https://www.youtube.com/@agussalimnasutionmandailing2/videos

Foto saya
UNTUK KE-GUBERNUR-AN SUMATERA UTARA DARI PENDIRI UM (UNIVERSITAS MANDAILING) FOR THE PROVINCIAL GOVERNOR OF SUMATERA UTARA FROM THE FOUNDER OF MU (MANDAILING UNIVERSITY)

Jumat, 19 Juli 2024

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 02 JULI 2444 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 02 JULI 2444 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos


EVOLUSI PENDIDIKAN MANDAILING 420 (EMPAT RATUS DUA PULUH) TAHUN DI TAHUN 2024 MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA







Arahan
dari 
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution


02 Juli 2444 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
July 02nd, 2444 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,


KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA

NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES

DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,

MEMUTUSKAN :
Menetapkan : 
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.

LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151


IIA.  FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI DAN IUPK TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN MINERAL LOGAM

IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE


Matrik 7. Rencana dan Realisasi Penimbunan Overburden (OB)/Batuan Penutup

Matrix 7. Plan and Realization of Overburden (OB)/Cover Rock

 

Bulan
Month

Rencana Tahun (N-1)
Year Plan (N-1)

Realisasi Tahun (N-1)
Year Realization (N-1)

Rencana Tahun (N)
Year Plan (N)

Rencana Tahun (N+1)
Year Plan (N+1)

Rencana Tahun (N+2)
Year Plan (N+2)

Inpit

Outpit

Total

Inpit

Outpit

Total

Inpit

Outpit

Total

Inpit

Outpit

Total

Inpit

Outpit

Total

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(10)

(11)

(12)

(13)

(14)

(15)

(16)

Januari
January

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Februari
February

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Maret
March

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

April

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Mei
May

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Juni
June

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Juli
July

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Agustus
August

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

September

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Oktober
October

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

November

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Desember
December

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Lokasi Location

Rencana Tahun (N-1)

Year Plan (N-1)

Realisasi Tahun (N-1)

Year Realization (N-1)

Inpit

Outpit

Inpit

Outpit

Lokasi Penimbunan

Hoarding Location

Sisa Kapasitas (Lcm)

Remaining Capacity (Lcm)

Elevasi Timbunan (Mdpl)

Embankment Elevation (Masl)

Elevasi Maksimal Timbunan Pada Fs (Mdpl)

Maximum Embankment Elevation at Fs (Masl)

Jumlah (Lcm)

Quantity (Lcm)

Cycle Time (Menit)

(Minute)

Lokasi Penimbunan

Hoarding Location

Sisa Kapasitas (Lcm)

Remaining Capacity (Lcm)

Elevasi Timbunan (Mdpl)

Embankment Elevation (Masl)

Elevasi Maksimal Timbunan Pada Fs (Mdpl)

Maximum Embankment Elevation at Fs (Masl)

Jumlah (Lcm)

Quantity (Lcm)

Cycle Time (Menit)

(Minute)

Lokasi Penimbunan

Hoarding Location

Sisa Kapasitas (Lcm)

Remaining Capacity (Lcm)

Elevasi Timbunan (Mdpl)

Embankment Elevation (Masl)

Elevasi Maksimal Timbunan Pada Fs (Mdpl)

Maximum Embankment Elevation at Fs (Masl)

Jumlah (Lcm)

Quantity (Lcm)

Cycle Time (Menit)

(Minute)

Lokasi Penimbunan

Hoarding Location

Sisa Kapasitas (Lcm)

Remaining Capacity (Lcm)

Elevasi Timbunan (Mdpl)

Embankment Elevation (Masl)

Elevasi Maksimal Timbunan Pada Fs (Mdpl)

Maximum Embankment Elevation at Fs (Masl)

Jumlah (Lcm)

Quantity (Lcm)

Cycle Time (Menit)

(Minute)

PIT 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PIT 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Lokasi

Location

Rencana Tahun (N)

Year Plan (N)

Inpit

Outpit

Lokasi Penimbunan

Hoarding Location

Sisa Kapasitas (Lcm)

Remaining Capacity (Lcm)

