https://www.youtube.com/@agussalimnasutionmandailing2/videos

Foto saya
UNTUK KE-GUBERNUR-AN SUMATERA UTARA DARI PENDIRI UM (UNIVERSITAS MANDAILING) FOR THE PROVINCIAL GOVERNOR OF SUMATERA UTARA FROM THE FOUNDER OF MU (MANDAILING UNIVERSITY)

Sabtu, 18 Mei 2024

TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 26 DESEMBER 2443 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 26 DESEMBER 2443 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos


EVOLUSI PENDIDIKAN MANDAILING 419 (EMPAT RATUS SEMBILAN BELAS) TAHUN DI TAHUN 2024






Arahan
dari 
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution


26 Desember 2443 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
December 26th, 2443 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,


KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA

NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES

DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,

MEMUTUSKAN :
Menetapkan : 
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.

ID. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN EKSPLORASI DAN IUPK TAHAP KEGIATAN EKSPLORASI GOLONGAN BATUBARA (halaman 110 Kepmen 373.K/2023)

ID. FORMAT FOR PREPARING RKAB (IN BAHASA) FOR ACTIVITY STAGE IUP (IN BAHASA) HOLDERS EXPLORATION AND IUPK (IN BAHASA) STAGE OF GROUP EXPLORATION ACTIVITIES COAL (page 110 Ministerial Decree 373.K/2023)


Matrik 8. Rencana dan Realisasi Biaya Pengelolaan dan Pemantauan Lingkungan Tahun N-1 dan Rencana Biaya Tahun N
Matrix 8. Plan and Realization of Environmental Management and Monitoring Costs for Year N-1 and Planned Costs for Year N
 

Uraian Biaya Pengelolaan dan Pemantauan Lingkungan
Description of Environmental Management and Monitoring Costs

Rencana dan Realisasi Tahun N-1 (IDR)/(USD)
Plans and Realization for Year N-1 (IDR)/(USD)

Rencana Tahun N (IDR)/(USD)
Year N Plan (IDR)/(USD)

Tri. I

Tri. II

Tri. III

Tri. IV

TOTAL

Tri. I

Tri. II

Tri. III

Tri. IV

TOTAL

Rencana
Plan

Realisasi
Realization

Rencana
Plan

Realisasi
Realization

Realisasi
Realization
 

Rencana
Plan

Realisasi
Realization

Rencana
Plan

Realisasi
Realization

Rencana
Plan

 

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(10)

(11)

(12)

(13)

(14)

(15)

(16)

1.

Biaya Pengelolaan Lingkungan
Environmental Management Costs

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

a.

Pembongkaran fasilitas penunjang eksplorasi (jika ada)
Dismantling of exploration supporting facilities (if any)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

b.

Penataan lahan
Land arrangement

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

c.

Penghijauan, meliputi:
Greening, including:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1)

Penanaman
Planting

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2)

Pemeliharaan (pemupukan, penyiangan, penyulaman, dll)
Maintenance (fertilizing, weeding, replanting, etc.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3)

Pembelian tanaman
Purchase of plants

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

d.

Pengelolaan Kualitas Air
Water Quality Management

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

e.

Pekerjaan sipil seperti pembuatan dam/kolam pengendap & Maintenance kolam pengendap
Civil work such as construction of dams/settling ponds & maintenance of settling ponds

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

f.

Pengelolaan Limbah B3 (Bahan Berbahaya dan Beracun)
Management of B3 (in Bahasa) Waste (Hazardous and Toxic Materials)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2.

Biaya Pemantauan Lingkungan
Environmental Monitoring Fees

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL BIAYA PENGELOLAAN DAN PEMANTAUAN LINGKUNGAN
TOTAL ENVIRONMENTAL MANAGEMENT AND MONITORING COSTS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
Penjelasan Matrik :
1. Menggunakan mata uang rupiah atau mata uang asing secara konsisten
2. Biaya per triwulan bukan kumulatif dari triwulan sebelumnya
3. Disesuaikan dengan Dokumen Lingkungan Hidup
Matrix Explanation :
1. Use rupiah or foreign currency consistently
2. Quarterly costs are not cumulative from the previous quarter
3. Adjusted to Environmental Documents
 
Sumber (source) :
Google Translate

Tidak ada komentar:

Posting Komentar

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 10 DESEMBER 2444 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 10 DESEMBER 2444 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos EVOLUSI PENDIDIKAN MANDAILING 420 (EMPAT RATUS DUA PULUH) TAHUN DI TAHUN 2024 M...