https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN MANDAILING 420 (EMPAT RATUS DUA PULUH) TAHUN DI TAHUN 2024 MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
02 Juli 2444 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
July 02nd, 2444 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIA. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI DAN IUPK TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN MINERAL LOGAM
IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE
Matrik 7. Rencana dan Realisasi Penimbunan Overburden (OB)/Batuan Penutup
Matrix 7. Plan and Realization of
Overburden (OB)/Cover Rock
Bulan
Month
Rencana Tahun (N-1)
Year
Plan (N-1)
Realisasi Tahun (N-1)
Year
Realization (N-1)
Rencana Tahun (N)
Year
Plan (N)
Rencana Tahun (N+1)
Year
Plan (N+1)
Rencana Tahun (N+2)
Year
Plan (N+2)
Inpit
Outpit
Total
Inpit
Outpit
Total
Inpit
Outpit
Total
Inpit
Outpit
Total
Inpit
Outpit
Total
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
Januari
January
Februari
February
Maret
March
April
Mei
May
Juni
June
Juli
July
Agustus
August
September
Oktober
October
November
Desember
December
TOTAL
Lokasi Location
Rencana Tahun (N-1)
Year
Plan (N-1)
Realisasi Tahun (N-1)
Year
Realization (N-1)
Inpit
Outpit
Inpit
Outpit
Lokasi Penimbunan
Hoarding
Location
Sisa Kapasitas (Lcm)
Remaining
Capacity (Lcm)
Elevasi Timbunan (Mdpl)
Embankment
Elevation (Masl)
Elevasi Maksimal Timbunan Pada Fs
(Mdpl)
Maximum
Embankment Elevation at Fs (Masl)
Jumlah (Lcm)
Quantity
(Lcm)
Cycle
Time (Menit)
(Minute)
Lokasi Penimbunan
Hoarding
Location
Sisa Kapasitas (Lcm)
Remaining
Capacity (Lcm)
Elevasi Timbunan (Mdpl)
Embankment
Elevation (Masl)
Elevasi Maksimal Timbunan Pada Fs
(Mdpl)
Maximum
Embankment Elevation at Fs (Masl)
Jumlah (Lcm)
Quantity
(Lcm)
Cycle
Time (Menit)
(Minute)
Lokasi Penimbunan
Hoarding
Location
Sisa Kapasitas (Lcm)
Remaining
Capacity (Lcm)
Elevasi Timbunan (Mdpl)
Embankment
Elevation (Masl)
Elevasi Maksimal Timbunan Pada Fs
(Mdpl)
Maximum
Embankment Elevation at Fs (Masl)
Jumlah (Lcm)
Quantity
(Lcm)
Cycle
Time (Menit)
(Minute)
Lokasi Penimbunan
Hoarding
Location
Sisa Kapasitas (Lcm)
Remaining
Capacity (Lcm)
Elevasi Timbunan (Mdpl)
Embankment
Elevation (Masl)
Elevasi Maksimal Timbunan Pada Fs
(Mdpl)
Maximum
Embankment Elevation at Fs (Masl)
Jumlah (Lcm)
Quantity
(Lcm)
Cycle
Time (Menit)
(Minute)
PIT 1
PIT 2
N
TOTAL
Lokasi
Location
Rencana Tahun (N)
Year
Plan (N)
Inpit
Outpit
Lokasi Penimbunan
Hoarding
Location
Sisa Kapasitas (Lcm)
Remaining
Capacity (Lcm)
Elevasi Timbunan (Mdpl)
Embankment
Elevation (Masl)
Elevasi Maksimal Timbunan Pada Fs
(Mdpl)
Maximum
Embankment Elevation at Fs (Masl)
Jumlah (Lcm)
Quantity
(Lcm)
Cycle
Time (Menit)
(Minute)
Lokasi Penimbunan
Hoarding
Location
Sisa Kapasitas (Lcm)
Remaining
Capacity (Lcm)
Elevasi Timbunan (Mdpl)
Embankment
Elevation (Masl)
Elevasi Maksimal Timbunan Pada Fs
(Mdpl)
Maximum
Embankment Elevation at Fs (Masl)
Jumlah (Lcm)
Quantity
(Lcm)
Cycle
Time (Menit)
(Minute)
PIT 1
PIT 2
N
TOTAL
Lokasi
Location
Rencana Tahun (N+1)
Year
Plan (N+1)
Inpit
Outpit
Lokasi Penimbunan
Hoarding
Location
Sisa Kapasitas (Lcm)
Remaining
Capacity (Lcm)
Elevasi Timbunan (Mdpl)
Embankment
Elevation (Masl)
Elevasi Maksimal Timbunan Pada Fs
(Mdpl)
Maximum
Embankment Elevation at Fs (Masl)
Jumlah (Lcm)
Quantity
(Lcm)
Cycle
Time (Menit)
(Minute)
Lokasi Penimbunan
Hoarding
Location
Sisa Kapasitas (Lcm)
Remaining
Capacity (Lcm)
Elevasi Timbunan (Mdpl)
Embankment
Elevation (Masl)
Elevasi Maksimal Timbunan Pada Fs
(Mdpl)
Maximum
Embankment Elevation at Fs (Masl)
