https://www.youtube.com/@agussalimnasutionmandailing2/videos

Foto saya
UNTUK KE-GUBERNUR-AN SUMATERA UTARA DARI PENDIRI UM (UNIVERSITAS MANDAILING) FOR THE PROVINCIAL GOVERNOR OF SUMATERA UTARA FROM THE FOUNDER OF MU (MANDAILING UNIVERSITY)

Senin, 06 Mei 2024

TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 21 NOPEMBER 2443 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 21 NOPEMBER 2443 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos


EVOLUSI PENDIDIKAN MANDAILING 419 (EMPAT RATUS SEMBILAN BELAS) TAHUN DI TAHUN 2024






Arahan
dari 
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution


21 Nopember 2443 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
November 21st, 2443 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,


KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA

NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES

DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,

MEMUTUSKAN :
Menetapkan : 
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.

ID. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN EKSPLORASI DAN IUPK TAHAP KEGIATAN EKSPLORASI GOLONGAN BATUBARA (halaman 110 Kepmen 373.K/2023)

ID. FORMAT FOR PREPARING RKAB FOR ACTIVITY STAGE IUP (IN BAHASA) HOLDERS EXPLORATION AND IUPK (IN BAHASA) STAGE OF GROUP EXPLORATION ACTIVITIES COAL


Matrik 3. Rencana dan Realisasi Peralatan Eksplorasi Tahun N-1 dan Rencana Tahun N *)
Matrix 3. Plan and Realization of Exploration Equipment for Year N-1 and Plan for Year N *)

 

Jenis Peralatan

Equipment Type

Tipe

Type

Rencana Tahun N-1

N-1 Year Plan

Realisasi Tahun N-1

Realization in Year N-1

Rencana Tahun N

N Year Plan

Jumlah Unit

Number of Units

Jumlah Unit

Number of Units

Jumlah Unit

Number of Units

1

2

3

4

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Penjelasan matrik :

1. Jenis peralatan yang digunakan untuk kegiatan eksplorasi.

2. Tipe peralatan yang digunakan untuk kegiatan eksplorasi.

3. Jumlah unit peralatan yang akan digunakan pada tahun berjalan.

4. Jumlah unit peralatan yang digunakan pada tahun berjalan.

5. Jumlah unit peralatan peralatan yang akan digunakan pada tahun berikutnya.

Matrix explanation:

1. Type of equipment used for exploration activities.

2. Type of equipment used for exploration activities.

3. Number of equipment units that will be used in the current year.

4. Number of equipment units used in the current year.

5. Number of units of equipment that will be used in the following year.

 
Catatan :
Tabel peralatan yang digunakan perusahaan dimasukkan dalam Laporan Investasi dan masing-masing kontraktor dibuat terpisah.
Notes :
A table of equipment used by the company is included in the Investment Report and each contractor is made separately.
 
Sumber (source) :
Google Translate

Tidak ada komentar:

Posting Komentar

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 16 SEPTEMBER 2445 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 16 SEPTEMBER 2445 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos EVOLUSI PENDIDIKAN LOKAL MANDAILING  UNTUK RENTANGAN TAHUN 2445 - 2024  =  421 ...