https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN MANDAILING 419 (EMPAT RATUS SEMBILAN BELAS) TAHUN DI TAHUN 2024
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
28 Nopember 2443 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
November 28th, 2443 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
ID. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN EKSPLORASI DAN IUPK TAHAP KEGIATAN EKSPLORASI GOLONGAN BATUBARA (halaman 110 Kepmen 373.K/2023)
ID. FORMAT FOR PREPARING RKAB (IN BAHASA) FOR ACTIVITY STAGE IUP (IN BAHASA) HOLDERS EXPLORATION AND IUPK (IN BAHASA) STAGE OF GROUP EXPLORATION ACTIVITIES COAL
Matrik 4. Hasil Estimasi Sumber Daya
Matrix 4. Resource Estimation
Results
A. Sumber Daya
A. Resources
No
Number
Nama
Blok/
Prospek
Block
Name /
Prospect
Seam
Ketebalan (m)
thickness
(m)
Sumberdaya Tahun N-1
Year
N-1 Resources
Luas
Wide
Kualitas
Quality
Keterangan
Information
Tereka
(Ton)
Guessed
(Tons)
Tertunjuk (Ton)
Indicated
(Tons)
Terukur (Ton)
Measurable
(Tons)
Total (Ton)
CV (Kcal/Kg)
FC (%)
TM (%) ar
IM (%) adb
TS (%) gar
ASH (%) gar
VM (%) adb
HGI
RD
CSN
(Ha)
Gar
adb
1.
….
Total
No
Number
Nama
Blok/
Prospek
Block
Name /
Prospect
Seam
Ketebalan (m)
thickness
(m)
Sumberdaya Tahun N*)
Year
N Resources*)
Luas
Wide
Kualitas
Quality
Keterangan
Information
Tereka
(Ton)
Guessed
(Tons)
Tertunjuk (Ton)
Indicated
(Tons)
Terukur (Ton)
Measurable
(Tons)
Total (Ton)
CV (Kcal/Kg)
FC (%)
TM (%) ar
IM (%) adb
TS (%) gar
ASH (%) gar
VM (%) adb
HGI
RD
CSN
(Ha)
Gar
adb
1.
….
Total
A.2 Aspal Buton
A.2 Buton Asphalt
No.
Number
Nama Blok/ Prospek
Block
Name
/
Prospects
Ketebalan (m)
Thickness
(m)
Sumberdaya Tahun N-1
Year
N-1 Resources
Luas
Wide
Kualitas
Quality
Keterangan
Information
Tereka
Guessed
Tertunjuk
Appointed
Terukur
Measurable
Total
Kadar Bitumen (%)
Bitumen
Content (%)
Kadar Air (%)
Water
content (%)
(Ha)
1.
….
Total
No.
Number
Nama Blok/ Prospek
Block
Name
/
Prospects
Ketebalan (m)
Thickness
(m)
Sumberdaya Tahun N*)
Year
N*) Resources
Luas
Wide
Kualitas
Quality
Keterangan
Information
Tereka
Guessed
Tertunjuk
Appointed
Terukur
Measurable
Total
Kadar Bitumen (%)
Bitumen
Content (%)
Kadar Air (%)
Water
content (%)
(Ha)
1.
….
Total
Keterangan :
*) Dijelaskan alasan perubahan sumber daya apakah karena :
a.
adanya penambahan data dari hasil kegiatan eksplorasi; atau
b.
adanya peningkatan klasifikasi sumber daya menjadi cadangan
c.
dalam hal data sumber daya dan cadangan pada laporan akhir eksplorasi dan
persetujuan studi kelayakan yang telah ada belum diestimasi oleh Competent Person/Competent Person Indonesia, maka harus dilakukan estimasi sumber
daya dan cadangan oleh Competent Person sepanjang
terkait penambahan data eksplorasi/perubahan asumsi dan data faktor pengubah
Information :
*) It is explained whether the
reason for changing resources is because:
a. additional data from the results of
exploration activities; or
b. there is an increase in the
classification of resources into reserves
c. In the event that the resource and
reserve data in the final exploration report and approval of the existing
feasibility study have not been estimated by the Indonesian Competent
Person/Competent Person, then the resource and reserve estimate must be carried
out by the Competent Person as long as it is related to additional exploration
data/changes in assumptions and modifier factor data.
