https://www.youtube.com/@agussalimnasutionmandailing2/videos

Foto saya
UNTUK KE-GUBERNUR-AN SUMATERA UTARA DARI PENDIRI UM (UNIVERSITAS MANDAILING) FOR THE PROVINCIAL GOVERNOR OF SUMATERA UTARA FROM THE FOUNDER OF MU (MANDAILING UNIVERSITY)

Kamis, 28 November 2024

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 29 JULI 2445 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 29 JULI 2445 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos


EVOLUSI PENDIDIKAN MANDAILING UNTUK RENTANGAN TAHUN 2445 - 2024 = 421 (EMPAT RATUS DUA PULUH SATU) TAHUN MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA


#SangKandidatSekjendPBBSekretarisJenderalPerserikatanBangsaBangsa #DariKantorGubernurSumutMedanKeKantorPerserikatanBangsaBangsaNewYork #SatuSatunyaTokohLegendarisSumutYangMemikirkanSumateraUtara1000SeribuTahunKeDepan #SumateraUtaraWorldMainProvincialClassRank #MembangunKegubernuranSumateraUtara #UniversitasMandailingUntukKegubernuranSumateraUtara #KearifanLokalMandailingUntukKegubernuranSumateraUtara #SeribuTahunEvolusiPendidikanMandailingUntukKegubernuranSumateraUtara





Arahan
dari 
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution


29 Juli 2445 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,

July 29th, 2445 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (Mandailing University) to understands,


KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA

NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES

DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,

MEMUTUSKAN :
Menetapkan : 
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.

LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151


Matrik 9. Rencana dan Realisasi Penambangan Mineral Bukan Logam Tahun (N-1)

dan Rencana Tahun (N) sampai dengan Tahun (N+2)

Matrix 9. Plan and Realization of Non-Metallic Mineral Mining for Year (N-1) and Plan for Year (N) up to Year (N+2)

 

Rencana

dan

Realisasi

Plan and Realization

Lokasi/Blok/Pit

Location/Block/Pit

Cut off

grade

Bulan (satuan)

Month (unit)

Total

Jan

Feb

Mar

Apr

Mei

May

Jun

Jul

Agu

Aug

Sep

Okt

Oct

Nop

Nov

Des

Dec

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(10)

(11)

(12)

(13)

(14)

(15)

(16)

(17)

RENCANA

TAHUN

N-1

YEAR PLAN N-1

BLOK A

BLOCK A

LOKASI (LOCATION )/PIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOKASI (LOCATION )/PIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BLOK B

BLOCK B

LOKASI (LOCATION )/PIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOKASI (LOCATION )/PIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RECOVERY PENAMBANGAN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

REALISASI

TAHUN

N-1

BLOK A

BLOCK A

LOKASI (LOCATION )/PIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOKASI (LOCATION )/PIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BLOK B

BLOCK B

LOKASI (LOCATION )/PIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOKASI (LOCATION )/PIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RECOVERY

PENAMBANGAN

TRUCK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SURVEY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RENCANA TAHUN

N

YEAR PLAN N

BLOK A

BLOCK A

LOKASI (LOCATION )/PIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOKASI/PIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BLOK B

BLOCK B

LOKASI (LOCATION )/PIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOKASI (LOCATION )/PIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RECOVERY PENAMBANGAN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RENCANA

TAHUN

(N+1)

BLOK A

BLOCK A

LOKASI (LOCATION )/PIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOKASI (LOCATION )/PIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BLOK B

BLOCK B

LOKASI (LOCATION )/PIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOKASI (LOCATION )/PIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RECOVERY PENAMBANGAN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RENCANA

TAHUN

(N+2)

BLOK A

BLOCK A

LOKASI (LOCATION )/PIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOKASI (LOCATION )/PIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BLOK B

BLOCK B

LOKASI (LOCATION )/PIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOKASI (LOCATION )/PIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RECOVERY PENAMBANGAN

MINING RECOVERY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sumber (source) :

Google Translate

Tidak ada komentar:

Posting Komentar

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 09 SEPTEMBER 2445 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 09 SEPTEMBER 2445 MASEHI)

  https://www.youtube.com/@agussalimnasutionmandailing2/videos EVOLUSI PENDIDIKAN LOKAL MANDAILING  UNTUK RENTANGAN TAHUN 2445 - 2024  =  42...