https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN MANDAILING 420 (EMPAT RATUS DUA PULUH) TAHUN DI TAHUN 2024 MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
30 Juli 2444 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
July 30th, 2444 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :
Menetapkan :
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIA. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI DAN IUPK TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN MINERAL LOGAM
IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE
Matrik 11. Rencana dan Realisasi Biaya Penambangan, Pengolahan dan
Pemasaran Mineral Logam Tahun (N-1) dan Rencana Tahun (N) sampai dengan Rencana
Tahun (N+2)
Matrix 11. Plan and Realization
of Mining, Processing and Marketing Costs for Metal Minerals Year (N-1) and
Plan Year (N) to Plan Year (N+2)
Matrik 11a. Rencana dan Realisasi Biaya Kegiatan Penambangan Mineral
Logam Tahun (N-1) dan Rencana Tahun(N) sampai dengan Tahun (N+2) (dalam USD)
Matrix 11a. Plan and Realization
of Metal Mineral Mining Activity Costs for Year (N-1) and Plan for Year (N) to
Year (N+2) (in USD)
No.
Number
Rencana dan Realisasi
Plans
and Realization
Lokasi Blok/Pit
Block/Pit
Location
Deskripsi
Description
Deskripsi
Description
Land
clearing (ha)
Overburden
removal (bcm)
Mineral
getting (ton)
Jumlah
Amount
1.
Rencana Tahun (N-1)
Year Plan (N-1)
Lokasi/PIT I
Location/PIT I
Kuantitas
Quantity
Satuan Biaya
Unit Cost
Lokasi/PIT II
Location/PIT II
Kuantitas
Quantity
Satuan Biaya
Unit Cost
Total Biaya
Total
Cost
2.
Realisasi Tahun (N-1)
Year Realization (N-1)
Lokasi/Pit I
Location/Pit I
Kuantitas
Quantity
Satuan Biaya
Unit Cost
Lokasi/PIT II
Location/PIT II
Kuantitas
Quantity
Satuan Biaya
Unit Cost
Total Biaya
Total
Cost
3.
Rencana Tahun (N)
Year Plan (N)
Lokasi/Pit I
Location/Pit I
Kuantitas
Quantity
Satuan Biaya
Unit Cost
Lokasi/PIT II
Location/PIT II
Kuantitas
Quantity
Satuan Biaya
Unit Cost
Total Biaya
Total
Cost
4.
Rencana Tahun (N +1)
Year Plan (N+1)
Lokasi/Pit I
Location/Pit I
Kuantitas
Quantity
Satuan Biaya
Unit Cost
Lokasi/PIT II
Location/PIT II
Kuantitas
Quantity
Satuan Biaya
Unit Cost
Total Biaya
Total
Cost
5.
Rencana Tahun (N +2)
Year Plan (N+2)
Lokasi/Pit I
Location/Pit I
Kuantitas
Quantity
Satuan Biaya
Unit Cost
Lokasi/PIT II
Location/PIT II
Kuantitas
Quantity
Satuan Biaya
Unit Cost
Total Biaya
Total
Cost
Matrik 11b. Rencana dan Realisasi Biaya Pengolahan dan/atau Pemurnian
Mineral Logam Tahun (N-1) dan Rencana Tahun (N) sampai dengan Tahun (N+2)
(dalam USD)
Matrix 11b. Plan and Realization
of Metal Mineral Processing and/or Refining Costs for Year (N-1) and Plan for
Year (N) to Year (N+2) (in USD)
No
Number
Kegiat an
Activity
Satuan
Unit
RENCANA TAHUN (N-1)
YEAR
PLAN (N-1)
REALISASI TAHUN (N-1)
YEAR
REALIZATION (N-1)
RENCANA TAHUN (N)
YEAR
PLAN (N)
RENCANA TAHUN (N+1)
YEAR
PLAN (N+1)
RENCANA TAHUN (N+2)
YEAR
PLAN (N+2)
Material Diolah/ dimurnik an
Processed/purified
material
Hasil pengolah an / pemruni an
Processing
/ purification results
Yield/
Recove ry (%)
Biaya Satua n
Unit
Cost
Tota l Biay a
Total
Cost
Material Diolah/ dimurnik an
Processed/purified
material
Hasil pengolah an / pemruni an
Processing
/ purification results
Yield/
Recove ry (%)
Biaya Satua n
Unit
Cost
Tota l Biay a
Total
Cost
Material Diolah/ dimurnik an
Processed/purified
material
Hasil pengolah an / pemruni an
Processing
/ purification results
Yield/
Recove ry (%)
Biaya Satua n
Unit
Cost
Tota l Biay a
Total
Cost
Material Diolah/ dimurnik an
Processed/purified
material
Hasil pengolah an / pemruni an
Processing
/ purification results
Yield/
Recove ry (%)
Biaya Satua n
Unit
Cost
Tota l Biay a
Total
Cost
Material Diolah/ dimurnik an
Processed/purified
material
Hasil pengolah an / pemruni an
Processing
/ purification results
Yield/
Recove ry (%)
Biaya Satua n
Unit
Cost
Tota l Biay a
Total
Cost
1.
