https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN MANDAILING 419 (EMPAT RATUS SEMBILAN BELAS) TAHUN DI TAHUN 2024
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
05 Desember 2443 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
December 05th, 2443 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
ID. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN EKSPLORASI DAN IUPK TAHAP KEGIATAN EKSPLORASI GOLONGAN BATUBARA (halaman 110 Kepmen 373.K/2023)
ID. FORMAT FOR PREPARING RKAB (IN BAHASA) FOR ACTIVITY STAGE IUP (IN BAHASA) HOLDERS EXPLORATION AND IUPK (IN BAHASA) STAGE OF GROUP EXPLORATION ACTIVITIES COAL
Matrik 5. Hasil Estimasi Cadangan
Matrix 5. Reserve Estimation
Results
A. Cadangan.
A. Reseerve.
No.
Number
Nama Blok/ Prospek
Block
Name
/
Prospects
Seam
Cadangan Tahun N-1
Reserve
Year N-1
SR
Luas (Ha)
Area
(Ha)
Kualitas
Quality
Keterangan
Information
Terkira
(Ton)
Estimated
(Tons)
Terbukti (Ton)
Proven
(Tons)
Total (Ton)
Batuan Penutup (Bcm)
Cover
Rock (Bcm)
CV (Kcal/Kg)
FC (%)
TM (%) ar
IM (%) adb
TS (%) gar
ASH (%) gar
VM (%) adb
HGI
RD
CSN
gar
adb
1.
…
Total
No.
Number
Nama Blok/ Prospek
Block
Name
/
Prospects
Seam
Cadangan Tahun N
Reserve
Year N
SR
Luas (Ha)
Area
(Ha)
Kualitas
Quality
Keterangan
Information
Terkira
(Ton)
Estimated
(Tons)
Terbukti (Ton)
Proven
(Tons)
Total (Ton)
Batuan Penutup (Bcm)
Cover
Rock (Bcm)
CV (Kcal/Kg)
FC (%)
TM (%) ar
IM (%) adb
TS (%) gar
ASH (%) gar
VM (%) adb
HGI
RD
CSN
gar
adb
1.
…
Total
B.2 Aspal Buton
B.2 Buton Asphalt
No.
Nama Blok/ Prospek
Cadangan Tahun N-1
Reserve
Year N-1
Luas
Wide
Kualitas
Quality
Keterangan
Information
Terkira
Estimated
Terbukti
Proven
Terukur
Measurable
Total
Kadar Bitumen (%)
Bitumen
Content (%)
Kadar Air
Water
Content (%)
(Ton)
(Ton)
(Ton)
(Ton)
(Ha)
1.
….
Total
No.
Nama Blok/ Prospek
Cadangan Tahun N *)
Reserve
Year N *)
Luas
Wide
Kualitas
Quality
Keterangan
Information
Terkira
Estimated
Terbukti
Proven
Terukur
Measurable
Total
Kadar Bitumen (%)
Bitumen
Content (%)
Kadar Air
Water
Content (%)
(Ton)
(Ton)
(Ton)
(Ton)
(Ha)
1.
….
Total
Keterangan :
*) Dijelaskan alasan perubahan sumber daya apakah karena :
a. adanya perubahan parameter estimasi cadangan;
atau
b. adanya penambahan data dari hasil kegiatan
eksplorasi
c.
dalam hal data sumber daya dan cadangan pada laporan akhir eksplorasi dan
persetujuan studi kelayakan yang telah ada belum diestimasi oleh Competent Person/Competent Person Indonesia, maka harus dilakukan estimasi sumber
daya dan cadangan oleh Competent Person
sepanjang terkait penambahan data eksplorasi/perubahan asumsi dan data faktor
pengubah.
Information :
*) It is explained whether the
reason for changing resources is because:
a. changes in reserve estimation parameters;
or
b. additional data from the results of
exploration activities
c. In the event that the resource and
reserve data in the final exploration report and approval of the existing
feasibility study have not been estimated by the Indonesian Competent
Person/Competent Person, then the resource and reserve estimate must be carried
out by the Competent Person as long as it is related to additional exploration
data/changes in assumptions and factor data. modifier.
