https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN MANDAILING 421 (EMPAT RATUS DUA PULUH SATU) TAHUN DI TAHUN 2024 MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
27 Mei 2445 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
May 27th, 2445 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIB. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN MINERAL BUKAN LOGAM (halaman 248)
IIB. FORMAT FOR PREPARATION OF WORK PLAN AND BUDGET FOR MINING BUSINESS LICENSE HOLDERS IN PRODUCTION OPERATION ACTIVITIES OF NON-METALLIC MINERALS (page 248)
Matrik 3c. Rencana dan Realisasi Biaya Eksplorasi Tahun (N-1) dan
Rencana Tahun (N) sampai dengan Tahun (N+2)
Matrix 3c. Exploration Cost Plan
and Realization for Year (N-1) and Plan for Year (N) up to Year (N+2)
Kegiatan Activity |
Rencana N-1 Plan
N-1 |
Realisasi N-1 Realization
N-1 |
Rencana N Plan
N |
Rencana N+1 Plan
N+1 |
Rencana N+2 Plan
N+2 |
||||||||||
Pengembangan Sumber Daya (Resources Development) |
Verifikasi Cadangan |
TOTAL |
Pengembangan Sumber Daya (Resources Development) |
Verifikasi Cadangan |
TOTAL |
Pengembangan Sumber Daya (Resources Development) |
Verifikasi Cadangan Backup
Verification |
TOTAL |
Pengembangan Sumber Daya (Resources Development) |
Verifikasi Cadangan Backup
Verification |
TOTAL |
Pengembangan Sumber Daya (Resources Development) |
Verifikasi Cadangan Backup
Verification |
TOTAL |
|
(Rp/USD) |
(Rp/USD) |
(Rp/USD) |
(Rp/USD) |
(Rp/USD) |
(Rp/USD) |
(Rp/USD) |
(Rp/USD) |
(Rp/USD) |
(Rp/USD) |
(Rp/USD) |
(Rp/USD) |
(Rp/USD) |
(Rp/USD) |
(Rp/USD) |
|
(1) |
(2) |
(3) |
|
(2) |
(3) |
|
(2) |
(3) |
|
(2) |
(3) |
|
(2) |
(3) |
|
Biaya Langsung, terdiri dari : Direct costs consist of: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1. Pemetaan Topografi Topographic mapping |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. Pemetaan Geologi Geological mapping |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. dst. etc. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Biaya Tidak Langsung, terdiri dari : Indirect costs consist of: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1. Gaji Wages |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. Administrasi Administration |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. dst. etc. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Keterangan:
1.
Kegiatan eksplorasi pengembangan dan verifikasi cadangan yang dibagi
berdasarkan biaya langsung yang berkaitan dengan kegiatan teknis eksplorasi dan
biaya tidak langsung yang tidak berkaitan langsung dengan kegiatan teknis
eksplorasi
2.
Kegiatan eksplorasi yang bersifat investasi jangka panjang di luar area
penambangan untuk mengembangkan potensi sumber daya
3.
Kegiatan eksplorasi di area penambangan untuk menverifikasi jumlah/kadar dari
cadangan yang akan diproduksi.
Description:
1. Exploration activities for development
and verification of reserves divided based on direct costs related to technical
exploration activities and indirect costs not directly related to technical
exploration activities
2. Exploration activities that are long-term
investments outside the mining area to develop potential resources
3. Exploration activities in the mining area
to verify the amount/grade of reserves to be produced.
Sumber
(source) :
Google Translate
Tidak ada komentar:
Posting Komentar