https://www.youtube.com/@agussalimnasutionmandailing2/videos

Foto saya
UNTUK KE-GUBERNUR-AN SUMATERA UTARA DARI PENDIRI UM (UNIVERSITAS MANDAILING) FOR THE PROVINCIAL GOVERNOR OF SUMATERA UTARA FROM THE FOUNDER OF MU (MANDAILING UNIVERSITY)

Kamis, 22 Februari 2024

TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 08 NOPEMBER 2442 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 08 NOPEMBER 2442 MASEHI)

 

https://www.youtube.com/@agussalimnasutionmandailing2/videos


EVOLUSI PENDIDIKAN MANDAILING 418 (EMPAT RATUS DELAPAN BELAS) TAHUN DI TAHUN 2024


Arahan
dari 
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution


08 Nopember 2442 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
November 08th, 2442 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,


KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA

NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES

DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,

MEMUTUSKAN :
Menetapkan : 
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.

Matrik 21. Rencana Strategis Lima Tahun
Matrix 21. Five Year Strategic Plan
 
Tahun (... -...)
Year (... -...)

 

No
Number

Kegiatan
Activity

Tahun (N)
Year (N)

Tahun (N+1)
Year (N+1)

Tahun (N+2)
Year (N+2)

Tahun (N+3)
Year (N+3)

Tahun (N+4)
Year (N+4)

1.

Kegiatan Eksplorasi
Exploration Activities

 

 

 

 

 

a.

Eksplorasi Awal
Initial Exploration

 

 

 

 

 

 

Lokasi (nama prospek)
Location (prospect name)

 

 

 

 

 

 

Biaya (Rp/USD)
Cost (IDR/USD)

 

 

 

 

 

b.

Eksplorasi Detil
Detailed Exploration

 

 

 

 

 

 

Lokasi (nama prospek)
Location (prospect name)

 

 

 

 

 

 

Biaya (Rp/USD)
Cost (IDR/USD)

 

 

 

 

 

c.

Pre-studi kelayakan/studi kelayakan
Pre-feasibility study/feasibility study

 

 

 

 

 

 

Lokasi (nama prospek)
Location (prospect name)

 

 

 

 

 

 

Biaya (Rp/USD)
Cost (IDR/USD)

 

 

 

 

 

 

 

 

 

 

 

 

2.

Lingkungan
Environment

 

 

 

 

 

 

Total Luas Bukaan Lahan
Total Land Opening Area

 

 

 

 

 

 

 

 

 

 

 

 

3.

Tenaga Kerja
Labor

 

 

 

 

 

 

Lokal
Local

 

 

 

 

 

 

Nasional
National

 

 

 

 

 

 

Asing
Foreign

 

 

 

 

 

 

 

 

 

 

 

 

4.

Investasi
Investment

 

 

 

 

 

 

 

 

 

 

 

 

5.

Pemanfaatan Produk Dalam Negeri (Domestik)
Utilization of Domestic Products (Domestic)

 

 

 

 

 

 

Penjelasan matrik :

1.  Luas bukaan lahan harus sama dengan dokumen rencana reklamasi; dan

2.  Bila tahun rencana strategis belum ditetapkan Rencana Reklamasi-nya, maka rencana luas bukaan lahan pada tahun perencanaan tersebut merupakan rencana yang akan dimohonkan dalam dokumen Rencana Reklamasi periode selanjutnya.

Matrix explanation:

1. The area of land opening must be the same as the reclamation plan document; And

2. If the Reclamation Plan has not been determined for the strategic planning year, then the land clearing area plan for that planning year is the plan that will be requested in the Reclamation Plan document for the following period.

 

sumber (source) :

Google Translate

Tidak ada komentar:

Posting Komentar

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 09 SEPTEMBER 2445 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 09 SEPTEMBER 2445 MASEHI)

  https://www.youtube.com/@agussalimnasutionmandailing2/videos EVOLUSI PENDIDIKAN LOKAL MANDAILING  UNTUK RENTANGAN TAHUN 2445 - 2024  =  42...