https://www.youtube.com/@agussalimnasutionmandailing2/videos

Foto saya
UNTUK KE-GUBERNUR-AN SUMATERA UTARA DARI PENDIRI UM (UNIVERSITAS MANDAILING) FOR THE PROVINCIAL GOVERNOR OF SUMATERA UTARA FROM THE FOUNDER OF MU (MANDAILING UNIVERSITY)

Selasa, 07 Maret 2017

KISI - KISI JBAR MGB SM 0064 APRIL 2015 - 8

https://www.youtube.com/c/agussalimnasutionmandailing?sub_confirmation=1

MENUJU BERDIRINYA UM (UNIVERSITAS MANDAILING)
TOWARDS THE ESTABLISHMENT OF MU (MANDAILING UNIVERSITY)
 
KISI-KISI KONTEN JURNAL ILMIAH UM (UNIVERSITAS MANDAILING)
TABLE OF SPECIFICATIONS OF THE SCIENTIFIC JOURNAL OF MU (MANDAILING UNIVERSITY)
JBAR MGB SM
(JURNAL BULANAN ANALISIS RISET MIKRON GEN BIOLOGIS SEPANJANG MASA)
THE MONTHLY JOURNAL OF RESEARCH ANALYSIS OF BIOLOGIC GEN MICRON OF ALL TIME
 
APRIL 2015
 
Arahan Pendiri & Ketum (Ketua Umum)
MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya
Referrals from The Founder & General Chairman of
The Central (Global) Leadership Assembly of The Great Mandailing Foundation
Agussalim, ST bin Abdur Rahim Nasution
 
 
 
TABEL 2
RENCANA BIAYA REKLAMASI TAHAP OPERASI PRODUKSI
PERIODE TAHUN : ....... s.d. ...... *)
TABLE 2
PLAN OF RECLAMATION OF PRODUCTION OPERATION STAGE
YEAR PERIOD: ....... to ...... *)
Keterangan :
Specification :
*) contoh
*) Example
**1) besarnya 2,5% dari biaya langsung atau berdasarkan perhitungan.
** 1) the amount of 2.5% of the direct costs or by calculation.
**2) besarnya 2% - 10% dari biaya langsung
** 2) the amount of 2% - 10% of the direct costs
**3) besarnya 3% - 14% dari biaya langsung.
** 3) the amount of 3% - 14% of direct costs.
**4) besarnya 2% - 7% dari biaya langsung
** 4) the amount of 2% - 7% of direct costs
 
