https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN MANDAILING 420 (EMPAT RATUS DUA PULUH) TAHUN DI TAHUN 2024 MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
06 Agustus 2444 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
August 06th, 2444 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :
Menetapkan :
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIA. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI DAN IUPK TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN MINERAL LOGAM
IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE
Matrik 12. Rencana dan Realisasi Pengolahan dan/atau Pemurnian Tahun
(N-1) dan Rencana Tahun (N) sampai dengan Tahun (N+2) Matrik
Matrix 12. Plan and Realization
of Processing and/or Refining Year (N-1) and Plan for Year (N) to Year (N+2)
Matrix
12a. Hasil Pengolahan dan/atau Pemurnian
12a. Processing and/or
Purification Results
No.
Number
Deskripsi
Description
Rencana Tahun N-1
N-1
Year Plan
Realisasi Tahun N-1
Realization
in Year N-1
1.
Material yang diolah (ton)
Processed material (tons)
Kadar Logam A (%)
Metal A Content (%)
Kadar Logam B (%)
Metal B Content (%)
2.
produk pengolahan (ton)
processing products (tons)
Kadar konsentrat (g/t)
Concentrate
grade (g/t)
3.
Produksi Utama
Main Production
Produksi Logam A (satuan)
Metal A Production (unit)
Produksi Logam B (satuan)
B Metal Production (unit)
4.
Recovery Logam A (%)
Metal A Recovery (%)
5.
Recovery Logam B (%)
Metal B Recovery (%)
No
Number
Deskripsi
Description
Rencana tahun (N)
Year
plan (N)
Keterangan
Information
Januari
January
Februari
February
Maret
March
April
Mei
May
……..
……..
November
Desember
December
Total
1
Material yang diolah (ton)
Processed material (tons)
Asal material yang diolah :
Origin of processed material:
Kadar Logam A (%)
Metal A Content (%)
Perusahaan, Volume, Kadar
Company, Volume, Rate
Kadar Logam B (%)
B Metal Content (%)
2
produk pengolahan (ton)
processing products (tons)
Kadar produk pengolahan (satuan)
Processing product content
(unit)
3
Produksi Utama
Main Production
Produksi Logam A (satuan)
Metal Production A (unit)
Kadar Logam A (satuan)
Metal A Content (unit)
Produksi Logam B (satuan)
B Metal Production (unit)
Kadar Logam B (satuan)
B Metal Content (unit)
4
Recovery Logam A (%)
Recovery of Metal A (%)
5.
Recovery Logam B (%)
Recovery of Metal B (%)
No
Number
Deskripsi
Description
Rencana tahun (N+1)
Year
plan (N+1)
Keterangan
Information
Januari
January
Februari
February
Maret
March
April
Mei
May
…..
…..
November
Desember
December
Total
1
Material yang diolah (ton)
Material processed (tons)
Asal material yang diolah :
Origin of processed materials:
Kadar Logam A (%)
Metal A Content (%)
Perusahaan, Volume, Kadar
Company, Volume, Level
Kadar Logam B (%)
Metal B Content (%)
2
produk pengolahan (ton)
processed products (tons)
Kadar produk pengolahan (satuan)
Processing product content
(unit)
3
Produksi Utama
Main Production
Produksi Logam A (satuan)
Metal Production A (unit)
Kadar Logam A (satuan)
Metal A Content (unit)
Produksi Logam B (satuan)
Metal Production B (unit)
Kadar Logam B (satuan)
Metal Content B (unit)
4
Recovery Logam A (%)
Recovery of Metal A (%)
5.
Recovery Logam B (%)
Recovery of Metal B (%)
No
Number
Deskripsi
Description
Rencana tahun (N+2)
Year
plan (N+2)
Keterangan
Information
Januari
January
Februari
February
Maret
March
April
Mei
May
…..
…..
