|
|
Non Pajak Non-Tax |
|
|
|
|
|
Penjelasan matrik :
1.
Luas bukaan lahan dan luas reklamasi harus sama dengan dokumen jaminan
reklamasi.
2.
Bila tahun rencana strategis belum ditetapkan Rencana Reklamasi-nya, maka
rencana luas bukaan lahan dan reklamasi pada tahun perencanaan tersebut
merupakan rencana yang akan dimohonkan dalam dokumen Rencana Reklamasi periode
selanjutnya.
Matrix explanation:
1. The area of land opening and
reclamation area must be the same as the reclamation guarantee document.
2. If the strategic plan year has not yet
determined the Reclamation Plan, then the land opening and reclamation area
plan in that planning year is the plan that will be requested in the
Reclamation Plan document for the next period.
sumber
(source) :
Googe Translate
Tidak ada komentar:
Posting Komentar