https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN MANDAILING 420 (EMPAT RATUS DUA PULUH) TAHUN DI TAHUN 2024 MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
17 September 2444 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
September 17th, 2444 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIA. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI DAN IUPK TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN MINERAL LOGAM
IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE
18. Rencana dan Realisasi Reklamasi Tahun N-1 dan Rencana Reklamasi
Tahun N, N+1, N+2
18. Matrix of Plan and
Realization of Reclamation of N-1 Year and Reclamation Plans for N, N+1, N+2
No
Number
Uraian Reklamasi
Reclamation
Description
Rencana Reklamasi Dalam Dokumen Rencana
Reklamasi Tahun N-1 (ha)
Reclamation
Plan in the N-1 Reclamation Plan Document (Ha)
Rencana Reklamasi RKAB Tahun N-1 (ha)
Reclamation
Plan Work Plan and Budget Cost Year N-1 (Ha)
Realisasi Tahun N-1 (ha)
Realization
of Year N-1 (Ha)
Kumulatif Realisasi Reklamasi s.d.
Tahun N-1 (ha)
Cumulative
Realization of Reclamation until N-1 Year (Ha)
Rencana Reklamasi Dalam Dokumen Rencana
Reklamasi Tahun N (ha)
Reclamation
Plan in the N Year Reclamation Plan Document (Ha)
Rencana Reklamasi RKAB Tahun (N) (ha)
Reclamation
Plan for Work Plan and Budget Cost Year (N) (Ha)
Total Rencana Reklamasi Tahun N (ha)
Total
Reclamation Plan for N (Ha)
Tri. I
Quarter
I.
Tri. II
Quarter
II
Tri. III
Quarter
III
Tri. IV
Quarter
IV
1.
Pengisian kembali lahan bekas tambang (backfilling) (ha)
Filling backfilling land (ha)
2.
Pengaturan permukaan lahan (ha)
Land surface regulation (ha)
a.
Timbunan tanah/batuan penutup di bekas tambang (inpit)
Landfill/rock cover in the
former mining (input)
b.
Timbunan tanah/batuan penutup di luar tambang (outpit)
Pile of land/rock cover outside
the mine (outpit)
c.
Timbunan sisa hasil pengolahan dan/atau pemurnian
The remaining processing of
processing and/or refining results
d.
Bekas kolam sedimen/sarana pengendali erosi
Former sediment ponds/erosion
control facilities
e.
Bekas jalan tambang
Former mining road
f.
Bekas jalan non tambang
Former non-mining road
g.
Fasilitas penunjang lainnya
Other supporting facilities
3.
Penghijauan (Revegetasi) (ha)
Reforestation (Revegetation)
(ha)
a.
Lahan bekas tambang (inpit)
Former mining land (input)
b.
Timbunan tanah/batuan penutup di luar tambang (outpit)
Piles of overburdened soil/rock
outside the mine (outpit)
c.
Timbunan sisa hasil pengolahan dan/atau pemurnian
Piles of waste from processing
and/or refining
d.
Bekas kolam sedimen/sarana pengendali erosi
Former sediment pond/erosion
control facility
e.
Bekas jalan tambang
Former mining road
f.
Bekas jalan non tambang
Former non-mining road
g.
Fasilitas penunjang lainnya
Other supporting facilities
4.
Reklamasi bentuk lain (waduk, permukiman,dll) (ha)
Other forms of reclamation
(reservoirs, settlements, etc.) (ha)
a.
Lahan bekas tambang
Former mining land
b.
Timbunan tanah/batuan penutup (outpit)
Filling of soil/rock cover
(outpit)
c.
Area lainnya (infrastruktur)
Other areas (infrastructure)
5.
Penempatan jaminan Reklamasi tahun N-1 (Rp/USD)
Placement of Reclamation
guarantee year N-1 (Rp/USD)
No.
