Rabu, 08 Mei 2024

TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 05 DESEMBER 2443 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 05 DESEMBER 2443 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos


EVOLUSI PENDIDIKAN MANDAILING 419 (EMPAT RATUS SEMBILAN BELAS) TAHUN DI TAHUN 2024






Arahan
dari 
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution


05 Desember 2443 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
December 05th, 2443 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,


KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA

NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES

DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,

MEMUTUSKAN :
Menetapkan : 
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.

ID. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN EKSPLORASI DAN IUPK TAHAP KEGIATAN EKSPLORASI GOLONGAN BATUBARA (halaman 110 Kepmen 373.K/2023)

ID. FORMAT FOR PREPARING RKAB (IN BAHASA) FOR ACTIVITY STAGE IUP (IN BAHASA) HOLDERS EXPLORATION AND IUPK (IN BAHASA) STAGE OF GROUP EXPLORATION ACTIVITIES COAL


Matrik 5. Hasil Estimasi Cadangan
Matrix 5. Reserve Estimation Results

  

A.   Cadangan.

A.   Reseerve.

 

No.
Number

Nama Blok/ Prospek
Block Name
/ Prospects

Seam

Cadangan Tahun N-1
Reserve Year N-1

SR

Luas (Ha)
Area (Ha)

Kualitas
Quality

Keterangan
Information

Terkira
(Ton)
Estimated
(Tons)

Terbukti (Ton)
Proven (Tons)

Total (Ton)

Batuan Penutup (Bcm)
Cover Rock (Bcm)

CV (Kcal/Kg)

FC (%)

TM (%) ar

IM (%) adb

TS (%) gar

ASH (%) gar

VM (%) adb

HGI

RD

CSN

gar

adb

1.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Total

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

No.

Number

Nama Blok/ Prospek

Block Name

/ Prospects

Seam

Cadangan Tahun N

Reserve Year N

SR

Luas (Ha)

Area (Ha)

Kualitas

Quality

Keterangan

Information

Terkira

(Ton)

Estimated

(Tons)

Terbukti (Ton)

Proven (Tons)

Total (Ton)

Batuan Penutup (Bcm)

Cover Rock (Bcm)

CV (Kcal/Kg)

FC (%)

TM (%) ar

IM (%) adb

TS (%) gar

ASH (%) gar

VM (%) adb

HGI

RD

CSN

gar

adb

1.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Total

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B.2 Aspal Buton
B.2 Buton Asphalt

No.

Nama Blok/ Prospek

Cadangan Tahun N-1
Reserve Year N-1

Luas
Wide

Kualitas
Quality

Keterangan
Information

Terkira
Estimated

Terbukti
Proven

Terukur
Measurable

Total

Kadar Bitumen (%)
Bitumen Content (%)

Kadar Air
Water Content (%)

(Ton)

(Ton)

(Ton)

(Ton)

(Ha)

1.

 

 

 

 

 

 

 

 

 

….

 

 

 

 

 

 

 

 

 

Total

 

 

 

 

 

 

 

 

No.

Nama Blok/ Prospek

Cadangan Tahun N *)

Reserve Year N *)

Luas

Wide

Kualitas

Quality

Keterangan

Information

Terkira

Estimated

Terbukti

Proven

Terukur

Measurable

Total

Kadar Bitumen (%)

Bitumen Content (%)

Kadar Air

Water Content (%)

(Ton)

(Ton)

(Ton)

(Ton)

(Ha)

1.

 

 

 

 

 

 

 

 

 

….

 

 

 

 

 

 

 

 

 

Total

 

 

 

 

 

 

 

 
Keterangan :
*) Dijelaskan alasan perubahan sumber daya apakah karena :
a. adanya perubahan parameter estimasi cadangan; atau
b. adanya penambahan data dari hasil kegiatan eksplorasi
c. dalam hal data sumber daya dan cadangan pada laporan akhir eksplorasi dan persetujuan studi kelayakan yang telah ada belum diestimasi oleh Competent Person/Competent Person Indonesia, maka harus dilakukan estimasi sumber daya dan cadangan oleh Competent Person sepanjang terkait penambahan data eksplorasi/perubahan asumsi dan data faktor pengubah.
Information :
*) It is explained whether the reason for changing resources is because:
a. changes in reserve estimation parameters; or
b. additional data from the results of exploration activities
c. In the event that the resource and reserve data in the final exploration report and approval of the existing feasibility study have not been estimated by the Indonesian Competent Person/Competent Person, then the resource and reserve estimate must be carried out by the Competent Person as long as it is related to additional exploration data/changes in assumptions and factor data. modifier.
 
Sumber (source) :
Google Translate

Tidak ada komentar:

Posting Komentar

TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 09 JANUARI 2444 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 09 JANUARI 2444 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos EVOLUSI PENDIDIKAN MANDAILING 420 (EMPAT RATUS DUA PULUH) TAHUN DI TAHUN 2024 A...