https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN MANDAILING 420 (EMPAT RATUS DUA PULUH) TAHUN DI TAHUN 2024 MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
09 Juli 2444 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
July 09th, 2444 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :
Menetapkan :
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIA. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI DAN IUPK TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN MINERAL LOGAM
IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE
Matrik 8. Rencana dan Realisasi Kemajuan Tambang Mineral Logam Tahun
(N-1) dan Rencana Tahun (N)
Matrix 8. Plan and Realization of
Metal Mineral Mining Progress Year (N-1) and Year Plan (N)
Matrik 8a. Rencana dan Realisasi Elevasi Kedalaman Tambang
Matrix 8a. Mine Depth Elevation
Plan and Realization
Rencana dan Realisasi
Plans
and Realization
Lokasi/Blok/Pit
Location/Block/Pit
Deskripsi
Description
Elevasi Tambang (m)
Mine
Elevation (m)
Elevasi Tambang Sesuai FS (m)
Mine
Elevation According to FS (m)
(1)
(2)
(3)
(4)
RENCANA TAHUN (N-1)
YEAR PLAN (N-1)
BLOK A
BLOCK A
PIT I
PIT II
BLOK B
BLOCK B
PIT I
PIT II
Rata-rata
Average
REALISASI TAHUN (N-1)
YEAR REALIZATION (N-1)
BLOK A
BLOCK A
PIT I
PIT II
BLOK B
BLOCK B
PIT I
PIT II
Rata-rata
Average
RENCANA TAHUN (N)
YEAR PLAN (N)
BLOK A
BLOCK A
PIT I
PIT II
BLOK B
BLOCK B
PIT I
PIT II
Rata-rata
Average
Keterangan :
Elevasi tambang merupakan elevasi paling dalam diukur dari permukaan
laut
Information :
Mine elevation is the deepest
elevation measured from sea level
Matrik 8b. Rencana dan Realisasi Kemajuan Tambang Bawah Tanah
Matrix 8b. Underground Mining
Progress Plans and Realization
Rencana & Realisasi
Plan
& Realization
Lokasi/Blok
Location/Block
Deskripsi
Description
Tunnel/Adit/Drift (m)
Shaft
(m)
Raise/Winze (M)
Total
meter development
RENCANA TAHUN (N-1)
YEAR PLAN (N-1)
BLOK A
BLOCK A
BLOK B
BLOCK B
TOTAL
REALISASI TAHUN (N-1)
YEAR REALIZATION (N-1)
BLOK A
BLOCK A
BLOK B
BLOCK B
TOTAL
KUMULATIF S/D (N-1)
CUMULATIVE UP TO (N-1)
BLOK A
BLOCK A
BLOK B
BLOCK B
TOTAL
RENCANA TAHUN (N)
YEAR PLAN (N)
BLOK A
BLOCK A
BLOK B
BLOCK B
TOTAL
Matrik 8c. Rencana dan Realisasi Level Kedalaman Tambang
Matrix 8c. Mining Depth Level
Plans and Realization
Rencana & Realisasi
Plan
& Realization
Lokasi/Blok
Location/Block
Deskripsi
Description
Level Penambangan (m)
Mining
Level (m)
Level Penambangan sesuai FS (m)
Mining
Level as per FS (m)
RENCANA TAHUN (N-1)
YEAR PLAN (N-1)
BLOK A
BLOCK A
BLOK B
BLOCK B
TOTAL
REALISASI TAHUN (N-1)
YEAR REALIZATION (N-1)
BLOK A
BLOCK A
BLOK B
BLOCK B
TOTAL
RENCANA TAHUN (N)
YEAR PLAN (N)
BLOK A
BLOCK A
BLOK B
BLOCK B
TOTAL
Sumber (source) :
Google Translate
IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE
Matrik 8. Rencana dan Realisasi Kemajuan Tambang Mineral Logam Tahun
(N-1) dan Rencana Tahun (N)
Matrix 8. Plan and Realization of
Metal Mineral Mining Progress Year (N-1) and Year Plan (N)
Matrik 8a. Rencana dan Realisasi Elevasi Kedalaman Tambang
Matrix 8a. Mine Depth Elevation
Plan and Realization
Rencana dan Realisasi
|
Lokasi/Blok/Pit
|
Deskripsi
|
||
Elevasi Tambang (m)
|
Elevasi Tambang Sesuai FS (m)
|
|||
(1) |
(2) |
(3) |
(4) |
|
RENCANA TAHUN (N-1)
|
BLOK A
|
PIT I |
|
|
|
|
PIT II |
|
|
|
BLOK B
|
PIT I |
|
|
|
|
PIT II |
|
|
|
Rata-rata
|
|
|
|
REALISASI TAHUN (N-1)
|
BLOK A
|
PIT I |
|
|
|
|
PIT II |
|
|
|
BLOK B
|
PIT I |
|
|
|
|
PIT II |
|
|
|
Rata-rata
|
|
|
|
RENCANA TAHUN (N)
|
BLOK A
|
PIT I |
|
|
|
|
PIT II |
|
|
|
BLOK B
|
PIT I |
|
|
|
|
PIT II |
|
|
|
Rata-rata
|
|
|
|
Keterangan :
Elevasi tambang merupakan elevasi paling dalam diukur dari permukaan
laut
Information :
Mine elevation is the deepest
elevation measured from sea level
Matrik 8b. Rencana dan Realisasi Kemajuan Tambang Bawah Tanah
Matrix 8b. Underground Mining
Progress Plans and Realization
Rencana & Realisasi
|
Lokasi/Blok
|
Deskripsi
|
|||
Tunnel/Adit/Drift (m) |
Shaft (m) |
Raise/Winze (M) |
Total meter development |
||
RENCANA TAHUN (N-1)
|
BLOK A
|
|
|
|
|
|
BLOK B
|
|
|
|
|
|
TOTAL |
|
|
|
|
REALISASI TAHUN (N-1)
|
BLOK A
|
|
|
|
|
|
BLOK B
|
|
|
|
|
|
TOTAL |
|
|
|
|
KUMULATIF S/D (N-1)
|
BLOK A
|
|
|
|
|
|
BLOK B
|
|
|
|
|
|
TOTAL |
|
|
|
|
RENCANA TAHUN (N)
|
BLOK A
|
|
|
|
|
|
BLOK B
|
|
|
|
|
|
TOTAL |
|
|
|
|
Matrik 8c. Rencana dan Realisasi Level Kedalaman Tambang
Matrix 8c. Mining Depth Level
Plans and Realization
Rencana & Realisasi
|
Lokasi/Blok
|
Deskripsi
|
|
Level Penambangan (m)
|
Level Penambangan sesuai FS (m)
|
||
RENCANA TAHUN (N-1)
|
BLOK A
|
|
|
|
BLOK B
|
|
|
|
TOTAL |
|
|
REALISASI TAHUN (N-1)
|
BLOK A
|
|
|
|
BLOK B
|
|
|
|
TOTAL |
|
|
RENCANA TAHUN (N)
|
BLOK A
|
|
|
|
BLOK B
|
|
|
|
TOTAL |
|
|