 
Lampiran iii
APPENDIX III
Peraturan menteri energi & sumber daya mineral republik indonesia Nomor 07 tahun 2014
THE REGULATION OF MINISTER OF ENERGY & MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA NUMBER 07 YEAR 2014
Tentang
ABOUT
Pelaksanaan reklamasi & pascatambang pada kegiatan usaha pertambangan mineral & batubara
IMPLEMENT RECLAMATION & POST-MINING AT  MINERAL & COAL MINING
Pedoman penyusunan rencana pascatambang
GUIDELINES OF COMPILATION OF MINE CLOSURE PLAN
Kerangka penyusunan dokumen rencana pascatambang
FRAMEWORK OF COMPILATION OF POST-MINING PLAN DOCUMENTS
A. Kata pengantar.
A. INTRODUCTION.
B. Intisari.
B. ABSTRACT.
C. Daftar isi.
C. CONTENTS LIST.
D. Batang tubuh.
D. STEM OF BODY.
Bab i pendahuluan
CHAPTER I INTRODUCTION
1. Latar belakang, meliputi,
1. Background, covers,
a. Identitas pemegang IUP atau IUPK (nama badan usaha / koperasi / perseorangan, alamat lengkap, penanggung jawab rencana atau kegiatan).
a. Identity of holder of The Mining Permit or The Especially Mining Permit (name of business entities / cooperatives / individual, full address, person in charge of the plan or activity).
b. Uraian singkat mengenai peraturan perundang-undangan yang berkaitan dengan kegiatan Pascatambang; dan
b. A brief description of the legislation relating to the Mine Closure activities; and
c. Uraian singkat mengenai status perizinan (nomor, tanggal diterbitkannya, masa berlaku, status PMA/PMDN IUP atau IUPK).
c. A brief description of the status of licenses (number, date of issuance, validity period, status of foreign / domestic investment of The Mining Permit or The Especially Mining Permit).
d. Maksud & tujuan.
d. Intent and purpose.
e. Pendekatan & ruang lingkup.
e. Approach and scope.
BAB II PROFIL WILAYAH.
CHAPTER II PROFILE OF AREAS.
Sekurang-kurangnya meliputi hal-hal sebagai berikut :
At least include the following matters :
1. Lokasi & kesampaian wilayah.
1. Location & accomplished territory.
a. Uraian singkat mengenai lokasi kegiatan Operasi Produksi (desa, kecamatan, kabupaten/kota, provinsi, & posisi geografi), dilengkapi dengan peta situasi lokasi tambang dengan ketelitian peta skala minimal 1:25.000 (satu banding dua puluh lima ribu); dan
a. A brief description of the location of Production Operations (village, sub-district, district/municipal, provincial, & geographic position), equipped with a map of the mine location situation with precision of map in scale of at least 1: 25,000 (one to twenty five thousand); and
b. Uraian singkat mengenai sarana perhubungan dari dan ke lokasi kegiatan Operasi Produksi.
b. A brief description of the means of transportation to and from the location of Production Operations.
2. Kepemilikan & peruntukan lahan.
2. Ownership & land use.
Uraian rinci mengenai status kepemilikan & peruntukan lahan di dalam WIUP atau WIUPK dilengkapi dengan peta peruntukan lahan dengan skala minimal 1:25.000 (satu dibanding dua puluh lima ribu).
A detailed description of the status of ownership & land use in The Area of Mining Permit or The Area of Especially Mining Permit equipped with maps of land use with a minimum scale of 1: 25,000 (one more than twenty-five thousand).
3. Rona lingkungan awal.
3. "Rona (in Bahasa)" of early environment.
Uraian rinci mengenai rona lingkungan hidup awal yang diperkirakan terkena dampak serta telaahan komponen lingkungan yang terkena dampak, meliputi :
A detailed description of the initial environmental baseline studied as well as estimated affected and component research of environmental affected, include :
a. Peruntukan lahan;
a. Land use;
b. Morfologi dilengkapi peta dengan ketelitian peta skala minimal 1:25.000 (satu banding dua puluh lima ribu);
b. Morphology is equipped with map with a precision of map in scale of at least 1: 25,000 (one to twenty five thousand);
c. Air permukaan (sungai, danau, & rawa);
c. Surface water (rivers, lakes, & swamps);
d. Air tanah;
d. Groundwater;
e. Biologi akuatik & teresterial; dan
e. Aquatic & terrestrial biology; and
f. Sosial, budaya, & ekonomi (demografi, mata pencaharian, kesehatan, pendidikan, dan lain-lain).
f. Social, cultural, & economic (demographic, livelihood, health, education, etc.).
4. Kegiatan lain di sekitar tambang.
4. Other activities in the vicinity of the mine.
