https://www.youtube.com/@agussalimnasutionmandailing2/videos

Foto saya
UNTUK KE-GUBERNUR-AN SUMATERA UTARA DARI PENDIRI UM (UNIVERSITAS MANDAILING) FOR THE PROVINCIAL GOVERNOR OF SUMATERA UTARA FROM THE FOUNDER OF MU (MANDAILING UNIVERSITY)

Senin, 26 Agustus 2024

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 17 SEPTEMBER 2444 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 17 SEPTEMBER 2444 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos


EVOLUSI PENDIDIKAN MANDAILING 420 (EMPAT RATUS DUA PULUH) TAHUN DI TAHUN 2024 MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA







Arahan
dari 
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution


17 September 2444 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
September 17th, 2444 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,


KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA

NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES

DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,

MEMUTUSKAN :
Menetapkan : 
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.

LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151


IIA.  FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI DAN IUPK TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN MINERAL LOGAM

IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE


18. Rencana dan Realisasi Reklamasi Tahun N-1 dan Rencana Reklamasi Tahun N, N+1, N+2

18. Matrix of Plan and Realization of Reclamation of N-1 Year and Reclamation Plans for N, N+1, N+2

 

No
Number
 

Uraian Reklamasi
Reclamation Description

Rencana Reklamasi Dalam Dokumen Rencana Reklamasi Tahun N-1 (ha)
Reclamation Plan in the N-1 Reclamation Plan Document (Ha)

Rencana Reklamasi RKAB Tahun N-1 (ha)
Reclamation Plan Work Plan and Budget Cost Year N-1 (Ha)

Realisasi Tahun N-1 (ha)
Realization of Year N-1 (Ha)

Kumulatif Realisasi Reklamasi s.d. Tahun N-1 (ha)
Cumulative Realization of Reclamation until N-1 Year (Ha)

Rencana Reklamasi Dalam Dokumen Rencana Reklamasi Tahun N (ha)
Reclamation Plan in the N Year Reclamation Plan Document (Ha)

Rencana Reklamasi RKAB Tahun (N) (ha)
Reclamation Plan for Work Plan and Budget Cost Year (N) (Ha)

Total Rencana Reklamasi Tahun N (ha)
Total Reclamation Plan for N (Ha)

Tri. I
Quarter I.

Tri. II
Quarter II

Tri. III
Quarter III

Tri. IV
Quarter IV

1.

Pengisian kembali lahan bekas tambang (backfilling) (ha)
Filling backfilling land (ha)

 

 

 

 

 

 

 

 

 

 

2.

Pengaturan permukaan lahan (ha)
Land surface regulation (ha)

 

 

 

 

 

 

 

 

 

 

 

a.

Timbunan tanah/batuan penutup di bekas tambang (inpit)
Landfill/rock cover in the former mining (input)

 

 

 

 

 

 

 

 

 

 

 

b.

Timbunan tanah/batuan penutup di luar tambang (outpit)
Pile of land/rock cover outside the mine (outpit)

 

 

 

 

 

 

 

 

 

 

 

c.

Timbunan sisa hasil pengolahan dan/atau pemurnian
The remaining processing of processing and/or refining results

 

 

 

 

 

 

 

 

 

 

 

d.

Bekas kolam sedimen/sarana pengendali erosi
Former sediment ponds/erosion control facilities

 

 

 

 

 

 

 

 

 

 

 

e.

Bekas jalan tambang
Former mining road

 

 

 

 

 

 

 

 

 

 

 

f.

Bekas jalan non tambang
Former non-mining road

 

 

 

 

 

 

 

 

 

 

 

g.

Fasilitas penunjang lainnya
Other supporting facilities

 

 

 

 

 

 

 

 

 

 

3.

Penghijauan (Revegetasi) (ha)
Reforestation (Revegetation) (ha)

 

 

 

 

 

 

 

 

 

 

 

a.

Lahan bekas tambang (inpit)
Former mining land (input)

 

 

 

 

 

 

 

 

 

 

 

b.

Timbunan tanah/batuan penutup di luar tambang (outpit)
Piles of overburdened soil/rock outside the mine (outpit)

 

 

 

 

 

 

 

 

 

 

 

c.

Timbunan sisa hasil pengolahan dan/atau pemurnian
Piles of waste from processing and/or refining

 

 

 

 

 

 

 

 

 

 

 

d.

Bekas kolam sedimen/sarana pengendali erosi
Former sediment pond/erosion control facility

 

 

 

 

 

 

 

 

 

 

 

e.

Bekas jalan tambang
Former mining road

 

 

 

 

 

 

 

 

 

 

 

f.

Bekas jalan non tambang
Former non-mining road

 

 

 

 

 

 

 

 

 

 

 

g.

Fasilitas penunjang lainnya
Other supporting facilities

 

 

 

 

 

 

 

 

 

 

4.

Reklamasi bentuk lain (waduk, permukiman,dll) (ha)
Other forms of reclamation (reservoirs, settlements, etc.) (ha)

 

 

 

 

 

 

 

 

 

 

 

a.

Lahan bekas tambang
Former mining land

 

 

 

 

 

 

 

 

 

 

 

b.

Timbunan tanah/batuan penutup (outpit)
Filling of soil/rock cover (outpit)

 

 

 

 

 

 

 

 

 

 

 

c.

Area lainnya (infrastruktur)
Other areas (infrastructure)

 

 

 

 

 

 

 

 

 

 

5.

