https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN MANDAILING 420 (EMPAT RATUS DUA PULUH) TAHUN DI TAHUN 2024 MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
20 Agustus 2444 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
August 20th, 2444 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIA. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI DAN IUPK TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN MINERAL LOGAM
IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE
Matrik 14. Realisasi Inventori Mineral Logam Tahun (N-1)
Matrix 14. Realization of Metal
Mineral Inventory Year (N-1)
Matrik 14a. Realisasi Inventori Bijih
Matrix 14a. Ore Inventory
Realization
No.
Number
Bulan
Month
Realisasi Tahun (N-1)
Year
Realization (N-1)
Stockpile
1
Stockpile
2
Stockpile
3
Volume (Satuan)
Volume
(Unit)
Kadar (Satuan)
Level
(Unit)
Volume (Satuan)
Volume
(Unit)
Kadar (Satuan)
Level
(Unit)
Volume (Satuan)
Volume
(Unit)
Kadar (Satuan)
Level
(Unit)
A.
Kapasitas Maksimum
Maximum Capacity
B
Stock Akhir Tahun
Sebelumnya (per 31 Desember N-2)
Previous Year End Stock (as of
December 31 N-2)
1
Januari
January
2
Februari
February
….
…..
11
November
12
Desember
December
Penjelasan Matrik :
1.
Jumlah dan penamaan stockpile
disesuaikan dengan masing-masing perusahaan
2.
Klasifikasi stockpile berdasarkan tingkat kadar logam dalam bijih (low grade, medium grade dan high grade)
Matrix Explanation:
1. The number and naming of stockpiles are
adjusted to each company
2. Classification of stockpiles based on the
level of metal content in the ore (low grade, medium grade and high grade)
Matrik
14b. Realisasi Inventori Produk Utama
Matrix 14b. Realization of Main Product
Inventory
No.
Number
Bulan
Month
Jenis Produk Utama 1
Main
Product Type 1
Jenis Produk Utama 2
Main
Product Type 2
Volume (satuan)
Volume
(units)
Kadar (satuan)
Level
(unit)
Volume (satuan)
Volume
(units)
Kadar (satuan)
Level
(unit)
A.
Kapasitas Maksimum
Maximum Capacity
B
Stock Akhir Tahun
Sebelumnya (per 31 Desember N-2)
Previous Year End Stock (as of
December 31 N-2)
1
Januari
January
2
Februari
February
….
…..
11
November
12
Desember
December
Matrik
14c. Realisasi Inventori Produk Samping
Matrix 14c. By-Product Inventory Realization
No.
Number
Bulan
Month
Jenis Produk Samping 1
Type
of By-Product 1
Jenis Produk Samping 2
Type
of By-Product 2
Volume (satuan)
Volume
(units)
Kadar (satuan)
Level
(unit)
Volume (satuan)
Volume
(units)
Kadar (satuan)
Level
(unit)
A.
Kapasitas Maksimum
Maximum Capacity
B
Stock Akhir Tahun
Sebelumnya (per 31 Desember N-2)
Previous Year End Stock (as of
December 31 N-2)
1
Januari
January
2
Februari
February
….
…..
11
November
12
Desember
December
sumber
(source) :
Google
Translate
IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE
Matrik 14. Realisasi Inventori Mineral Logam Tahun (N-1)
Matrix 14. Realization of Metal
Mineral Inventory Year (N-1)
Matrik 14a. Realisasi Inventori Bijih
Matrix 14a. Ore Inventory
Realization
No.
|
Bulan
|
Realisasi Tahun (N-1)
|
|||||
Stockpile 1 |
Stockpile 2 |
Stockpile 3 |
|||||
Volume (Satuan)
|
Kadar (Satuan)
|
Volume (Satuan)
|
Kadar (Satuan)
|
Volume (Satuan)
|
Kadar (Satuan)
|
||
A. |
Kapasitas Maksimum
|
|
|
|
|
|
|
B |
Stock Akhir Tahun
Sebelumnya (per 31 Desember N-2)
|
|
|
|
|
|
|
1 |
Januari
|
|
|
|
|
|
|
2 |
Februari
|
|
|
|
|
|
|
…. |
….. |
|
|
|
|
|
|
11 |
November |
|
|
|
|
|
|
12 |
Desember
|
|
|
|
|
|
|
Penjelasan Matrik :
1.
Jumlah dan penamaan stockpile
disesuaikan dengan masing-masing perusahaan
2.
Klasifikasi stockpile berdasarkan tingkat kadar logam dalam bijih (low grade, medium grade dan high grade)
Matrix Explanation:
1. The number and naming of stockpiles are
adjusted to each company
2. Classification of stockpiles based on the
level of metal content in the ore (low grade, medium grade and high grade)
Matrik
14b. Realisasi Inventori Produk Utama
Matrix 14b. Realization of Main Product
Inventory
No.
|
Bulan
|
Jenis Produk Utama 1
|
Jenis Produk Utama 2
|
||
Volume (satuan)
|
Kadar (satuan)
|
Volume (satuan)
|
Kadar (satuan)
|
||
A. |
Kapasitas Maksimum
|
|
|
|
|
B |
Stock Akhir Tahun
Sebelumnya (per 31 Desember N-2)
|
|
|
|
|
1 |
Januari
|
|
|
|
|
2 |
Februari
|
|
|
|
|
…. |
….. |
|
|
|
|
11 |
November |
|
|
|
|
12 |
Desember
|
|
|
|
|
Matrik
14c. Realisasi Inventori Produk Samping
Matrix 14c. By-Product Inventory Realization
No.
|
Bulan
|
Jenis Produk Samping 1
|
Jenis Produk Samping 2
|
||
Volume (satuan)
|
Kadar (satuan)
|
Volume (satuan)
|
Kadar (satuan)
|
||
A. |
Kapasitas Maksimum
|
|
|
|
|
B |
Stock Akhir Tahun
Sebelumnya (per 31 Desember N-2)
|
|
|
|
|
1 |
Januari
|
|
|
|
|
2 |
Februari
|
|
|
|
|
…. |
….. |
|
|
|
|
11 |
November |
|
|
|
|
12 |
Desember
|
|
|
|
|
sumber
(source) :
Google Translate
Tidak ada komentar:
Posting Komentar