https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN MANDAILING 418 (EMPAT RATUS DELAPAN BELAS) TAHUN DI TAHUN 2024
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
15 Nopember 2442 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
November 15th, 2442 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
IB. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN EKSPLORASI
GOLONGAN MINERAL BUKAN LOGAM
IB. FORMAT FOR PREPARING RKAB FOR
IUP HOLDERS FOR THE EXPLORATION ACTIVITIES STAGE OF THE NON-METAL MINERALS
GROUP
SISTEMATIKA
SYSTEMATIC
URAIAN
DESCRIPTION
RINGKASAN (Executive Summary)
KATA PENGANTAR
FOREWORD
DAFTAR ISI
LIST OF CONTENTS
DAFTAR GAMBAR
LIST OF FIGURES
DAFTAR TABEL
LIST OF TABLES
DAFTAR LAMPIRAN
APPENDIX LIST
BAB I PENDAHULUAN
1.1.
Latar Belakang
Background
berisi gambaran umum profil perusahaan, peta kesampaian daerah, bagan
struktur organisasi (head office
dan site) mulai dari pengurus
perusahaan (management) hingga tingkat pelaksana
contains a general overview of
the company profile, a map of regional achievements, an organizational
structure chart (head office and site) starting from the company management
(management) to the executive level
1.2.
Legalitas
Legality
format 1.2. disusun sesuai dengan matrik 1
format 1.2. arranged according
to matrix 1
BAB II PERSETUJUAN DAN REALISASI RKAB TAHUN N-1 SERTA RKAB TAHUN N
CHAPTER II APPROVAL AND
REALIZATION OF RKAB YEAR N-1 AND RKAB YEAR N
berisi kegiatan eksplorasi dan realisasi pada tahun sebelumnya N1 dan
Rencana Tahun N
contains exploration and
realization activities in the previous year N1 and Year Plan N
2.1.
Kegiatan Eksplorasi
Exploration Activities
2.1.1.
Rekapitulasi Kegiatan Eksplorasi sampai Tahun N-1
Recapitulation of Exploration
Activities up to Year N-1
format 2.1.1. disusun sesuai dengan matrik 2a
format 2.1.1. arranged
according to matrix 2a
2.1.2.
Rencana dan Realisasi Kegiatan Eksplorasi Tahun N-1 dan Rencana Tahun
N
Plans and Realization of
Exploration Activities for Year N-1 and Year N Plans
format 2.1.2. disusun sesuai dengan matrik 2b termasuk pembiayaannya
format 2.1.2. prepared in
accordance with matrix 2b including financing
2.1.3.
Rencana dan Realisasi Biaya Eksplorasi Tahun N-1 dan Rencana Tahun N
Plan and Realization of
Exploration Costs for Year N-1 and Plan for Year N
format 2.1.3. disusun sesuai dengan matrik 2c
format 2.1.3. arranged
according to matrix 2c
2.1.5.
Hasil Estimasi Sumber Daya dan Cadangan *)
Resource and Reserve Estimation
Results *)
format 2.1.5. disusun sesuai dengan matrik 4
format 2.1.5. arranged according
to matrix 4
2.2.
Perlindungan Lingkungan
Environmental Protection
2.2.1.
Kegiatan Pengelolaan dan Pemantauan Lingkungan
Environmental Management and
Monitoring Activities
format 2.2.1. disusun sesuai dengan matrik 5
format 2.2.1. arranged
according to matrix 5
2.2.2.
Pemantauan Lingkungan
Environmental Monitoring
format 2.2.2. disusun sesuai dengan matrik 6
format 2.2.2. arranged
according to matrix 6
2.2.3.
Biaya Pengelolaan dan Pemantauan Lingkungan
Environmental Management and
Monitoring Costs
format 2.2.3. disusun sesuai dengan matrik 7
format 2.2.3. arranged
according to matrix 7
2.3.
Keselamatan Pertambangan
Mining Safety
2.3.1.
Statistik Keselamatan Pertambangan
Mining Safety Statistics
format 2.3.1. disusun sesuai dengan matrik 8
format 2.3.1. arranged
according to matrix 8
2.3.2.
Rencana Pengujian Kelayakan Penggunaan Peralatan dan/atau Instalasi
Equipment and/or Installation
Feasibility Test Plan
format 2.3.2. disusun sesuai dengan matrik 9a
format 2.3.2. arranged
according to matrix 9a
2.3.3.
Rencana dan Realisasi Program dan Biaya Keselamatan Pertambangan
Plans and Realization of Mining
Safety Programs and Costs
format 2.3.3. disusun sesuai dengan matrik 9b
format 2.3.3. arranged
according to matrix 9b
2.4.
Standardisasi dan Usaha Jasa Pertambangan
Standardization and Mining
Services Business
2.4.1.
Standardisasi
Standardization
format 2.4.1. disusun sesuai dengan matrik 10a
format 2.4.1. arranged
according to matrix 10a
2.4.2.
