Rabu, 07 Februari 2024

TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 19 JULI 2442 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 19 JULI 2442 MASEHI)


https://www.youtube.com/@agussalimnasutionmandailing2/videos

EVOLUSI PENDIDIKAN MANDAILING 418 (EMPAT RATUS DELAPAN BELAS) TAHUN DI TAHUN 2024


Arahan
dari 
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)

Agussalim, ST bin Abdur Rahim Nasution


19 Juli 2442 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,

July 19th, 2442 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,

KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES

DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,

MEMUTUSKAN :
Menetapkan : 
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.


Matrik 9. Rencana dan Realisasi Biaya Pengelolaan dan Pemantauan Lingkungan Tahun N-1 dan Rencana Biaya Tahun N
Matrix 9. Plan and Realization of Environmental Management and Monitoring Costs for Year N-1 and Planned Costs for Year N

Uraian Biaya Pengelolaan dan Pemantauan Lingkungan

Description of Environmental Management and Monitoring Costs

Rencana dan Realisasi Tahun N-1 (IDR)/(USD)

Plans and Realization for Year N-1 (IDR)/(USD)

Rencana Tahun N (IDR)/(USD)

Year N Plan (IDR)/(USD)

Tri. I

Qua. I

Tri. II

Qua. II

Tri. III

Qua. III

Tri. IV

Qua. IV

TOTAL

Tri. I

Qua. I

Tri. II

Qua. II

Tri. III

Qua. III

Tri. IV

Qua. IV

TOTAL

Rencana

Realisasi

Rencana

Realisasi

Rencana

Realisasi

Rencana

Realisasi

Rencana

Realisasi

 

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(10)

(11)

(12)

(13)

(14)

(15)

(16)

1.

Biaya Pengelolaan Lingkungan

Environmental Management Costs

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

a.     Pembongkaran fasilitas penunjang eksplorasi (jika ada)

a. Dismantling of exploration supporting facilities (if any)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

b. Penataan lahan

b. Land arrangement

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

c. Penghijauan, meliputi :

c. Greening, including:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1) Penanaman

1) Planting

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2) Pemeliharaan (pemupukan, penyiangan, penyulaman, dll)

2) Maintenance (fertilizing, weeding, replanting, etc.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3) Pembelian tanaman

3) Purchase of plants

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

d. Pengelolaan Kualitas Kualitas Air

d. Water Quality Management

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

e. Pekerjaan sipil seperti pembuatan dam/kolam pengendap & Maintenance kolam pengendap

e. Civil work such as construction of dams/settling ponds & maintenance of settling ponds

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

f. Pengelolaan Limbah B3

f. B3 (in Bahasa)Waste Management

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2.

Biaya Pemantauan Lingkungan

Environmental Monitoring Fees

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Total Biaya Pengelolaan dan Pemantauan Lingkungan

Total Environmental Management and Monitoring Costs

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 Penjelasan matrik :

1. Menggunakan mata uang rupiah atau mata uang asing secara konsisten;
2. Biaya per triwulan bukan kumulatif dari triwulan sebelumnya; dan
3. Disesuaikan dengan Dokumen Lingkungan Hidup
Matrix explanation:
1. Consistently use rupiah or foreign currency;
2. Quarterly costs are not cumulative from the previous quarter; and
3. Adjusted to Environmental Documents.
 
Sumber (source) :
Google Translate

Tidak ada komentar:

Posting Komentar

TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 05 DECEMBER 2443 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 05 DESEMBER 2443 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos EVOLUSI PENDIDIKAN MANDAILING 419 (EMPAT RATUS SEMBILAN BELAS) TAHUN DI TAHUN 2...