https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN MANDAILING 420 (EMPAT RATUS DUA PULUH) TAHUN DI TAHUN 2024 MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
23 Juli 2444 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
July 23rd, 2444 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIA. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI DAN IUPK TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN MINERAL LOGAM
IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE
Matrik 10. Daftar Peralatan, Tahun (N-1) dan (N) sampai dengan Tahun
(N+2)
Matrix 10. Equipment List, Year
(N-1) and (N) to Year (N+2)
Matrik 10a. Daftar Peralatan Penambangan yang Dimiliki Perusahaan dan
Kontraktor
Matrix 10a. List of Mining
Equipment Owned by Companies and Contractors
No.
Number
Jenis Peralatan Alat Gali
Types
of Digging Equipment
Tipe
Type
Produktivitas (Bcm/Hour)
Productivity
(Bcm/Hour)
PA
MA
UA
EU
Rencana Tahun (N-1)
Year
Plan (N-1)
Rencana Tahun (N)
Year
Plan (N)
Rencana Tahun (N+1)
Year
Plan (N+1)
Rencana Tahun (N+2)
Year
Plan (N+2)
%
Jumlah Unit
Number
of Units
Jumlah Unit
Number
of Units
Jumlah Unit
Number
of Units
Jumlah Unit
Number
of Units
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
1.
2.
N
No.
Number
Jenis
Peralatan
Alat Muat
Equipment Type
Loading Tool
Tipe
Type
Produktivitas (Bcm/Hour)
Productivity
(Bcm/Hour)
PA
MA
UA
EU
Rencana Tahun (N-1)
Year
Plan (N-1)
Rencana Tahun (N)
Year
Plan (N)
Rencana Tahun (N+1)
Year
Plan (N+1)
Rencana Tahun (N+2)
Year
Plan (N+2)
%
Jumlah Unit
Number
of Units
Jumlah Unit
Number
of Units
Jumlah Unit
Number
of Units
Jumlah Unit
Number
of Units
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
1.
2.
N
No.
Number
Jenis
Peralatan
Alat Angkut
Types
of Transport Equipment
Tipe
Type
Produktivitas (Bcm/Hour)
Productivity
(Bcm/Hour)
PA
MA
UA
EU
Rencana Tahun (N-1)
Year
Plan (N-1)
Rencana Tahun (N)
Year
Plan (N)
Rencana Tahun (N+1)
Year
Plan (N+1)
Rencana Tahun (N+2)
Year
Plan (N+2)
%
Jumlah Unit
Number
of Units
Jumlah Unit
Number
of Units
Jumlah Unit
Number
of Units
Jumlah Unit
Number
of Units
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
1.
2.
N
No.
Numbder
Jenis
Peralatan
Alat
Pendukung
Types
of Supporting Equipment
Tipe
Type
Produktivitas (Bcm/Hour)
PA
MA
UA
EU
Rencana Tahun (N-1)
Year
Plan (N-1)
Rencana Tahun (N)
Year
Plan (N)
Rencana Tahun (N+1)
Year
Plan (N+1)
Rencana Tahun (N+2)
Year
Plan (N+2)
%
Jumlah Unit
Number
of Units
Jumlah Unit
Number
of Units
Jumlah Unit
Number
of Units
Jumlah Unit
Number
of Units
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
1.
2.
N
Matrik 10b. Peralatan Pengolahan dan/atau Pemurnian yang Dimiliki
Perusahaan dan Kontraktor
Matrix 10b. Processing and/or
Refining Equipment Owned by Companies and Contractors
No.
Number
Tipe
Type
Kapasitas
Capacity
Jumlah Unit
Number
of Units
Keterangan *)
Information
*)
1.
2.
N
Keterangan :
*) Diisi status milik sendiri/Kontraktor
Information :
*) Fill in own/Contractor status
Matrik 10c. Rencana dan Realisasi Pengelolaan Air Tambang Tahun (N-1)
dan Rencana Tahun (N) sampai dengan Tahun (N+2)
Matrix 10c. Plan and Realization
of Mine Water Management for Year (N-1) and Plan for Year (N) to Year (N+2)
Tahun
Year
Keterangan
Information
JAN
FEB
MAR
……..
