https://www.youtube.com/@agussalimnasutionmandailing2/videos

Foto saya
UNTUK KE-GUBERNUR-AN SUMATERA UTARA DARI PENDIRI UM (UNIVERSITAS MANDAILING) FOR THE PROVINCIAL GOVERNOR OF SUMATERA UTARA FROM THE FOUNDER OF MU (MANDAILING UNIVERSITY)

Sabtu, 14 Desember 2024

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 23 DESEMBER 2445 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 23 DESEMBER 2445 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos


EVOLUSI PENDIDIKAN LOKAL MANDAILING UNTUK RENTANGAN TAHUN 2445 - 2024 = 421 (EMPAT RATUS DUA PULUH SATU) TAHUN MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA KE PERUBAHAN WAJAH PERADABAN BARU PERDAMAIAN ABADI DUNIA INTERNASIONAL GLOBAL BUMI


#SangKandidatSekjendPBBSekretarisJenderalPerserikatanBangsaBangsa #DariKantorGubernurSumutMedanKeKantorPerserikatanBangsaBangsaNewYork #SatuSatunyaTokohLegendarisSumutYangMemikirkanSumateraUtara1000SeribuTahunKeDepan #SumateraUtaraWorldMainProvincialClassRank #MembangunKegubernuranSumateraUtara #UniversitasMandailingUntukKegubernuranSumateraUtara #KearifanLokalMandailingUntukKegubernuranSumateraUtara #SeribuTahunEvolusiPendidikanMandailingUntukKegubernuranSumateraUtara





Arahan
dari 
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution


23 Desember 2445 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,

December 23rd, 2445 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (Mandailing University) to understands,


KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA

NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES

DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,

MEMUTUSKAN :
Menetapkan : 
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.

LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151


IIB. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN MINERAL BUKAN LOGAM (halaman 248)

IIB. FORMAT FOR PREPARATION OF WORK PLAN AND BUDGET FOR MINING BUSINESS LICENSE HOLDERS IN PRODUCTION OPERATION ACTIVITIES OF NON-METALLIC MINERALS (page 248)

Matrik 21. Statistik Keselamatan Pertambangan

Matrix 21. Mining Safety Statistics

 

 

Jumlah Tenaga Kerja

Number of Workers

Jumlah Jam Kerja

Number of Working Hours

Jumlah Kecelakaan Tambang

Number of Mining Accidents

Hari Kerja Hilang Akibat Kecelakaan

Work Day Lost Due to Accident

FR

SR

Jumlah Pekerja Sakit

Number of Sick Workers

Jumlah Spell

Number of Spells

Jumlah Absensi Karena Sakit

Number of Absences Due to Sickness

Jumlah Tenaga Kerja Layak Kerja Berdasarkan Pemeriksaan Kesehatan

Number of Workers Eligible for Work Based on Health Examination

Jumlah Kasus PAK

Number of Cases of Occupational Diseases

Rasio Kelayakan Kerja

Employability Ratio

MFR

ASR

SSR

Rasio PAK

Occupational Disease Ratio

Ringan

Berat

Mati

Tahun N-3

Year N-3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tahun N-2

Year N-2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tahun N-1

Year N-1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Penjelasan Matrik :

1. FR (Frequency Rate): Jumlah korban kecelakaan x 1.000.000/Jumlah jam kerja kumulatif

2. SR (Severity Rate): Jumlah hari kerja hilang x 1.000.000/Jumlah jam kerja kumulatif

3. Rasio Kelayakan Kerja = Jumlah pekerja yang sakit karena penyakit, tidak termasuk kecelakaan/Jumlah Tenaga kerja x 100%

4. MFR (Morbidity Frequency Rate) = Jumlah pekerja yang sakit karena penyakit, tidak termasuk kecelakaan/Jumlah jam kerja kumulatif x 1.000.000

5. Absence Severity Rate (ASR) = Jumlah absensi karena sakit, tidak termasuk kecelakaan)/Jumlah jam kerja kumulatif x 1.000.000

6. Spell Severity Rate (SSR) = Jumlah absensi karena sakit, tidak termasuk kecelakaan/jumlah spell

7. Rasio PAK = Jumlah kasus PAK/Jumlah tenaga kerja

Matrix Explanation:

1. FR (Frequency Rate): Number of accident victims x 1,000,000/Cumulative number of working hours

2. SR (Severity Rate): Number of work days lost x 1,000,000/Cumulative number of working hours

3. Work Eligibility Ratio = Number of workers who are sick due to illness, excluding accidents/Number of Workers x 100%

4. MFR (Morbidity Frequency Rate) = Number of workers who are sick due to illness, excluding accidents/Cumulative number of working hours x 1,000,000

5. Absence Severity Rate (ASR) = Number of absences due to illness, excluding accidents)/Cumulative number of working hours x 1,000,000

6. Spell Severity Rate (SSR) = Number of absences due to illness, excluding accidents/number of spells

7. PAK Ratio = Number of PAK cases/Number of workers

 

Sumber (source) :

Google Translate

Tidak ada komentar:

Posting Komentar

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 15 DESEMBER 2446 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 15 DESEMBER 2446 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing3 EVOLUSI PENDIDIKAN LOKAL MANDAILING  UNTUK RENTANGAN TAHUN 2446 - 2025  =  421 (EMPAT ...