https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN MANDAILING 418 (EMPAT RATUS DELAPAN BELAS) TAHUN DI TAHUN 2024
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
06 Desember 2442 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
December 06th, 2442 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :
Menetapkan :
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
IB. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN EKSPLORASI GOLONGAN MINERAL BUKAN LOGAM
IB. FORMAT FOR PREPARING RKAB FOR IUP HOLDERS FOR THE EXPLORATION ACTIVITIES STAGE OF THE NON-METAL MINERALS GROUP
Matrik 2b. Rencana dan Realisasi Kegiatan Eksplorasi Tahun N-1 dan Rencana Tahun N
Matrix 2b. Plans and Realization
of Exploration Activities for Year N-1 and Year N Plans
LOKASI KEGIATAN |
KEGIATAN |
SATUAN*) |
BIAYA/ SATUAN (Rp/USD per Satuan) |
RENCANA TAHUN (N-1) |
BIAYA/ SATUAN (Rp/USD per Satuan) |
REALISASI TAHUN (N-1) |
BIAYA/ SATUAN (Rp/ USD per Satuan) |
RENCANA TAHUN (N) |
|||
KEGIATAN |
BIAYA |
KEGIATAN |
BIAYA |
KEGIATAN |
BIAYA |
||||||
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
(7) |
(8) |
(9) |
(10) |
(11) |
(12) |
|
Pemetaan |
|
|
|
|
|
|
|
|
|
|
|
- Topografi |
ha |
|
|
|
|
|
|
|
|
|
|
- Geologi lokal |
ha |
|
|
|
|
|
|
|
|
|
|
Survei Geokimia |
|
|
|
|
|
|
|
|
|
|
|
Survei Geofisika **) |
|
|
|
|
|
|
|
|
|
|
|
Pengeboran Open Hole
|
|
|
|
|
|
|
|
|
|
|
|
- Jumlah |
Titik |
|
|
|
|
|
|
|
|
|
|
- Kedalaman |
m |
|
|
|
|
|
|
|
|
|
|
- Spasi Pengeboran |
m |
|
|
|
|
|
|
|
|
|
|
Pengeboran Coring
|
|
|
|
|
|
|
|
|
|
|
|
- Jumlah |
Titik |
|
|
|
|
|
|
|
|
|
|
- Kedalaman |
m |
|
|
|
|
|
|
|
|
|
|
- Spasi Pengeboran |
m |
|
|
|
|
|
|
|
|
|
|
Sumur Uji |
m |
|
|
|
|
|
|
|
|
|
|
Parit Uji |
m |
|
|
|
|
|
|
|
|
|
|
Analisa Conto ***) |
Sampel |
|
|
|
|
|
|
|
|
|
|
Analisa Geoteknik |
Sampel |
|
|
|
|
|
|
|
|
|
|
Penyusunan laporan lengkap eksplorasi |
|
|
|
|
|
|
|
|
|
|
|
Penyusunan Laporan Studi Kelayakan |
|
|
|
|
|
|
|
|
|
|
|
Kajian Lingkungan |
|
|
|
|
|
|
|
|
|
|
|
Kegiatan teknis dan non teknis yang terkait kegiatan eksplorasi ****) |
|
|
|
|
|
|
|
|
|
|
TOTAL BIAYA EKSPLORASI |
|
|
|
|
|
|
|
|
|
1. Kolom (6) = Kolom (4) x kolom (5)
2. Kolom (9) = Kolom (7) x kolom (8)
3. Kolom (12) = Kolom (10) x kolom (11)
Matrix explanation :
1. Column (6) = Column (4) x column (5)
2. Column (9) = Column (7) x column (8)
3. Column (12) = Column (10) x column (11)
*) Satuan menyesuaikan kegiatan yang dicantumkan
**) Jika dilakukan.
***) Jika analisa conto dilakukan di luar negeri, pemegang IUP/IUPK wajib mengajukan permohonan pengiriman conto ke luar negeri secara khusus sesuai ketentuan peraturan perundangan.
****) Kegiatan teknis dan non teknis harus dirinci per kegiatan.
Information :
*) [asterisk] Units adjust to the activities listed
**) [asterisk asterisk] If done.
***) [asterisk asterisk asterisk] the sample analysis is carried out abroad, the IUP/IUPK (in Bahasa) holder is required to submit a special application for sending the sample abroad in accordance with the provisions of the laws and regulations.
****) [asterisk asterisk asterisk asterisk] Technical and non-technical activities must be detailed per activity.
Google Translate
Tidak ada komentar:
Posting Komentar