Sumber (source) :
Google Translate
ID. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN EKSPLORASI DAN IUPK TAHAP KEGIATAN EKSPLORASI GOLONGAN BATUBARA (halaman 110 Kepmen 373.K/2023)
ID. FORMAT FOR PREPARING RKAB (IN BAHASA) FOR ACTIVITY STAGE IUP (IN BAHASA) HOLDERS EXPLORATION AND IUPK (IN BAHASA) STAGE OF GROUP EXPLORATION ACTIVITIES COAL
Matrik 5. Hasil Estimasi Cadangan
Matrix 5. Reserve Estimation
Results
A. Cadangan.
A. Reseerve.
No.
|
Nama Blok/ Prospek
|
Seam |
Cadangan Tahun N-1
|
SR |
Luas (Ha)
|
Kualitas
|
Keterangan
|
|||||||||||||
Terkira
|
Terbukti (Ton)
|
Total (Ton) |
Batuan Penutup (Bcm)
|
CV (Kcal/Kg) |
FC (%) |
TM (%) ar |
IM (%) adb |
TS (%) gar |
ASH (%) gar |
VM (%) adb |
HGI |
RD |
CSN |
|||||||
gar |
adb |
|||||||||||||||||||
1. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
… |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
No. Number |
Nama Blok/ Prospek Block
Name /
Prospects |
Seam |
Cadangan Tahun N Reserve
Year N |
SR |
Luas (Ha) Area
(Ha) |
Kualitas Quality |
Keterangan Information |
|||||||||||||
Terkira (Ton) Estimated (Tons) |
Terbukti (Ton) Proven
(Tons) |
Total (Ton) |
Batuan Penutup (Bcm) Cover
Rock (Bcm) |
CV (Kcal/Kg) |
FC (%) |
TM (%) ar |
IM (%) adb |
TS (%) gar |
ASH (%) gar |
VM (%) adb |
HGI |
RD |
CSN |
|||||||
gar |
adb |
|||||||||||||||||||
1. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
… |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B.2 Aspal Buton
B.2 Buton Asphalt
No. |
Nama Blok/ Prospek |
Cadangan Tahun N-1
|
Luas
|
Kualitas
|
Keterangan
|
||||
Terkira
|
Terbukti
|
Terukur
|
Total |
Kadar Bitumen (%)
|
Kadar Air
|
||||
(Ton) |
(Ton) |
(Ton) |
(Ton) |
(Ha) |
|||||
1. |
|
|
|
|
|
|
|
|
|
…. |
|
|
|
|
|
|
|
|
|
Total |
|
|
|
|
|
|
|
No. |
Nama Blok/ Prospek |
Cadangan Tahun N *) Reserve
Year N *) |
Luas Wide |
Kualitas Quality |
Keterangan Information |
||||
Terkira Estimated |
Terbukti Proven |
Terukur Measurable |
Total |
Kadar Bitumen (%) Bitumen
Content (%) |
Kadar Air Water
Content (%) |
||||
(Ton) |
(Ton) |
(Ton) |
(Ton) |
(Ha) |
|||||
1. |
|
|
|
|
|
|
|
|
|
…. |
|
|
|
|
|
|
|
|
|
Total |
|
|
|
|
|
|
|
Keterangan :
*) Dijelaskan alasan perubahan sumber daya apakah karena :
a. adanya perubahan parameter estimasi cadangan;
atau
b. adanya penambahan data dari hasil kegiatan
eksplorasi
c.
dalam hal data sumber daya dan cadangan pada laporan akhir eksplorasi dan
persetujuan studi kelayakan yang telah ada belum diestimasi oleh Competent Person/Competent Person Indonesia, maka harus dilakukan estimasi sumber
daya dan cadangan oleh Competent Person
sepanjang terkait penambahan data eksplorasi/perubahan asumsi dan data faktor
pengubah.
Information :
*) It is explained whether the
reason for changing resources is because:
a. changes in reserve estimation parameters;
or
b. additional data from the results of
exploration activities
c. In the event that the resource and
reserve data in the final exploration report and approval of the existing
feasibility study have not been estimated by the Indonesian Competent
Person/Competent Person, then the resource and reserve estimate must be carried
out by the Competent Person as long as it is related to additional exploration
data/changes in assumptions and factor data. modifier.
Sumber (source) :
Google Translate
Tidak ada komentar:
Posting Komentar