https://www.youtube.com/@agussalimnasutionmandailing2/videos

Foto saya
UNTUK KE-GUBERNUR-AN SUMATERA UTARA DARI PENDIRI UM (UNIVERSITAS MANDAILING) FOR THE PROVINCIAL GOVERNOR OF SUMATERA UTARA FROM THE FOUNDER OF MU (MANDAILING UNIVERSITY)

Senin, 22 Juli 2024

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 23 JULI 2444 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 23 JULI 2444 MASEHI)

 

https://www.youtube.com/@agussalimnasutionmandailing2/videos


EVOLUSI PENDIDIKAN MANDAILING 420 (EMPAT RATUS DUA PULUH) TAHUN DI TAHUN 2024 MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA







Arahan
dari 
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution


23 Juli 2444 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
July 23rd, 2444 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,


KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA

NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES

DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,

MEMUTUSKAN :
Menetapkan : 
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.

LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151


IIA.  FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI DAN IUPK TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN MINERAL LOGAM

IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE


Matrik 10. Daftar Peralatan, Tahun (N-1) dan (N) sampai dengan Tahun (N+2)
Matrix 10. Equipment List, Year (N-1) and (N) to Year (N+2)
 
Matrik 10a. Daftar Peralatan Penambangan yang Dimiliki Perusahaan dan Kontraktor
Matrix 10a. List of Mining Equipment Owned by Companies and Contractors

 

No.

Number

Jenis Peralatan Alat Gali

Types of Digging Equipment

Tipe

Type

Produktivitas (Bcm/Hour)

Productivity (Bcm/Hour)

PA

MA

UA

EU

Rencana Tahun (N-1)

Year Plan (N-1)

Rencana Tahun (N)

Year Plan (N)

Rencana Tahun (N+1)

Year Plan (N+1)

Rencana Tahun (N+2)

Year Plan (N+2)

%

Jumlah Unit

Number of Units

Jumlah Unit

Number of Units

Jumlah Unit

Number of Units

Jumlah Unit

Number of Units

 

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

1.

 

 

 

 

 

 

 

 

 

 

 

2.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N

 

 

 

 

 

 

 

 

 

 

 

 

No.

Number

Jenis

Peralatan

Alat Muat

Equipment Type

Loading Tool

Tipe

Type

Produktivitas (Bcm/Hour)

Productivity (Bcm/Hour)

PA

MA

UA

EU

Rencana Tahun (N-1)

Year Plan (N-1)

Rencana Tahun (N)

Year Plan (N)

Rencana Tahun (N+1)

Year Plan (N+1)

Rencana Tahun (N+2)

Year Plan (N+2)

%

Jumlah Unit

Number of Units

Jumlah Unit

Number of Units

Jumlah Unit

Number of Units

Jumlah Unit

Number of Units

 

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

1.

 

 

 

 

 

 

 

 

 

 

 

2.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N

 

 

 

 

 

 

 

 

 

 

 

 

No.

Number

Jenis

Peralatan

Alat Angkut

Types of Transport Equipment

Tipe

Type

Produktivitas (Bcm/Hour)

Productivity (Bcm/Hour)

PA

MA

UA

EU

Rencana Tahun (N-1)

Year Plan (N-1)

Rencana Tahun (N)

Year Plan (N)

Rencana Tahun (N+1)

Year Plan (N+1)

Rencana Tahun (N+2)

Year Plan (N+2)

%

Jumlah Unit

Number of Units

Jumlah Unit

Number of Units

Jumlah Unit

Number of Units

Jumlah Unit

Number of Units

 

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

1.

 

 

 

 

 

 

 

 

 

 

 

2.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N

 

 

 

 

 

 

 

 

 

 

 

 

No.

Numbder

Jenis

Peralatan

Alat

Pendukung

Types of Supporting Equipment

Tipe

Type

Produktivitas (Bcm/Hour)

PA

MA

UA

EU

Rencana Tahun (N-1)

Year Plan (N-1)

Rencana Tahun (N)

Year Plan (N)

Rencana Tahun (N+1)

Year Plan (N+1)

Rencana Tahun (N+2)

Year Plan (N+2)

%

Jumlah Unit

Number of Units

Jumlah Unit

Number of Units

Jumlah Unit

Number of Units

Jumlah Unit

Number of Units

 

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

1.

 

 

 

 

 

 

 

 

 

 

 

2.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N

 

 

 

 

 

 

 

 

 

 

 

 

 

Matrik 10b. Peralatan Pengolahan dan/atau Pemurnian yang Dimiliki Perusahaan dan Kontraktor

Matrix 10b. Processing and/or Refining Equipment Owned by Companies and Contractors

 

No.
Number

Tipe
Type

Kapasitas
Capacity

Jumlah Unit
Number of Units

Keterangan *)
Information *)

1.

 

 

 

 

2.

