https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN MANDAILING 421 (EMPAT RATUS DUA PULUH SATU) TAHUN DI TAHUN 2024 MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
01 Juli 2445 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
July 01st, 2445 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (Mandailing University) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
Matrik 7. Rencana dan Realisasi Penimbunan Over Burden (OB) / Batuan
Penutup Tahun (N-1) dan Rencana Tahun (N)
Matrix 7. Plan and Realization of
Over Burden (OB) / Overburden Filling Year (N-1) and Planned Year (N)
Lokasi Location |
Rencana Tahun (N-1) Year
Plan (N-1) |
Realisasi Tahun (N-1) Year
Realization (N-1) |
||
Lokasi Penimbunan Landfill
Location |
Jumlah (Lcm) Amount
(Lcm) |
Lokasi Penimbunan Landfill
Location |
Jumlah (Lcm) Amount
(Lcm) |
|
(1) |
(2) |
(3) |
(4) |
(5) |
Pit 1 |
|
|
|
|
Pit 2 |
|
|
|
|
… |
|
|
|
|
N |
|
|
|
|
Total |
|
|
|
|
Lokasi Location |
Rencana Tahun (N) Year
Plan (N) |
Rencana Tahun (N+1) Year
Plan (N+1) |
Rencana Tahun (N+2) Year
Plan (N+2) |
|||
Lokasi Penimbunan Landfill
Location |
Jumlah (Lcm) Amount
(Lcm) |
Lokasi Penimbunan Landfill
Location |
Jumlah (Lcm) Amount
(Lcm) |
Lokasi Penimbunan Landfill
Location |
Jumlah (Lcm) Amount
(Lcm) |
|
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
(7) |
Pit 1 |
|
|
|
|
|
|
Pit 2 |
|
|
|
|
|
|
… |
|
|
|
|
|
|
N |
|
|
|
|
|
|
Total |
|
|
|
|
|
|
Penjelasan Matrik :
1. Satuan dalam LCM;
2. Untuk penambangan sistem bawah tanah disesuaikan.
Matrix Explanation:
1. Units in LCM;
2. For underground mining systems
adjusted.
sumber (source) :
Google Translate
Tidak ada komentar:
Posting Komentar