EVOLUSI PENDIDIKAN MANDAILING 420 (EMPAT RATUS DUA PULUH) TAHUN DI TAHUN 2024
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
23 April 2444 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
April 23rd, 2444 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN
ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN
BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY
AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF
THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND
REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIA.
FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG
IUP TAHAP KEGIATAN OPERASI PRODUKSI DAN IUPK TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN
MINERAL LOGAM
IIA. FORMAT FOR PREPARING WORK PLANS AND
COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS
ACTIVITIES AND IUPK FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE
SISTEMATIKA
SYSTEMATIC
URAIAN
DESCRIPTION
RINGKASAN (Executive Summary)
KATA PENGANTAR
FOREWORD
DAFTAR ISI
LIST OF CONTENTS
DAFTAR GAMBAR
LIST OF FIGURES
DAFTAR TABEL
LIST OF TABLES
DAFTAR LAMPIRAN
APPENDIX LIST
BAB I
CHAPTER I
PENDAHULUAN
INTRODUCTION
1.1.
Latar Belakang
Background
berisi gambaran umum profil perusahaan, peta kesampaian daerah, bagan
struktur organisasi (head office dan site) mulai dari pengurus perusahaan (management) hingga tingkat pelaksana
contains a general overview of
the company profile, a map of regional achievements, an organizational
structure chart (head office and site) starting from the company management
(management) to the executive level
1.2.
Legalitas dan Pemasangan Tanda Batas
Legality and Installation of
Boundary Signs
Format 1.2 disusun dengan matrik 1, bagan 2a, dan matrik 2b
Format 1.2 is arranged with
matrix 1, chart 2a, and matrix 2b
BAB II
CHAPTER II
PERSETUJUAN DAN REALISASI RKAB TAHUN N-1 SERTA RKAB TAHUN N
APPROVAL AND REALIZATION OF
WORK PLAN AND COST BUDGET FOR YEAR N-1 AND WORK PLAN AND COST BUDGET FOR YEAR
N
2.1.
Kegiatan Eksplorasi
Exploration Activities
2.1.1.
Rekapitulasi Hasil Kegiatan Eksplorasi Sampai Tahun (N-1)
Recapitulation of Exploration
Activity Results Up to Year (N-1)
format 2.1.1 disusun dengan matrik 3a
format 2.1.1 is arranged with
matrix 3a
2.1.2.
Rencana dan Realisasi Kegiatan Eksplorasi Tahun N-1 dan Rencana Tahun
(N) sampai dengan Tahun (N+2)
Plans and Realization of
Exploration Activities for Year N-1 and Plans for Years (N) to Year (N+2)
format 2.1.2 disusun dengan matrik 3b
format 2.1.2 is arranged with
matrix 3b
2.1.3.
Rencana dan Realisasi Biaya Eksplorasi Tahun (N-1) dan Rencana Tahun
(N) sampai dengan Tahun (N+2)
Plan and Realization of
Exploration Costs for Year (N-1) and Plan for Year (N) to Year (N+2)
format 2.1.3 disusun dengan matrik 3c
format 2.1.3 is arranged with
matrix 3c
2.1.4.
Neraca Sumber daya dan Cadangan
Balance of Resources and
Reserves
format 2.1.4 disusun dengan matrik 4
format 2.1.4 is arranged with matrix
4
2.2.
Konstruksi dan Infrastruktur
Construction and Infrastructure
2.2.1.
Konstruksi dan Infrastruktur
Construction and Infrastructure
format 2.2.1 dan 2.2.2 disusun dengan matrik 5a dan 5b
formats 2.2.1 and 2.2.2 are
arranged with matrices 5a and 5b
2.2.2.
Biaya Konstruksi dan Infrastruktur
Construction and Infrastructure
Costs
format 2.2.1 dan 2.2.2 disusun dengan matrik 5a dan 5b
formats 2.2.1 and 2.2.2 are
arranged with matrices 5a and 5b
2.3.
Kegiatan Penambangan
Mining Activities
2.3.1.
Metode Penambangan
Mining Methods
berisikan tentang metode penambangan yang digunakan
contains the mining methods
used
2.3.2.