Number
Uraian Reklamasi
Reclamation
Description
Rencana Reklamasi Dalam Dokumen Rencana
Reklamasi Tahun N+1 (ha)
Reclamation
Plan in the Reclamation Plan Document for Year N+1 (ha)
Rencana Reklamasi RKAB Tahun N+1 (ha)
Reclamation
Plan Work Plan and Budget Year N+1 (ha)
Total Rencana Reklamasi Tahun N+1 (ha)
Total
Reclamation Plan for Year N+1 (ha)
Rencana Reklamasi Dalam Dokumen Rencana
Reklamasi Tahun N+2 (ha)
Reclamation
Plan in the Reclamation Plan Document for Year N+2 (ha)
Rencana Reklamasi RKAB Tahun N+2 (ha)
Reclamation
Plan Work Plan and Budget Year N+2 (ha)
Total Rencana Reklamasi Tahun N+2 (ha)
Total
Reclamation Plan for Year N+2 (ha)
Tri. I
Quarter
I
Tri. II
Quarter
II
Tri. III
Quarter
III
Tri. IV
Quarter
IV
Tri. I
Quarter
I
Tri. II
Quarter
II
Tri. III
Quarter
III
Tri. IV
Quarter
IV
1.
Pengisian kembali lahan bekas tambang (backfilling) (ha)
Backfilling of ex-mining land
(ha)
2.
Pengaturan permukaan lahan (ha)
Land surface area (ha)
a.
Timbunan tanah/batuan penutup di bekas tambang (inpit)
Overburden/rock deposits in
former mines (inpit)
b.
Timbunan tanah/batuan penutup di luar tambang (outpit)
Piles of overburdened soil/rock
outside the mine (outpit)
c.
Timbunan sisa hasil pengolahan dan/atau pemurnian
Piles of waste from processing
and/or refining
d.
Bekas kolam sedimen/sarana pengendali erosi
Former sediment pond / erosion
control facility
e.
Bekas jalan tambang
Former mining road
f.
Bekas jalan non tambang
Former non-mining road
g.
Fasilitas penunjang lainnya
Other supporting facilities
3.
Penghijauan (Revegetasi) (ha)
Reforestation (Revegetation)
(ha)
a.
Lahan bekas tambang (inpit)
Former mining land (inpit)
b.
Timbunan tanah/batuan penutup di luar tambang (outpit)
Piles of soil/overburden rock
outside the mine (outpit)
c.
Timbunan sisa hasil pengolahan dan/atau pemurnian
Piles of waste from processing
and/or refining
d.
Bekas kolam sedimen/sarana pengendali erosi
Former sediment pond / erosion
control facility
e.
Bekas jalan tambang
Former mining road
f.
Bekas jalan non tambang
Former non-mining road
g.
Fasilitas penunjang lainnya
Other supporting facilities
4.
Reklamasi bentuk lain (waduk, permukiman, dll) (ha)
Other forms of reclamation
(reservoirs, settlements, etc.) (ha)
a.
Lahan bekas tambang
Former mining land
b.
Timbunan tanah/batuan penutup (outpit)
Filling of soil/rock cover
(outpit)
c.
Area lainnya (infrastruktur)
Other areas (infrastructure)
Penjelasan Matrik :
1.
Rencana luas reklamasi tidak boleh kurang dari rencana reklamasi lima tahunan
2.
Realisasi reklamasi merupakan luas area yang direklamasi-revegetasi per tahun
(bukan kumulatifnya)
Matrix Explanation:
1. The reclamation area plan must not be less
than the five-year reclamation plan
2. Reclamation realization is the area
reclaimed-revegeted per year (not cumulatively)
Sumber
(source) :
Google Translate
IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE
18. Rencana dan Realisasi Reklamasi Tahun N-1 dan Rencana Reklamasi
Tahun N, N+1, N+2
18. Matrix of Plan and
Realization of Reclamation of N-1 Year and Reclamation Plans for N, N+1, N+2
No
|
Uraian Reklamasi
|
Rencana Reklamasi Dalam Dokumen Rencana
Reklamasi Tahun N-1 (ha)
|
Rencana Reklamasi RKAB Tahun N-1 (ha)
|
Realisasi Tahun N-1 (ha)
|
Kumulatif Realisasi Reklamasi s.d.
