https://www.youtube.com/@agussalimnasutionmandailing2/videos

Foto saya
UNTUK KE-GUBERNUR-AN SUMATERA UTARA DARI PENDIRI UM (UNIVERSITAS MANDAILING) FOR THE PROVINCIAL GOVERNOR OF SUMATERA UTARA FROM THE FOUNDER OF MU (MANDAILING UNIVERSITY)

Senin, 11 November 2024

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 20 MEI 2445 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 20 MEI 2445 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos


EVOLUSI PENDIDIKAN MANDAILING 421 (EMPAT RATUS DUA PULUH SATU) TAHUN DI TAHUN 2024 MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA


#SangKandidatSekjendPBBSekretarisJenderalPerserikatanBangsaBangsa #DariKantorGubernurSumutMedanKeKantorPerserikatanBangsaBangsaNewYork #SatuSatunyaTokohLegendarisSumutYangMemikirkanSumateraUtara1000SeribuTahunKeDepan #SumateraUtaraWorldMainProvincialClassRank #MembangunKegubernuranSumateraUtara #UniversitasMandailingUntukKegubernuranSumateraUtara #KearifanLokalMandailingUntukKegubernuranSumateraUtara #SeribuTahunEvolusiPendidikanMandailingUntukKegubernuranSumateraUtara





Arahan
dari 
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution


20 Mei 2445 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
May 20th, 2445 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,


KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA

NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES

DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,

MEMUTUSKAN :
Menetapkan : 
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.

LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151


IIB. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN MINERAL BUKAN LOGAM (halaman 248)

IIB. FORMAT FOR PREPARATION OF WORK PLAN AND BUDGET FOR MINING BUSINESS LICENSE HOLDERS IN PRODUCTION OPERATION ACTIVITIES OF NON-METALLIC MINERALS (page 248)


Matrik 3b. Rencana dan Realisasi Kegiatan Eksplorasi Tahun (N-1) dan Rencana Tahun (N) sampai dengan Tahun (N+2)

Matrix 3b. Exploration Activity Plan and Realization for Year (N-1) and Plan for Year (N) up to Year (N+2)

 

Lokasi

Kegiatan

Activity Location

Kegiatan

Activity

Satuan*)

Unit*)

Biaya/

Satuan

(Rp/USD Per

Satuan)

Cost/Unit (Rp/USD Per Unit)

Rencana Tahun

(N-1)

Year Plan (N-1)

Realisasi Tahun

(N-1)

Year Realization (N-1)

Rencana Tahun

(N)

Year Plan (N)

Rencana Tahun

(N+1)

Year Plan (N+1)

Rencana Tahun

(N+2)

Year Plan (N+2)

Kegiatan

Activity

Biaya

Cost

Kegiatan

Activity

Biaya

Cost

Kegiatan

Activity

Biaya

Cost

Kegiatan

Activity

Biaya

Cost

Kegiatan

Activity

Biaya

Cost

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(10)

(11)

(12)

(13)

(14)

 

Pemetaan

Mapping

 

 

 

 

 

 

 

 

 

 

 

 

 

- Topografi

Topography

 

ha

 

 

 

 

 

 

 

 

 

 

 

- Geologi Lokal

Local Geology

 

ha

 

 

 

 

 

 

 

 

 

 

 

Survei

Geokimia

Geochemical Survey

 

 

 

 

 

 

 

 

 

 

 

 

 

Survei

Geofisika **)

Geophysical Survey **)

 

 

 

 

 

 

 

 

 

 

 

 

 

Pengeboran

Open Hole

Open Hole Drilling

 

 

 

 

 

 

 

 

 

 

 

 

 

- Jumlah

- Amount

 

Titik

point

 

 

 

 

 

 

 

 

 

 

 

- Kedalaman

Depth

 

m

 

 

 

 

 

 

 

 

 

 

 

- Spasi

Pengeboran

Drilling Spacing

 

m

 

 

 

 

 

 

 

 

 

 

 

Pengeboran

Coring

Coring Drilling

 

 

 

 

 

 

 

 

 

 

 

 

 

- Jumlah

Amount

 

Titik

point

 

 

 

 

 

 

 

 

 

 

 

- Kedalaman

Depth

 

m

 

 

 

 

 

 

 

 

 

 

 

- Spasi

Pengeboran

Drilling Spacing

 

m

 

 

 

 

 

 

 

 

 

 

 

Sumur Uji

Test Well

 

m

 

 

 

 

 

 

 

 

 

 

 

Parit Uji

Test Trench

 

m

 

 

 

 

 

 

 

 

 

 

 

Analisa Conto

Example Analysis

 

sampel

sample

 

 

 

 

 

 

 

 

 

 

 

Analisa

Geoteknik

Geotechnical Analysis

 

Sampel

sample

 

 

 

 

 

 

 

 

 

 

 

Kegiatan

teknis dan non

teknis yang terkait

kegiatan

eksplorasi**)

Technical and non-technical activities related to exploration activities**)

 

 

 

 

 

 

 

 

 

 

 

 

Total Biaya Eksplorasi

Total Exploration Cost

 

 

 

 

 

 

 

 

 

 

 

 

Keterangan :

Kolom (6) = Kolom (4) x kolom (5)

Kolom (8) = Kolom (4) x kolom (7)

Kolom (10) = Kolom (4) x kolom (9)

Kolom (12) = Kolom (4) x kolom (11)

Kolom (14) = Kolom (4) x kolom (13)

Information :

Column (6) = Column (4) x column (5)

Column (8) = Column (4) x column (7)

Column (10) = Column (4) x column (9)

Column (12) = Column (4) x column (11)

Column (14) = Column (4) x column (13)

 

*)            Satuan menyesuaikan kegiatan yang dicantumkan

**)         Jika dilakukan

***)       Kegiatan teknis dan non teknis harus dirinci per kegiatan

*)            Units adjust the activities listed

**)         If carried out

***)       Technical and non-technical activities must be detailed per activity

 

Sumber (source) :

Google Translate


Tidak ada komentar:

Posting Komentar