https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN MANDAILING UNTUK RENTANGAN TAHUN 2445 - 2024 = 421 (EMPAT RATUS DUA PULUH SATU) TAHUN MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
05 Agustus 2445 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
August 05th, 2445 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (Mandailing University) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIB. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI
PRODUKSI GOLONGAN MINERAL BUKAN LOGAM (halaman 248)
IIB. FORMAT FOR PREPARATION OF
WORK PLAN AND BUDGET FOR MINING BUSINESS LICENSE HOLDERS IN PRODUCTION
OPERATION ACTIVITIES OF NON-METALLIC MINERALS (page 248)
Matrik 10. Daftar Peralatan, Tahun (N-1) dan (N) sampai dengan Tahun
(N+2)
Matrix 10. List of Equipment,
Years (N-1) and (N) to Year (N+2)
Matrik 10a. Daftar Peralatan Penambangan yang Dimiliki Perusahaan dan
Kontraktor
Matrix 10a. List of Mining
Equipment Owned by the Company and Contractors
No Number |
Jenis Peralatan Alat Gali Types of Excavation Equipment |
Tipe Type |
Produktivitas Productivity (Bcm/Hour) |
PA |
MA |
UA |
EU |
Rencana Tahun (N-1) Year
Plan (N-1) |
Realisasi Tahun (N-1) Year Realization (N-1) |
Rencana Tahun (N) Year
Plan (N) |
Rencana Tahun (N+1) Year
Plan (N+1) |
Rencana Tahun (N+2) Year
Plan (N+2) |
(%) |
|
|
|
|
|
|||||||
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
(7) |
(8) |
(9) |
||||
1. |
|
|
|
|
|
|
|
|
|
|
|
|
2. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
N |
|
|
|
|
|
|
|
|
|
|
|
|
No Number |
Jenis Peralatan Alat Muat Types
of Loading Equipment |
Tipe Type |
Produktivitas Productivity (Bcm/Hour) |
PA |
MA |
UA |
EU |
Rencana Tahun (N-1) Year
Plan (N-1) |
Realisasi Tahun (N-1) Year Realization (N-1) |
Rencana Tahun (N) Year
Plan (N) |
Rencana Tahun (N+1) Year
Plan (N+1) |
Rencana Tahun (N+2) Year
Plan (N+2) |
(%) |
|
|
|
|
|
|||||||
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
(7) |
(8) |
(9) |
||||
1. |
|
|
|
|
|
|
|
|
|
|
|
|
2. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
N |
|
|
|
|
|
|
|
|
|
|
|
|
No |
Jenis Peralatan Alat Angkut |
Tipe |
Produktivitas Productivity (Bcm/Hour) |
PA |
MA |
UA |
EU |
Rencana Tahun (N-1) Year
Plan (N-1) |
Realisasi Tahun (N-1) Year Realization (N-1) |
Rencana Tahun (N) Year
Plan (N) |
Rencana Tahun (N+1) Year
Plan (N+1) |
Rencana Tahun (N+2) Year
Plan (N+2) |
(%) |
|
|
|
|
|
|||||||
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
(7) |
(8) |
(9) |
||||
1. |
|
|
|
|
|
|
|
|
|
|
|
|
2. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
N |
|
|
|
|
|
|
|
|
|
|
|
|
No |
Jenis Peralatan Alat Pendukung |
Tipe |
Produktivitas Productivity (Bcm/Hour) |
PA |
MA |
UA |
EU |
Rencana Tahun (N-1) Year
Plan (N-1) |
Realisasi Tahun (N-1) Year Realization (N-1) |
Rencana Tahun (N) Year
Plan (N) |
Rencana Tahun (N+1) Year
Plan (N+1) |
Rencana Tahun (N+2) Year
Plan (N+2) |
(%) |
|
|
|
|
|
|||||||
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
(7) |
(8) |
(9) |
||||
1. |
|
|
|
|
|
|
|
|
|
|
|
|
2. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
N |
|
|
|
|
|
|
|
|
|
|
|
|
Penjelasan matrik:
* jenis peralatan : Jenis peralatan yang digunakan untuk
penambangan yang digunakan
** tipe : Tipe peralatan yang
digunakan untuk penambangan yang digunakan
*** Produktivitas : Produktivitas dari peralatan yang
digunakan
**** Kapasitas : Kapasitas dari peralatan yang
digunakan
***** Utilitas (%) : Persentase (PA, MA, UA), dan EU
Matrix explanation:
* equipment type: Type of equipment used for mining used
** type: Type of equipment used for mining used
*** Productivity: Productivity of equipment used
**** Capacity: Capacity of equipment used
***** Utilities (%): Percentage (PA, MA, UA), and EU
Study
PA (Physical Availability) : Angka yg menunjukan persentase ketersediaan
suatu alat beroperasi dengan memperhitungkan kehilangan waktu yg
dikarenakan selain sebab
mekanis, misalnya hujan, jalan rusak, istirahat, dll.
MA (Mechanical Availability) : Angka yang menunjukan persentase suatu alat
untuk beroperasi dengan memperhitungkan kehilangan waktu sebab-sebab mekanis,
misalnya repair, perawatan,
perbaikan, dll.
UA (Use of Availability) :
Angka yg menunjukan berapa persen waktu yang digunakan oleh suatu alat untuk beroperasi
pada saat alat dapat digunakan.
EU (Effective Utilization) :
Angka yang menunjukan berapa persen waktu yang digunakan untuk beroperasi oleh
suatu alat dan seluruh waktu yang tersedia.
PA (Physical Availability):
A number that shows the percentage of availability of a tool to operate by
taking into account time lost due to other than mechanical causes, such as
rain, damaged roads, breaks, etc.
MA (Mechanical Availability):
A number that shows the percentage of a tool to operate by taking into account
time lost due to mechanical causes, such as repair, maintenance, repair, etc.
UA (Use Of Availability):
A number that shows how many percent of time is used by a tool to operate when
the tool can be used.
EU (Effective Utilization):
A number that shows how many percent of time is used to operate by a tool and
all available time.
Sumber (source) : https://amtiss.com/blog/2021/02/02/pa-ma-ua-eu-indikator-produktivitas-alat-berat/
diakses pada Jumat, 29 Nopember 2024 pukul 19:40 WIB
accessed on Friday, November 29,
2024 at 07:40 pm of Western Indonesian Time
Sumber (source) :
Google Translate
Tidak ada komentar:
Posting Komentar