https://www.youtube.com/@agussalimnasutionmandailing2/videos

Foto saya
UNTUK KE-GUBERNUR-AN SUMATERA UTARA DARI PENDIRI UM (UNIVERSITAS MANDAILING) FOR THE PROVINCIAL GOVERNOR OF SUMATERA UTARA FROM THE FOUNDER OF MU (MANDAILING UNIVERSITY)

Sabtu, 28 Desember 2024

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 07 JULI 2446 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 07 JULI 2446 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos


EVOLUSI PENDIDIKAN LOKAL MANDAILING UNTUK RENTANGAN TAHUN 2446 - 2024 = 422 (EMPAT RATUS DUA PULUH DUA) TAHUN MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA KE PERUBAHAN WAJAH PERADABAN BARU PERDAMAIAN ABADI DUNIA INTERNASIONAL GLOBAL BUMI


#SangKandidatSekjendPBBSekretarisJenderalPerserikatanBangsaBangsa #DariKantorGubernurSumutMedanKeKantorPerserikatanBangsaBangsaNewYork #SatuSatunyaTokohLegendarisSumutYangMemikirkanSumateraUtara1000SeribuTahunKeDepan #SumateraUtaraWorldMainProvincialClassRank #MembangunKegubernuranSumateraUtara #UniversitasMandailingUntukKegubernuranSumateraUtara #KearifanLokalMandailingUntukKegubernuranSumateraUtara #SeribuTahunEvolusiPendidikanMandailingUntukKegubernuranSumateraUtara





Arahan
dari 
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution


07 Juli 2446 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,

July 07th, 2446 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (Mandailing University) to understands,


KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA

NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES

DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,

MEMUTUSKAN :
Menetapkan : 
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.

LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151


IIC. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN BATUAN (Halaman 330)

IIC. FORMAT FOR PREPARATION OF WORK PLAN AND BUDGET FOR MINING BUSINESS LICENSE HOLDERS IN THE PRODUCTION OPERATION ACTIVITY STAGE OF ROCK GROUPS (Page 330)

 

Matrik 3. Neraca Sumber Daya dan Cadangan Tahun (N)

Matrix 3. Balance of Resources and Reserves Year (N)

 

A. Sumber Daya

A. Resources

 

No.

Number

Nama Blok/ Prospek

Block/Prospect Name

Jenis Material **)

Material Type **)

Sumber Daya Tahun N-1

Resources Year N-1

Luas (Ha)

Area (Ha)

Tereka

Guessed

Tertunjuk

Designated

Terukur

Measurable

Tonase

Tonnage

Kadar ***)

Level ***)

Tonase

Tonnage

Kadar ***)

Level ***)

Tonase

Tonnage

Kadar ***)

Level ***)

Unsur 1

Element 1

Unsur 2

Element 2

Unsur 1

Element 1

Unsur 2

Element 2

Unsur 1

Element 1

Unsur 2

Element 2

1

 

 

 

 

 

 

 

 

 

 

 

 

...

 

 

 

 

 

 

 

 

 

 

 

 

Total

 

 

 

 

 

 

 

 

 

 

 

 

No.

Number

Nama Blok/ Prospek

Block/Prospect Name

Jenis Material **)

Material Type **)

Sumber Daya Tahun N *)

Resources Year N *)

Luas (Ha)

Area (Ha)

Tereka

Guessed

Tertunjuk

Designated

Terukur

Measurable

Tonase

Tonnage

Kadar ***)

Level ***)

Tonase

Tonnage

Kadar ***)

Level ***)

Tonase

Tonnage

Kadar ***)

Level ***)

Unsur 1

Element 1

Unsur 2

Element 2

Unsur 1

Element 1

Unsur 2

Element 2

Unsur 1

Element 1

Unsur 2

Element 2

1

 

 

 

 

 

 

 

 

 

 

 

 

...

 

 

 

 

 

 

 

 

 

 

 

 

Total

 

 

 

 

 

 

 

 

 

 

 

 

Keterangan:

*)           dijelaskan alasan perubahan sumber daya apakah karena:

a. adanya penambahan data dari hasil kegiatan eksplorasi

b. adanya peningkatan klasifikasi sumber daya menjadi cadangan

**)         jika dapat diterapkan, agar dipisahkan berdasarkan jenis material.

***)       Jika golongan ekonomis lebih dari 2 unsur agar disesuaikan dengan jumlah unsur yang ada.

Description:

*)            explain the reason for the change in resources, whether because:

a. additional data from exploration activities

b. an increase in resource classification to reserves

**)         if applicable, to be separated based on the type of material.

***)       If the economic group is more than 2 elements, to be adjusted to the number of existing elements.

 

 

B. Cadangan

B. Reserves

 

No.

Number

Nama Blok/ Prospek

Block/Prospect Name

Jenis Material **)

Material Type **)

Cadangan Tahun N-1

Reserve Year N-1

Luas (Ha)

Area (Ha)

Terkira

Estimated

Terbukti

Proven

Tonase

Tonnage

Kadar ***)

Level ***)

Tonase

Tonnage

Kadar ***)

Level ***)

Unsur 1

Element 1

Unsur 2

Element 2

Unsur 1

Element 1

Unsur 2

Element 2

1

 

 

 

 

 

 

 

 

 

….

 

 

 

 

 

 

 

 

 

Total

 

 

 

 

 

 

 

 

 

Penjelasan Matrik:

Berikan penjelasan mengenai apakah cadangan merupakan bagian dari sumber daya atau masing-masing berdiri sendiri Keterangan:

*)           Dijelaskan alasan perubahan cadangan apakah karena:

a. adanya pengurangan produksi

b. adanya perubahan parameter estimasi cadangan; atau

c. adanya penambahan data dari hasil kegiatan eksplorasi.

**)         Jika dapat diterapkan, agar dipisahkan berdasarkan jenis material.

***)       Jika golongan ekonomis lebih dari 2 unsur agar disesuaikan dengan jumlah unsur yang ada

Matrix Explanation:

Provide an explanation of whether reserves are part of resources or stand alone. Description:

*)            Explain the reasons for changes in reserves, whether due to:

a. a reduction in production

b. a change in reserve estimation parameters; or

c. additional data from exploration activities.

**)         If applicable, separate them based on material type.

***)       If the economic group is more than 2 elements, adjust it to the number of elements available

 

Sumber (source) :

Google Translate

Tidak ada komentar:

Posting Komentar

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 15 DESEMBER 2446 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 15 DESEMBER 2446 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing3 EVOLUSI PENDIDIKAN LOKAL MANDAILING  UNTUK RENTANGAN TAHUN 2446 - 2025  =  421 (EMPAT ...