https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN MANDAILING 420 (EMPAT RATUS DUA PULUH) TAHUN DI TAHUN 2024 MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
21 Mei 2444 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
May 21st, 2444 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :
Menetapkan :
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIA. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI DAN IUPK TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN MINERAL LOGAM
IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE
Matrik 3b. Rencana dan Realisasi Kegiatan Eksplorasi Tahun (N-1) dan
Rencana Tahun (N) sampai dengan Tahun (N+2)
Matrix 3b. Plans and Realization
of Exploration Activities for Year (N-1) and Plans for Year (N) to Year (N+2)
LOKASI KEGIATAN
LOCATION
OF ACTIVITIES
KEGIATAN
ACTIVITY
SATUAN *)
UNIT
*)
BIAYA/ SATUAN (Rp/USD per Satuan)
COST/
UNIT (Rp/USD per Unit)
RENCANA TAHUN (N-1)
REALISASI TAHUN (N-1)
RENCANA TAHUN (N)
RENCANA TAHUN (N+1)
RENCANA TAHUN (N+2)
KEGIATAN
ACTIVITY
BIAYA
COST
KEGIATAN
ACTIVITY
BIAYA
COST
KEGIATAN
ACTIVITY
BIAYA
COST
KEGIATAN
ACTIVITY
BIAYA
COST
KEGIATAN
ACTIVITY
BIAYA
COST
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
Blok/ Prospek
Block
/ Prospect
Studi Indraja
Remote Sensing Studies
Pemetaan
Mapping
− Topografi
− Topography
ha
− Geologi lokal
Local geology
ha
Survei Geokimia
Geochemical Survey
Survei Geofisika
Geophysical Survey
Pengeboran Open Hole
Open Hole Drilling
− Jumlah
− Amount
Titik
point
− Kedalaman
− Depth
m
− Spasi Pengeboran
− Drilling Spacing
m
Pengeboran Coring
Coring Drilling
− Jumlah
− Amount
Titik
point
− Kedalaman
− Depth
m
− Spasi Pengeboran
− Drilling Spacing
m
Sumur Uji
Test Well
m
Parit Uji
Test Trench
m
Analisa Conto
Example Analysis
Sampel
sample
Analisa Geoteknik
Geotechnical Analysis
sampel
sample
Analisa Metalurgi
Metallurgical Analysis
sampel
sample
Kegiatan teknis dan non teknis yang terkait kegiatan eksplorasi**)
Technical and non-technical
activities related to exploration activities**)
TOTAL BIAYA EKSPLORASI
TOTAL EXPLORATION COSTS
Keterangan :
Kolom (6) = Kolom (4) x kolom (5)
Kolom (8) = Kolom (4) x kolom (7)
Kolom (10) = Kolom (4) x kolom (9)
Kolom (12) = Kolom (4) x kolom (11)
Kolom (14) = Kolom (4) x kolom (13)
*)
Satuan menyesuaikan kegiatan yang
dicantumkan
**) Kegiatan teknis dan non teknis harus dirinci
per kegiatan.
Information :
Column (6) = Column (4) x column (5)
Column (8) = Column (4) x column (7)
Column (10) = Column (4) x column (9)
Column (12) = Column (4) x column (11)
Column (14) = Column (4) x column (13)
*) Units adjust to the activities listed
**) Technical and non-technical activities
must be detailed per activity.
Sumber (source) :
Google Translate
IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE
Matrik 3b. Rencana dan Realisasi Kegiatan Eksplorasi Tahun (N-1) dan
Rencana Tahun (N) sampai dengan Tahun (N+2)
Matrix 3b. Plans and Realization
of Exploration Activities for Year (N-1) and Plans for Year (N) to Year (N+2)
LOKASI KEGIATAN
|
KEGIATAN
|
SATUAN *)
|
BIAYA/ SATUAN (Rp/USD per Satuan)
|
RENCANA TAHUN (N-1) |
REALISASI TAHUN (N-1) |
RENCANA TAHUN (N) |
RENCANA TAHUN (N+1) |
RENCANA TAHUN (N+2) |
|||||
KEGIATAN
|
BIAYA
|
KEGIATAN
|
BIAYA
|
KEGIATAN
|
BIAYA
|
KEGIATAN
|
BIAYA
|
KEGIATAN
|
BIAYA
|
||||
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
(7) |
(8) |
(9) |
(10) |
(11) |
(12) |
(13) |
(14) |
Blok/ Prospek
|
Studi Indraja
|
|
|
|
|
|
|
|
|
|
|
|
|
Pemetaan
|
|
|
|
|
|
|
|
|
|
|
|
|
|
− Topografi
|
ha |
|
|
|
|
|
|
|
|
|
|
|
|
− Geologi lokal
|
ha |
|
|
|
|
|
|
|
|
|
|
|
|
Survei Geokimia
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Survei Geofisika
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Pengeboran Open Hole
|
|
|
|
|
|
|
|
|
|
|
|
|
|
− Jumlah
|
Titik
|
|
|
|
|
|
|
|
|
|
|
|
|
− Kedalaman
|
m |
|
|
|
|
|
|
|
|
|
|
|
|
− Spasi Pengeboran
|
m |
|
|
|
|
|
|
|
|
|
|
|
|
Pengeboran Coring
|
|
|
|
|
|
|
|
|
|
|
|
|
|
− Jumlah
|
Titik
|
|
|
|
|
|
|
|
|
|
|
|
|
− Kedalaman
|
m |
|
|
|
|
|
|
|
|
|
|
|
|
− Spasi Pengeboran
|
m |
|
|
|
|
|
|
|
|
|
|
|
|
Sumur Uji
|
m |
|
|
|
|
|
|
|
|
|
|
|
|
Parit Uji
|
m |
|
|
|
|
|
|
|
|
|
|
|
|
Analisa Conto
|
Sampel
|
|
|
|
|
|
|
|
|
|
|
|
|
Analisa Geoteknik
|
sampel
|
|
|
|
|
|
|
|
|
|
|
|
|
Analisa Metalurgi
|
sampel
|
|
|
|
|
|
|
|
|
|
|
|
|
Kegiatan teknis dan non teknis yang terkait kegiatan eksplorasi**)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL BIAYA EKSPLORASI
|
|
|
|
|
|
|
|
|
|
|
|
Keterangan :
Kolom (6) = Kolom (4) x kolom (5)
Kolom (8) = Kolom (4) x kolom (7)
Kolom (10) = Kolom (4) x kolom (9)
Kolom (12) = Kolom (4) x kolom (11)
Kolom (14) = Kolom (4) x kolom (13)
*)
Satuan menyesuaikan kegiatan yang
dicantumkan
**) Kegiatan teknis dan non teknis harus dirinci
per kegiatan.
Information :
Column (6) = Column (4) x column (5)
Column (8) = Column (4) x column (7)
Column (10) = Column (4) x column (9)
Column (12) = Column (4) x column (11)
Column (14) = Column (4) x column (13)
*) Units adjust to the activities listed
**) Technical and non-technical activities
must be detailed per activity.
Sumber (source) :
Google Translate
Tidak ada komentar:
Posting Komentar