sumber (source) :
Google Translate
NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :
Menetapkan :
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
ID. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN EKSPLORASI DAN IUPK TAHAP KEGIATAN EKSPLORASI GOLONGAN BATUBARA (halaman 110 Kepmen 373.K/2023)
ID. FORMAT FOR PREPARING RKAB (IN BAHASA) FOR ACTIVITY STAGE IUP (IN BAHASA) HOLDERS EXPLORATION AND IUPK (IN BAHASA) STAGE OF GROUP EXPLORATION ACTIVITIES COAL
Matrik 4. Hasil Estimasi Sumber Daya
Matrix 4. Resource Estimation
Results
A. Sumber Daya
A. Resources
No
|
Nama
|
Seam |
Ketebalan (m)
|
Sumberdaya Tahun N-1
|
Luas
|
Kualitas
|
Keterangan
|
||||||||||||||
Tereka
|
Tertunjuk (Ton)
|
Terukur (Ton)
|
Total (Ton) |
CV (Kcal/Kg) |
FC (%) |
TM (%) ar |
IM (%) adb |
TS (%) gar |
ASH (%) gar |
VM (%) adb |
HGI |
RD |
CSN |
||||||||
(Ha) |
Gar |
adb |
|||||||||||||||||||
1. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
…. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
No
|
Nama
|
Seam |
Ketebalan (m)
|
Sumberdaya Tahun N*)
|
Luas
|
Kualitas
|
Keterangan
|
||||||||||||||
Tereka
|
Tertunjuk (Ton)
|
Terukur (Ton)
|
Total (Ton) |
CV (Kcal/Kg) |
FC (%) |
TM (%) ar |
IM (%) adb |
TS (%) gar |
ASH (%) gar |
VM (%) adb |
HGI |
RD |
CSN |
||||||||
(Ha) |
Gar |
adb |
|||||||||||||||||||
1. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
…. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
A.2 Buton Asphalt
No.
|
Nama Blok/ Prospek
|
Ketebalan (m)
|
Sumberdaya Tahun N-1
|
Luas
|
Kualitas
|
Keterangan
|
||||
Tereka
|
Tertunjuk
|
Terukur
|
Total |
Kadar Bitumen (%)
|
Kadar Air (%)
|
|||||
|
|
|
|
(Ha) |
||||||
1. |
|
|
|
|
|
|
|
|
|
|
…. |
|
|
|
|
|
|
|
|||
Total |
|
|
|
|
|
No.
|
Nama Blok/ Prospek
|
Ketebalan (m)
|
Sumberdaya Tahun N*)
|
Luas
|
Kualitas
|
Keterangan
|
||||
Tereka
|
Tertunjuk
|
Terukur
|
Total |
Kadar Bitumen (%)
|
Kadar Air (%)
|
|||||
|
|
|
|
(Ha) |
||||||
1. |
|
|
|
|
|
|
|
|
|
|
…. |
|
|
|
|
|
|
|
|||
Total |
|
|
|
|
|
*) Dijelaskan alasan perubahan sumber daya apakah karena :
a. adanya penambahan data dari hasil kegiatan eksplorasi; atau
b. adanya peningkatan klasifikasi sumber daya menjadi cadangan
c. dalam hal data sumber daya dan cadangan pada laporan akhir eksplorasi dan persetujuan studi kelayakan yang telah ada belum diestimasi oleh Competent Person/Competent Person Indonesia, maka harus dilakukan estimasi sumber daya dan cadangan oleh Competent Person sepanjang terkait penambahan data eksplorasi/perubahan asumsi dan data faktor pengubah
Information :
*) It is explained whether the reason for changing resources is because:
a. additional data from the results of exploration activities; or
b. there is an increase in the classification of resources into reserves
c. In the event that the resource and reserve data in the final exploration report and approval of the existing feasibility study have not been estimated by the Indonesian Competent Person/Competent Person, then the resource and reserve estimate must be carried out by the Competent Person as long as it is related to additional exploration data/changes in assumptions and modifier factor data.
Tidak ada komentar:
Posting Komentar