https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN LOKAL MANDAILING UNTUK RENTANGAN TAHUN 2446 - 2024 = 422 (EMPAT RATUS DUA PULUH DUA) TAHUN MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA KE PERUBAHAN WAJAH PERADABAN BARU PERDAMAIAN ABADI DUNIA INTERNASIONAL GLOBAL BUMI
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
16 Juni 2446 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
June 16th, 2446 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (Mandailing University) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIC. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN BATUAN (Halaman 330)
IIC. FORMAT FOR PREPARATION OF
WORK PLAN AND BUDGET FOR MINING BUSINESS LICENSE HOLDERS IN THE PRODUCTION
OPERATION ACTIVITY STAGE OF ROCK GROUPS (Page 330)
Matrik 1. Legalitas
Matrix 1. Legality
No. Number |
URAIAN DESCRIPTION |
KETERANGAN INFORMATION |
||||||||||
(1) |
(2) |
|||||||||||
1. |
Nama Perusahaan Company Name |
|
||||||||||
2. |
NPWP Perusahaan Company Taxpayer Identification
Number |
|
||||||||||
3. |
Nomor SK IUP/IUPK Mining Business Permit Decree
Number / Special Mining Business Permit |
|
||||||||||
4. |
Status IUP/IUPK Mining Business Permit Status /
Special Mining Business Permit |
|
||||||||||
5. |
Kode WIUP/WIUPK Code of Mining Business License
Area / Special Mining Business License Area |
|
||||||||||
6. |
Nomor SK Penetapan Tanda Batas WIUP/WIUPK Number of Decree on Determination
of Boundary Marks for Mining Business Permit Areas / Special Mining Business
Permit Areas |
|
||||||||||
7. |
Golongan Group |
|
||||||||||
8. |
Jangka Waktu WIUP/WIUPK Term of Mining Business Permit
Area / Special Mining Business Permit Area |
Mulai … s.d ... (Tanggal/Bulan/Tahun) From … to … (Date/Month/Year) |
||||||||||
9. |
Kepala Teknik Tambang Head of Mining Engineering |
Nama: Nomor Surat Pengesahan: Tanggal Surat Pengesahan: Name: Approval Letter Number: Approval Letter Date: |
||||||||||
10. |
Persetujuan Dokumen Lingkungan (Nomor dan Tanggal) Environmental Document Approval
(Number and Date) |
|
berakhir tahun : end of year : |
|||||||||
11. |
Persetujuan Studi Kelayakan/FS (Nomor dan Tanggal) Feasibility Study/FS Approval
(Number and Date) |
|
berakhir tahun : end of year : |
|||||||||
|
a. |
Tambang (Golongan dan Waste) Mining (Group and Waste) |
|
|
||||||||
|
b. |
Pengolahan Processing |
|
|
||||||||
12 |
Rencana Produksi Production Plan |
Tahun N (ton) Year
N (tons) |
Tahun N + 1 (ton) Year
N + 1 (tons) |
Tahun N + 2 (ton) Year
N + 2 (tons) |
||||||||
|
a. |
Tambang Golongan & Waste Class & Waste Mining |
|
|
||||||||
|
b. |
Pengolahan Processing |
|
|
||||||||
13. |
Luas Wilayah Izin Operasi Produksi Area of Production Operation
Permit |
Kawasan Hutan (ha) Forest
Area (ha) |
Bukan Kawasan Hutan (ha) Not
Forest Area (ha) |
|||||||||
HK Conservation
Forest |
HL Protected
Forest |
HP Production
Forest |
||||||||||
|
|
|
|
|
|
|||||||
Total Luas Wilayah Total Area |
ha |
|||||||||||
14. |
Luas Project Area Project Area Size |
ha |
||||||||||
15. |
Ijin Pinjam Pakai Kawasan Hutan (IPPKH) Untuk Operasi Produksi Forest Area Borrowing Permit
for Production Operations |
No. Number |
… |
|||||||||
Tanggal Date |
… |
|||||||||||
Ijin Pinjam Pakai Kawasan Hutan (IPPKH) Untuk Eksplorasi Lanjutan Forest Area Use Permit for
Further Exploration |
No. Number |
… |
||||||||||
Tanggal Date |
… |
|||||||||||
16 |
Luas Wilayah Pinjam Pakai Kawasan Hutan Untuk Operasi Produksi Area of Forest Area Borrowed
for Production Operations |
|
ha |
|||||||||
Luas Wilayah Pinjam Pakai Kawasan Hutan Untuk Eksplorasi Lanjutan Area of Forest Area Borrowed
for Further Exploration |
|
ha |
||||||||||
17. |
Pemegang Saham Shareholders |
1. … : … % 2. … : … % |
||||||||||
18. |
Susunan Pengurus Board of Management |
Direksi: 1. (Nama) 2. (Nama) Komisaris: 1. (Nama) 2. (Nama) Board of Directors: 1. (Name) 2. (Name) Commissioners: 1. (Name) 2. (Name) |
||||||||||
Keterangan:
*) Definitif atau
Sementara
**) sesuai dengan Studi
Kelayakan dan atau AMDAL pada periode tahun berjalan
***) Hutan Konservasi (Taman
Nasional, Cagar Alam, Suaka Alam, dan lain lain) yang dilarang untuk
melakukan kegiatan usaha pertambangan
****) Hutan Lindung
*****) Hutan Produksi (Terbatas,
Tetap, Konversi)
******) Luas area di luar Wilayah IUP/KK/PKP2B yang digunakan atas
seizin Pemda
(Provinsi/Kabupaten) Jika IPPKH masih dalam proses
pengurusan supaya mencantumkan nomor
surat korespondensi dengan instansi terkait.
Description:
*) Definitive or Temporary
**) in accordance with the Feasibility Study and or Environmental
Impact Analysis in the current year period
***) Conservation Forests (National Parks, Nature Reserves, Nature
Reserves, etc.) which are prohibited from conducting mining business activities
****) Protected Forests
*****) Production Forests (Limited, Permanent, Conversion)
******) Area outside the Mining
Business Permit Area / Work Contract / Coal Mining Business Work Agreement used
with the permission of the Regional Government (Province / Regency) If the
Forest Area Borrow-Use Permit is still in the process of being processed, please
include the number of the correspondence letter with the relevant agency.
Sumber (source) :
Google Translate
Tidak ada komentar:
Posting Komentar