https://www.youtube.com/@agussalimnasutionmandailing2/videos

Foto saya
UNTUK KE-GUBERNUR-AN SUMATERA UTARA DARI PENDIRI UM (UNIVERSITAS MANDAILING) FOR THE PROVINCIAL GOVERNOR OF SUMATERA UTARA FROM THE FOUNDER OF MU (MANDAILING UNIVERSITY)

Jumat, 12 Juli 2024

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 28 MEI 2444 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 28 MEI 2444 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos


EVOLUSI PENDIDIKAN MANDAILING 420 (EMPAT RATUS DUA PULUH) TAHUN DI TAHUN 2024 MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA







Arahan
dari 
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution


28 Mei 2444 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
May 28th, 2444 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,


KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA

NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES

DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,

MEMUTUSKAN :
Menetapkan : 
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.

LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151


IIA.  FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI DAN IUPK TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN MINERAL LOGAM

IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE


Matrik 3c. Rencana dan Realisasi Biaya Eksplorasi Tahun (N-1) dan Rencana Tahun (N) sampai dengan Tahun (N+2)
Matrix 3c. Plan and Realization of Exploration Costs for Year (N-1) and Plan for Year (N) to Year (N+2)

 

Kegiatan
Activity

Rencana N-1
Plan N-1

Realisasi N-1
Realization N-1

Rencana N
Plan N

Rencana N+1
N+1 Plan

Rencana N+2
Plan N+2

Pengembangan Sumber Daya (Resources Development)

Verifikasi Cadangan
Backup Verification

TOTAL

Pengembangan Sumber Daya (Resources Development)

Verifikasi Cadangan
Reserve Verification

TOTAL

Pengembangan Sumber Daya (Resources Development)

Verifikasi Cadangan
Reserve Verification

TOTAL

Pengembangan Sumber Daya (Resources Development)

Verifikasi Cadangan
Reserve Verification

TOTAL

Pengembangan Sumber Daya (Resources Development)

Verifikasi Cadangan
Reserve Verification

TOTAL

(Rp/USD)

(Rp/USD)

(Rp/USD)

(Rp/USD)

(Rp/USD)

(Rp/USD)

(Rp/USD)

(Rp/USD)

(Rp/USD)

(Rp/USD)

(Rp/USD)

(Rp/USD)

(Rp/USD)

(Rp/USD)

(Rp/USD)

(1)

(2)

(3)

 

(2)

(3)

 

(2)

(3)

 

(2)

(3)

 

(2)

(3)

 

Biaya Langsung terdiri dari :
Direct costs consist of:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

Pemetaan topografi
Topographic mapping

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

Pemetaan geologi
Geological mapping

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

Dst.
Etc.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Biaya Tidak Langsung, terdiri dari :
Indirect Costs, consisting of:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1.

Gaji
Wages

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2.

Administrasi
Administration

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3.

Dst
etc

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Penjelasan matrik :

1. Kegiatan eksplorasi pengembangan dan verifikasi cadangan yang dibagi berdasarkan biaya langsung yang berkaitan dengan kegiatan teknis eksplorasi dan biaya tidak langsung yang tidak berkaitan langsung dengan kegiatan teknis eksplorasi

2. Kegiatan eksplorasi yang bersifat investasi jangka panjang di luar area penambangan untuk mengembangkan potensi sumber daya

3. Kegiatan eksplorasi di area penambangan untuk menverifikasi jumlah/kadar dari cadangan yang akan diproduksi

Matrix explanation :

1. Exploration activities for development and verification of reserves divided based on direct costs related to technical exploration activities and indirect costs that are not directly related to technical exploration activities

2. Long-term investment exploration activities outside the mining area to develop resource potential

3. Exploration activities in the mining area to verify the amount/grade of reserves to be produced

 

Sumber (source) :

Google Translate

Tidak ada komentar:

Posting Komentar

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 09 SEPTEMBER 2445 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 09 SEPTEMBER 2445 MASEHI)

  https://www.youtube.com/@agussalimnasutionmandailing2/videos EVOLUSI PENDIDIKAN LOKAL MANDAILING  UNTUK RENTANGAN TAHUN 2445 - 2024  =  42...