Sabtu, 24 Februari 2024

TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 22 NOPEMBER 2442 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 22 NOPEMBER 2442 MASEHI)

 

https://www.youtube.com/@agussalimnasutionmandailing2/videos


EVOLUSI PENDIDIKAN MANDAILING 418 (EMPAT RATUS DELAPAN BELAS) TAHUN DI TAHUN 2024


Arahan
dari 
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution


22 Nopember 2442 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
November 22nd, 2442 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,


KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA

NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES

DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,

MEMUTUSKAN :
Menetapkan : 
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.

IB. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN EKSPLORASI GOLONGAN MINERAL BUKAN LOGAM
IB. FORMAT FOR PREPARING RKAB FOR IUP HOLDERS FOR THE EXPLORATION ACTIVITIES STAGE OF THE NON-METAL MINERALS GROUP


Matrik 1. Legalitas
Matrix 1. Legality

 

No.
Number

URAIAN
DESCRIPTION

KETERANGAN
INFORMATION

1.

Nama Perusahaan
Company Name

 

 

 

 

2

NPWP Perusahaan
Company NPWP (in Bahasa)

 

 

 

 

3.

Nomor SK IUP/IUPK
SK IUP/IUPK (in Bahasa) number

 

 

 

 

4.

Kode WIUP/WIUPK
WIUP/WIUPK (in Bahasa) Code

 

 

 

 

5.

Golongan Mineral Bukan Logam
Non-Metal Mineral Group

 

 

 

 

6.

Jangka Waktu IUP/IUPK
Period of IUP/IUPK (in Bahasa)

Mulai ... s.d ... (tanggal/bulan/tahun)
From ... to ... (date/month/year)

7.

Kepala Teknik Tambang
Head of Mining Engineering

Nama :
Nomor Surat Pengesahan :
Tanggal Surat Pengesahan :
Name :
Confirmation Letter Number :
Date of Confirmation Letter :

8.

Luas Wilayah IUP/IUPK
Area of IUP/IUPK (in Bahasa)

Kawasan Hutan (ha)
Forest Area (ha)

Bukan Kawasan Hutan (ha)
Not Forest Area (ha)

HK *)
HK *) (in Bahasa)

HL **
HL ** (in Bahasa)

HP ***)
HP ***) (in Bahasa)

 

9.

Total Luas Wilayah IUP/IUPK
Total Area of IUP/IUPK (in Bahasa)

ha

10.

Luas Project Area ****
Project Area ****

ha

11.

Ijin Pinjam Pakai Kawasan Hutan (IPPKH)
Borrow-to-use Forest Area Permit [(IPPKH) in Bahasa) *****)

No.
Number

 

 

Tanggal
Date

 

 

Luas
Wide

ha

 

 

Jangka Waktu
Time Period

mulai ... s.d ... (Tanggal/Bulan/Tahun)
from ... to ... (Date/Month/Year)

12.

Pemegang Saham
Shareholders

1.

…..

:

………

%

 

 

 

 

2.

…..

:

………

%

 

 

13.

Susunan Pengurus
Board of Management

Direksi
Directors

:

 

 

 

1.

…..

 

 

2.

……

 

 

Komisaris
Commissioner

 

 

1.

…..

 

 

2.

…..

 
Keterangan :
*)           Hutan Konservasi (Taman Nasional, Cagar Alam, Suaka Alam, dan lain lain) yang dilarang untuk melakukan kegiatan usaha pertambangan
 **)        Hutan Lindung
 ***)      Hutan Produksi (Terbatas, Tetap, Konversi)
 ****)    Luas area di luar Wilayah IUP/IUPK yang digunakan dan mendapatkan persetujuan, jika berada dalam WIUP/WIUPK lain wajib membuat perjanjian permanfaatan lahan
*****) Jika IPPKH masih dalam proses pengurusan agar mencantumkan nomor surat korespondensi dengan instansi terkait
Information :
*)           Conservation Forests (National Parks, Nature Reserves, Nature Reserves, etc.) which are prohibited from carrying out mining business activities
  **)       Protected forest
  ***)     Production Forest (Limited, Permanent, Conversion)
  ****)   The area outside the IUP/IUPK area that is used and has received approval, if it is in another WIUP/WIUPK, you must make a land use agreement
*****) If the IPPKH is still in the processing process, please include the number of the correspondence letter with the relevant agency
 
Sumber (source) :
Google Translate

Tidak ada komentar:

Posting Komentar

TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 05 DECEMBER 2443 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 05 DESEMBER 2443 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos EVOLUSI PENDIDIKAN MANDAILING 419 (EMPAT RATUS SEMBILAN BELAS) TAHUN DI TAHUN 2...