https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN LOKAL MANDAILING UNTUK RENTANGAN TAHUN 2446 - 2025 = 421 (EMPAT RATUS DUA PULUH SATU) TAHUN MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA KE PERUBAHAN WAJAH PERADABAN BARU PERDAMAIAN ABADI DUNIA INTERNASIONAL GLOBAL BUMI
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
27 Oktober 2446 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
October 27th, 2446 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (Mandailing University) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIC. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN BATUAN (Halaman 330)
IIC. FORMAT FOR PREPARATION OF WORK PLAN AND BUDGET FOR MINING BUSINESS LICENSE HOLDERS IN THE PRODUCTION OPERATION ACTIVITY STAGE OF ROCK GROUPS (Page 330)
Matrik 15. Rencana dan Realisasi Reklamasi Tahun N-1 dan Rencana
Reklamasi Tahun N, (N+1), (N+2)
Matrix 15. Reclamation Plan and
Realization for Year N-1 and Reclamation Plan for Year N, (N+1), (N+2)
Uraian Reklamasi Reclamation
Description |
Rencana Reklamasi Dalam Dokumen Rencana
Reklamasi Tahun N-1 (ha) Reclamation
Plan in the Reclamation Plan Document for Year N-1 (ha) |
Rencana Reklamasi RKAB Tahun N-1 (ha) Reclamation
Plan Work Plan and Budget Year N-1 (ha) |
Realisasi Tahun N-1 (ha) Realization
Year N-1 (ha) |
Kumulatif Realisasi Reklamasi s.d.
Tahun N-1 (ha) Cumulative
Reclamation Realization up to Year N-1 (ha) |
Rencana Reklamasi Dalam Dokumen Rencana
Reklamasi Tahun N (ha) Reclamation
Plan in the Reclamation Plan Document for Year N (ha) |
Rencana Reklamasi RKAB Tahun N (ha) Reclamation
Plan Work Plan and Budget Year N (ha) |
Total Rencana Reklamasi Tahun N (ha) Total
Reclamation Plan Year N (ha) |
|||||
Tri. I Quarter
I |
Tri. II Quarter
II |
Tri. III Quarter
III |
Tri. IV Quarter
IV |
|||||||||
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11= (7+8+9+10) |
||
1. |
Pengisian kembali lahan bekas tambang (backfilling) (ha) Backfilling of ex-mining land
(ha) |
|
|
|
|
|
|
|
|
|
|
|
2. |
Pengaturan permukaan lahan (ha) Land surface area (ha) |
|
|
|
|
|
|
|
|
|
|
|
|
a. |
Timbunan tanah/batuan penutup di bekas tambang (inpit) Overburden/rock deposits in
former mines (input) |
|
|
|
|
|
|
|
|
|
|
|
b. |
Timbunan tanah/batuan penutup di luar tambang (outpit) Piles of soil/rock covering
outside the mine (outpit) |
|
|
|
|
|
|
|
|
|
|
|
c. |
Timbunan sisa hasil pengolahan dan/atau pemurnian Piles of waste from processing
and/or refining |
|
|
|
|
|
|
|
|
|
|
|
d. |
Bekas kolam sedimen/sarana pengendali erosi Former sediment pond/erosion
control facility |
|
|
|
|
|
|
|
|
|
|
|
e. |
Bekas jalan tambang Former mining road |
|
|
|
|
|
|
|
|
|
|
|
f. |
Bekas jalan non tambang Former non-mining road |
|
|
|
|
|
|
|
|
|
|
|
g. |
Fasilitas penunjang lainnya Other supporting facilities |
|
|
|
|
|
|
|
|
|
|
3. |
Penghijauan (Revegetasi) (ha) Reforestation (Revegetation)
(ha) |
|
|
|
|
|
|
|
|
|
|
|
|
a. |
Lahan bekas tambang (inpit) Former mining land (input) |
|
|
|
|
|
|
|
|
|
|
|
b. |
Timbunan tanah/batuan penutup di luar tambang (outpit) Piles of soil/rock covering
outside the mine (outpit) |
|
|
|
|
|
|
|
|
|
|
|
c. |
Timbunan sisa hasil pengolahan dan/atau pemurnian Piles of waste from processing
and/or refining |
|
|
|
|
|
|
|
|
|
|
|
d. |
Bekas kolam sedimen/sarana pengendali erosi Former sediment pond/erosion
control facility |
|
|
|
|
|
|
|
|
|
|
|
e. |
Bekas jalan tambang Former mining road |
|
|
|
|
|
|
|
|
|
|
|
f. |
Bekas jalan non tambang Former non-mining road |
|
|
|
|
|
|
|
|
|
|
|
g. |
Fasilitas penunjang lainnya Other supporting facilities |
|
|
|
|
|
|
|
|
|
|
4. |
Reklamasi bentuk lain (waduk, permukiman,dll) (ha) Other forms of reclamation
(reservoirs, settlements, etc.) (ha) |
|
|
|
|
|
|
|
|
|
|
|
|
a. |
Lahan bekas tambang Former mining land |
|
|
|
|
|
|
|
|
|
|
|
b. |
Timbunan tanah/batuan penutup (outpit) Covering soil/rock embankment
(outpit) |
|
|
|
|
|
|
|