Rencana Perubahan Studi Kelayakan *)
Feasibility Study Change Plan
*)
berisikan tentang apakah akan ada rencana perubahan studi kelayakan
dan penjelasan mengapa melakukan perubahan studi kelayakan
contains whether there will be
any planned changes to the feasibility study and an explanation of why
changes to the feasibility study are being made
2.3.3.
Pengupasan dan Penimbunan Overburden/
Batuan Penutup *)
Stripping and Piling
Overburden/Cover Rock *)
Format 2.3.3 disusun dengan matrik 6, 7, dan 8
Format 2.3.3 is arranged with
matrices 6, 7, and 8
2.3.4.
Produksi
Production
Format 2.3.4 disusun dengan matrik 9
Format 2.3.4 is arranged with a
matrix of 9
2.3.5.
Recovery Penambangan
Format 2.3.5 disusun dengan matrik 9
Format 2.3.5 is arranged with a
matrix of 9
2.3.6.
Daftar Peralatan (Penambangan, Pengangkutan dan Penunjang),
Pengelolaan Air Tambang dan Pengelolaan Geoteknik Tambang
List of Equipment (Mining,
Transportation and Support), Mine Water Management and Mine Geotechnical
Management
Format 2.3.6 disusun dengan matrik 10
Format 2.3.6 is arranged with a
matrix of 10
2.3.7.
Biaya Penambangan
Mining Fees
Format 2.3.7 disusun dengan matrik 11
Format 2.3.7 is arranged with
matrix 11
2.4.
Pengolahan dan/atau Pemurnian
Processing and/or Purification
2.4.1.
Metode Pengolahan dan/atau Pemurnian
Processing and/or Purification
Methods
berisikan tentang metode pengolahan dan/atau pemurnian yang
digunakan;
contains the processing and/or
purification methods used;
2.4.2.
Hasil Pengolahan dan/atau Pemurnian
Processing and/or Purification
Results
Format 2.4.2 disusun dengan matrik 12a
Format 2.4.2 is arranged using
matrix 12a
2.4.3.
Recovery Pengolahan
dan/atau Pemurnian
Recovery Processing and/or
Purification
Format 2.4.3 disusun dengan matrik 12a
Format 2.4.3 is arranged with
matrix 12a
2.4.4.
Sisa Hasil Pengolahan/Tailing
Remaining Processing Results/Tailings
Format 2.4.4 disusun dengan matrik 12b
Format 2.4.4 is arranged with
matrix 12b
2.4.5.
Pemanfaatan Sisa Hasil Pengolahan dan Pengelolaan Mineral Ikutan
Utilization of residual
processing results and management of associated minerals
Berisikan penjelasan tentang pemanfaatan sisa hasil pengolahan dan
pengelolaan mineral ikutan
Contains an explanation
regarding the use of residual processing results and management of associated
minerals
2.4.6.
Daftar Peralatan Pengolahan
Processing Equipment List
Format 2.4.6 disusun dengan matrik 10
Format 2.4.6 is arranged with a
matrix of 10
2.4.7.
Biaya Pengolahan dan/atau Pemurnian
Processing and/or Refining
Costs
Format 2.4.7 disusun dengan matrik 11b
Format 2.4.7 is arranged with
matrix 11b
2.5.
Pemasaran dan Persediaan (Inventory)
Marketing and Inventory
(Inventory)
2.5.1.
Pemasaran dan Persediaan (Inventory)
Marketing and Inventory
format 2.5.1 disusun dengan matrik 13a, 13b, 14a, 14b, dan 14c
2.5.2.
Biaya Pemasaran dan Persediaan (Inventory)
Marketing and Inventory Costs
(Inventory)
format 2.5.2 disusun dengan matrik 11c
format 2.5.2 is arranged with
matrix 11c
2.6.
Perlindungan Lingkungan
Environmental Protection
2.6.1.
Kegiatan Pengelolaan dan Pemantauan Lingkungan (Kegiatan Pengelolaan
dan Pemantauan Lingkungan, Pembukaan dan Reklamasi Lahan)
Environmental Management and
Monitoring Activities (Environmental Management and Monitoring Activities,
Land Clearing and Reclamation)
format 2.6.1 disusun dengan matrik 15,16,17, 18, dan 19
format 2.6.1 is arranged with
matrices 15, 16, 17, 18, and 19
2.6.2.
