EVOLUSI PENDIDIKAN LOKAL MANDAILING UNTUK RENTANGAN TAHUN 2445 - 2024 = 421 (EMPAT RATUS DUA PULUH SATU) TAHUN MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA KE PERUBAHAN WAJAH PERADABAN BARU PERDAMAIAN ABADI DUNIA INTERNASIONAL GLOBAL BUMI
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
30 Desember 2445 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
December 30th, 2445 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (Mandailing University) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIB. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN MINERAL BUKAN LOGAM (halaman 248)
IIB. FORMAT FOR PREPARATION OF
WORK PLAN AND BUDGET FOR MINING BUSINESS LICENSE HOLDERS IN PRODUCTION
OPERATION ACTIVITIES OF NON-METALLIC MINERALS (page 248)
Matrik 22a. Rencana dan Realisasi Penggunaan Bahan Peledak
Matrix 22a. Plan and Realization
of Use of Explosives
No. Number |
Keterangan Information |
Satuan Unit |
Rencana Tahun N-1 Year
Plan N-1 |
Realisasi Tahun N-1 Realization
Year N-1 |
|||||||
Pengupasan tanah penutup / overburden / country rock UG / OP Overburden
/ country rock UG / OP stripping |
Penambangan UG/OP UG/OP
Mining |
Pengupasan tanah penutup / overburden / country rock UG / OP |
Penambangan UG/OP UG/OP
Mining |
Sisa Persediaan Bahan Peledak Remaining
Stock of Explosives |
|||||||
Jumlah Amount |
Biaya Cost |
Jumlah Amoun |
Biaya Cost |
Jumlah Amoun |
Biaya Cost |
Jumlah Amoun |
Biaya Cost |
Jumlah Amoun |
|||
1. |
Target Pembongkaran batuan dengan peledakan Rock demolition target by
blasting |
Ton |
|
|
|
|
|
|
|
|
|
2. |
Diameter lubang ledak Blast hole diameter |
Inchi Inches |
|
|
|
|
|
|
|
|
|
3. |
Spasi antara lubang ledak Space between blast holes |
M |
|
|
|
|
|
|
|
|
|
4. |
Burden lubang ledak Blast hole burden |
M |
|
|
|
|
|
|
|
|
|
5. |
Kedalaman lubang ledak Blast hole depth |
M |
|
|
|
|
|
|
|
|
|
6. |
Densitas Batuan Rock Density |
Kg/M3 |
|
|
|
|
|
|
|
|
|
7. |
Dinamit / booster per
lubang ledak Dynamite / booster per blast
hole |
Biji Seed |
|
|
|
|
|
|
|
|
|
8. |
Detonator per lubang ledak termasuk di permukaan Detonator per blast hole
including on the surface |
Biji Seed |
|
|
|
|
|
|
|
|
|
9. |
Sumbu ledak/api per lubang ledak Blasting fuse/fire per blast
hole |
Meter |
|
|
|
|
|
|
|
|
|
10. |
Powder factor |
Kg/M3 |
|
|
|
|
|
|
|
|
|
11. |
Jumlah lubang ledak yang akan diledakkan per hari Number of blast holes to be
blasted per day |
Lubang Hole |
|
|
|
|
|
|
|
|
|
12. |
Bahan Ramuan Bahan Peledak …. Ingredients for Explosives
…. |
Kg |
|
|
|
|
|
|
|
|
|
13. |
Bahan Peledak Peka Primer……. Primary Sensitive Explosives……. |
Kg |
|
|
|
|
|
|
|
|
|
14. |
Aksesoris Peledakan …. Blasting Accessories …. |
Buah Fruit |
|
|
|
|
|
|
|
|
|
15. |
Detonator …. |
Buah Fruit |
|
|
|
|
|
|
|
|
|
Matrik 22a. (lanjutan)
Matrix 22a. (continued)
No. Number |
Keterangan Information |
Satuan Unit |
Rencana Tahun N Year Plan N |
Rencana Tahun N+1 N+1 Year Plan |
Rencana Tahun N+1 N+1 Year Plan |
|||||||||||||||||||||
Pengupasan tanah
penutup / overburden / country rock UG/OP Overburden / country rock UG/OP stripping |
Penambangan UG/OP UG/OP Mining |
Pengupasan tanah
penutup / overburden / country rock UG/OP Overburden / country rock UG/OP stripping |