Jumlah (Lcm)
Quantity
(Lcm)
Cycle
Time (Menit)
(Minute)
PIT 1
PIT 2
N
TOTAL
Lokasi
Location
Rencana Tahun (N+2)
Year
Plan (N+2)
Inpit
Outpit
Lokasi Penimbunan
Hoarding
Location
Sisa Kapasitas (Lcm)
Remaining
Capacity (Lcm)
Elevasi Timbunan (Mdpl)
Embankment
Elevation (Masl)
Elevasi Maksimal Timbunan Pada Fs
(Mdpl)
Maximum
Embankment Elevation at Fs (Masl)
Jumlah (Lcm)
Quantity
(Lcm)
Cycle
Time (Menit)
(Minute)
Lokasi Penimbunan
Hoarding
Location
Sisa Kapasitas (Lcm)
Remaining
Capacity (Lcm)
Elevasi Timbunan (Mdpl)
Embankment
Elevation (Masl)
Elevasi Maksimal Timbunan Pada Fs
(Mdpl)
Maximum
Embankment Elevation at Fs (Masl)
Jumlah (Lcm)
Quantity
(Lcm)
Cycle
Time (Menit)
(Minute)
PIT 1
PIT 2
N
TOTAL
Penjelasan
Matrik :
1. Satuan dalam LCM
2. Penamaan Pit sumber batuan penutup dan Lokasi
Timbunan disamakan dengan nama lokasi pada dokumen studi kelayakan
3. Elevasi Timbunan adalah elevasi paling dalam/
tinggi diukur dari permukaan laut.
Matrix Explanation:
1. Units in LCM
2. The naming of the overburden source pit
and embankment location is the same as the name of the location in the
feasibility study document
3. Embankment elevation is the
deepest/highest elevation measured from sea level.
Sumber
(source) :
Google Translate
IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE
Matrik 7. Rencana dan Realisasi Penimbunan Overburden (OB)/Batuan Penutup
Matrix 7. Plan and Realization of
Overburden (OB)/Cover Rock
Bulan
|
Rencana Tahun (N-1)
|
Realisasi Tahun (N-1)
|
Rencana Tahun (N)
|
Rencana Tahun (N+1)
|
Rencana Tahun (N+2)
|
||||||||||
Inpit |
Outpit |
Total |
Inpit |
Outpit |
Total |
Inpit |
Outpit |
Total |
Inpit |
Outpit |
Total |
Inpit |
Outpit |
Total |
|
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
(7) |
(8) |
(9) |
(10) |
(11) |
(12) |
(13) |
(14) |
(15) |
(16) |
Januari
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Februari
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Maret
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
April |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mei
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Juni
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Juli
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Agustus
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
September |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Oktober
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
November |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Desember
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Lokasi Location |
Rencana Tahun (N-1) Year
Plan (N-1) |
Realisasi Tahun (N-1) Year
Realization (N-1) |
||||||||||||||||||||||
Inpit |
Outpit |
Inpit |
Outpit |
|||||||||||||||||||||
Lokasi Penimbunan Hoarding
Location |
Sisa Kapasitas (Lcm) Remaining
Capacity (Lcm) |
Elevasi Timbunan (Mdpl) Embankment
Elevation (Masl) |
Elevasi Maksimal Timbunan Pada Fs
(Mdpl) Maximum
Embankment Elevation at Fs (Masl) |
Jumlah (Lcm) Quantity
(Lcm) |
Cycle
Time (Menit) (Minute) |
Lokasi Penimbunan Hoarding
Location |
Sisa Kapasitas (Lcm) Remaining
Capacity (Lcm) |
Elevasi Timbunan (Mdpl) Embankment
Elevation (Masl) |
Elevasi Maksimal Timbunan Pada Fs
(Mdpl) Maximum
Embankment Elevation at Fs (Masl) |
Jumlah (Lcm) Quantity
(Lcm) |
Cycle
Time (Menit) (Minute) |
Lokasi Penimbunan Hoarding
Location |
Sisa Kapasitas (Lcm) Remaining
Capacity (Lcm) |
Elevasi Timbunan (Mdpl) Embankment
Elevation (Masl) |
Elevasi Maksimal Timbunan Pada Fs
(Mdpl) Maximum
Embankment Elevation at Fs (Masl) |
Jumlah (Lcm) Quantity
(Lcm) |
Cycle
