https://www.youtube.com/@agussalimnasutionmandailing2/videos

Foto saya
UNTUK KE-GUBERNUR-AN SUMATERA UTARA DARI PENDIRI UM (UNIVERSITAS MANDAILING) FOR THE PROVINCIAL GOVERNOR OF SUMATERA UTARA FROM THE FOUNDER OF MU (MANDAILING UNIVERSITY)

Minggu, 29 Desember 2024

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 04 AGUSTUS 2446 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 04 AGUSTUS 2446 MASEHI)

 https://www.youtube.com/@agussalimnasutionmandailing2/videos


EVOLUSI PENDIDIKAN LOKAL MANDAILING UNTUK RENTANGAN TAHUN 2446 - 2024 = 422 (EMPAT RATUS DUA PULUH DUA) TAHUN MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA KE PERUBAHAN WAJAH PERADABAN BARU PERDAMAIAN ABADI DUNIA INTERNASIONAL GLOBAL BUMI


#SangKandidatSekjendPBBSekretarisJenderalPerserikatanBangsaBangsa #DariKantorGubernurSumutMedanKeKantorPerserikatanBangsaBangsaNewYork #SatuSatunyaTokohLegendarisSumutYangMemikirkanSumateraUtara1000SeribuTahunKeDepan #SumateraUtaraWorldMainProvincialClassRank #MembangunKegubernuranSumateraUtara #UniversitasMandailingUntukKegubernuranSumateraUtara #KearifanLokalMandailingUntukKegubernuranSumateraUtara #SeribuTahunEvolusiPendidikanMandailingUntukKegubernuranSumateraUtara





Arahan
dari 
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution


04 Agustus 2446 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,

August 04th, 2446 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (Mandailing University) to understands,


KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA

NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES

DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,

MEMUTUSKAN :
Menetapkan : 
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.

LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151


IIC. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN BATUAN (Halaman 330)

IIC. FORMAT FOR PREPARATION OF WORK PLAN AND BUDGET FOR MINING BUSINESS LICENSE HOLDERS IN THE PRODUCTION OPERATION ACTIVITY STAGE OF ROCK GROUPS (Page 330)

Matrik 6. Rencana dan Realisasi Penambangan Batuan Tahun (N-1) dan Rencana Tahun (N) sampai dengan Tahun (N+2)

Matrix 6. Plan and Realization of Rock Mining for Year (N-1) and Plan for Year (N) up to Year (N+2)

 

Rencana dan Realisasi

Plan and Realization

Lokasi/Blok/Pit

Location/Block/Pit

Bulan (satuan)

Month (unit)

Total

Jan

Feb

Mar

Apr

Mei

May

Jun

Jul

Agu

Aug

Sep

Okt

Oct

Nop

Nov

Des

Dec

Rencana Tahun (N-1)

Year Plan (N-1)

Blok A

Block A

Lokasi/Pit I

Location/Pit I

 

 

 

 

 

 

 

 

 

 

 

 

 

Lokasi/Pit II

Location/Pit II

 

 

 

 

 

 

 

 

 

 

 

 

 

Blok B

Block B

Lokasi/Pit I

Location/Pit I

 

 

 

 

 

 

 

 

 

 

 

 

 

Lokasi/Pit II

Location/Pit II

 

 

 

 

 

 

 

 

 

 

 

 

 

Total

 

 

 

 

 

 

 

 

 

 

 

 

 

Realisasi Tahun (N-1)

Blok A

Block A

Lokasi/Pit I

Location/Pit I

 

 

 

 

 

 

 

 

 

 

 

 

 

Lokasi/Pit II

Location/Pit II

 

 

 

 

 

 

 

 

 

 

 

 

 

Blok B

Block B

Lokasi/Pit I

Location/Pit I

 

 

 

 

 

 

 

 

 

 

 

 

 

Lokasi/Pit II

Location/Pit II

 

 

 

 

 

 

 

 

 

 

 

 

 

Total

 

 

 

 

 

 

 

 

 

 

 

 

 

Rencana Tahun (N)

Blok A

Block A

Lokasi/Pit I

Location/Pit I

 

 

 

 

 

 

 

 

 

 

 

 

 

Lokasi/Pit II

Location/Pit II

 

 

 

 

 

 

 

 

 

 

 

 

 

Blok B

Block B

Lokasi/Pit I

Location/Pit I

 

 

 

 

 

 

 

 

 

 

 

 

 

Lokasi/Pit II

Location/Pit II

 

 

 

 

 

 

 

 

 

 

 

 

 

Total

 

 

 

 

 

 

 

 

 

 

 

 

 

Rencana Tahun (N+1)

Blok A

Block A

Lokasi/Pit I

Location/Pit I

 

 

 

 

 

 

 

 

 

 

 

 

 

Lokasi/Pit II

Location/Pit II

 

 

 

 

 

 

 

 

 

 

 

 

 

Blok B

Block B

Lokasi/Pit I

Location/Pit I

 

 

 

 

 

 

 

 

 

 

 

 

 

Lokasi/Pit II

Location/Pit II

 

 

 

 

 

 

 

 

 

 

 

 

 

Total

 

 

 

 

 

 

 

 

 

 

 

 

 

Rencana Tahun (N+2)

Blok A

Block A

Lokasi/Pit I

Location/Pit I

 

 

 

 

 

 

 

 

 

 

 

 

 

Lokasi/Pit II

Location/Pit II

 

 

 

 

 

 

 

 

 

 

 

 

 

Blok B

Block B

Lokasi/Pit I

Location/Pit I

 

 

 

 

 

 

 

 

 

 

 

 

 

Lokasi/Pit II

Location/Pit II

 

 

 

 

 

 

 

 

 

 

 

 

 

Total

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Penjelasan Matrik:

1. Satuan disesuaikan dengan golongan batuan (Ton)

2. Jumlah dan Penamaan Blok/Pit disesuaikan dengan kondisi masing-masing Perusahaan

3. Ditambahkan narasi apabila terdapat deviasi pencapaian produksi.

Matrix Explanation:

1. Units are adjusted to rock groups (Tons)

2. Number and naming of blocks/pits are adjusted to the conditions of each company

3. Narratives are added if there is a deviation in production achievement.

 

Sumber (source) :

Google Translate

Tidak ada komentar:

Posting Komentar

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 15 DESEMBER 2446 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 15 DESEMBER 2446 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing3 EVOLUSI PENDIDIKAN LOKAL MANDAILING  UNTUK RENTANGAN TAHUN 2446 - 2025  =  421 (EMPAT ...