Usaha Jasa Pertambangan
Mining Services Business
format 2.4.2. disusun sesuai dengan matrik 10b
format 2.4.2. arranged according to matrix 10b
2.5.
Tenaga Kerja dan Pengembangan Sumber Daya Manusia
Labor and Human Resources
Development
2.5.1.
Rencana dan Realisasi Penggunaan Tenaga Kerja IUP/IUPK Tahun N-1 dan
Rencana Tahun N
Plans and Realization of the
Use of IUP/IUPK (in Bahasa) Labor Forces for Year N-1 and Plans for Year N
2.5.2.
Rencana dan Realisasi Pelatihan Tenaga Kerja Tahun N-1 dan Rencana
Tahun N
Plans and Realization of
Manpower Training for Year N-1 and Year N Plans
format 2.5.2. disusun sesuai dengan matrik 12a
format 2.5.2. arranged
according to matrix 12a
2.5.3.
Rencana Penggunaan Tenaga Kerja Asing
Plans for Using Foreign Workers
format 2.5.3. disusun sesuai dengan matrik 12b
format 2.5.3. arranged
according to matrix 12b
2.6.
Angka Pengenal Importir Produsen (API-P)
Producer Importer
Identification Number [(API-P) in Bahasa]
format 2.6. disusun sesuai dengan matrik 13
format 2.6. arranged according
to matrix 13
2.7.
Keuangan dan Penerimaan Negara
Finance and State Revenue
2.7.1.
Rencana dan Realisasi Keuangan Tahun N-1 dan Rencana Tahun N
Financial Plans and Realization
for Year N-1 and Year N Plans
format 2.7.1. disusun sesuai dengan matrik 14, 15, 16, 18, 19
format 2.7.1. arranged
according to matrix 14, 15, 16, 18, 19
2.7.2.
Penerimaan Negara
State Revenue
format 2.7.2 disusun sesuai dengan matrik 17
format 2.7.2 is arranged
according to matrix 17
BAB III RENCANA STRATEGIS LIMA TAHUN
CHAPTER III FIVE YEAR STRATEGIC
PLAN
format BAB III disusun sesuai dengan matrik 20
The format for CHAPTER III is
arranged according to matrix 20
LAMPIRAN-LAMPIRAN
ATTACHMENTS
Peta-peta yang dibuat harus representatif dan informatif menggambarkan
keadaan yang sebenarnya.
The maps created must be
representative and informative, depicting the actual situation.
1.
SK Tahapan Kegiatan;
Decree on Activity Stages;
2.
Peta Geologi dan Sebaran Bahan Galian;
Geological Map and Distribution
of Minerals;
3.
Peta lokasi sumur/parit uji dan pemboran;
Map of test and drilling
well/trench locations;
4.
Penampang geologi, sumur uji, parit uji dan penampang bor;
Geological cross-sections, test
wells, test trenches and drilled cross-sections;
5.
Daftar hasil analisis conto;
List of sample analysis
results;
6.
Peta Realisasi Bukaan Lahan Tahun N-1;
Map of Realization of Land
Openings Year N-1;
7.
Peta Rencana Bukaan Lahan Tahun N;
Land Opening Plan Map for Year
N;
8.
Peta Realisasi Reklamasi Tahun N-1;
Reclamation Realization Map for
Year N-1;
9.
Peta Rencana Reklamasi Lahan Tahun N; dan
Land Reclamation Plan Map for
Year N; and
10.
Peta Rencana Pemantauan Lingkungan Tahun N dan Realisasi Tahun N-1.
Map of Environmental Monitoring
Plan for Year N and Realization for Year N-1.