Processi ng
- Crushi ng
- Washi ng
…….
2.
Refinin g
…..
Jumla h
Matrik 11c. Rencana dan Realisasi Biaya Kegiatan Pemasaran Mineral
Logam Tahun (N-1) dan Rencana (N) sampai dengan Tahun (N+2) (dalam USD)
Matrix 11c. Plan and Realization
of Metal Mineral Marketing Activity Costs for Year (N-1) and Plan (N) up to
Year (N+2) (in USD)
No.
Number
Bulan
Month
Satuan
Unit
Rencana Tahun (N-1)
Year
Plan (N-1)
Realisasi Tahun (N-1)
Year
Realization (N-1)
Rencana Tahun (N)
Year
Plan (N)
Rencana Tahun (N+1)
Year
Plan (N+1)
Rencana Tahun (N+1)
Year
Plan (N+2)
Jarak/ Tonase
Distance/Tonnage
Biaya Satuan
Unit
Cost
Total Biaya
Total
Cost
Jarak/ Tonase
Distance/Tonnage
Biaya Satuan
Unit
Cost
Total Biaya
Total
Cost
Jarak/ Tonase
Distance/Tonnage
Biaya Satuan
Unit
Cost
Total Biaya
Total
Cost
Jarak/ Tonase
Distance/Tonnage
Biaya Satuan
Unit
Cost
Total Biaya
Total
Cost
Jarak/ Tonase
Distance/Tonnage
Biaya Satuan
Unit
Cost
Total Biaya
Total
Cost
1.
Januari
January
2.
Februari
February
….
…..
Jumlah
Amount
Sumber (source) :
Google Translate
IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE
Matrik 11. Rencana dan Realisasi Biaya Penambangan, Pengolahan dan
Pemasaran Mineral Logam Tahun (N-1) dan Rencana Tahun (N) sampai dengan Rencana
Tahun (N+2)
Matrix 11. Plan and Realization
of Mining, Processing and Marketing Costs for Metal Minerals Year (N-1) and
Plan Year (N) to Plan Year (N+2)
Matrik 11a. Rencana dan Realisasi Biaya Kegiatan Penambangan Mineral
Logam Tahun (N-1) dan Rencana Tahun(N) sampai dengan Tahun (N+2) (dalam USD)
Matrix 11a. Plan and Realization
of Metal Mineral Mining Activity Costs for Year (N-1) and Plan for Year (N) to
Year (N+2) (in USD)
No.