DES
DEC
TOTAL
Unit
Unit
Unit
Unit
Unit
Unit
Rencana Tahun (N-1)
Year Plan (N-1)
Jumlah Kolam
Number of Pools
Pompa
Pump
No.
Number
Merek
Brand
Type
Kapasitas Total Head (m)
Total
Head Capacity (m)
Flowrate
(liter/detik)
Flowrate
(liters/second)
1
2
3
Realisasi Tahun (N-1)
Year Realization (N-1)
Jumlah Kolam
Number of Pools
Pompa
Pump
No.
Number
Merek
Brand
Type
Kapasitas Total Head (m)
Total
Head Capacity (m)
Flowrate
(liter/detik)
Flowrate (liters/second)
1
2
3
Rencana Tahun (N)
Year Plan (N)
Jumlah Kolam
Number of Pools
Pompa
Pump
No.
Number
Merek
Brand
Type
Kapasitas Total Head (m)
Total
Head Capacity (m)
Flowrate
(liter/detik)
Flowrate
(liters/second)
1
2
3
Rencana Tahun (N+1)
Year Plan (N+1)
Jumlah Kolam
Number of Pools
Pompa
Pump
No.
Number
Merek
Brand
Type
Kapasitas Total Head (m)
Total
Head Capacity (m)
Flowrate
(liter/detik)
Flowrate
(liters/second)
1
2
3
Rencana Tahun (N+2)
Year Plan (N+2)
Jumlah Kolam
Number of Pools
Pompa
Pump
No.
Number
Merek
Brand
Type
Kapasitas Total Head (m)
Total
Head Capacity (m)
Flowrate
(liter/detik)
Flowrate
(liters/second)
1
2
3
Matrik 10d. Rencana dan Realisasi Pengelolaan Geoteknik Tambang Tahun
(N-1) dan Rencana Tahun (N) sampai dengan Rencana Tahun (N+2)
10d Matrix. Mining Geotechnical
Management Plan and Realization for Year (N-1) and Year Plan (N) to Year Plan
(N+2)
Lokasi
Location
Rencana Tahun (N-1)
Year
Plan (N-1)
Realisasi Tahun (N-1)
Year
Realization (N-1)
Rencana Tahun (N)
Year
Plan (N)
Rencana Tahun (N+1)
Year
Plan (N+1)
Rencana Tahun (N+2)
Year
Plan (N+2)
Metode Pemantauan
Monitoring
Method
Jumlah Titik Pemantauan
Number
of Monitoring Points
Metode Pemantauan
Monitoring
Method
Jumlah Titik Pemantauan
Number
of Monitoring Points
Metode Pemantauan
Monitoring
Method
Jumlah Titik Pemantauan
Number
of Monitoring Points
Metode Pemantauan
Monitoring
Method
Jumlah Titik Pemantauan
Number
of Monitoring Points
Metode Pemantauan
Monitoring
Method
Jumlah Titik Pemantauan
Number
of Monitoring Points
PIT 1
PIT 2
In Pit Dump 1
Out Pit Dump 1
Dll
Penjelasan Matrik :
1. Lokasi menyesuaikan titik pemantauan
2. Tambang bawah tanah menyesuaikan
Matrix Explanation:
1. Location adjust monitoring
point
2. Underground mine adapts
sumber (source) :
Google Translate
IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE
Matrik 10. Daftar Peralatan, Tahun (N-1) dan (N) sampai dengan Tahun
(N+2)
Matrix 10. Equipment List, Year
(N-1) and (N) to Year (N+2)
Matrik 10a. Daftar Peralatan Penambangan yang Dimiliki Perusahaan dan
Kontraktor
Matrix 10a. List of Mining
Equipment Owned by Companies and Contractors
No. Number |
Jenis Peralatan Alat Gali Types
of Digging Equipment |
Tipe Type |
Produktivitas (Bcm/Hour) Productivity
(Bcm/Hour) |
PA |
MA |
UA |
EU |
Rencana Tahun (N-1) Year
Plan (N-1) |
Rencana Tahun (N) Year
Plan (N) |
Rencana Tahun (N+1) Year
Plan (N+1) |
Rencana Tahun (N+2) Year
Plan (N+2) |
% |
Jumlah Unit Number
of Units |