Pemantauan Lingkungan
Environmental Monitoring
format 2.6.2 disusun dengan matrik 20 dan 21
format 2.6.2 is arranged with
matrices 20 and 21
2.6.3.
Biaya Pengelolaan dan Pemantauan Lingkungan
Environmental Management and
Monitoring Costs
format 2.6.3 disusun dengan matrik 22
format 2.6.3 is arranged with a
matrix of 22
2.7.
Keselamatan Pertambangan
Mining Safety
2.7.1.
Statistik Keselamatan Pertambangan
Mining Safety Statistics
format 2.7.1 disusun dengan matrik 23
format 2.7.1 is arranged with a
matrix of 23
2.7.2.
Rencana dan Realisasi Penggunaan Bahan Peledak, Gudang Bahan Peledak,
dan Peledakan Tidur
Plans and Realization of the
Use of Explosives, Explosives Warehouse, and Sleep Blasting
format 2.7.2 disusun dengan matrik 24a
format 2.7.2 is arranged with
matrix 24a
2.7.3.
Rencana dan Realisasi Penggunaan Bahan Bakar Cair
Plans and Realization of Liquid
Fuel Use
format 2.7.3 disusun dengan matrik 24b
format 2.7.3 is arranged with
matrix 24b
2.7.4.
Rencana Pembangunan Tempat Penimbunan Bahan Bakar Cair
Plan for the Construction of a
Liquid Fuel Storage Site
format 2.7.4 disusun dengan matrik 24c
format 2.7.4 is arranged with a
24c matrix
2.7.5.
Rencana Pengujian Kelayakan Peralatan dan/atau Instalasi
Equipment and/or Installation
Feasibility Test Plan
format 2.7.5 disusun dengan matrik 24d
2.7.5 format is arranged with a
24d matrix
2.7.6.
Rencana Pengoperasian Kapal Keruk/Isap
Dredger/Suction Boat Operation
Plan
format 2.7.6 disusun disusun dengan matrik 24e
format 2.7.6 is arranged using
a 24e matrix
2.7.7.
Rencana dan Realisasi Penggunaan Bahan Berbahaya dan Beracun
Plans and Realization of Use of
Hazardous and Toxic Materials
format 2.7.7 disusun dengan matrik 24f
format 2.7.7 is arranged with a
24f matrix
2.7.8.
Rencana dan Realisasi Program dan Biaya Keselamatan Pertambangan
Plans and Realization of Mining
Safety Programs and Costs
format 2.7.8 disusun dengan matrik 24g
2.7.8 format compiled with 24g
matrix
2.8.
Standardisasi dan Usaha Jasa Pertambangan *
Standardization and Mining
Services Business *
2.8.1.
Standardisasi
Standardization
format 2.8.1 disusun dengan matrik 25a
format 2.8.1 is arranged with matrix
25a
2.8.2.
Usaha Jasa Pertambangan
Mining Services Business
format 2.8.2 disusun dengan matrik 25b
format 2.8.2 is arranged with
matrix 25b
2.9.
Tenaga Kerja dan Pengembangan Sumber Daya Manusia
Labor and Human Resources
Development
2.9.1.
Penggunaan Tenaga Kerja IUP/IUPK
Use of Mining Business Permit / Special
Mining Business Permit Labor
format 2.9.1 disusun dengan matrik 26a
format 2.9.1 is arranged with
matrix 26a
2.9.2.
Pelatihan Tenaga Kerja
Workforce Training
format 2.9.2 disusun dengan matrik 26b
format 2.9.2 is arranged with
matrix 26b
2.9.3.
Rencana Penggunaan Tenaga Kerja Asing
Plans for Using Foreign Workers
format 2.9.3 disusun dengan matrik 26c
format 2.9.3 is arranged with a
26c matrix
2.10.
Rencana dan Realisasi Pengembangan dan Pemberdayaan Masyarakat Tahun
(N-1) dan Rencana Tahun (N) sampai dengan Tahun (N+2)
Plans and Realization of
Community Development and Empowerment for Year (N-1) and Plans for Year (N)
to Year (N+2)
format 2.10 disusun dengan matrik 27
2.10 format is arranged with a
matrix of 27
2.11.