Uraian rinci mengenai kegiatan lain yang berada di sekitar tambang dilengkapi dengan peta situasi dengan skala minimal 1:25.000 (satu banding dua puluh lima ribu).
A detailed description of the other activities that are in the vicinity of the mine is equipped with a map of the situation with a minimum scale of 1: 25,000 (one to twenty five thousand).
BAB III DESKRIPSI KEGIATAN PERTAMBANGAN.
CHAPTER III DESCRIPTION OF MINING ACTIVITIES.
1. Keadaan cadangan awal.
1. The state of early reserve.
Uraian rinci mengenai cadangan komoditas tambang pada awal kegiatan dan/atau pada saat dokumen ini disusun yang meliputi penyebaran, jumlah, kadar dan klasifikasi, serta karakteristik geokimia batuan samping dan/atau tanah/batuan penutup.
A detailed description of the mining commodity reserves at the start of activities and/or at the time of documen wrote that includes deployment, quantity, grade and classification, as well as the geochemical characteristics of the rock side and/or cover soil/rock.
2. Sistem & Metode Penambangan.
2. The System & Method of Mining.
Uraian rinci mengenai sistem & metode penambangan, persiapan penambangan, jadwal penambangan, tingkat produksi & umur tambang, penanganan tanah zona pengakaran, batuan samping dan/atau tanah/batuan penutup, & air asam tambang serta upaya pengendalian erosi dan sedimentasi.
A detailed description of the system & method of mining, preparation of mining, mining schedules, production levels & the life of mine, handling rooting zone ground, next to the rock and/or cover soil/rock cover, & acid mine drainage and erosion and sedimentation control measures.
3. Pengolahan dan/atau pemurnian.
3. Processing and/or purification.
Uraian rinci mengenai kegiatan pengolahan dan/atau pemurnian komoditas tambang yang meliputi proses, jenis, & jumlah pemakaian reagen, serta jumlah & upaya pengendalian erosi & sedimentasi.
A detailed description of the activities of processing and/or purification of mining commodities which include process, type, & number of reagent usage, as well as the number & efforts to control erosion & sedimentation.
4. Fasilitas penunjang.
4. Supporting facilities.
Uraian rinci mengenai fasilitas penunjang yang telah dan/atau akan dibangun, antara lain kantor, mess, gudang, sekolah, rumah sakit / poliklinik, laboratorium, transmisi tegangan tinggi, tangki bahan bakar minyak, tempat ibadah, jembatan, jalan, tangki air, pelabuhan/dermaga, bandara, rel kereta api, jalur kabel, jalur pipa, jalur conveyor, dam/bendungan, beserta informasi lokasi, ukuran, konstruksi serta dilengkapi peta situasi dengan skala minimal 1:25.000 (satu banding dua puluh lima ribu).
A detailed description of the support facilities that have been and/or will be built, among other offices, living quarters, warehouses, schools, hospitals / clinics, laboratories, high-voltage transmission, fuel oil tanks, places of worship, bridges, roads, water tanks, harbor / docks, airports, railroads, cable lines, pipelines, conveyor lines, dam, along with information about the location, size, construction and equipped with the situation map in scale of at least 1: 25,000 (one to twenty five thousand).
BAB IV RONA LINGKUNGAN AKHIR LAHAN PASCATAMBANG.
CHAPTER IV FINAL ENVIRONMENTAL BASELINE OF POST-MINING LAND.
1. Keadaan cadangan tersisa.
1. The state of the remaining reserves.
Uraian rinci mengenai cadangan komoditas tambang yang tersisa setelah umur tambang berakhir sebelum daerah tersebut ditinggalkan;
A detailed description of the mines commodity reserves in remaining after mine life ends before the area is abandoned;
2. Peruntukan lahan.
2. Appropriation of land.
Uraian rinci mengenai peruntukan lahan setelah umur tambang berakhir.
A detailed description of the land use after the end of mine life.
3. Morfologi.
3. Morphology.
Uraian rinci mengenai prediksi kondisi morfologi akhir setelah umur tambang berakhir.
A detailed description of the predictions of the end morphological conditions after the mine life ends.
4. Air permukaan & air tanah.
4. Surface water & groundwater.
Uraian rinci mengenai prediksi kondisi kualitas air sungai, danau, rawa, dan kondisi air tanah setelah umur tambang berakhir.
A detailed description of the prediction of water quality conditions of the river, lakes, wetlands, and groundwater conditions after the end of mine life.
5. Biologi akuatik & teresterial.
5. Biology of aquatic & terrestrial.