November
Desember
December
Total
1
Material yang diolah (ton)
Material processed (tons)
Asal material yang diolah :
Origin of processed materials:
Kadar Logam A (%)
Metal A Content (%)
Perusahaan, Volume, Kadar
Company, Volume, Level
Kadar Logam B (%)
Metal B Content (%)
2
produk pengolahan (ton)
processed products (tons)
Kadar produk pengolahan (satuan)
Processing product content
(unit)
3
Produksi Utama
Main Production
Produksi Logam A (satuan)
Metal Production A (unit)
Kadar Logam A (satuan)
Metal A Content (unit)
Produksi Logam B (satuan)
Metal Production B (unit)
Kadar Logam B (satuan)
Metal Content B (unit)
4
Recovery Logam A (%)
Recovery of Metal A (%)
5.
Recovery Logam B (%)
Recovery of Metal B (%)
Matrik 12b. Sisa Hasil Pengolahan
Matrix 12b. Remaining
Processing Results
No.
Number
Deskripsi
Description
Realisasi Tahun (N-1)
Year
Realization (N-1)
Januari
January
Februari
February
………..
Desember
December
Total
1.
Jenis
Type
2.
Lokasi
Location
3.
Dimensi Tempat Penimbunan atau TSF
Dimensions of Landfill or TSF
- luas (ha)
- area (ha)
- tinggi (m)
-
height (m)
4.
Volume (m3)
Volume (m3)
Kadar A
Level A
Kadar B
B Level
5.
Berat jenis
Specific gravity
Sumber (source)
:
Google Translate
IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE
Matrik 12. Rencana dan Realisasi Pengolahan dan/atau Pemurnian Tahun
(N-1) dan Rencana Tahun (N) sampai dengan Tahun (N+2) Matrik
Matrix 12. Plan and Realization
of Processing and/or Refining Year (N-1) and Plan for Year (N) to Year (N+2)
Matrix
12a. Hasil Pengolahan dan/atau Pemurnian
12a. Processing and/or
Purification Results
No.
|
Deskripsi
|
Rencana Tahun N-1
|
Realisasi Tahun N-1
|
1. |
Material yang diolah (ton)
|
|
|
|
Kadar Logam A (%)
|
|
|
|
Kadar Logam B (%)
|
|
|
2. |
produk pengolahan (ton)
|
|
|
|
Kadar konsentrat (g/t)
|
|
|
3. |
Produksi Utama
|
|
|
|
Produksi Logam A (satuan)
|
|
|
|
Produksi Logam B (satuan)
|
|
|
4. |
Recovery Logam A (%)
|
|
|
5. |
Recovery Logam B (%)
|
|
|
No
|
Deskripsi
|
Rencana tahun (N)
|
Keterangan
|
|||||||||
Januari
|
Februari
|
Maret
|
April |
Mei
|
…….. |
…….. |
November |
Desember
|
Total |
|||
1 |
Material yang diolah (ton)
|
|
|
|
|
|
|
|
|
|
|
Asal material yang diolah :
|
|
Kadar Logam A (%)
|
|
|
|
|
|
|
|
|
|
|
Perusahaan, Volume, Kadar
|
|
Kadar Logam B (%)
|
|
|
|
|
|
|
|
|
|
|
|
2 |
produk pengolahan (ton)
|
|
|
|
|
|
|
|
|
|
|
|
|
Kadar produk pengolahan (satuan)
|
|
|
|
|
|
|
|
|
|
|
|
3 |
Produksi Utama
|
|
|
|
|
|