Penambangan UG/OP UG/OP Mining |
Pengupasan tanah
penutup / overburden / country rock UG/OP Overburden / country rock UG/OP stripping |
Penambangan UG/OP UG/OP Mining |
|||||||||||||||||||||
Sem 1 |
Sem 2 |
Sem 1 |
Sem 2 |
Sem 1 |
Sem 2 |
Sem 1 |
Sem 2 |
Sem 1 |
Sem 2 |
Sem 1 |
Sem 2 |
|||||||||||||||
Jml Amount |
Biaya Cost |
Jml Amount |
Biaya Cost |
Jml Amount |
Biaya Cost |
Jml Amount |
Biaya Cost |
Jml Amount |
Biaya Cost |
Jml Amount |
Biaya Cost |
Jml Amount |
Biaya Cost |
Jml Amount |
Biaya Cost |
Jml Amount |
Biaya Cost |
Jml Amount |
Biaya Cost |
Jml Amount |
Biaya Cost |
Jml Amount |
Biaya Cost |
|||
1. |
Target Pembongkar an batuan dengan peledakan Target of rock
demolition by blasting |
Ton |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. |
Diameter lubang ledak Blast hole
diameter |
Inchi Inches |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. |
Spasi antara lubang ledak Space between
blast holes |
M |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4. |
Burden
lubang ledak Blast hole
burden |
M |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5. |
Kedalaman lubang ledak Blast hole
depth |
M |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6. |
Densitas Batuan Rock Density |
Kg/M 3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7. |
Dinamit/ booster
per lubang ledak Dynamite/
booster per blast hole |
Biji Seed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8. |
Detonator per lubang ledak termasuk di permukaan Detonator per
blast hole including on the surface |
Biji Seed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9. |
Sumbu ledak/api per lubang ledak Blasting
fuse/fire per blast hole |
Meter |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
10. |
Powder factor |
Kg/ M 3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11. |
Jumlah lubang ledak yang akan diledakkan per hari Number of blast holes to be
blasted per day |
Lubang |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
12. |
Bahan Ramuan Bahan Peledak Explosive
Ingredients |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
…… |
Kg |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
13. |
Bahan Peledak Peka Primer Primary
Sensitive Explosives |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
… |
Kg |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
14. |
Aksesoris Peledakan Blasting
Accessories |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
…… |
Buah Fruit |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
15. |
Detonator |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
….. |
Buah Fruit |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Data Alat Bor.
A. Drilling Tool
Data.
No. Number |
Merek / Tipe Alat Brand / Type of Tool |
Diameter (mm) |
Kedalaman (meter) Depth (meters) |
PA/MA/UA (%) |
Jumlah Amount |
|||||||
Rencana Tahun N-1 Year Plan N-1 |
Realisasi Tahun N-1 Realization Year N-1 |
Rencana Tahun N Year Plan N |
Rencana Tahun N +1 Year Plan N +1 |
Rencana Tahun N +2 Year Plan N +2 |
||||||||
Semester 1 |
Semester 2 |
Semester 1 |
Semester 2 |
Semester 1 |
Semester 2 |
|||||||
1. |
|
|
|
|
|
|
|
|
|
|
|
|
… |
|
|
|
|
|
|
|
|
|
|
|
|
B. Data Alat Pemuat / Loading.
B. Loading
Equipment Data.