a. Uraian rinci mengenai prediksi kondisi flora akuatik & teresterial setelah umur tambang berakhir; dan
a. A detailed description of the predictions of the aquatic & terrestrial flora conditions after the end of mine life; and
b. Uraian rinci mengenai prediksi kondisi fauna akuatik & teresterial setelah umur tambang berakhir.
b. A detailed description of the predictions of aquatic & terrestrial fauna condition after the end of mine life.
6. Sosial, budaya, & ekonomi.
6. Social, cultural, & economic.
Uraian rinci mengenai prediksi kondisi sosial, budaya, & ekonomi masyarakat setempat pada saat umur tambang berakhir.
A detailed description of the predictions of social, cultural, & economic of community during mine life ends.
BAB V HASIL KONSULTASI DENGAN PEMANGKU KEPENTINGAN (STAKEHOLDER)
CHAPTER V RESULTS OF CONSULTATION WITH STAKEHOLDERS
Uraian rinci mengenai konsultasi (tanggapan, saran, pendapat, & pandangan) dengan pihak yang berkepentingan terhadap rencana Pascatambang, termasuk rencana alih pengelolaan fasilitas tambang kepada Pemangku Kepentingan & perubahan rencana peruntukan lahan.
A detailed description of the consultation (comments, suggestions, opinions, & views) with interested parties on Mine Closure plans, including the plan over the management of mining facilities to Stakeholders & change the land use plan.
BAB VI PROGRAM PASCATAMBANG.
CHAPTER VI PROGRAM OF POST-MINING.
1. Reklamasi pada lahan bekas tambang & lahan di luar bekas tambang.
1. reclamation on mined land & land outside the former quarry.
a. Tapak bekas tambang.
a. Tread of former quarry.
Uraian rinci mengenai rencana lokasi & luas lahan tapak bekas tambang yang akan ditutup yang meliputi kegiatan :
A detailed description of the planned of location & land area of footprint of ex-mining to be closed which includes the following activities :
1) Pembongkaran fasilitas tambang;
1) Demolition of mine facilities;
2) Reklamasi lahan bekas fasilitas tambang;
2) Reclamation of land of former mine facilities;
3) Pembongkaran & Reklamasi jalan tambang;
3) Demolition & Reclamation of mining road;
4) Reklamasi lahan bekas tambang permukaan;
4) Reclamation of surface mined land;
5) Reklamasi lahan bekas kolam pengendap; dan
5) Reclamation of land of former settling ponds; and
6) Pengamanan semua lahan bekas tambang dengan sistem tambang bawah tanah yang berpotensi bahaya terhadap manusia (shaft, raise, stope, adit, decline, pit, tunnel, final void, dan lain-lain).
6) Securing all mined lands with a system of underground mine in potential be danger to humans (shafts, raises, stope, adit, decline, pit, tunnel, the final void, and others).
b. Fasilitas pengolahan dan/atau pemurnian.
b. Facilities of processing and/or purification.
Uraian rinci mengenai rencana lokasi & luas lahan pada fasilitas pengolahan dan/atau pemurnian yang meliputi kegiatan :
A detailed description of the location plan & land area at facilities of processing and/or purification which includes the following activities :
1) Pembongkaran fasilitas pengolahan dan/atau pemurnian;
1) Demolition of facilities of processing and/or purification;
2) Reklamasi lahan bekas fasilitas pengolahan dan/atau pemurnian;
2) Reclamation of the former land of facilities of processing and/or purification;
3) Reklamasi lahan bekas kolam tailing & upaya stabilisasinya;
3) Reclamation of the former land of the tailings pond & its stabilization efforts;
4) Reklamasi lahan bekas timbunan komoditas tambang;
4) Reclamation of former land of mining commodities heap;
5) Pemulihan (remediasi) tanah yang terkontaminasi bahan kimia, minyak, serta bahan berbahaya & beracun & limbah bahan berbahaya & beracun.
5) Recovery (remediation) of contaminated soil of chemicals, oil & hazardous and toxic materials & hazardous & toxic materials waste.
c. Fasilitas penunjang.
c. Supporting facilities.
Uraian rinci mengenai rencana lokasi & luas lahan serta kegiatan yang meliputi :
A detailed description of the planned location & land area as well as activities that include :
1) Reklamasi lahan bekas landfill;
1) Reclamation of former land of landfill;
2) Pembongkaran sisa-sisa bangunan, transmisi listrik, pipa, pelabuhan (udara & air), & fasilitas lainnya;
2) Demolition of the remains of buildings, power transmission, pipelines, ports (air & water), & other facilities;