 

 

 

 

N

 

 

 

 

 

Keterangan :
*) Diisi status milik sendiri/Kontraktor
Information :
*) Fill in own/Contractor status
 

 

Matrik 10c. Rencana dan Realisasi Pengelolaan Air Tambang Tahun (N-1) dan Rencana Tahun (N) sampai dengan Tahun (N+2)
Matrix 10c. Plan and Realization of Mine Water Management for Year (N-1) and Plan for Year (N) to Year (N+2)
 

Tahun
Year

Keterangan
Information

JAN

FEB

MAR

……..

DES
DEC

TOTAL

Unit

Unit

Unit

Unit

Unit

Unit

Rencana Tahun (N-1)
Year Plan (N-1)

Jumlah Kolam
Number of Pools

 

 

 

 

 

 

Pompa
Pump

 

 

 

 

 

 

No.
Number

Merek
Brand

Type

Kapasitas Total Head (m)
Total Head Capacity (m)

Flowrate (liter/detik)
Flowrate (liters/second)

 

 

 

 

 

 

1

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

 

3

 

 

 

 

 

 

 

 

 

 

Realisasi Tahun (N-1)
Year Realization (N-1)

Jumlah Kolam
Number of Pools

 

 

 

 

 

 

Pompa
Pump

 

 

 

 

 

 

No.
Number

Merek
Brand

Type

Kapasitas Total Head (m)
Total Head Capacity (m)

Flowrate (liter/detik)
Flowrate (liters/second)

 

 

 

 

 

 

1

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

 

3

 

 

 

 

 

 

 

 

 

 

Rencana Tahun (N)
Year Plan (N)

Jumlah Kolam
Number of Pools

 

 

 

 

 

 

Pompa          
Pump

 

 

 

 

 

 

No.
Number

Merek
Brand

Type

Kapasitas Total Head (m)
Total Head Capacity (m)

Flowrate (liter/detik)
Flowrate (liters/second)

 

 

 

 

 

 

1

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

 

3

 

 

 

 

 

 

 

 

 

 

Rencana Tahun (N+1)
Year Plan (N+1)

Jumlah Kolam
Number of Pools

 

 

 

 

 

 

Pompa
Pump

 

 

 

 

 

 

No.
Number

Merek
Brand

Type

Kapasitas Total Head (m)
Total Head Capacity (m)

Flowrate (liter/detik)
Flowrate (liters/second)

 

 

 

 

 

 

1

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

 

3

 

 

 

 

 

 

 

 

 

 

Rencana Tahun (N+2)
Year Plan (N+2)

Jumlah Kolam
Number of Pools

 

 

 

 

 

 

Pompa
Pump

 

 

 

 

 

 

No.
Number

Merek
Brand

Type

Kapasitas Total Head (m)
Total Head Capacity (m)

Flowrate (liter/detik)
Flowrate (liters/second)

 

 

 

 

 

 

1

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

 

3

 

 

 

 

 

 

 

 

 

 

 
 

 

Matrik 10d. Rencana dan Realisasi Pengelolaan Geoteknik Tambang Tahun (N-1) dan Rencana Tahun (N) sampai dengan Rencana Tahun (N+2)
10d Matrix. Mining Geotechnical Management Plan and Realization for Year (N-1) and Year Plan (N) to Year Plan (N+2)

 

Lokasi

Location

Rencana Tahun (N-1)

Year Plan (N-1)

Realisasi Tahun (N-1)

Year Realization (N-1)

Rencana Tahun (N)

Year Plan (N)

Rencana Tahun (N+1)

Year Plan (N+1)

Rencana Tahun (N+2)

Year Plan (N+2)

Metode Pemantauan

Monitoring Method

Jumlah Titik Pemantauan

Number of Monitoring Points

Metode Pemantauan

Monitoring Method

Jumlah Titik Pemantauan

Number of Monitoring Points

Metode Pemantauan

Monitoring Method

Jumlah Titik Pemantauan

Number of Monitoring Points

Metode Pemantauan

Monitoring Method

Jumlah Titik Pemantauan

Number of Monitoring Points

Metode Pemantauan

Monitoring Method

Jumlah Titik Pemantauan

Number of Monitoring Points

PIT 1

 

 

 

 

 

 

 

 

 

 

PIT 2

 

 

 

 

 

 

 

 

 

 

In Pit Dump 1

 

 

 

 

 

 

 

 

 

 

Out Pit Dump 1

 

 

 

 

 

 

 

 

 

 

Dll

 

 

 

 

 

 

 

 

 

 

 

Penjelasan Matrik :
1. Lokasi menyesuaikan titik pemantauan
2. Tambang bawah tanah menyesuaikan
Matrix Explanation:
1. Location adjust monitoring point
2. Underground mine adapts
 
sumber (source) :
Google Translate

Tidak ada komentar:

Posting Komentar

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 09 SEPTEMBER 2445 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 09 SEPTEMBER 2445 MASEHI)

  https://www.youtube.com/@agussalimnasutionmandailing2/videos EVOLUSI PENDIDIKAN LOKAL MANDAILING  UNTUK RENTANGAN TAHUN 2445 - 2024  =  42...