Senin, 26 Februari 2024

TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 13 DESEMBER 2442 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 13 DESEMBER 2442 MASEHI)

  

https://www.youtube.com/@agussalimnasutionmandailing2/videos


EVOLUSI PENDIDIKAN MANDAILING 418 (EMPAT RATUS DELAPAN BELAS) TAHUN DI TAHUN 2024


Arahan
dari 
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution


13 Desember 2442 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
December 13th, 2442 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,


KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA

NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES

DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,

MEMUTUSKAN :
Menetapkan : 
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.

IB. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN EKSPLORASI GOLONGAN MINERAL BUKAN LOGAM
IB. FORMAT FOR PREPARING RKAB (IN BAHASA) FOR IUP HOLDERS FOR THE EXPLORATION ACTIVITIES STAGE OF THE NON-METAL MINERALS GROUP


Matrik 2c. Rencana dan Realisasi Biaya Eksplorasi Tahun N-1 dan Rencana Tahun N
Matrix 2c. Plan and Realization of Exploration Costs for Year N-1 and Plan for Year N
 

Keterangan *)
Information *) [asterisk]

Rencana N-1
Plan N-1

Realisasi N-1
Realization N-1

Rencana N
Plan N

(Rp/USD)

(Rp/USD)

(Rp/ USD)

Biaya Langsung, terdiri dari :
Direct Costs, consisting of :

 

 

 

1.

Pemetaan topografi
Topographic mapping

 

 

 

2.

Pemetaan geologi
Geological mapping

 

 

 

3.

……..

 

 

 

Biaya Tidak Langsung, terdiri dari :
Indirect Costs, consisting of:

 

 

 

1.

Gaji
Wages

 

 

 

2.

Administrasi
Administration

 

 

 

3.

……

 

 

 

 

Keterangan :

*)   Kegiatan eksplorasi yang dibagi berdasarkan biaya langsung (berkaitan langsung dengan kegiatan teknis eksplorasi) dan biaya tidak langsung (tidak berkaitan langsung dengan kegiatan teknis eksplorasi).

Information :

*)   [asterisk] Exploration activities are divided based on direct costs (directly related to technical exploration activities) and indirect costs (not directly related to technical exploration activities).


sumber (source) :

Google Translate

Tidak ada komentar:

Posting Komentar

TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 05 DECEMBER 2443 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 05 DESEMBER 2443 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos EVOLUSI PENDIDIKAN MANDAILING 419 (EMPAT RATUS SEMBILAN BELAS) TAHUN DI TAHUN 2...