11
Surat Pengesahan KTT/KTT Sementara/Pjs. KTT
Letter of Endorsement of the KTT
(in Bahasa) / Temporary KTT (in Bahasa) / Acting KTT (in Bahasa)
Keterangan :
*) Disesuaikan dengan tahap kegiatan
**) Jika dilakukan
Information :
*) Adjusted to the activity stage
**) If done
Sumber (source) :
Google
Translate
NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :
Menetapkan :
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
IB. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN EKSPLORASI
GOLONGAN MINERAL BUKAN LOGAM
IB. FORMAT FOR PREPARING RKAB FOR
IUP HOLDERS FOR THE EXPLORATION ACTIVITIES STAGE OF THE NON-METAL MINERALS
GROUP
SISTEMATIKA |
URAIAN |
|||
RINGKASAN (Executive Summary) |
|
|||
KATA PENGANTAR |
|
|||
DAFTAR ISI |
|
|||
DAFTAR GAMBAR |
|
|||
DAFTAR TABEL |
|
|||
DAFTAR LAMPIRAN |
|
|||
BAB I PENDAHULUAN |
|
|||
|
1.1. |
Latar Belakang |
berisi gambaran umum profil perusahaan, peta kesampaian daerah, bagan
struktur organisasi (head office
dan site) mulai dari pengurus
perusahaan (management) hingga tingkat pelaksana |
|
|
1.2. |
Legalitas |
format 1.2. disusun sesuai dengan matrik 1 |
|
BAB II PERSETUJUAN DAN REALISASI RKAB TAHUN N-1 SERTA RKAB TAHUN N |
berisi kegiatan eksplorasi dan realisasi pada tahun sebelumnya N1 dan
Rencana Tahun N |
|||
|
2.1. |
Kegiatan Eksplorasi |
|
|
|
|
2.1.1. |
Rekapitulasi Kegiatan Eksplorasi sampai Tahun N-1 |
format 2.1.1. disusun sesuai dengan matrik 2a |
|
|
2.1.2. |
Rencana dan Realisasi Kegiatan Eksplorasi Tahun N-1 dan Rencana Tahun
N |
format 2.1.2. disusun sesuai dengan matrik 2b termasuk pembiayaannya |
|
|
2.1.3. |
Rencana dan Realisasi Biaya Eksplorasi Tahun N-1 dan Rencana Tahun N |
format 2.1.3. disusun sesuai dengan matrik 2c |
|
|
2.1.5. |
Hasil Estimasi Sumber Daya dan Cadangan *) |
format 2.1.5. disusun sesuai dengan matrik 4 |
|
2.2. |
Perlindungan Lingkungan |
|
|
|
|
2.2.1. |
Kegiatan Pengelolaan dan Pemantauan Lingkungan |
format 2.2.1. disusun sesuai dengan matrik 5
|
|
|
2.2.2. |
Pemantauan Lingkungan |
format 2.2.2. disusun sesuai dengan matrik 6 |
|
|
2.2.3. |
Biaya Pengelolaan dan Pemantauan Lingkungan |
format 2.2.3. disusun sesuai dengan matrik 7 |
|
2.3. |
Keselamatan Pertambangan |
|
|
|
|
2.3.1. |
Statistik Keselamatan Pertambangan |
format 2.3.1. disusun sesuai dengan matrik 8 |
|
|
2.3.2. |
Rencana Pengujian Kelayakan Penggunaan Peralatan dan/atau Instalasi |
format 2.3.2. disusun sesuai dengan matrik 9a |
|
|
2.3.3. |
Rencana dan Realisasi Program dan Biaya Keselamatan Pertambangan |
format 2.3.3. disusun sesuai dengan matrik 9b |
|
2.4. |
Standardisasi dan Usaha Jasa Pertambangan |
|
|
|
|
2.4.1. |
Standardisasi |
format 2.4.1. disusun sesuai dengan matrik 10a |
|
|
2.4.2. |
Usaha Jasa Pertambangan |
format 2.4.2. disusun sesuai dengan matrik 10b |
|
2.5. |
Tenaga Kerja dan Pengembangan Sumber Daya Manusia |
|
|
|
|
2.5.1. |
Rencana dan Realisasi Penggunaan Tenaga Kerja IUP/IUPK Tahun N-1 dan
Rencana Tahun N |
|
|
|
2.5.2. |
Rencana dan Realisasi Pelatihan Tenaga Kerja Tahun N-1 dan Rencana
Tahun N |
format 2.5.2. disusun sesuai dengan matrik 12a |
|
|
2.5.3. |
Rencana Penggunaan Tenaga Kerja Asing |
format 2.5.3. disusun sesuai dengan matrik 12b |
|
2.6. |
Angka Pengenal Importir Produsen (API-P) |
format 2.6. disusun sesuai dengan matrik 13 |
|
|
2.7. |
Keuangan dan Penerimaan Negara |
|
|
|
|
2.7.1. |
Rencana dan Realisasi Keuangan Tahun N-1 dan Rencana Tahun N |
format 2.7.1. disusun sesuai dengan matrik 14, 15, 16, 18, 19 |
|
|
2.7.2. |
Penerimaan Negara |
format 2.7.2 disusun sesuai dengan matrik 17 |
BAB III RENCANA STRATEGIS LIMA TAHUN |
format BAB III disusun sesuai dengan matrik 20 |
|||
LAMPIRAN-LAMPIRAN |
Peta-peta yang dibuat harus representatif dan informatif menggambarkan
keadaan yang sebenarnya. |
|||
1. |
SK Tahapan Kegiatan; |
|||
2. |
Peta Geologi dan Sebaran Bahan Galian; |
|||
3. |
Peta lokasi sumur/parit uji dan pemboran; |
|||
4. |
Penampang geologi, sumur uji, parit uji dan penampang bor; |
|||
5. |
Daftar hasil analisis conto; |
|||
6. |
Peta Realisasi Bukaan Lahan Tahun N-1; |
|||
7. |
Peta Rencana Bukaan Lahan Tahun N; |
|||
8. |
Peta Realisasi Reklamasi Tahun N-1; |
|||
9. |
Peta Rencana Reklamasi Lahan Tahun N; dan |
|||
10. |
Peta Rencana Pemantauan Lingkungan Tahun N dan Realisasi Tahun N-1. |
|||
11 |
Surat Pengesahan KTT/KTT Sementara/Pjs. KTT |
Tidak ada komentar:
Posting Komentar