Penempatan jaminan Reklamasi tahun N-1 (Rp/USD)
Placement of Reclamation guarantee year N-1 (Rp/USD)

 

 

 

 

 

 

 

 

 

 

 
 

No.

Number

Uraian Reklamasi

Reclamation Description

Rencana Reklamasi Dalam Dokumen Rencana Reklamasi Tahun N+1 (ha)

Reclamation Plan in the Reclamation Plan Document for Year N+1 (ha)

Rencana Reklamasi RKAB Tahun N+1 (ha)

Reclamation Plan Work Plan and Budget Year N+1 (ha)

Total Rencana Reklamasi Tahun N+1 (ha)

Total Reclamation Plan for Year N+1 (ha)

Rencana Reklamasi Dalam Dokumen Rencana Reklamasi Tahun N+2 (ha)

Reclamation Plan in the Reclamation Plan Document for Year N+2 (ha)

Rencana Reklamasi RKAB Tahun N+2 (ha)

Reclamation Plan Work Plan and Budget Year N+2 (ha)

Total Rencana Reklamasi Tahun N+2 (ha)

Total Reclamation Plan for Year N+2 (ha)

Tri. I

Quarter I

Tri. II

Quarter II

Tri. III

Quarter III

Tri. IV

Quarter IV

Tri. I

Quarter I

Tri. II

Quarter II

Tri. III

Quarter III

Tri. IV

Quarter IV

1.

Pengisian kembali lahan bekas tambang (backfilling) (ha)

Backfilling of ex-mining land (ha)

 

 

 

 

 

 

 

 

 

 

 

 

2.

Pengaturan permukaan lahan (ha)

Land surface area (ha)

 

 

 

 

 

 

 

 

 

 

 

 

 

a.

Timbunan tanah/batuan penutup di bekas tambang (inpit)

Overburden/rock deposits in former mines (inpit)

 

 

 

 

 

 

 

 

 

 

 

 

 

b.

Timbunan tanah/batuan penutup di luar tambang (outpit)

Piles of overburdened soil/rock outside the mine (outpit)

 

 

 

 

 

 

 

 

 

 

 

 

 

c.

Timbunan sisa hasil pengolahan dan/atau pemurnian

Piles of waste from processing and/or refining

 

 

 

 

 

 

 

 

 

 

 

 

 

d.

Bekas kolam sedimen/sarana pengendali erosi

Former sediment pond / erosion control facility

 

 

 

 

 

 

 

 

 

 

 

 

 

e.

Bekas jalan tambang

Former mining road

 

 

 

 

 

 

 

 

 

 

 

 

 

f.

Bekas jalan non tambang

Former non-mining road

 

 

 

 

 

 

 

 

 

 

 

 

 

g.

Fasilitas penunjang lainnya

Other supporting facilities

 

 

 

 

 

 

 

 

 

 

 

 

3.

Penghijauan (Revegetasi) (ha)

Reforestation (Revegetation) (ha)

 

 

 

 

 

 

 

 

 

 

 

 

 

a.

Lahan bekas tambang (inpit)

Former mining land (inpit)

 

 

 

 

 

 

 

 

 

 

 

 

 

b.

Timbunan tanah/batuan penutup di luar tambang (outpit)

Piles of soil/overburden rock outside the mine (outpit)

 

 

 

 

 

 

 

 

 

 

 

 

 

c.

Timbunan sisa hasil pengolahan dan/atau pemurnian

Piles of waste from processing and/or refining

 

 

 

 

 

 

 

 

 

 

 

 

 

d.

Bekas kolam sedimen/sarana pengendali erosi

Former sediment pond / erosion control facility

 

 

 

 

 

 

 

 

 

 

 

 

 

e.

Bekas jalan tambang

Former mining road

 

 

 

 

 

 

 

 

 

 

 

 

 

f.

Bekas jalan non tambang

Former non-mining road

 

 

 

 

 

 

 

 

 

 

 

 

 

g.

Fasilitas penunjang lainnya

Other supporting facilities

 

 

 

 

 

 

 

 

 

 

 

 

4.

Reklamasi bentuk lain (waduk, permukiman, dll) (ha)

Other forms of reclamation (reservoirs, settlements, etc.) (ha)

 

 

 

 

 

 

 

 

 

 

 

 

 

a.

Lahan bekas tambang

Former mining land

 

 

 

 

 

 

 

 

 

 

 

 

 

b.

Timbunan tanah/batuan penutup (outpit)

Filling of soil/rock cover (outpit)

 

 

 

 

 

 

 

 

 

 

 

 

 

c.

Area lainnya (infrastruktur)

Other areas (infrastructure)

 

 

 

 

 

 

 

 

 

 

 

 

 
Penjelasan Matrik :

1. Rencana luas reklamasi tidak boleh kurang dari rencana reklamasi lima tahunan

2. Realisasi reklamasi merupakan luas area yang direklamasi-revegetasi per tahun (bukan kumulatifnya)

Matrix Explanation:

1. The reclamation area plan must not be less than the five-year reclamation plan

2. Reclamation realization is the area reclaimed-revegeted per year (not cumulatively)

 

 

Sumber (source) :

Google Translate

Tidak ada komentar:

Posting Komentar

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 10 DESEMBER 2444 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 10 DESEMBER 2444 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos EVOLUSI PENDIDIKAN MANDAILING 420 (EMPAT RATUS DUA PULUH) TAHUN DI TAHUN 2024 M...