https://www.youtube.com/@agussalimnasutionmandailing2/videos

Foto saya
UNTUK KE-GUBERNUR-AN SUMATERA UTARA DARI PENDIRI UM (UNIVERSITAS MANDAILING) FOR THE PROVINCIAL GOVERNOR OF SUMATERA UTARA FROM THE FOUNDER OF MU (MANDAILING UNIVERSITY)

Jumat, 16 Agustus 2024

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 10 SEPTEMBER 2444 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 10 SEPTEMBER 2444 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos


EVOLUSI PENDIDIKAN MANDAILING 420 (EMPAT RATUS DUA PULUH) TAHUN DI TAHUN 2024 MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA







Arahan
dari 
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution


10 September 2444 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
September 10th, 2444 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,


KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA

NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES

DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,

MEMUTUSKAN :
Menetapkan : 
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.

LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151


IIA.  FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI DAN IUPK TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN MINERAL LOGAM

IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE


Matrik 17. Rencana dan Realisasi Pembukaan Lahan Tahun N-1 dan Rencana Pembukaan Lahan Tahun N, (N+1), (N+2)
Matrix 17. Land Clearing Plan and Realization for Year N-1 and Land Clearing Plan for Year N, (N+1), (N+2)


Uraian Pembukaan Lahan
Land Clearing Description

Rencana Bukaan Lahan Dalam Dokumen Rencana Reklamasi Tahun N-1
Land Opening Plan in Reclamation Plan Document Year N-1

Realisasi Pembukaan Lahan Tahun N-1 (ha)
Land Clearing Realization Year N-1 (ha)

Total Pembukaan Lahan Tahun N-1 (ha)
Total Land Clearing Year N-1 (ha)

Rencana Bukaan Lahan Dalam Dokumen Rencana Reklamasi Tahun N
Land Opening Plan in the Reclamation Plan Document for Year N

Rencana Pembukaan Lahan Tahun N (ha)
Land Clearing Plan Year N (ha)

Total Pembukaan Lahan Tahun N-1
(ha)
Total Land Clearing Year N-1
(ha)

Tri. I
Quarter I

Tri. II
Quarter II

Tri. III
Quarter III

Tri. IV
Quarter IV

Tri. I
Quarter I

Tri. II
Quarter II

Tri. III
Quarter III

Tri. IV
Quarter IV

1.

Lahan untuk Tambang (ha)
Land for Mining (ha)

 

 

 

 

 

 

 

 

 

 

 

 

2.

Timbunan Overburden / batuan penutup di luar tambang (ha)
Overburden / cover rock outside the mine (ha)

 

 

 

 

 

 

 

 

 

 

 

 

3.

Timbunan Tanah Pucuk (ha)
Topsoil Fill (ha)

 

 

 

 

 

 

 

 

 

 

 

 

4.

Jalan Tambang (ha)
Mining Road (ha)

 

 

 

 

 

 

 

 

 

 

 

 

5.

Kolam Sedimen/Kendali Erosi (ha)
Sediment Pond / Erosion Control (ha)

 

 

 

 

 

 

 

 

 

 

 

 

6.

Fasilitas Penunjang
Supporting Facilities

 

 

 

 

 

 

 

 

 

 

 

 

 

a.

Pabrik Pengolahan dan Pemurnian
Processing and Refining Plant

 

 

 

 

 

 

 

 

 

 

 

 

 

b.

Kolam/Timbunan Sisa Hasil Pengolahan dan/atau Pemurnian
Pond/Heap of Waste Processing and/or Purification Results

 

 

 

 

 

 

 

 

 

 

 

 

 

c.

Perumahan Karyawan
Employee Housing

 

 

 

 

 

 

 

 

 

 

 

 

 

d.

Jalan non Tambang
Non-Mining Road

 

 

 

 

 

 

 

 

 

 

 

 

 

e.

Gudang Handak
Explosive Materials Warehouse

 

 

 

 

 

 

 

 

 

 

 

 

 

f.

Kantor
Office

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

g.

Bengkel
Workshop

 

 

 

 

 

 

 

 

 

 

 

 

 

h.