Jumlah Unit Number
of Units |
Jumlah Unit Number
of Units |
Jumlah Unit Number
of Units |
|||||||
|
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
(7) |
(8) |
|||
1. |
|
|
|
|
|
|
|
|
|
|
|
2. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
N |
|
|
|
|
|
|
|
|
|
|
|
No. Number |
Jenis Peralatan Alat Muat Equipment Type Loading Tool |
Tipe Type |
Produktivitas (Bcm/Hour) Productivity
(Bcm/Hour) |
PA |
MA |
UA |
EU |
Rencana Tahun (N-1) Year
Plan (N-1) |
Rencana Tahun (N) Year
Plan (N) |
Rencana Tahun (N+1) Year
Plan (N+1) |
Rencana Tahun (N+2) Year
Plan (N+2) |
% |
Jumlah Unit Number
of Units |
Jumlah Unit Number
of Units |
Jumlah Unit Number
of Units |
Jumlah Unit Number
of Units |
|||||||
|
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
(7) |
(8) |
|||
1. |
|
|
|
|
|
|
|
|
|
|
|
2. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
N |
|
|
|
|
|
|
|
|
|
|
|
No. Number |
Jenis Peralatan Alat Angkut Types
of Transport Equipment |
Tipe Type |
Produktivitas (Bcm/Hour) Productivity
(Bcm/Hour) |
PA |
MA |
UA |
EU |
Rencana Tahun (N-1) Year
Plan (N-1) |
Rencana Tahun (N) Year
Plan (N) |
Rencana Tahun (N+1) Year
Plan (N+1) |
Rencana Tahun (N+2) Year
Plan (N+2) |
% |
Jumlah Unit Number
of Units |
Jumlah Unit Number
of Units |
Jumlah Unit Number
of Units |
Jumlah Unit Number
of Units |
|||||||
|
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
(7) |
(8) |
|||
1. |
|
|
|
|
|
|
|
|
|
|
|
2. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
N |
|
|
|
|
|
|
|
|
|
|
|
No. Numbder |
Jenis Peralatan Alat Pendukung Types
of Supporting Equipment |
Tipe Type |
Produktivitas (Bcm/Hour) |
PA |
MA |
UA |
EU |
Rencana Tahun (N-1) Year
Plan (N-1) |
Rencana Tahun (N) Year
Plan (N) |
Rencana Tahun (N+1) Year
Plan (N+1) |
Rencana Tahun (N+2) Year
Plan (N+2) |
% |
Jumlah Unit Number
of Units |
Jumlah Unit Number
of Units |
Jumlah Unit Number
of Units |
Jumlah Unit Number
of Units |
|||||||
|
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
(7) |
(8) |
|||
1. |
|
|
|
|
|
|
|
|
|
|
|
2. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
N |
|
|
|
|
|
|
|
|
|
|
|
Matrik 10b. Peralatan Pengolahan dan/atau Pemurnian yang Dimiliki
Perusahaan dan Kontraktor
Matrix 10b. Processing and/or
Refining Equipment Owned by Companies and Contractors
No.
|
Tipe
|
Kapasitas
|
Jumlah Unit
|
Keterangan *)
|
1. |
|
|
|
|
2. |
|
|
|
|
N |
|
|
|
|
Keterangan :
*) Diisi status milik sendiri/Kontraktor
Information :
*) Fill in own/Contractor status
Matrik 10c. Rencana dan Realisasi Pengelolaan Air Tambang Tahun (N-1)
dan Rencana Tahun (N) sampai dengan Tahun (N+2)
Matrix 10c. Plan and Realization
of Mine Water Management for Year (N-1) and Plan for Year (N) to Year (N+2)
Tahun
|
Keterangan
|
JAN |
FEB |
MAR |
…….. |
DES
|
TOTAL |
||||
Unit |
Unit |
Unit |
Unit |
Unit |
Unit |
||||||
Rencana Tahun (N-1)
|
Jumlah Kolam
|
|
|
|
|
|
|
||||
Pompa
|
|
|
|
|
|
|
|||||
No.