Pemanfaatan Produk Dalam Negeri dan Belanja Barang *)
Utilization of Domestic
Products and Shopping for Goods *)
2.11.1.
Rencana dan Realisasi Belanja Barang dan Peralatan Tahun (N-1) dan
Rencana Tahun (N) sampai dengan Tahun (N+2)
Plan and Realization of
Expenditure on Goods and Equipment for Year (N-1) and Plan for Year (N) to
Year (N+2)
format 2.11.1 disusun dengan matrik 28
format 2.11.1 is arranged with
a matrix of 28
2.12.
Keuangan dan Penerimaan Negara
Finance and State Revenue
2.12.1.
Keuangan
Finance
format 2.12.1 disusun dengan matrik 29,29a,29b,29c,29d,29f, 29g, dan
29h
2.12.1 format is arranged with
matrices 29,29a,29b,29c,29d,29f, 29g, and 29h
2.12.2.
Penerimaan Negara
State Revenue
format 2.12.2 disusun dengan matrik 29e
format 2.12.2 is arranged with
a 29e matrix
BAB III RENCANA STRATEGIS LIMA TAHUN
CHAPTER III FIVE YEAR STRATEGIC
PLAN
3.1.
Kegiatan Eksplorasi
Exploration Activities
format Bab III disusun dengan matrik 30
The format for Chapter III is
arranged with a matrix of 30
3.2.
Produksi
Production
3.3.
Pemasaran
Marketing
3.4.
Lingkungan
Environment
3.5.
Keselamatan Pertambangan
Mining Safety
3.6.
Tenaga Kerja
Labor
3.7.
Investasi
Investment
3.8.
Keuangan dan Penerimaan Negara
Finance and State Revenue
Catatan: apabila terdapat pembahasan lain sesuai kebutuhan perusahaan
agar disesuaikan
Note: if there are other
discussions according to the company's needs, they must be adjusted
LAMPIRAN-LAMPIRAN
ATTACHMENTS
1.
Citra satelit high resolution
(natural colour) berupa raw data dan data raster (sudah terkoreksi geometrik)
High resolution (natural color)
satellite imagery in the form of raw data and raster data (geometrically
corrected)
Peta-peta dibuat harus dengan skala yang representatif dan
informatif.
Maps must be made on a
representative and informative scale.
2.
Peta Situasi Penambangan/Topografi Tahun (N-1) dan Tahun (N), dan
Data Digital (Format.PDF)
Mining Situation Map/Topography
Year (N-1) and Year (N), and Digital Data (PDF Format)
3.
Peta Geologi
Geological Map
4.
Peta Sebaran Bahan Galian (modeling
ore body) dan Data Digital (Format .PDF/DXF)
Mineral Distribution Map (ore
body modeling) and Digital Data (PDF/DXF Format)
5.
Peta Realisasi Eksplorasi
Exploration Realization Map
6.
Peta Rencana Eksplorasi
Exploration Plan Map
7.
Peta Rencana Penambangan Dilengkapi Dengan Cross Section Tahun (N), (N+1), dan (N+2) dan Data Digital
(Format .PDF)
Mining Plan Map Equipped with
Cross Section Years (N), (N+1), and (N+2) and Digital Data (.PDF Format)
8.
Peta Penimbunan Tanah/Batuan Penutup Dilengkapi Dengan Cross Section, dan Data Digital (N-1),
(N), (N+1), dan (N+2) (Format .PDF)
Landfill/Overburden Rock Map
Equipped with Cross Sections, and Digital Data (N-1), (N), (N+1), and (N+2)
(.PDF Format)
9.
Peta Peranginan (Underground)
Resort Map (Underground)
10.
Peta Realisasi Bukaan Lahan Tahun N-1 dan Data Digital (Format .PDF)
Map of Realization of Land
Openings Year N-1 and Digital Data (.PDF Format)
11.
Peta Rencana Bukaan Lahan Tahun N dan Data Digital (Format .PDF)
Year N Land Opening Plan Map
and Digital Data (.PDF Format)
12.
Peta Realisasi Reklamasi Tahun N-1
Map of Reclamation Realization
Year N-1
13.
Peta Rencana Reklamasi Lahan Tahun N
Land
Reclamation Plan Map for Year N
14.