No. Number |
Nama Alat Tool Name |
Merek/Tipe Alat Brand/Type of Tool |
Kapasitas (ton) Capacity (tons) |
Jumlah Amount |
|||||||
Rencana Tahun N-1 Year Plan N-1 |
Realisasi Tahun N-1 Realization Year N-1 |
Rencana Tahun N Year Plan N |
Rencana Tahun N+1 Year Plan N +1 |
Rencana Tahun N +2 N+2 Year Plan |
|||||||
Semester 1 |
Semester 2 |
Semester 1 |
Semester 2 |
Semester 1 |
Semester 2 |
||||||
1. |
|
|
|
|
|
|
|
|
|
|
|
… |
|
|
|
|
|
|
|
|
|
|
|
C. Mixing Plant
No. Number |
Nama Alat Tool Name |
Lokasi Location |
Kapasitas (ton) Capacity (tons) |
Jumlah yang di-Mixing (ton) Mixed Amount (tons) |
|||||||
Rencana Tahun N-1 Year Plan N-1 |
Realisasi Tahun N-1 Realization Year N-1 |
Rencana Tahun N Year Plan N |
Rencana Tahun N +1 Year Plan N +1 |
Rencana Tahun N+2 N+2 Year Plan |
|||||||
Semester 1 |
Semester 2 |
Semester 1 |
Semester 2 |
Semester 1 |
Semester 2 |
||||||
1. |
|
|
|
|
|
|
|
|
|
|
|
... |
|
|
|
|
|
|
|
|
|
|
|
D. Rencana Pembangunan Fasilitas Pengangkutan,
Penyimpanan/Penimbunan Bahan Peledak dan/atau Rencana Peledakan Tidur
D. Plan for
Construction of Explosive Materials Transportation, Storage/Stockpiling
Facilities and/or Plan for Blasting
1) Rencana Pembangunan Fasilitas Pengangkutan,
Penyimpanan/Penimbunan Bahan Peledak.
1) Plan for
Construction of Explosive Materials Transportation, Storage/Hoarding
Facilities.
No. Number |
Item |
Kondisi Eksisting*) Existing Condition*) |
Rencana Pembangunan Development Plan |
|||
Rencana Tahun N Year Plan N |
Rencana Tahun N+1 N+1 Year Plan |
Rencana Tahun N+2 N+2 Year Plan |
||||
1. |
Rencana Pembangunan Fasillitas Pengangkutan,
Penyimpanan/ Penimbunan Bahan Peledak Explosive
Materials Transportation, Storage/Hoarding Facility Development Plan |
|
|
|
|
|
|
a. |
Nama/Nomor Gudang Warehouse
Name/Number |
|
|
|
|
|
b. |
Jenis Gudang Warehouse Type |
|
|
|
|
|
c. |
Fungsi Gudang Warehouse
Function |
|
|
|
|
|
d. |
Bentuk Gudang Warehouse Form |
|
|
|
|
|
e. |
Jenis Bahan Peledak yang Disimpan Types of
Explosives Stored |
|
|
|
|
|
f. |
Kapasitas Gudang Warehouse
Capacity |
|
|
|
|
|
g. |
Lokasi Gudang Kecamatan Kabupaten Provinsi Warehouse
Location District Regency Province |
|
|
|
|
Keterangan :
*) Jelaskan informasi gudang bahan peledak yang telah
dimiliki pada tahun berjalan
Description:
*) Explain information
about the explosives warehouse owned in the current year.
2) Rencana Peledakan Tidur.
2) Sleep Blast Plan.
No. Number |
Item |
Kondisi Eksisting*) Existing
Condition*) |
Rencana Peledakan Tidur Sleep
Blast Plan |
|||
Rencana Tahun N Year
Plan N |
Rencana Tahun N+1 N+1
Year Plan |
Rencana Tahun N+2 N+2
Year Plan |
||||
1. |
Rencana Pelaksanaan Peledakan Tidur Sleep Blast Implementation Plan |
|
|
|
|
|
|
a. |
Lokasi Rencana Pelaksanaan Peledakan Tidur (Blok/Pit/Panel) Location of Planned Blasting
Implementation (Block/Pit/Panel) |
|
|
|
|
|
b. |
Batas maksimal waktu tidur bahan peledak Maximum sleep time limit for
explosives |
|
|
|
|
|
c. |
Jumlah maksimal lubang ledak yang diizinkan untuk peledakan tidur The maximum number of blast
holes permitted for sleeper blasting |
|
|
|
|
Keterangan :
*) Jelaskan
informasi pelaksanaan peledakan tidur yang telah dilakukan pada tahun berjalan
Description:
*) Explain the information on the
implementation of sleep blasting that has been carried out in the current year.
sumber (source) :
Google Translate
Tidak ada komentar:
Posting Komentar