Tahun N-1 (ha)
|
Rencana Reklamasi Dalam Dokumen Rencana
Reklamasi Tahun N (ha)
|
Rencana Reklamasi RKAB Tahun (N) (ha)
|
Total Rencana Reklamasi Tahun N (ha)
|
||||
Tri. I
|
Tri. II
|
Tri. III
|
Tri. IV
|
|||||||||
1. |
Pengisian kembali lahan bekas tambang (backfilling) (ha)
|
|
|
|
|
|
|
|
|
|
|
|
2. |
Pengaturan permukaan lahan (ha)
|
|
|
|
|
|
|
|
|
|
|
|
|
a. |
Timbunan tanah/batuan penutup di bekas tambang (inpit)
|
|
|
|
|
|
|
|
|
|
|
|
b. |
Timbunan tanah/batuan penutup di luar tambang (outpit)
|
|
|
|
|
|
|
|
|
|
|
|
c. |
Timbunan sisa hasil pengolahan dan/atau pemurnian
|
|
|
|
|
|
|
|
|
|
|
|
d. |
Bekas kolam sedimen/sarana pengendali erosi
|
|
|
|
|
|
|
|
|
|
|
|
e. |
Bekas jalan tambang
|
|
|
|
|
|
|
|
|
|
|
|
f. |
Bekas jalan non tambang
|
|
|
|
|
|
|
|
|
|
|
|
g. |
Fasilitas penunjang lainnya
|
|
|
|
|
|
|
|
|
|
|
3. |
Penghijauan (Revegetasi) (ha)
|
|
|
|
|
|
|
|
|
|
|
|
|
a. |
Lahan bekas tambang (inpit)
|
|
|
|
|
|
|
|
|
|
|
|
b. |
Timbunan tanah/batuan penutup di luar tambang (outpit)
|
|
|
|
|
|
|
|
|
|
|
|
c. |
Timbunan sisa hasil pengolahan dan/atau pemurnian
|
|
|
|
|
|
|
|
|
|
|
|
d. |
Bekas kolam sedimen/sarana pengendali erosi
|
|
|
|
|
|
|
|
|
|
|
|
e. |
Bekas jalan tambang
|
|
|
|
|
|
|
|
|
|
|
|
f. |
Bekas jalan non tambang
|
|
|
|
|
|
|
|
|
|
|
|
g. |
Fasilitas penunjang lainnya
|
|
|
|
|
|
|
|
|
|
|
4. |
Reklamasi bentuk lain (waduk, permukiman,dll) (ha)
|
|
|
|
|
|
|
|
|
|
|
|
|
a. |
Lahan bekas tambang
|
|
|
|
|
|
|
|
|
|
|
|
b. |
Timbunan tanah/batuan penutup (outpit)
|
|
|
|
|
|
|
|
|
|
|
|
c. |
Area lainnya (infrastruktur)
|
|
|
|
|
|
|
|
|
|
|
5. |
Penempatan jaminan Reklamasi tahun N-1 (Rp/USD)
|
|
|
|
|
|
|
|
|
|
|
No. Number |
Uraian Reklamasi Reclamation
Description |
Rencana Reklamasi Dalam Dokumen Rencana
Reklamasi Tahun N+1 (ha) Reclamation
Plan in the Reclamation Plan Document for Year N+1 (ha) |
Rencana Reklamasi RKAB Tahun N+1 (ha) Reclamation
Plan Work Plan and Budget Year N+1 (ha) |
Total Rencana Reklamasi Tahun N+1 (ha) Total
Reclamation Plan for Year N+1 (ha) |
Rencana Reklamasi Dalam Dokumen Rencana
Reklamasi Tahun N+2 (ha) Reclamation
Plan in the Reclamation Plan Document for Year N+2 (ha) |
Rencana Reklamasi RKAB Tahun N+2 (ha) Reclamation
Plan Work Plan and Budget Year N+2 (ha) |
Total Rencana Reklamasi Tahun N+2 (ha) Total
Reclamation Plan for Year N+2 (ha) |
|||||||
Tri. I Quarter
I |
Tri. II Quarter
II |
Tri. III Quarter
III |
Tri. IV Quarter
IV |
Tri. I Quarter
I |
Tri. II Quarter
II |
Tri. III Quarter
III |
Tri. IV Quarter
IV |
|||||||
1. |
Pengisian kembali lahan bekas tambang (backfilling) (ha) Backfilling of ex-mining land
(ha) |
|
|