3) Reklamasi lahan bekas bangunan, transmisi listrik, pipa, pelabuhan (udara & air), & fasilitas lainnya;
3) Reclamation of former land buildings, power transmission, pipelines, ports (air & water), and other facilities;
4) Pembongkaran peralatan, mesin, tangki bahan bakar minyak, & pelumas;
4) Demolition of equipment, machines, tanks of fuel, & lubricants;
5) Penanganan sisa bahan bakar minyak, pelumas, serta bahan kimia;
5) Handling of residual of fuel oil, lubricants, and chemicals;
6) Reklamasi lahan bekas sarana transportasi;
6) Reclamation of used land of means of transport;
7) Reklamasi lahan bekas bangunan & fondasi beton; dan
7) Reclamation of used land of building & concrete foundation; and
8) Pemulihan (remediasi) tanah yang terkontaminasi bahan kimia, minyak, serta bahan berbahaya & beracun & limbah bahan berbahaya & beracun.
8) Recovery (remediation) of contaminated soil of chemicals, oil and hazardous & toxic materials & hazardous and toxic materials waste.
2. Pengembangan, sosial, budaya, & ekonomi.
2. The development, social, cultural, & economic.
a. Uraian mengenai penanganan pengurangan & pemutusan hubungan kerja, bimbingan, & bantuan untuk pengalihan pekerjaan bagi karyawan; dan
a. The description of the handling of the reduction & termination of employment, guidance, & assistance for the transfer of work for employees; and
b. Pengembangan usaha alternatif untuk masyarakat lokal yang disesuaikan dengan program sosial, budaya, & ekonomi.
b. Development of alternative business development for local communities that are tailored to the programs of social, culture, & economy.
3. Pemeliharaan.
3. Maintenance.
Uraian rinci mengenai pemeliharaan terhadap tapak bekas tambang, lahan bekas fasilitas pengolahan dan/atau pemurnian, & lahan bekas fasilitas penunjang.
A detailed description of the maintenance of the former mine site, the former land of facilities of processing and/or purification, & former land of supporting facilities.
PEMANTAUAN.
MONITORING.
Uraian rinci mengenai program & prosedur pemantauan, termasuk lokasi, metode, & frekuensi pemantauan, pencatatan hasil pemantauan serta pelaporannya mengenai :
A detailed description of the program & monitoring procedures, including location, method, & frequency of monitoring, recording the results of monitoring and reporting on :
1. Kestabilan fisik.
1. Physical Stability.
Uraian mengenai pemantauan kestabilan lereng, keamanan bangunan pengendali erosi & sedimentasi, penimbunan material penutup, serta fasilitas lain.
A description of the monitoring slope stability, building security of control of erosion & sedimentation, stockpiling cover material, as well as other amenities.
2. Air permukaan & air tanah.
2. Surface water and groundwater.
Uraian mengenai pemantauan terhadap kualitas air sungai, air sumur di sekitar lokasi bekas tambang, sumur pantau, air di dalam bekas tambang & lain-lain.
A description of the monitoring of the quality of river water, well water around the site of the former mine, monitoring wells, the water in the former mine & others.
3. Biologi akuatik & teresterial.
3. Biology of aquatic and terrestrial.
Uraian mengenai pemantauan terhadap flora & fauna akuatik & teresterial.
A description of the monitoring of the flora & fauna of aquatic & terrestrial.
4. Sosial, budaya, & ekonomi.
4. Social, culture, & economy.
Uraian mengenai pemantauan sosial, budaya & ekonomi (demografi, mata pencaharian, kesehatan, pendidikan, & lain-lain).
A description of the monitoring of social, cultural & economic (demographic, livelihood, health, education, & others).
BAB VIII ORGANISASI.
CHAPTER VIII ORGANIZATION.
Uraian rinci mengenai :
A detailed description about :
1. Organisasi; dan
1. Organization; and
2. Jadwal pelaksanaan Pascatambang.
2. Post-Mining implementation schedule.
BAB IX KRITERIA KEBERHASILAN PASCATAMBANG
CHAPTER IX CRITERIA FOR SUCCESS OF POST MINING
Uraian mengenai kriteria keberhasilan yang akan dicapai pada kegiatan Pascatambang yang meliputi standar keberhasilan pada tapak bekas tambang, fasilitas pengolahan dan/atau pemurnian, fasilitas penunjang, & pemantauan.
A description of the criteria for success to be achieved in the Post-Mining activities that include standard of success at the former mine site, facilities of processing and/or purification, supporting facilities, & monitoring.
BAB X RENCANA BIAYA PASCATAMBANG.