|
|
|
|
|
|
|
Produksi Logam A (satuan)
|
|
|
|
|
|
|
|
|
|
|
|
|
Kadar Logam A (satuan)
|
|
|
|
|
|
|
|
|
|
|
|
|
Produksi Logam B (satuan)
|
|
|
|
|
|
|
|
|
|
|
|
|
Kadar Logam B (satuan)
|
|
|
|
|
|
|
|
|
|
|
|
4 |
Recovery Logam A (%)
|
|
|
|
|
|
|
|
|
|
|
|
5. |
Recovery Logam B (%)
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||
|
||||||||||||
No
|
Deskripsi
|
Rencana tahun (N+1)
|
Keterangan
|
|||||||||
Januari
|
Februari
|
Maret
|
April |
Mei
|
….. |
….. |
November |
Desember
|
Total |
|||
1 |
Material yang diolah (ton)
|
|
|
|
|
|
|
|
|
|
|
Asal material yang diolah :
|
|
Kadar Logam A (%)
|
|
|
|
|
|
|
|
|
|
|
Perusahaan, Volume, Kadar
|
|
Kadar Logam B (%)
|
|
|
|
|
|
|
|
|
|
|
|
2 |
produk pengolahan (ton)
|
|
|
|
|
|
|
|
|
|
|
|
|
Kadar produk pengolahan (satuan)
|
|
|
|
|
|
|
|
|
|
|
|
3 |
Produksi Utama
|
|
|
|
|
|
|
|
|
|
|
|
|
Produksi Logam A (satuan)
|
|
|
|
|
|
|
|
|
|
|
|
|
Kadar Logam A (satuan)
|
|
|
|
|
|
|
|
|
|
|
|
|
Produksi Logam B (satuan)
|
|
|
|
|
|
|
|
|
|
|
|
|
Kadar Logam B (satuan)
|
|
|
|
|
|
|
|
|
|
|
|
4 |
Recovery Logam A (%)
|
|
|
|
|
|
|
|
|
|
|
|
5. |
Recovery Logam B (%)
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||
No
|
Deskripsi
|
Rencana tahun (N+2)
|
Keterangan
|
|||||||||
Januari
|
Februari
|
Maret
|
April |
Mei
|
….. |
….. |
November |
Desember
|
Total |
|||
1 |
Material yang diolah (ton)
|
|
|
|
|
|
|
|
|
|
|
Asal material yang diolah :
|
|
Kadar Logam A (%)
|
|
|
|
|
|
|
|
|
|
|
Perusahaan, Volume, Kadar
|
|
Kadar Logam B (%)
|
|
|
|
|
|
|
|
|
|
|
|
2 |
produk pengolahan (ton)
|
|
|
|
|
|
|
|
|
|
|
|
|
Kadar produk pengolahan (satuan)
|
|
|
|
|
|
|
|
|
|
|
|
3 |
Produksi Utama
|
|
|
|
|
|
|
|
|
|
|
|
|
Produksi Logam A (satuan)
|
|
|
|
|
|
|
|
|
|
|
|
|
Kadar Logam A (satuan)
|
|
|
|
|
|
|
|
|
|
|
|
|
Produksi Logam B (satuan)
|
|
|
|
|
|
|
|
|
|
|
|
|
Kadar Logam B (satuan)
|
|
|
|
|
|
|
|
|
|
|
|
4 |
Recovery Logam A (%)
|
|
|
|
|
|
|
|
|
|
|
|
5. |
Recovery Logam B (%)
|
|
|
|
|
|
|
|
|
|
|
|
Matrik 12b. Sisa Hasil Pengolahan
Matrix 12b. Remaining
Processing Results
No.
|
Deskripsi
|
Realisasi Tahun (N-1)
|
||||
Januari
|
Februari
|
……….. |
Desember
|
Total |
||
1. |
Jenis
|
|
|
|
|
|
2. |
Lokasi
|
|
|
|
|
|
3. |
Dimensi Tempat Penimbunan atau TSF
|
|
|
|
|
|
|
- luas (ha)
|
|
|
|
|
|
|
- tinggi (m)
|
|
|
|
|
|
4. |
Volume (m3)
|
|
|
|
|
|
|
Kadar A
|
|
|
|
|
|
|
Kadar B
|
|
|
|
|
|
5. |
Berat jenis
|
|
|
|
|
|
Tidak ada komentar:
Posting Komentar