Time (Menit) (Minute) |
Lokasi Penimbunan Hoarding
Location |
Sisa Kapasitas (Lcm) Remaining
Capacity (Lcm) |
Elevasi Timbunan (Mdpl) Embankment
Elevation (Masl) |
Elevasi Maksimal Timbunan Pada Fs
(Mdpl) Maximum
Embankment Elevation at Fs (Masl) |
Jumlah (Lcm) Quantity
(Lcm) |
Cycle
Time (Menit) (Minute) |
|
PIT 1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PIT 2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
N |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Lokasi Location |
Rencana Tahun (N) Year
Plan (N) |
|||||||||||
Inpit |
Outpit |
|||||||||||
Lokasi Penimbunan Hoarding
Location |
Sisa Kapasitas (Lcm) Remaining
Capacity (Lcm) |
Elevasi Timbunan (Mdpl) Embankment
Elevation (Masl) |
Elevasi Maksimal Timbunan Pada Fs
(Mdpl) Maximum
Embankment Elevation at Fs (Masl) |
Jumlah (Lcm) Quantity
(Lcm) |
Cycle
Time (Menit) (Minute) |
Lokasi Penimbunan Hoarding
Location |
Sisa Kapasitas (Lcm) Remaining
Capacity (Lcm) |
Elevasi Timbunan (Mdpl) Embankment
Elevation (Masl) |
Elevasi Maksimal Timbunan Pada Fs
(Mdpl) Maximum
Embankment Elevation at Fs (Masl) |
Jumlah (Lcm) Quantity
(Lcm) |
Cycle
Time (Menit) (Minute) |
|
PIT 1 |
|
|
|
|
|
|
|
|
|
|
|
|
PIT 2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
N |
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
|
|
|
|
|
|
|
|
|
|
|
Lokasi Location |
Rencana Tahun (N+1) Year
Plan (N+1) |
|||||||||||
Inpit |
Outpit |
|||||||||||
Lokasi Penimbunan Hoarding
Location |
Sisa Kapasitas (Lcm) Remaining
Capacity (Lcm) |
Elevasi Timbunan (Mdpl) Embankment
Elevation (Masl) |
Elevasi Maksimal Timbunan Pada Fs
(Mdpl) Maximum
Embankment Elevation at Fs (Masl) |
Jumlah (Lcm) Quantity
(Lcm) |
Cycle
Time (Menit) (Minute) |
Lokasi Penimbunan Hoarding
Location |
Sisa Kapasitas (Lcm) Remaining
Capacity (Lcm) |
Elevasi Timbunan (Mdpl) Embankment
Elevation (Masl) |
Elevasi Maksimal Timbunan Pada Fs
(Mdpl) Maximum
Embankment Elevation at Fs (Masl) |
Jumlah (Lcm) Quantity
(Lcm) |
Cycle
Time (Menit) (Minute) |
|
PIT 1 |
|
|
|
|
|
|
|
|
|
|
|
|
PIT 2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
N |
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
|
|
|
|
|
|
|
|
|
|
|
Lokasi Location |
Rencana Tahun (N+2) Year
Plan (N+2) |
|||||||||||
Inpit |
Outpit |
|||||||||||
Lokasi Penimbunan Hoarding
Location |
Sisa Kapasitas (Lcm) Remaining
Capacity (Lcm) |
Elevasi Timbunan (Mdpl) Embankment
Elevation (Masl) |
Elevasi Maksimal Timbunan Pada Fs
(Mdpl) Maximum
Embankment Elevation at Fs (Masl) |
Jumlah (Lcm) Quantity
(Lcm) |
Cycle
Time (Menit) (Minute) |
Lokasi Penimbunan Hoarding
Location |
Sisa Kapasitas (Lcm) Remaining
Capacity (Lcm) |
Elevasi Timbunan (Mdpl) Embankment
Elevation (Masl) |
Elevasi Maksimal Timbunan Pada Fs
(Mdpl) Maximum
Embankment Elevation at Fs (Masl) |
Jumlah (Lcm) Quantity
(Lcm) |
Cycle
Time (Menit) (Minute) |
|
PIT 1 |
|
|
|
|
|
|
|
|
|
|
|
|
PIT 2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
N |
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
|
|
|
|
|
|
|
|
|
|
|
Penjelasan
Matrik :
1. Satuan dalam LCM
2. Penamaan Pit sumber batuan penutup dan Lokasi
Timbunan disamakan dengan nama lokasi pada dokumen studi kelayakan
3. Elevasi Timbunan adalah elevasi paling dalam/
tinggi diukur dari permukaan laut.
Matrix Explanation:
1. Units in LCM
2. The naming of the overburden source pit
and embankment location is the same as the name of the location in the
feasibility study document
3. Embankment elevation is the
deepest/highest elevation measured from sea level.
Sumber
(source) :
Google Translate
Tidak ada komentar:
Posting Komentar