Peta Penyaliran Tambang, Peta Pemantauan Lingkungan Tahun N dan
Realisasi Tahun N-1
Mining Distribution Map,
Environmental Monitoring Map for Year N and Realization for Year N-1
15.
Kontrak – kontrak penjualan
Sales contracts
16.
Surat Pengesahan Kepala Teknik Tambang / Kepala Teknik Tambang
Sementara / Pjs. Kepala Teknik Tambang
Letter of Approval of Head of
Mining Engineering / Temporary Head of Mining Engineering / Acting Head of
Mining Engineering
Sumber (source) :
Google
Translate
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN
ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN
BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY
AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIA.
FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG
IUP TAHAP KEGIATAN OPERASI PRODUKSI DAN IUPK TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN
MINERAL LOGAM
IIA. FORMAT FOR PREPARING WORK PLANS AND
COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS
ACTIVITIES AND IUPK FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE
SISTEMATIKA
|
URAIAN
|
|||
RINGKASAN (Executive Summary) |
|
|||
KATA PENGANTAR
|
|
|||
DAFTAR ISI
|
|
|||
DAFTAR GAMBAR
|
|
|||
DAFTAR TABEL
|
|
|||
DAFTAR LAMPIRAN
|
|
|||
BAB I
|
PENDAHULUAN
|
|
||
|
1.1. |
Latar Belakang
|
berisi gambaran umum profil perusahaan, peta kesampaian daerah, bagan
struktur organisasi (head office dan site) mulai dari pengurus perusahaan (management) hingga tingkat pelaksana
|
|
|
1.2. |
Legalitas dan Pemasangan Tanda Batas
|
Format 1.2 disusun dengan matrik 1, bagan 2a, dan matrik 2b
|
|
BAB II
|
PERSETUJUAN DAN REALISASI RKAB TAHUN N-1 SERTA RKAB TAHUN N
|
|
||
|
2.1. |
Kegiatan Eksplorasi
|
|
|
|
|
2.1.1. |
Rekapitulasi Hasil Kegiatan Eksplorasi Sampai Tahun (N-1)
|
format 2.1.1 disusun dengan matrik 3a
|
|
|
2.1.2. |
Rencana dan Realisasi Kegiatan Eksplorasi Tahun N-1 dan Rencana Tahun
(N) sampai dengan Tahun (N+2)
|
format 2.1.2 disusun dengan matrik 3b
|
|
|
2.1.3. |
Rencana dan Realisasi Biaya Eksplorasi Tahun (N-1) dan Rencana Tahun
(N) sampai dengan Tahun (N+2)
|
format 2.1.3 disusun dengan matrik 3c
|
|
|
2.1.4. |
Neraca Sumber daya dan Cadangan
|
format 2.1.4 disusun dengan matrik 4
|
|
2.2. |
Konstruksi dan Infrastruktur
|
|
|
|
|
2.2.1. |
Konstruksi dan Infrastruktur
|
format 2.2.1 dan 2.2.2 disusun dengan matrik 5a dan 5b
|
|
|
2.2.2. |
Biaya Konstruksi dan Infrastruktur
|
format 2.2.1 dan 2.2.2 disusun dengan matrik 5a dan 5b
|
|
2.3. |
Kegiatan Penambangan
|
|
|
|
|
2.3.1. |
Metode Penambangan
|
berisikan tentang metode penambangan yang digunakan
|
|
|
2.3.2. |
Rencana Perubahan Studi Kelayakan *)
|
berisikan tentang apakah akan ada rencana perubahan studi kelayakan
dan penjelasan mengapa melakukan perubahan studi kelayakan
|
|
|
2.3.3. |
Pengupasan dan Penimbunan Overburden/
Batuan Penutup *)
|
Format 2.3.3 disusun dengan matrik 6, 7, dan 8
|
|
|
2.3.4. |
