https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN MANDAILING 418 (EMPAT RATUS DELAPAN BELAS) TAHUN DI TAHUN 2024
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
14 Juni 2442 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
June 14th, 2442 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERALREPUBLIK INDONESIANOMOR : 373.K/MB.01/MEM.B/2023TENTANGPEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARADECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIANUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
Matrik
4. Hasil Estimasi Sumber Daya dan Cadangan
Matrix 4. Resource and Reserve Estimation Results
a. Sumber
Daya
a. Resource
No
Number
1
N
Total
Nama Blok/Prospek
Block/Prospect Name
Jenis Material **)
Material Type **)
Sumber Daya Tahun N-1
Year N-1 Resources
Tereka
Inferred
Tonase
Tonnage
Kadar ***)
Grade ***)
Unsur 1
Element 1
Unsur 2
Element 2
Logam ***)
Metal ***)
Unsur 1
Element 1
Unsur 2
Element 2
Tertunjuk
Indicated
Tonase
Tonnage
Kadar ***)
Grade ***)
Unsur 1
Element 1
Unsur 2
Element 2
Logam ***)
Metal ***)
Unsur 1
Element 1
Unsur 2
Element 2
Terukur
Measurable
Tonase
Tonnage
Kadar ***)
Grade ***)
Unsur 1
Element 1
Unsur 2
Element 2
Logam ***)
Metal ***)
Unsur 1
Element 1
Unsur 2
Element 2
Luas (ha)
Area (ha)
No
Number
1
N
Total
Nama Blok/Prospek
Block/Prospect Name
Jenis Material **)
Material Type **)
Sumber Daya Tahun N *)
Year N Resources *)
Tereka
Inferred
Tonase
Tonnage
Kadar ***)
Grade ***)
Unsur 1
Element 1
Unsur 2
Element 2
Logam ***)
Metal ***)
Unsur 1
Element 1
Unsur 2
Element 2
Tertunjuk
Indicated
Tonase
Tonnage
Kadar ***)
Grade ***)
Unsur 1
Element 1
Unsur 2
Element 2
Logam ***)
Metal ***)
Unsur 1
Element 1
Unsur 2
Element 2
Terukur
Measurable
Tonase
Tonnage
Kadar ***)
Grade ***)
Unsur 1
Element 1
Unsur 2
Element 2
Logam ***)
Metal ***)
Unsur 1
Element 1
Unsur 2
Element 2
Luas (ha)
Area (ha)
Keterangan :*) Dalam hal data sumber daya dan cadangan pada laporan akhir eksplorasi dan persetujuan studi kelayakan yang telah ada belum diestimasi oleh Competent Person/Competent Person Indonesia, maka harus dilakukan estimasi sumber daya dan cadangan oleh Competent Person sepanjang terkait penambahan data eksplorasi/perubahan asumsi dan data faktor pengubah.**) jika dapat diterapkan, agar dipisahkan berdasarkan jenis material. Sebagai contoh, golongan emas dapat dipisahkan menjadi bijih oksida, bijih transisi dan bijih sulfida***) jika golongan ekonomis lebih dari 2 (dua) unsur agar disesuaikan dengan jumlah unsur yang adaInformation :*) In the event that the resource and reserve data in the final exploration report and approval of the existing feasibility study have not been estimated by the Competent Person/Indonesian Competent Person, then the resource and reserve estimate must be carried out by the Competent Person as long as it is related to additional exploration data/changes in assumptions and modifying factor data.**) if applicable, to be separated by material type. For example, the gold class can be separated into oxide ores, transition ores and sulfide ores***) if the economic group contains more than 2 (two) elements, it must be adjusted to the number of elements present
sumber (source) :
Google Translate
EVOLUSI PENDIDIKAN MANDAILING 418 (EMPAT RATUS DELAPAN BELAS) TAHUN DI TAHUN 2024
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
14 Juni 2442 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
Matrik 4. Hasil Estimasi Sumber Daya dan Cadangan
Matrix 4. Resource and Reserve Estimation Results
a. Sumber
Daya
No |
|
|
|
1 |
N |
Total |
Nama Blok/Prospek |
|
|
|
|
|
|
Jenis Material **) |
|
|
|
|
|
|
Sumber Daya Tahun N-1 |
Tereka |
Tonase |
|
|
|
|
Kadar ***) |
Unsur 1 |
|
|
|
||
Unsur 2 |
|
|
|
|||
Logam ***) |
Unsur 1 |
|
|
|
||
Unsur 2 |
|
|
|
|||
Tertunjuk |
Tonase |
|
|
|
|
|
Kadar ***) |
Unsur 1 |
|
|
|
||
Unsur 2 |
|
|
|
|||
Logam ***) |
Unsur 1 |
|
|
|
||
Unsur 2 |
|
|
|
|||
Terukur |
Tonase |
|
|
|
|
|
Kadar ***) |
Unsur 1 |
|
|
|
||
Unsur 2 |
|
|
|
|||
Logam ***) |
Unsur 1 |
|
|
|
||
Unsur 2 |
|
|
|
|||
Luas (ha) |
|
|
|
|
|
|
No
Number
1
N
Total
Nama Blok/Prospek
Block/Prospect Name
Jenis Material **)
Material Type **)
Sumber Daya Tahun N *)
Year N Resources *)
Tereka
Inferred
Tonase
Tonnage
Kadar ***)
Grade ***)
Unsur 1
Element 1
Unsur 2
Element 2
Logam ***)
Metal ***)
Unsur 1
Element 1
Unsur 2
Element 2
Tertunjuk
Indicated
Tonase
Tonnage
Kadar ***)
Grade ***)
Unsur 1
Element 1
Unsur 2
Element 2
Logam ***)
Metal ***)
Unsur 1
Element 1
Unsur 2
Element 2
Terukur
Measurable
Tonase
Tonnage
Kadar ***)
Grade ***)
Unsur 1
Element 1
Unsur 2
Element 2
Logam ***)
Metal ***)
Unsur 1
Element 1
Unsur 2
Element 2
Luas (ha)
Area (ha)
No |
|
|
|
1 |
N |
Total |
Nama Blok/Prospek |
|
|
|
|
|
|
Jenis Material **) |
|
|
|
|
|
|
Sumber Daya Tahun N *) |
Tereka |
Tonase |
|
|
|
|
Kadar ***) |
Unsur 1 |
|
|
|
||
Unsur 2 |
|
|
|
|||
Logam ***) |
Unsur 1 |
|
|
|
||
Unsur 2 |
|
|
|
|||
Tertunjuk |
Tonase |
|
|
|
|
|
Kadar ***) |
Unsur 1 |
|
|
|
||
Unsur 2 |
|
|
|
|||
Logam ***) |
Unsur 1 |
|
|
|
||
Unsur 2 |
|
|
|
|||
Terukur |
Tonase |
|
|
|
|
|
Kadar ***) |
Unsur 1 |
|
|
|
||
Unsur 2 |
|
|
|
|||
Logam ***) |
Unsur 1 |
|
|
|
||
Unsur 2 |
|
|
|
|||
Luas (ha) |
|
|
|
|
|
|
Tidak ada komentar:
Posting Komentar