Pelabuhan
Harbor

 

 

 

 

 

 

 

 

 

 

 

 

 

i.

Landfill

 

 

 

 

 

 

 

 

 

 

 

 

 

j

Lainnya
Other

 

 

 

 

 

 

 

 

 

 

 

 

Total

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 
 
 

Uraian Pembukaan Lahan
Land Clearing Description

Rencana Bukaan Lahan Dalam Dokumen Rencana Reklamasi Tahun N+1
Land Opening Plan in the Reclamation Plan Document for Year N+1

Realisasi Pembukaan Lahan Tahun N-1 (ha)
Land Clearing Realization Year N-1 (ha)

Total Pembukaan Lahan Tahun N+1 (ha)
Total Land Clearing Year N+1 (ha)

Rencana Bukaan Lahan Dalam Dokumen Rencana Reklamasi Tahun N+2

Rencana Pembukaan Lahan Tahun N+2 (ha)
Land Clearing Plan for Year N+2 (ha)

Total Pembukaan Lahan Tahun N+1
(ha)

Tri. I

Tri. II

Tri. III

Tri. IV

Tri. I

Tri. II

Tri. III

Tri. IV

1.

Lahan untuk Tambang (ha)
Land for Mining (ha)

 

 

 

 

 

 

 

 

 

 

 

 

2.

Timbunan Overburden / batuan penutup di luar tambang (ha)
Overburden / cover rock outside the mine (ha)

 

 

 

 

 

 

 

 

 

 

 

 

3.

Timbunan Tanah Pucuk (ha)
Topsoil Fill (ha)

 

 

 

 

 

 

 

 

 

 

 

 

4.

Jalan Tambang (ha)
Mining Road (ha)

 

 

 

 

 

 

 

 

 

 

 

 

5.

Kolam Sedimen/Kendali Erosi (ha)
Sediment Pond/Erosion Control (ha)

 

 

 

 

 

 

 

 

 

 

 

 

6.

Fasilitas Penunjang
Supporting Facilities

 

 

 

 

 

 

 

 

 

 

 

 

 

a.

Pabrik Pengolahan dan Pemurnian
Processing and Refining Plant

 

 

 

 

 

 

 

 

 

 

 

 

 

b.

Kolam/Timbunan Sisa Hasil Pengolahan dan/atau Pemurnian
Pond/Heap of Waste Processing and/or Purification Results

 

 

 

 

 

 

 

 

 

 

 

 

 

c.

Perumahan Karyawan
Employee Housing

 

 

 

 

 

 

 

 

 

 

 

 

 

d.

Jalan non Tambang
Non-Mining Road

 

 

 

 

 

 

 

 

 

 

 

 

 

e.

Gudang Handak
Explosive Materials Warehouse

 

 

 

 

 

 

 

 

 

 

 

 

 

f.

Kantor
Office

 

 

 

 

 

 

 

 

 

 

 

 

 

g.

Bengkel
Workshop

 

 

 

 

 

 

 

 

 

 

 

 

 

h.

Pelabuhan
Harbor

 

 

 

 

 

 

 

 

 

 

 

 

 

i.

Landfill

 

 

 

 

 

 

 

 

 

 

 

 

 

j

Lainnya
Other

 

 

 

 

 

 

 

 

 

 

 

 

Total

 

 

 

 

 

 

 

 

 

 

 

 

 

Penjelasan Matrik :
1. Realisasi pembukaan lahan merupakan luas area yang dibuka per triwulan (bukan kumulatifnya)
2. Total adalah jumlah keseluruhan lahan yang dibuka
3. Disesuaikan dengan sarana, prasarana, dan fasilitas penunjang yang ada
Matrix Explanation:
1. Land clearing realization is the area cleared per quarter (not cumulative)
2. Total is the total amount of land cleared
3. Adjusted to existing facilities, infrastructure, and supporting facilities
 
Sumber (source) :
Google Translate

Tidak ada komentar:

Posting Komentar

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 10 DESEMBER 2444 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 10 DESEMBER 2444 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos EVOLUSI PENDIDIKAN MANDAILING 420 (EMPAT RATUS DUA PULUH) TAHUN DI TAHUN 2024 M...