https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN LOKAL MANDAILING UNTUK RENTANGAN TAHUN 2446 - 2025 = 421 (EMPAT RATUS DUA PULUH SATU) TAHUN MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA KE PERUBAHAN WAJAH PERADABAN BARU PERDAMAIAN ABADI DUNIA INTERNASIONAL GLOBAL BUMI
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
06 Oktober 2446 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
October 06th, 2446 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (Mandailing University) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIC. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN BATUAN (Halaman 330)
IIC. FORMAT FOR PREPARATION OF WORK PLAN AND BUDGET FOR MINING BUSINESS LICENSE HOLDERS IN THE PRODUCTION OPERATION ACTIVITY STAGE OF ROCK GROUPS (Page 330)
Matrik 12. Kegiatan Pengelolaan dan Pemantauan Lingkungan Tahun (N-1)
dan Rencana Tahun (N), (N+1) dan (N+2)
Matrix 12. Environmental
Management and Monitoring Activities for Year (N-1) and Planned Years (N),
(N+1) and (N+2)
Uraian Kegiatan Activity
Description |
Realisasi Tahun N-1 Realization
Year N-1 |
Rencana Tahun N Year
Plan N |
Rencana Tahun N+1 N+1
Year Plan |
Rencana Tahun N+2 N+2
Year Plan |
|||||||||||||||
Tri. I Quarter
I |
Tri. II Quarter
II |
Tri. III Quarter
III |
Tri. IV Quarter
IV |
Tri. I Quarter
I |
Tri. II Quarter
II |
Tri. III Quarter
III |
Tri. IV Quarter
IV |
Tri. I Quarter
I |
Tri. II Quarter
II |
Tri. III Quarter
III |
Tri. IV Quarter
IV |
Tri. I Quarter
I |
Tri. II Quarter
II |
Tri. III Quarter
III |
Tri. IV Quarter
IV |
||||
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
(7) |
(8) |
(9) |
(10) |
(11) |
(12) |
(13) |
(14) |
(15) |
(16) |
(17) |
|||
I. |
Pengelolaan lingkungan Environmental management |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
1. |
Pengelolaan kualitas air Water quality management |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a. |
Pemberian kapur (kg) Lime application (kg) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b. |
Pemberian tawas (kg) Alum administration (kg) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c. |
Pemberian reagen lainnya (jika ada) (satuan volume) Other reagents (if any) (volume
units) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. |
Pengelolaan kualitas udara (berapa kali per triwulan) Air quality management (how
many times per quarter) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a. |
Penyiraman jalan tambang Watering of mine roads |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b. |
Penyiraman jalan hauling Watering of hauling road |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. |
Pengelolaan kualitas tanah (berapa kali per triwulan) Soil quality management (how
many times per quarter) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a. |
Pemupukan Fertilization |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b. |
Pemberian kapur pertanian Application of agricultural
lime |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4. |
Pengelolaan limbah B3 (berapa kali per triwulan) Management of Hazardous and
Toxic Waste (how many times per quarter) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a. |
Pengumpulan limbah Waste collection |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b. |
Penyimpanan Storage |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c. |
Pengiriman ke pihak ketiga (pengumpul limbah B3 yang berizin) Delivery to third parties
(licensed Hazardous and Toxic Materials waste collectors) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d. |
Remediasi (jika ada) Remediation (if any) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e, |
Pemusnahan di insinerator (jika ada) Pemusnahan di insinerator (jika
ada) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
II. |
Pemantauan (berapa kali per triwulan) Monitoring (how many times per
quarter) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
1. |
Kualitas air Water quality |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. |
Kualitas udara Air quality |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. |
Kualitas tanah Soil quality |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4. |
Kestabilan lereng Slope stability |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5. |
Limbah B3 Hazardous and Toxic Waste |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6. |
Amblesan (jika ada) Subsidence (if any) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7. |
Revegetasi (tingkat pertumbuhan) Revegetation (growth rate) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8. |
Flora dan fauna, biota perairan Flora and fauna, aquatic biota |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Penjelasan Matrik:
Disesuaikan dengan Dokumen Lingkungan Hidup
Matrix Explanation:
Adjusted to Environmental
Documents
Sumber (source) :
Google Translate
Tidak ada komentar:
Posting Komentar