|
|
|
|
c. |
Area lainnya (infrastruktur) Other areas (infrastructure) |
|
|
|
|
|
|
|
|
|
|
5. |
Penempatan Jaminan Reklamasi Tahun N-1 (Rp/USD) Placement of Reclamation
Guarantee Year N-1 (Rp/USD) |
|
|
|
|
|
|
|
|
|
|
Uraian Reklamasi Reclamation
Description |
Rencana Reklamas i Dalam Dokumen
Rencana Reklamas i Tahun N+1 (ha) Reclamation
Plan in the Reclamation Plan Document for Year N+1 (ha) |
Rencana Reklamasi RKAB Tahun N+1 (ha) Reclamation
Plan Work Plan and Budget Year N+1 (ha) |
Total Rencana Reklamasi Tahun N+1 (ha) Total Reclamation Plan for Year N+1 (ha) |
Rencana Reklamas i Dalam Dokumen
Rencana Reklamas i Tahun N+2 (ha) Reclamation
Plan in the Reclamation Plan Document for Year N+2 (ha) |
Rencana Reklamasi RKAB Tahun N+2 (ha) Reclamation
Plan Work Plan and Budget Year N+2 (ha) |
Total Rencana Reklamasi Tahun N+2 (ha) Total
Reclamation Plan for Year N+2 (ha) |
||||||||
Tri. I Quarter
I |
Tri. II Quarter
II |
Tri. III Quarter
III |
Tri. IV Quarter
IV |
Tri. I Quarter
I |
Tri. II Quarter
II |
Tri. III Quarter
III |
Tri. IV Quarter
IV |
|||||||
|
12 |
13 |
14 |
15 |
16 |
17= (13+14+15+16) |
18 |
19 |
20 |
21 |
22 |
23= (19+20+21+22 ) |
||
1. |
Pengisian kembali lahan bekas tambang (backfilling) (ha) Backfilling of ex-mining land
(ha) |
|
|
|
|
|
|
|
|
|
|
|
|
|
2. |
Pengaturan permukaan lahan (ha) Land surface area (ha) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a. |
Timbunan tanah/batuan penutup di bekas tambang (inpit) Overburden/rock deposits in
former mines (input) |
|
|
|
|
|
|
|
|
|
|
|
|
|
b. |
Timbunan tanah/batuan penutup di luar tambang (outpit) Piles of soil/rock covering
outside the mine (outpit) |
|
|
|
|
|
|
|
|
|
|
|
|
|
c. |
Timbunan sisa hasil pengolahan dan/atau pemurnian Piles of waste from processing
and/or refining |
|
|
|
|
|
|
|
|
|
|
|
|
|
d. |
Bekas kolam sedimen/sarana pengendali erosi Former sediment pond/erosion
control facility |
|
|
|
|
|
|
|
|
|
|
|
|
|
e. |
Bekas jalan tambang Former mining road |
|
|
|
|
|
|
|
|
|
|
|
|
|
f. |
Bekas jalan non tambang Former non-mining road |
|
|
|
|
|
|
|
|
|
|
|
|
|
g. |
Fasilitas penunjang lainnya Other supporting facilities |
|
|
|
|
|
|
|
|
|
|
|
|
3. |
Penghijauan (Revegetasi) (ha) Reforestation (Revegetation)
(ha) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a. |
Lahan bekas tambang (inpit) Former mining land (input) |
|
|
|
|
|
|
|
|
|
|
|
|
|
b. |
Timbunan tanah/batuan penutup di luar tambang (outpit) Piles of soil/rock covering
outside the mine (outpit) |
|
|
|
|
|
|
|
|
|
|
|
|
|
c. |
Timbunan sisa hasil pengolahan dan/atau pemurnian Piles of waste from processing
and/or refining |
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Bekas kolam sedimen/sarana pengendali erosi Former sediment pond/erosion
control facility |
|
|
|
|
|
|
|
|
|
|
|
|
|
e. |
Bekas jalan tambang Former mining road |
|
|
|
|
|
|
|
|
|
|
|
|
|
f. |
Bekas jalan non tambang Former non-mining road |
|
|
|
|
|
|
|
|
|
|
|
|
|
g. |
Fasilitas penunjang lainnya Other supporting facilities |
|
|
|
|
|
|
|
|
|
|
|
|
5. |
Reklamasi bentuk lain (waduk, permukiman,dll) (ha) Other forms of reclamation
(reservoirs, settlements, etc.) (ha) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a. |
Lahan bekas tambang Former mining land |
|
|
|
|
|
|
|
|
|
|
|
|
|
b. |
Timbunan tanah/batuan penutup (outpit) Covering soil/rock embankment
(outpit) |
|
|
|
|
|
|
|
|
|
|
|
|
|
c. |
Area lainnya (infrastruktur) Other areas (infrastructure) |
|
|
|
|
|
|
|
|
|
|
|
|
Penjelasan Matrik:
1. Rencana luas reklamasi tidak boleh kurang dari rencana
reklamasi lima tahunan
2. Realisasi reklamasi merupakan luas area yang
direklamasi-revegetasi per tahun (bukan kumulatifnya)
Matrix Explanation:
1. The reclamation
area plan must not be less than the five-year reclamation plan
2. Reclamation
realization is the area reclaimed-revegeted per year (not cumulatively)
Sumber (source) :
Google Translate
Tidak ada komentar:
Posting Komentar