|
Merek
|
Type |
Kapasitas Total Head (m)
|
Flowrate
(liter/detik)
|
|
|
|
|
|
|
|
1 |
|
|
|
|
|
|
|
|
|
|
|
2 |
|
|
|
|
|
|
|
|
|
|
|
3 |
|
|
|
|
|
|
|
|
|
|
|
Realisasi Tahun (N-1)
|
Jumlah Kolam
|
|
|
|
|
|
|
||||
Pompa
|
|
|
|
|
|
|
|||||
No.
|
Merek
|
Type |
Kapasitas Total Head (m)
|
Flowrate
(liter/detik)
|
|
|
|
|
|
|
|
1 |
|
|
|
|
|
|
|
|
|
|
|
2 |
|
|
|
|
|
|
|
|
|
|
|
3 |
|
|
|
|
|
|
|
|
|
|
|
Rencana Tahun (N)
|
Jumlah Kolam
|
|
|
|
|
|
|
||||
Pompa
|
|
|
|
|
|
|
|||||
No.
|
Merek
|
Type |
Kapasitas Total Head (m)
|
Flowrate
(liter/detik)
|
|
|
|
|
|
|
|
1 |
|
|
|
|
|
|
|
|
|
|
|
2 |
|
|
|
|
|
|
|
|
|
|
|
3 |
|
|
|
|
|
|
|
|
|
|
|
Rencana Tahun (N+1)
|
Jumlah Kolam
|
|
|
|
|
|
|
||||
Pompa
|
|
|
|
|
|
|
|||||
No.
|
Merek
|
Type |
Kapasitas Total Head (m)
|
Flowrate
(liter/detik)
|
|
|
|
|
|
|
|
1 |
|
|
|
|
|
|
|
|
|
|
|
2 |
|
|
|
|
|
|
|
|
|
|
|
3 |
|
|
|
|
|
|
|
|
|
|
|
Rencana Tahun (N+2)
|
Jumlah Kolam
|
|
|
|
|
|
|
||||
Pompa
|
|
|
|
|
|
|
|||||
No.
|
Merek
|
Type |
Kapasitas Total Head (m)
|
Flowrate
(liter/detik)
|
|
|
|
|
|
|
|
1 |
|
|
|
|
|
|
|
|
|
|
|
2 |
|
|
|
|
|
|
|
|
|
|
|
3 |
|
|
|
|
|
|
|
|
|
|
Matrik 10d. Rencana dan Realisasi Pengelolaan Geoteknik Tambang Tahun
(N-1) dan Rencana Tahun (N) sampai dengan Rencana Tahun (N+2)
10d Matrix. Mining Geotechnical
Management Plan and Realization for Year (N-1) and Year Plan (N) to Year Plan
(N+2)
Lokasi Location |
Rencana Tahun (N-1) Year
Plan (N-1) |
Realisasi Tahun (N-1) Year
Realization (N-1) |
Rencana Tahun (N) Year
Plan (N) |
Rencana Tahun (N+1) Year
Plan (N+1) |
Rencana Tahun (N+2) Year
Plan (N+2) |
|||||
Metode Pemantauan Monitoring
Method |
Jumlah Titik Pemantauan Number
of Monitoring Points |
Metode Pemantauan Monitoring
Method |
Jumlah Titik Pemantauan Number
of Monitoring Points |
Metode Pemantauan Monitoring
Method |
Jumlah Titik Pemantauan Number
of Monitoring Points |
Metode Pemantauan Monitoring
Method |
Jumlah Titik Pemantauan Number
of Monitoring Points |
Metode Pemantauan Monitoring
Method |
Jumlah Titik Pemantauan Number
of Monitoring Points |
|
PIT 1 |
|
|
|
|
|
|
|
|
|
|
PIT 2 |
|
|
|
|
|
|
|
|
|
|
In Pit Dump 1 |
|
|
|
|
|
|
|
|
|
|
Out Pit Dump 1 |
|
|
|
|
|
|
|
|
|
|
Dll |
|
|
|
|
|
|
|
|
|
|
Tidak ada komentar:
Posting Komentar