Produksi
|
Format 2.3.4 disusun dengan matrik 9
|
|
|
2.3.5. |
Recovery Penambangan |
Format 2.3.5 disusun dengan matrik 9
|
|
|
2.3.6. |
Daftar Peralatan (Penambangan, Pengangkutan dan Penunjang),
Pengelolaan Air Tambang dan Pengelolaan Geoteknik Tambang
|
Format 2.3.6 disusun dengan matrik 10
|
|
|
2.3.7. |
Biaya Penambangan
|
Format 2.3.7 disusun dengan matrik 11
|
|
2.4. |
Pengolahan dan/atau Pemurnian
|
||
|
|
2.4.1. |
Metode Pengolahan dan/atau Pemurnian
|
berisikan tentang metode pengolahan dan/atau pemurnian yang
digunakan;
|
|
|
2.4.2. |
Hasil Pengolahan dan/atau Pemurnian
|
Format 2.4.2 disusun dengan matrik 12a
|
|
|
2.4.3. |
Recovery Pengolahan
dan/atau Pemurnian
|
Format 2.4.3 disusun dengan matrik 12a
|
|
|
2.4.4. |
Sisa Hasil Pengolahan/Tailing
|
Format 2.4.4 disusun dengan matrik 12b
|
|
|
2.4.5. |
Pemanfaatan Sisa Hasil Pengolahan dan Pengelolaan Mineral Ikutan
|
Berisikan penjelasan tentang pemanfaatan sisa hasil pengolahan dan
pengelolaan mineral ikutan
|
|
|
2.4.6. |
Daftar Peralatan Pengolahan
|
Format 2.4.6 disusun dengan matrik 10
|
|
|
2.4.7. |
Biaya Pengolahan dan/atau Pemurnian
|
Format 2.4.7 disusun dengan matrik 11b
|
|
2.5. |
Pemasaran dan Persediaan (Inventory)
|
|
|
|
|
2.5.1. |
Pemasaran dan Persediaan (Inventory)
|
format 2.5.1 disusun dengan matrik 13a, 13b, 14a, 14b, dan 14c |
|
|
2.5.2. |
Biaya Pemasaran dan Persediaan (Inventory)
|
format 2.5.2 disusun dengan matrik 11c
|
|
2.6. |
Perlindungan Lingkungan
|
|
|
|
|
2.6.1. |
Kegiatan Pengelolaan dan Pemantauan Lingkungan (Kegiatan Pengelolaan
dan Pemantauan Lingkungan, Pembukaan dan Reklamasi Lahan)
|
format 2.6.1 disusun dengan matrik 15,16,17, 18, dan 19
|
|
|
2.6.2. |
Pemantauan Lingkungan
|
format 2.6.2 disusun dengan matrik 20 dan 21
|
|
|
2.6.3. |
Biaya Pengelolaan dan Pemantauan Lingkungan
|
format 2.6.3 disusun dengan matrik 22
|
|
2.7. |
Keselamatan Pertambangan
|
|
|
|
|
2.7.1. |
Statistik Keselamatan Pertambangan
|
format 2.7.1 disusun dengan matrik 23
|
|
|
2.7.2. |
Rencana dan Realisasi Penggunaan Bahan Peledak, Gudang Bahan Peledak,
dan Peledakan Tidur
|
format 2.7.2 disusun dengan matrik 24a
|
|
|
2.7.3. |
Rencana dan Realisasi Penggunaan Bahan Bakar Cair
|
format 2.7.3 disusun dengan matrik 24b
|
|
|
2.7.4. |
Rencana Pembangunan Tempat Penimbunan Bahan Bakar Cair
|
format 2.7.4 disusun dengan matrik 24c
|
|
|
2.7.5. |
Rencana Pengujian Kelayakan Peralatan dan/atau Instalasi
|
format 2.7.5 disusun dengan matrik 24d
|
|
|
2.7.6. |
Rencana Pengoperasian Kapal Keruk/Isap
|
format 2.7.6 disusun disusun dengan matrik 24e
|
|
|
2.7.7. |
Rencana dan Realisasi Penggunaan Bahan Berbahaya dan Beracun
|
format 2.7.7 disusun dengan matrik 24f
|
|
|
2.7.8. |
Rencana dan Realisasi Program dan Biaya Keselamatan Pertambangan
|
format 2.7.8 disusun dengan matrik 24g
|
|
2.8. |
Standardisasi dan Usaha Jasa Pertambangan *
|
|
|
|
|
2.8.1. |
Standardisasi
|