|
|
|
|
|
|
|
|
|
|
|
2. |
Pengaturan permukaan lahan (ha) Land surface area (ha) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a. |
Timbunan tanah/batuan penutup di bekas tambang (inpit) Overburden/rock deposits in
former mines (inpit) |
|
|
|
|
|
|
|
|
|
|
|
|
|
b. |
Timbunan tanah/batuan penutup di luar tambang (outpit) Piles of overburdened soil/rock
outside the mine (outpit) |
|
|
|
|
|
|
|
|
|
|
|
|
|
c. |
Timbunan sisa hasil pengolahan dan/atau pemurnian Piles of waste from processing
and/or refining |
|
|
|
|
|
|
|
|
|
|
|
|
|
d. |
Bekas kolam sedimen/sarana pengendali erosi Former sediment pond / erosion
control facility |
|
|
|
|
|
|
|
|
|
|
|
|
|
e. |
Bekas jalan tambang Former mining road |
|
|
|
|
|
|
|
|
|
|
|
|
|
f. |
Bekas jalan non tambang Former non-mining road |
|
|
|
|
|
|
|
|
|
|
|
|
|
g. |
Fasilitas penunjang lainnya Other supporting facilities |
|
|
|
|
|
|
|
|
|
|
|
|
3. |
Penghijauan (Revegetasi) (ha) Reforestation (Revegetation)
(ha) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a. |
Lahan bekas tambang (inpit) Former mining land (inpit) |
|
|
|
|
|
|
|
|
|
|
|
|
|
b. |
Timbunan tanah/batuan penutup di luar tambang (outpit) Piles of soil/overburden rock
outside the mine (outpit) |
|
|
|
|
|
|
|
|
|
|
|
|
|
c. |
Timbunan sisa hasil pengolahan dan/atau pemurnian Piles of waste from processing
and/or refining |
|
|
|
|
|
|
|
|
|
|
|
|
|
d. |
Bekas kolam sedimen/sarana pengendali erosi Former sediment pond / erosion
control facility |
|
|
|
|
|
|
|
|
|
|
|
|
|
e. |
Bekas jalan tambang Former mining road |
|
|
|
|
|
|
|
|
|
|
|
|
|
f. |
Bekas jalan non tambang Former non-mining road |
|
|
|
|
|
|
|
|
|
|
|
|
|
g. |
Fasilitas penunjang lainnya Other supporting facilities |
|
|
|
|
|
|
|
|
|
|
|
|
4. |
Reklamasi bentuk lain (waduk, permukiman, dll) (ha) Other forms of reclamation
(reservoirs, settlements, etc.) (ha) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a. |
Lahan bekas tambang Former mining land |
|
|
|
|
|
|
|
|
|
|
|
|
|
b. |
Timbunan tanah/batuan penutup (outpit) Filling of soil/rock cover
(outpit) |
|
|
|
|
|
|
|
|
|
|
|
|
|
c. |
Area lainnya (infrastruktur) Other areas (infrastructure) |
|
|
|
|
|
|
|
|
|
|
|
|
1.
Rencana luas reklamasi tidak boleh kurang dari rencana reklamasi lima tahunan
2.
Realisasi reklamasi merupakan luas area yang direklamasi-revegetasi per tahun
(bukan kumulatifnya)
Matrix Explanation:
1. The reclamation area plan must not be less
than the five-year reclamation plan
2. Reclamation realization is the area
reclaimed-revegeted per year (not cumulatively)
Sumber
(source) :
Google Translate
Tidak ada komentar:
Posting Komentar