CHAPTER X PLAN OF COSTS OF POST-MINING.
Bab ini memuat rencana biaya yang diperlukan untuk melaksanakan pekerjaan Pascatambang.
This chapter contains the plan of cost necessary to carry out the job of Mine Closure.
Perhitungan biaya Pascatambang terdiri atas :
Mine Closure cost calculation consists of :
1. Biaya langsung.
1. Direct costs.
Uraian mengenai biaya yang perlu dihitung dalam penyusunan rencana biaya Pascatambang yang meliputi :
Description of the costs that need to be calculated in planning the Mine Closure costs include :
a. Biaya pada tapak bekas tambang, terdiri atas biaya :
a. Costs on the former mine site, consists of the cost of :
1) Pembongkaran fasilitas tambang;
1) Demolition of mine facilities;
2) Reklamasi lahan bekas fasilitas tambang;
2) Reclamation of land of former mine facilities;
3) Pembongkaran & Reklamasi jalan tambang;
3) Demolition & Reclamation of mining road;
4) Reklamasi tambang permukaan (pit, waste dump);
4) Reclamation of surface mine (pit, waste dumps);
5) Reklamasi lahan bekas kolam pengendap;
5) Reclamation of land of former of settling ponds;
6) Pengamanan semua lahan bekas tambang dengan sistem tambang bawah tanah yang berpotensi bahaya terhadap manusia (shaft, raise, stope, adit, decline, tunnel, dan lain-lain).
6) Securing all mined lands with a system of underground mine in potential be danger to humans (shafts, raises, stope, adit, decline, tunnel, etc.).
b. Biaya pada fasilitas pengolahan dan/atau pemurnian, terdiri atas biaya :
b. The cost of the facilities of processing and/or purification, consists of the cost of :
1) Pembongkaran fasilitas pengolahan dan/atau pemurnian;
1) Demolition of facilities of processing and/or purification;
2) Reklamasi lahan bekas fasilitas pengolahan dan/atau pemurnian;
2) Reclamation of the former land of facilities of processing and/or purification;
3) Reklamasi lahan bekas kolam tailing & upaya stabilisasinya;
3) Reclamation of the former land of the tailings pond & its stabilization efforts;
4) Reklamasi lahan bekas timbunan komoditas tambang;
4) Reclamation of former land of mining commodities heap;
5) Pemulihan (remediasi) tanah yang terkontaminasi bahan kimia, minyak, serta bahan berbahaya & beracun & limbah bahan berbahaya & beracun.
5) Recovery (remediation) of contaminated soil of chemicals, oil and hazardous & toxic materials & hazardous and toxic materials waste.
c. Biaya & fasilitas penunjang, terdiri atas biaya :
c. Costs & supporting facilities, consisting of the cost of :
1) Pembongkaran sisa bangunan, transmisi listrik, pipa, pelabuhan (udara & air), & fasilitas lainnya.
1) Demolition of the remaining of buildings, power transmission, pipelines, ports (air & water), & other facilities.
2) Pembongkaran peralatan, mesin, serta tanki bahan bakar minyak & pelumas;
2) Demolition of tools, machines, as well as fuel tanks & lubricating oils;
3) Reklamasi lahan bekas landfill;
3) Reclamation of former land of landfill;
4) Reklamasi lahan bekas bangunan, transmisi listrik, pipa, pelabuhan (udara & air), & fasilitas lainnya;
4) Reclamation of former land of buildings, power transmission, pipelines, ports (air & water), and other facilities;
5) Reklamasi lahan bekas sarana transportasi;
5) Reclamation of used land of means of transport;
6) Reklamasi lahan bekas bangunan & fondasi beton;
6) Reclamation of used land of building & concrete foundation;
7) Penanganan sisa bahan bakar minyak, pelumas, serta bahan kimia;
7) Handling of residual of fuel oil, lubricants, and chemicals;
8) Pemulihan (remediasi) tanah yang terkontaminasi bahan kimia, minyak, serta bahan berbahaya & beracun & limbah bahan berbahaya & beracun.
8) Recovery (remediation) of contaminated soil of chemicals, oil and hazardous & toxic materials & hazardous & toxic materials waste.
d. Pengembangan sosial, budaya, & ekonomi;
d. Development of social, culture, & economics;
e. Pemeliharaan;
e. Maintenance;
f. Pemantauan.
f. Monitoring.
2. Biaya tidak Langsung.
2. Indirect Costs.
Uraian mengenai biaya yang harus dimasukkan dalam perhitungan Pascatambang & sedapat mungkin ditetapkan dengan menggunakan standar acuan yang ditentukan sebagai berikut :
Description of the costs that should be included in the calculation of Mine Closure & wherever possible are established using a reference standard which is defined as follows :

