https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN MANDAILING 420 (EMPAT RATUS DUA PULUH) TAHUN DI TAHUN 2024 MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
03 September 2444 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
September 03rd, 2444 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :
Menetapkan :
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIA. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI DAN IUPK TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN MINERAL LOGAM
IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE
Matrik 16. Rencana dan Realisasi Penggunaan Lahan untuk Kegiatan
Pertambangan Tahun N-1
Matrix 16. Plan and Realization
of Land Use for Mining Activities Year N-1
Deskripsi
Description
Kumulatif Bukaan Lahan s.d Tahun N-2
Cumulative
Land Openings up to Year N-2
Rencana Tahun N-1
Year
Plan N-1
Realiasi Tahun N-1
Realization
Year N-1
Kumulatif Bukaan Lahan s.d Tahun N-1
Cumulative
Land Openings up to Year N-1
1.
Lahan untuk Tambang (ha)
Land for Mining (ha)
a.
Tambang aktif (ha)
Active mines (ha)
b.
Tambang selesai (ha)
Mine completed (ha)
2.
Timbunan OB/batuan penutup di bekas tambang (backfilling) (ha)
OB/cover rock piles in former
mines (backfilling) (ha)
a.
Backfilling aktif
Backfilling is active
b.
Backfilling selesai
Backfilling completed
3.
Timbunan OB/batuan penutup di luar tambang (ha)
OB/overburden stockpiles
outside the mine (ha)
a.
Timbunan aktif (ha)
Active stockpile (ha)
b.
Timbunan selesai (ha)
Completed embankment (ha)
4.
Timbunan tanah pucuk (ha)
Topsoil stockpile (ha)
5.
Jalan tambang (ha)
Mining road (ha)
6.
Kolam sedimen/kendali erosi (ha)
Sediment pond/erosion control
(ha)
7.
Fasilitas penunjang
Supporting facilities
a.
Pabrik pengolahan dan pemurnian
Processing and refining plant
b.
Kolam/timbunan tailing
Tailings pond/pile
c.
Perumahan karyawan
Employee housing
d.
Jalan non tambang
Non-mining road
e.
Gudang
Warehouse
f.
Kantor
Office
g.
Bengkel
Workshop
h.
Pelabuhan
Harbor
i.
Landfill
j.
Lainnya
Other
Total
Penjelasan Matrik :
1. Aktif : tambang/timbunan yang sedang dan atau masih dikerjakan;
2. Selesai : tambang yang sudah mined
out atau timbunan yang desain
elevasinya final;
3. Disesuaikan dengan sarana, prasarana, dan fasilitas penunjang yang
ada.
Matrix Explanation:
1. Active: mines/embankments that
are being and/or still being worked on;
2. Completed: mines that have
been mined out or embankments with final elevation designs;
3. Adjusted to existing
facilities, infrastructure, and supporting facilities
Sumber (source) :
Google Translate
IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE
Matrik 16. Rencana dan Realisasi Penggunaan Lahan untuk Kegiatan
Pertambangan Tahun N-1
Matrix 16. Plan and Realization
of Land Use for Mining Activities Year N-1
Deskripsi
|
Kumulatif Bukaan Lahan s.d Tahun N-2
|
Rencana Tahun N-1
|
Realiasi Tahun N-1
|
Kumulatif Bukaan Lahan s.d Tahun N-1
|
||
1. |
Lahan untuk Tambang (ha)
|
|
|
|
|
|
|
a. |
Tambang aktif (ha)
|
|
|
|
|
|
b. |
Tambang selesai (ha)
|
|
|
|
|
2. |
Timbunan OB/batuan penutup di bekas tambang (backfilling) (ha)
|
|
|
|
|
|
|
a. |
Backfilling aktif
|
|
|
|
|
|
b. |
Backfilling selesai
|
|
|
|
|
3. |
Timbunan OB/batuan penutup di luar tambang (ha)
|
|
|
|
|
|
|
a. |
Timbunan aktif (ha)
|
|
|
|
|
|
b. |
Timbunan selesai (ha)
|
|
|
|
|
4. |
Timbunan tanah pucuk (ha)
|
|
|
|
|
|
5. |
Jalan tambang (ha)
|
|
|
|
|
|
6. |
Kolam sedimen/kendali erosi (ha)
|
|
|
|
|
|
7. |
Fasilitas penunjang
|
|
|
|
|
|
|
a. |
Pabrik pengolahan dan pemurnian
|
|
|
|
|
|
b. |
Kolam/timbunan tailing
|
|
|
|
|
|
c. |
Perumahan karyawan
|
|
|
|
|
|
d. |
Jalan non tambang
|
|
|
|
|
|
e. |
Gudang
|
|
|
|
|
|
f. |
Kantor
|
|
|
|
|
|
g. |
Bengkel
|
|
|
|
|
|
h. |
Pelabuhan
|
|
|
|
|
|
i. |
Landfill |
|
|
|
|
|
j. |
Lainnya
|
|
|
|
|
Total |
|
|
|
|
Penjelasan Matrik :
1. Aktif : tambang/timbunan yang sedang dan atau masih dikerjakan;
2. Selesai : tambang yang sudah mined
out atau timbunan yang desain
elevasinya final;
3. Disesuaikan dengan sarana, prasarana, dan fasilitas penunjang yang
ada.
Matrix Explanation:
1. Active: mines/embankments that
are being and/or still being worked on;
2. Completed: mines that have
been mined out or embankments with final elevation designs;
3. Adjusted to existing
facilities, infrastructure, and supporting facilities
Sumber (source) :
Google Translate
Tidak ada komentar:
Posting Komentar