format 2.8.1 disusun dengan matrik 25a
|
|
|
2.8.2. |
Usaha Jasa Pertambangan
|
format 2.8.2 disusun dengan matrik 25b
|
|
2.9. |
Tenaga Kerja dan Pengembangan Sumber Daya Manusia
|
|
|
|
|
2.9.1. |
Penggunaan Tenaga Kerja IUP/IUPK
|
format 2.9.1 disusun dengan matrik 26a
|
|
|
2.9.2. |
Pelatihan Tenaga Kerja
|
format 2.9.2 disusun dengan matrik 26b
|
|
|
2.9.3. |
Rencana Penggunaan Tenaga Kerja Asing
|
format 2.9.3 disusun dengan matrik 26c
|
|
2.10. |
Rencana dan Realisasi Pengembangan dan Pemberdayaan Masyarakat Tahun
(N-1) dan Rencana Tahun (N) sampai dengan Tahun (N+2)
|
format 2.10 disusun dengan matrik 27
|
|
|
2.11. |
Pemanfaatan Produk Dalam Negeri dan Belanja Barang *)
|
|
|
|
|
2.11.1. |
Rencana dan Realisasi Belanja Barang dan Peralatan Tahun (N-1) dan
Rencana Tahun (N) sampai dengan Tahun (N+2)
|
format 2.11.1 disusun dengan matrik 28
|
|
2.12. |
Keuangan dan Penerimaan Negara
|
|
|
|
|
2.12.1. |
Keuangan
|
format 2.12.1 disusun dengan matrik 29,29a,29b,29c,29d,29f, 29g, dan
29h
|
|
|
2.12.2. |
Penerimaan Negara
|
format 2.12.2 disusun dengan matrik 29e
|
BAB III RENCANA STRATEGIS LIMA TAHUN
|
|
|||
|
3.1. |
Kegiatan Eksplorasi
|
format Bab III disusun dengan matrik 30
|
|
|
3.2. |
Produksi
|
||
|
3.3. |
Pemasaran
|
||
|
3.4. |
Lingkungan
|
||
|
3.5. |
Keselamatan Pertambangan
|
||
|
3.6. |
Tenaga Kerja
|
||
|
3.7. |
Investasi
|
||
|
3.8. |
Keuangan dan Penerimaan Negara
|
||
Catatan: apabila terdapat pembahasan lain sesuai kebutuhan perusahaan
agar disesuaikan
|
|
|||
LAMPIRAN-LAMPIRAN
|
|
|||
1. |
Citra satelit high resolution
(natural colour) berupa raw data dan data raster (sudah terkoreksi geometrik)
|
Peta-peta dibuat harus dengan skala yang representatif dan
informatif.
|
||
2. |
Peta Situasi Penambangan/Topografi Tahun (N-1) dan Tahun (N), dan
Data Digital (Format.PDF)
|
|||
3. |
Peta Geologi
|
|||
4. |
Peta Sebaran Bahan Galian (modeling
ore body) dan Data Digital (Format .PDF/DXF)
|
|||
5. |
Peta Realisasi Eksplorasi
|
|||
6. |
Peta Rencana Eksplorasi
|
|||
7. |
Peta Rencana Penambangan Dilengkapi Dengan Cross Section Tahun (N), (N+1), dan (N+2) dan Data Digital
(Format .PDF)
|
|||
8. |
Peta Penimbunan Tanah/Batuan Penutup Dilengkapi Dengan Cross Section, dan Data Digital (N-1),
(N), (N+1), dan (N+2) (Format .PDF)
|
|||
9. |
Peta Peranginan (Underground)
|
|||
10. |
Peta Realisasi Bukaan Lahan Tahun N-1 dan Data Digital (Format .PDF)
|
|||
11. |
Peta Rencana Bukaan Lahan Tahun N dan Data Digital (Format .PDF)
|
|||
12. |
Peta Realisasi Reklamasi Tahun N-1
|
|||
13. |
Peta Rencana Reklamasi Lahan Tahun N
|
|||
14. |
Peta Penyaliran Tambang, Peta Pemantauan Lingkungan Tahun N dan
Realisasi Tahun N-1
|
|||
15. |
Kontrak – kontrak penjualan
|
|||
16. |
Surat Pengesahan Kepala Teknik Tambang / Kepala Teknik Tambang
Sementara / Pjs. Kepala Teknik Tambang
|
Sumber (source) :
Google Translate
Tidak ada komentar:
Posting Komentar