Elevasi Timbunan (Mdpl)

Embankment Elevation (Masl)

Elevasi Maksimal Timbunan Pada Fs (Mdpl)

Maximum Embankment Elevation at Fs (Masl)

Jumlah (Lcm)

Quantity (Lcm)

Cycle Time (Menit)

(Minute)

Lokasi Penimbunan

Hoarding Location

Sisa Kapasitas (Lcm)

Remaining Capacity (Lcm)

Elevasi Timbunan (Mdpl)

Embankment Elevation (Masl)

Elevasi Maksimal Timbunan Pada Fs (Mdpl)

Maximum Embankment Elevation at Fs (Masl)

Jumlah (Lcm)

Quantity (Lcm)

Cycle Time (Menit)

(Minute)

PIT 1

 

 

 

 

 

 

 

 

 

 

 

 

PIT 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL

 

 

 

 

 

 

 

 

 

 

 

 

 

Lokasi

Location

Rencana Tahun (N+1)

Year Plan (N+1)

Inpit

Outpit

Lokasi Penimbunan

Hoarding Location

Sisa Kapasitas (Lcm)

Remaining Capacity (Lcm)

Elevasi Timbunan (Mdpl)

Embankment Elevation (Masl)

Elevasi Maksimal Timbunan Pada Fs (Mdpl)

Maximum Embankment Elevation at Fs (Masl)

Jumlah (Lcm)

Quantity (Lcm)

Cycle Time (Menit)

(Minute)

Lokasi Penimbunan

Hoarding Location

Sisa Kapasitas (Lcm)

Remaining Capacity (Lcm)

Elevasi Timbunan (Mdpl)

Embankment Elevation (Masl)

Elevasi Maksimal Timbunan Pada Fs (Mdpl)

Maximum Embankment Elevation at Fs (Masl)

Jumlah (Lcm)

Quantity (Lcm)

Cycle Time (Menit)

(Minute)

PIT 1

 

 

 

 

 

 

 

 

 

 

 

 

PIT 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL

 

 

 

 

 

 

 

 

 

 

 

 

 

Lokasi

Location

Rencana Tahun (N+2)

Year Plan (N+2)

Inpit

Outpit

Lokasi Penimbunan

Hoarding Location

Sisa Kapasitas (Lcm)

Remaining Capacity (Lcm)

Elevasi Timbunan (Mdpl)

Embankment Elevation (Masl)

Elevasi Maksimal Timbunan Pada Fs (Mdpl)

Maximum Embankment Elevation at Fs (Masl)

Jumlah (Lcm)

Quantity (Lcm)

Cycle Time (Menit)

(Minute)

Lokasi Penimbunan

Hoarding Location

Sisa Kapasitas (Lcm)

Remaining Capacity (Lcm)

Elevasi Timbunan (Mdpl)

Embankment Elevation (Masl)

Elevasi Maksimal Timbunan Pada Fs (Mdpl)

Maximum Embankment Elevation at Fs (Masl)

Jumlah (Lcm)

Quantity (Lcm)

Cycle Time (Menit)

(Minute)

PIT 1

 

 

 

 

 

 

 

 

 

 

 

 

PIT 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL

 

 

 

 

 

 

 

 

 

 

 

 

 
 

Penjelasan Matrik :

1.  Satuan dalam LCM

2.  Penamaan Pit sumber batuan penutup dan Lokasi Timbunan disamakan dengan nama lokasi pada dokumen studi kelayakan

3.  Elevasi Timbunan adalah elevasi paling dalam/ tinggi diukur dari permukaan laut.

Matrix Explanation:

1. Units in LCM

2. The naming of the overburden source pit and embankment location is the same as the name of the location in the feasibility study document

3. Embankment elevation is the deepest/highest elevation measured from sea level.

 

 

Sumber (source) :

Google Translate

Tidak ada komentar:

Posting Komentar

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 10 DESEMBER 2444 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 10 DESEMBER 2444 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos EVOLUSI PENDIDIKAN MANDAILING 420 (EMPAT RATUS DUA PULUH) TAHUN DI TAHUN 2024 M...