a. Biaya mobilisasi & demobilisasi alat sebesar 2,5% (dua koma lima persen) dari biaya langsung atau berdasarkan perhitungan;
a. Mobilization & demobilization costs in appliance of 2.5% (two point five percent) of direct costs or by calculation;
b. Biaya perencanaan Pascatambang sebesar 2% (dua persen) sampai 10% (sepuluh persen) dari biaya langsung;
b. Mine Closure planning costs of 2% (two percent) to 10% (ten percent) of direct costs;
c. Biaya administrasi & keuntungan pihak ketiga   sebagai pelaksana Pascatambang sebesar 3% sampai dengan 14% (empat belas persen) dari biaya langsung; dan
c. Cost of administrative & profit of third parties as executor of Mine Closure by 3% to 14% (fourteen percent) of direct costs; and

d. Biaya supervisi sebesar 2% (dua persen) sampai dengan 7% (tujuh persen) dari biaya langsung.
d. Supervision fee of 2% (two percent) to 7% (seven percent) of direct costs.
3. Total biaya.
3. The total cost.
Uraian mengenai total biaya langsung ditambah dengan biaya tidak langsung & biaya tersebut sudah harus memperhitungkan pajak yang berlaku & dibuat dalam mata uang Rupiah atau Dolar Amerika Serikat.
Description of the total direct costs plus indirect costs & the cost of the already must take into account any applicable taxes & are made in Rupiah or US Dollar.
E. DAFTAR LAMPIRAN.
E. APPENDIX LIST.
1. Peta situasi rona awal, dengan skala minimal 1:25.000 (satu banding dua puluh lima ribu);
1. Map of the baseline situation, with a minimum scale of 1: 25,000 (one to twenty five thousand);
2. Peta situasi lokasi pertambangan, dengan skala minimal 1:25.000 (satu banding dua puluh lima ribu);    
2. Map of mine site situations, with a minimum scale of 1: 25,000 (one to twenty five thousand);
3. Peta situasi rona awal Pascatambang, dengan skala minimal 1:25.000 (satu banding dua puluh lima ribu);
3. Map of early baseline situation of Post-Mining, with a minimum scale of 1: 25,000 (one to twenty five thousand);
4. Peta situasi rencana rona akhir Pascatambang, dengan skala minimal 1:25.000 (satu banding dua puluh lima ribu);
4. Map the final baseline plan situation of Mine Closure, with a minimum scale of 1: 25,000 (one to twenty five thousand);
5. Peta lokasi pemantauan, dengan skala minimal 1:10.000 (satu banding sepuluh ribu).
5. Map of the location of monitoring, with a minimum scale of 1: 10,000 (one in ten thousand).
F. DAFTAR TABEL.
F. LIST OF TABLES.
Rencana & biaya Pascatambang.
Plan and costs of Mine Closure.
     
Referensi :
Reference :
1. Peraturan Menteri Energi & Sumber Daya Mineral Nomor : 07 Tahun 2014 tentang Pelaksanaan Reklamasi & Pascatambang pada Kegiatan Usaha Pertambangan Mineral & Batubara, Direktorat Jenderal Mineral & Batubara, Direktorat Teknik & Lingkungan Mineral & Batubara.
1. Regulation of the Minister of Energy and Mineral Resources Number 07 Year 2014 on the Implementation of Reclamation and Mine Closure on Business Activities of Mineral and Coal, Directorate General of Mineral and Coal, Engineering & Environment Directorate of Mineral & Coal.
2. Google Translate.
 
 
Roburan Lombang, 01 April, 2015.
Roburan Lombang, April 01st, 2015

Tidak ada komentar:

Posting Komentar

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 09 SEPTEMBER 2445 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 09 SEPTEMBER 2445 MASEHI)

  https://www.youtube.com/@agussalimnasutionmandailing2/videos EVOLUSI PENDIDIKAN LOKAL MANDAILING  UNTUK RENTANGAN TAHUN 2445 - 2024  =  42...