Jumat, 05 April 2024

TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 20 JUNI 2443 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 20 JUNI 2443 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos


EVOLUSI PENDIDIKAN MANDAILING 419 (EMPAT RATUS SEMBILAN BELAS) TAHUN DI TAHUN 2024






Arahan
dari 
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution


20 Juni 2443 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
June 20th, 2443 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,


KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA

NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES

DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,

MEMUTUSKAN :
Menetapkan : 
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.

IC.  FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN EKSPLORASI GOLONGAN BATUAN (halaman 86 Kepmen 373.K/2023)

I.C. FORMAT FOR PREPARING RKAB (IN BAHASA) FOR IUP (IN BAHASA) HOLDERS FOR ROCK GROUP EXPLORATION ACTIVITIES STAGE


Matrik 3. Hasil Estimasi Sumber Daya dan Cadangan
Matrix 3. Resource and Reserve Estimation Results
 
a. Sumber Daya
a. Resource

 

No.
Number.

Nama Blok/ Prospek
Block/Prospect Name

Sumber Daya Tahun N-1
Year N-1 Resources

Luas (ha)
Area (ha)

Tereka
Inferred

Tertunjuk
Indicated

Terukur
Measurable

Volume (m3)

Tonase
Tonnage
(ton)

Volume (m3)

Volume (m3)

Tonase
Tonnage

Tonase
Tonnage
(ton)

1.

 

 

 

 

 

 

 

 

N

 

 

 

 

 

 

 

 

Total

 

 

 

 

 

 

 

 

 

No.
Number.

Nama Blok/ Prospek
Block/Prospect Name

Sumber Daya Tahun N *)
Year N Resources

Luas (ha)
Area (ha)

Tereka
Inferred

Tertunjuk
Indicated

Terukur
Measurable

Volume (m3)

Tonase
Tonnage
(ton)

Volume (m3)

Volume (m3)

Tonase
Tonnage

Tonase
Tonnage
(ton)

1.

 

 

 

 

 

 

 

 

N

 

 

 

 

 

 

 

 

Total

 

 

 

 

 

 

 

 

Keterangan:

*) Dijelaskan alasan perubahan sumber daya apakah karena:

a. adanya penambahan data dari hasil kegiatan eksplorasi;

b. adanya peningkatan klasifikasi sumber daya menjadi cadangan.

Information:

*) It is explained whether the reason for changing resources is because:

a. additional data from the results of exploration activities;

b. there is an increase in the classification of resources into reserves.

 

 

b. Cadangan.

b. Reserve.

 

No.
Number.

Nama Blok/ Prospek
Block/Prospect Name

Cadangan Tahun N-1
Year N-1 Reserve

Luas (ha)
Area (ha)

Tereka
Inferred

Tertunjuk
Indicated

Terukur
Measurable

Volume (m3)

Tonase
Tonnage
(ton)

Volume (m3)

Volume (m3)

Tonase
Tonnage

Tonase
Tonnage
(ton)

1.

 

 

 

 

 

 

 

 

N

 

 

 

 

 

 

 

 

Total

 

 

 

 

 

 

 

 

 

No.
Number.

Nama Blok/ Prospek
Block/Prospect Name

Cadangan Tahun N *)
Year N Reserve

Luas (ha)
Area (ha)

Tereka
Inferred

Tertunjuk
Indicated

Terukur
Measurable

Volume (m3)

Tonase
Tonnage
(ton)

Volume (m3)

Volume (m3)

Tonase
Tonnage

Tonase
Tonnage
(ton)

1.

 

 

 

 

 

 

 

 

N

 

 

 

 

 

 

 

 

Total

 

 

 

 

 

 

 

 

 

Keterangan :
*) Dijelaskan alasan perubahan sumber daya apakah karena :
a. adanya perubahan parameter estimasi cadangan; atau
b. adanya penambahan data dari hasil kegiatan eksplorasi
Information :
*) It is explained whether the reason for changing resources is because:
a. changes in reserve estimation parameters; or
b. additional data from the results of exploration activities

 

sumber (source) :

Google Translate 

Tidak ada komentar:

Posting Komentar

TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 31 OKTOBER 2443 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 31 OKTOBER 2443 MASEHI)

  https://www.youtube.com/@agussalimnasutionmandailing2/videos EVOLUSI PENDIDIKAN MANDAILING 419 (EMPAT RATUS SEMBILAN BELAS) TAHUN DI TAHUN...