|
Rencana dan Realisasi
|
Lokasi Blok/Pit
|
Deskripsi
|
Deskripsi
|
|||
Land clearing (ha) |
Overburden removal (bcm) |
Mineral getting (ton) |
Jumlah
|
||||
1. |
Rencana Tahun (N-1)
|
Lokasi/PIT I
|
Kuantitas
|
|
|
|
|
|
|
|
Satuan Biaya
|
|
|
|
|
|
|
Lokasi/PIT II
|
Kuantitas
|
|
|
|
|
|
|
|
Satuan Biaya
|
|
|
|
|
|
Total Biaya
|
|
|
|
|
||
2. |
Realisasi Tahun (N-1)
|
Lokasi/Pit I
|
Kuantitas
|
|
|
|
|
|
|
|
Satuan Biaya
|
|
|
|
|
|
|
Lokasi/PIT II
|
Kuantitas
|
|
|
|
|
|
|
|
Satuan Biaya
|
|
|
|
|
|
Total Biaya
|
|
|
|
|
||
3. |
Rencana Tahun (N)
|
Lokasi/Pit I
|
Kuantitas
|
|
|
|
|
|
|
|
Satuan Biaya
|
|
|
|
|
|
|
Lokasi/PIT II
|
Kuantitas
|
|
|
|
|
|
|
|
Satuan Biaya
|
|
|
|
|
|
Total Biaya
|
|
|
|
|
||
4. |
Rencana Tahun (N +1)
|
Lokasi/Pit I
|
Kuantitas
|
|
|
|
|
|
|
|
Satuan Biaya
|
|
|
|
|
|
|
Lokasi/PIT II
|
Kuantitas
|
|
|
|
|
|
|
|
Satuan Biaya
|
|
|
|
|
|
Total Biaya
|
|
|
|
|
||
5. |
Rencana Tahun (N +2)
|
Lokasi/Pit I
|
Kuantitas
|
|
|
|
|
|
|
|
Satuan Biaya
|
|
|
|
|
|
|
Lokasi/PIT II
|
Kuantitas
|
|
|
|
|
|
|
|
Satuan Biaya
|
|
|
|
|
|
Total Biaya
|
|
|
|
|
Matrik 11b. Rencana dan Realisasi Biaya Pengolahan dan/atau Pemurnian
Mineral Logam Tahun (N-1) dan Rencana Tahun (N) sampai dengan Tahun (N+2)
(dalam USD)
Matrix 11b. Plan and Realization
of Metal Mineral Processing and/or Refining Costs for Year (N-1) and Plan for
Year (N) to Year (N+2) (in USD)
No
|
Kegiat an
|
Satuan
|
RENCANA TAHUN (N-1)
|
REALISASI TAHUN (N-1)
|
RENCANA TAHUN (N)
|
RENCANA TAHUN (N+1)
|
RENCANA TAHUN (N+2)
|
||||||||||||||||||||
Material Diolah/ dimurnik an
|
Hasil pengolah an / pemruni an
|
Yield/ Recove ry (%) |
Biaya Satua n
|
Tota l Biay a
|
Material Diolah/ dimurnik an
|
Hasil pengolah an / pemruni an
|
Yield/ Recove ry (%) |
Biaya Satua n
|
Tota l Biay a
|
Material Diolah/ dimurnik an
|
Hasil pengolah an / pemruni an
|
Yield/ Recove ry (%) |
Biaya Satua n
|
Tota l Biay a
|
Material Diolah/ dimurnik an
|
Hasil pengolah an / pemruni an
|
Yield/ Recove ry (%) |
Biaya Satua n
|
Tota l Biay a
|
Material Diolah/ dimurnik an
|
Hasil pengolah an / pemruni an
|
Yield/ Recove ry (%) |
Biaya Satua n
|
Tota l Biay a
|
|||
1. |
Processi ng |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- Crushi ng |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- Washi ng |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
……. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. |
Refinin g |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
….. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Jumla h |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Matrik 11c. Rencana dan Realisasi Biaya Kegiatan Pemasaran Mineral
Logam Tahun (N-1) dan Rencana (N) sampai dengan Tahun (N+2) (dalam USD)
Matrix 11c. Plan and Realization
of Metal Mineral Marketing Activity Costs for Year (N-1) and Plan (N) up to
Year (N+2) (in USD)
No.
|
Bulan
|
Satuan
|
Rencana Tahun (N-1)
|
Realisasi Tahun (N-1)
|
Rencana Tahun (N)
|
Rencana Tahun (N+1)
|
Rencana Tahun (N+1)
|
||||||||||
|
|
|
Jarak/ Tonase
|
Biaya Satuan
|
Total Biaya
|
Jarak/ Tonase
|
Biaya Satuan
|
Total Biaya
|
Jarak/ Tonase
|
Biaya Satuan
|
Total Biaya
|
Jarak/ Tonase
|
Biaya Satuan
|
Total Biaya
|
Jarak/ Tonase
|
Biaya Satuan
|
Total Biaya
|
1. |
Januari
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. |
Februari
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
…. |
….. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Jumlah
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sumber (source) :
Google Translate
Tidak ada komentar:
Posting Komentar