https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN MANDAILING 421 (EMPAT RATUS DUA PULUH SATU) TAHUN DI TAHUN 2024 MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
20 Mei 2445 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
May 20th, 2445 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIB. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN MINERAL BUKAN LOGAM (halaman 248)
IIB. FORMAT FOR PREPARATION OF WORK PLAN AND BUDGET FOR MINING BUSINESS LICENSE HOLDERS IN PRODUCTION OPERATION ACTIVITIES OF NON-METALLIC MINERALS (page 248)
Matrik 3b. Rencana dan Realisasi Kegiatan Eksplorasi Tahun (N-1) dan
Rencana Tahun (N) sampai dengan Tahun (N+2)
Matrix 3b. Exploration Activity
Plan and Realization for Year (N-1) and Plan for Year (N) up to Year (N+2)
Lokasi Kegiatan Activity
Location |
Kegiatan Activity |
Satuan*) Unit*) |
Biaya/ Satuan (Rp/USD Per Satuan) Cost/Unit
(Rp/USD Per Unit) |
Rencana Tahun (N-1) Year
Plan (N-1) |
Realisasi Tahun (N-1) Year
Realization (N-1) |
Rencana Tahun (N) Year
Plan (N) |
Rencana Tahun (N+1) Year
Plan (N+1) |
Rencana Tahun (N+2) Year
Plan (N+2) |
|||||
Kegiatan Activity |
Biaya Cost |
Kegiatan Activity |
Biaya Cost |
Kegiatan Activity |
Biaya Cost |
Kegiatan Activity |
Biaya Cost |
Kegiatan Activity |
Biaya Cost |
||||
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
(7) |
(8) |
(9) |
(10) |
(11) |
(12) |
(13) |
(14) |
|
Pemetaan Mapping |
|
|
|
|
|
|
|
|
|
|
|
|
|
- Topografi Topography |
|
ha |
|
|
|
|
|
|
|
|
|
|
|
- Geologi Lokal Local Geology |
|
ha |
|
|
|
|
|
|
|
|
|
|
|
Survei Geokimia Geochemical Survey |
|
|
|
|
|
|
|
|
|
|
|
|
|
Survei Geofisika **) Geophysical Survey **) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Pengeboran Open Hole Open Hole Drilling |
|
|
|
|
|
|
|
|
|
|
|
|
|
- Jumlah - Amount |
|
Titik point |
|
|
|
|
|
|
|
|
|
|
|
- Kedalaman Depth |
|
m |
|
|
|
|
|
|
|
|
|
|
|
- Spasi Pengeboran Drilling Spacing |
|
m |
|
|
|
|
|
|
|
|
|
|
|
Pengeboran Coring Coring Drilling |
|
|
|
|
|
|
|
|
|
|
|
|
|
- Jumlah Amount |
|
Titik point |
|
|
|
|
|
|
|
|
|
|
|
- Kedalaman Depth |
|
m |
|
|
|
|
|
|
|
|
|
|
|
- Spasi Pengeboran Drilling Spacing |
|
m |
|
|
|
|
|
|
|
|
|
|
|
Sumur Uji Test Well |
|
m |
|
|
|
|
|
|
|
|
|
|
|
Parit Uji Test Trench |
|
m |
|
|
|
|
|
|
|
|
|
|
|
Analisa Conto Example Analysis |
|
sampel sample |
|
|
|
|
|
|
|
|
|
|
|
Analisa Geoteknik Geotechnical Analysis |
|
Sampel sample |
|
|
|
|
|
|
|
|
|
|
|
Kegiatan teknis dan non teknis yang terkait kegiatan eksplorasi**) Technical and non-technical
activities related to exploration activities**) |
|
|
|
|
|
|
|
|
|
|
|
|
Total Biaya Eksplorasi Total
Exploration Cost |
|
|
|
|
|
|
|
|
|
|
|
Keterangan :
Kolom (6) = Kolom (4) x kolom (5)
Kolom (8) = Kolom (4) x kolom (7)
Kolom (10) = Kolom (4) x kolom (9)
Kolom (12) = Kolom (4) x kolom (11)
Kolom (14) = Kolom (4) x kolom (13)
Information :
Column (6) = Column (4) x column
(5)
Column (8) = Column (4) x column
(7)
Column (10) = Column (4) x column
(9)
Column (12) = Column (4) x column
(11)
Column (14) = Column (4) x column
(13)
*) Satuan menyesuaikan
kegiatan yang dicantumkan
**) Jika dilakukan
***) Kegiatan teknis dan non
teknis harus dirinci per kegiatan
*) Units adjust the activities listed
**) If carried out
***) Technical and non-technical activities must be detailed per
activity
Sumber (source) :
Google Translate
Tidak ada komentar:
Posting Komentar